HSCG23-10-R-MOT005 AMENDMENT 2
Department of Homeland Security (DHS)
Response Boat - Small (RB-S)
SPECIFICATION
25 August 2010
USCG RB-S 1 of 71 SPECIFICATION
USCG RB-S SPECIFICATON
SECTION 0: GENERAL GUIDANCE AND ADMINISTRATION
040 INTRODUCTION AND GENERAL DESCRIPTION
042 GENERAL ADMINISTRATIVE REQUIREMENTS
042-1 General Requirements 042-2 Definitions 042-3 Referenced Documents 042-4 Access for Government Representatives 042-5 Product Warranties 042-6 Warranty Plan 042-7 Equipment Substitutions
044 RB-S OPERATION
044-1 Concept of Operations 044-2 Operating Conditions 044-3 Annual Hours of Operation
051 RB-S SYSTEM REQUIREMENTS
051-1 General 051-2 Speed, Range Acceleration and Endurance 051-3 Maneuvering and Sea Keeping 051-4 Launch and Recovery
070 GENERAL REQUIREMENTS FOR DESIGN AND CONSTRUCTION
070-1 General 070-2 Principal Characteristics 070-3 Arrangements 070-4 Design Maturity 070-5 Service Life 070-6 Operating Environment 070-7 General Requirements for Equipment, Machinery and Materials
071 ACCESS
071-1 General
073 NOISE AND VIBRATION
073-1 General
074 WELDING
074-1 General
075 FASTENERS
075-1 General
076 RELIABILITY, MAINTAINABILITY AND AVAILABILITY
076-1 General
078 MATERIALS
078-1 General 078-2 Aluminum 078-3 Stainless Steel 078-4 Bedding Compounds 078-5 Prohibited Materials
079 STABILITY
079-1 General 079-2 Trim and List Limits 079-3 Watertight Requirements
083 LOGISTICS
083-1 General 083-2 Logistics Conference 083-3 Master Equipment Configuration List (MECL) 083-4 Provisioning Parts List/Recommended Spare Parts List 083-5 List of Special Tools and Test Equipment 083-6 Initial Spare Parts
USCG RB-S 2 of 71 SPECIFICATION
083-7 Engine Spares 083-8 Preservation, Packaging and Packing of Parts and Tools 083-9 Delivery and Validation of Logistics Information
084 TRANSPORTATION, SHIPPING AND STORAGE OF BOAT
084-1 General 084-2 Cover
085 DRAWINGS & 3-D SOFTWARE MODEL
085-1 General 085-2 3-D Software Model 085-3 Drawing Versions 085-4 Required Drawings
086 TECHNICAL PUBLICATIONS AND MANUALS
086-1 General 086-2 Technical Publications 086-3 Technical Manual Update Revisions 086-4 Technical Publication Amendments
088 HUMAN FACTORS
088-1 General
089 PERFORMANCE SUPPORT AND TRAINING
089-1 General 089-2 Operator Familiarization Training 089-3 Maintainer Familiarization Training
092 TESTING
092-1 General 092-2 Documentation of Tests
094 TRIALS
094-1 General 094-2 Trials Schedule, Performance and Test Plan 094-3 Speed Trials 094-4 Endurance Trials 094-5 Backing Performance 094-6 Steering and Maneuvering Performance
096 WEIGHT AND LOAD CONDITIONS
096-1 General 096-2 Definitions of Load Conditions
097 WEIGHING, INCLINING EXPERIMENT AND FLOTATION
097-1 Load Cell Scale Weighing and Inclining Experiment 097-2 Flotation Test
098 DISPLAY MODELS
098-1 General
SECTION 1: HULL STRUCTURE
100 HULL AND DECKHOUSE STRUCTURE
100-1 General 100-2 Workmanship, General 100-3 Construction
114 FENDERING SYSTEM AND OUTBOARD PROTECTION
114-1 General 114-2 Removal and Replacement 114-3 Propulsion System Protection
131 MAIN DECK
131-1 General
164 BALLISTIC PANELS
164-1 General
171 MASTS AND ARCHES
171-1 General
191 FLOTATION
USCG RB-S 3 of 71 SPECIFICATION
191-1 General 191-2 Installation
SECTION 2: PROPULSION
200 PROPULSION PLANT
200-1 General Requirements
252 PROPULSION CONTROL AND MONITORING SYSTEMS
252-1 General 252-2 Instruments and Alarms
261 FUEL SYSTEM
261-1 Gasoline 261-2 Diesel (For Heating System)
SECTION 3: ELECTRICAL POWER GENERATION AND DISTRIBUTION SYSTEM
300 ELECTRICAL POWER GENERATION AND DISTRIBUTION SYSTEM
300-1 General
303 PROTECTIVE DEVICES FOR ELECTRIC CIRCUITS
303-1 General
304 WIRING AND ELECTRIC CABLE
304-1 General 304-2 Wire Lugs, Terminals, and Connectors
305 ELECTRICAL DESIGNATION AND MARKING
305-1 General
306 POWER GENERATION
306-1 12 Volt DC Alternator
311 ELECTRIC POWER GENERATION
311-1 General
313 BATTERIES AND BATTERY CHARGING
313-1 General
320 POWER DISTRIBUTION
320-1 Onboard Outlets
332 LIGHTING
332-1 Search Light 332-2 Law Enforcement Light 332-3 Interior Lights 332-4 Deck Lights and Alongside Lights
SECTION 4: COMMAND, CONTROL AND COMMUNICATION
400 COMMAND, CONTROL AND COMMUNICATION
400-1 General
407 ELECTROMAGNETIC (EMI) AND RADIO FREQUENCY INTERFERENCE (RFI) REDUCTION . 50
407-1 General
410 REQUIREMENTS FOR CONTROL STATIONS AND DATA DISPLAY SYSTEMS
410-1 General 410-2 Consoles
421 ELECTRICAL NAVIGATION AIDS
421-1 Navigation Lights
422 ELECTRONIC NAVIGATION SYSTEMS
422-1 General
436 ALARM SYSTEM
436-1 Carbon Monoxide Alarm
441 RADIO SYSTEMS
441-1 General 441-2 SECURE VHF Radio System 441-3 Tactical-VHF Radio System (Primary VHF) (Coast Guard Only) 441-4 Tactical-UHF Radio System
441-5 KVL3000 PLUS KEYLOADER
USCG RB-S 4 of 71 SPECIFICATION
441-6 Marine Band-VHF/DSC Radio System (Secondary VHF) 441-7 Crew Communication System 441-8 AIS (Automatic Identification System) 441-9 Loudhailer
443 HORN
443-1 General
SECTION 5: AUXILIARY SYSTEMS
505 PIPING, HOSE AND VALVE REQUIREMENTS
505-1 General 505-2 Valves
512 VENTILATION
512-1 General
526 DECK DRAINAGE
526-1 General
529 BILGE DRAINAGE AND PUMPS
529-1 General
555 FIRE EXTINGUISHING SYSTEM
555-1 Portable Fire Extinguishers
561 STEERING SYSTEM
561-1 General
565 TRIM SYSTEMS
565-1 General
581 ANCHOR HANDLING SYSTEMS
581-1 General 581-2 Anchor Bitt / Cleat
582 MOORING, TOWING, TIE DOWN AND LIFTING FITTINGS
582-1 General 582-2 Mooring Fittings 582-3 Towing Fittings 582-4 Towline Reel 582-5 Tie Down Fittings 582-6 Lifting Fittings 582-7 Lifting Straps
SECTION 6: OUTFIT AND FURNISHINGS
600 OUTFIT AND FURNISHINGS
600-1 General
602 HULL AND MECHANICAL DESIGNATION AND MARKING
602-1 Boat Identification Plate 602-2 Markings 602-3 Label Plates
612 RAILS AND HAND HOLDS
612-1 General
625 WINDOWS
625-1 General
631 COLORS, COATINGS, AND APPEARANCE
631-1 General 631-2 Aluminum
633 CATHODIC PROTECTION
633-1 Sacrificial Anodes
634 DECK COVERING
634-1 General
660 OPERATOR AND CREW STATIONS
660-1 Operator and Crew Seating
670 STOWAGE
670-1 General
USCG RB-S 5 of 71 SPECIFICATION
SECTION 7: WEAPON SYSTEMS
710 WEAPON MOUNTS
710-1 General
SECTION 9: SUPPORT EQUIPMENT
910 TRAILER (ROAD TRANSPORT)
910-1 General
920 TRAILER (C-130 AIRCRAFT TRANSPORT AND ROAD TRANSPORT)
920-1 General
930 DURABLE COVER FOR WINTER STORAGE
930-1 General
989 RIGGING SYSTEM
989-1 General
USCG RB-S 6 of 71 SPECIFICATION
SECTION 0: GENERAL GUIDANCE AND ADMINISTRATION
040 INTRODUCTION AND GENERAL DESCRIPTION
040-1.1 The Response Boat – Small (RB-S) will be operated in shallow water areas with varying types of bottoms, in a port environment, as well as along coastal waters. The RB-S shall be rapidly deployable and fully capable of performing all missions in shallow water and in moderate weather. The RB-S will be a standard Coast Guard multi-mission asset. Typical missions include Search and Rescue (SAR), Maritime Law Enforcement (MLE), and Port, Waterways, and Coastal Security (PWCS). The RB-S shall be capable of tactical and interdiction operations which include performing high speed maneuvers and turns in close proximity of another vessel. This shore-based asset is not intended for cutter deployment. However, the RB-S shall be trailerable and air transportable. Operations will typically consist of a four (4) person crew; however, the boat may be operated with a two (2) person crew at times. The vessel will be of aluminum construction and have shock mitigating seating and the ability to mount M240 machine guns to cover a 360 degree field of fire for PWCS missions. The vessel shall be designed to protect the crew from the environment. The vessel shall have outboard engines. The vessel shall have space and weight reserved to facilitate retrofit of a removable ballistic plate to provide crew protection. The RB-S shall be C-130 air transportable utilizing a special trailer.
042 GENERAL ADMINISTRATIVE REQUIREMENTS
042-1 General Requirements
042-1.1 This section describes the general administrative and technical requirements and information defining the work and responsibilities required by the Contractor for the construction and delivery of the RB-S.
042-2 Definitions
042-2.1 RB-S, “the boat,” and “the vessel,” all refer to the U.S. Coast Guard Response Boat – Small as defined in this Specification.
042-2.2 Items followed by the word (threshold) are minimum requirements or performance that must be delivered by the Contractor. Items followed by the word (objective) represent desirable increases in operational capabilities. These objective requirements or any portion thereof, as well as any other items or increased performance capabilities the Contractor considers desirable or to add value, may be offered, provided that doing so does not breach any threshold requirements, and provided that the RB-S and all its systems can achieve all required performance capabilities and can withstand the extreme conditions of every capability. Items not followed by either the word (threshold) or the word (objective) are considered to be threshold.
042-2.3 A proposed objective, either fully or partially met, may be incorporated as a part of any resulting contract. Should an offeror offer an “objective” item and that offeror is selected for award, that “objective” item shall become a requirement in its respective contract.
042-2.4 “Survivable” means the RB-S is able to float upright with positive stability and is able to safely maintain headway and control, but may not be able to perform missions.
042-3 Referenced Documents
042-3.1 Throughout this Specification, where only the basic Government specification, standard, drawing, or publication number is used, and prefix zeros or suffix letters which identify amendments or revisions are not given, the amendment or revision in effect as of the date of release of this solicitation shall apply.
USCG RB-S 7 of 71 SPECIFICATION
TWBlose Highlight
042-3.2 Where industry standards such as the American Boat and Yacht Council (ABYC) and the American Society for Testing Materials (ASTM) are referred to, the issue or revision in effect on the date of release of this solicitation shall apply.
042-3.3 In case of inconsistency between the requirements of the Contract, this Specification and the documents referenced in this Specification, the following order of precedence applies:
042-3.3.1 Contract requirements.
042-3.3.2 Specification requirements.
042-3.3.3 Government specifications and standards, industry standards, and similar referenced documents.
042-3.4 The Government shall be notified immediately of contract or specification requirements that deviate from Government and industry standards in such a way as to cause Government liability, void product warranties, or reduce the inherent safety of the boat.
042-3.5 Silence of one document with respect to details shown in another shall not be considered an inconsistency.
042-3.6 The following reference sources are applicable to this Specification:
042-3.6.1 American Boat and Yacht Council (ABYC), available at:
http://www.abycinc.org.
042-3.6.2 Coast Guard Coatings and Color Manual, COMDTINST M10360.3 (series), available at: http://www.uscg.mil/directives/cim/10000- 10999/CIM_10360_3C.pdf.
042-3.6.3 Navigation Rules, International-Inland, COMDT M16672.2 (series), available at: http://www.uscg.mil/directives/cim/16000- 16999/CIM_16672_2D.pdf.
042-3.6.4 Naval Engineering Manual, COMDTINST M9000.6 (series), available at:
http://www.uscg.mil/directives/cim/9000-9999/CIM_9000_6E.pdf.
042-3.6.5 International Standards Organization (ISO), available at:
http://www.iso.org.
042-3.6.6 Society of Allied Weight Engineers (SAWE), available at:
http://www.sawe.org/.
042-3.6.7 Code of Federal Regulations (CFR), available at:
http://www.gpoaccess.gov/cfr/index.html.
042-3.6.8 American Society for Testing and Materials (ASTM), available at:
http://www.astm.org.
042-3.6.9 American Welding Society (AWS), available at: http://www.aws.org.
042-3.6.10 Surface Forces Time Compliance Technical Order (TCTO) Process Guide, CGTO PG 85-00-40-S. (Will be provided as GFI.)
042-3.6.11 Ballistic Resistant Protective Materials NIJ Standard-0108.01, available at: http://www.eeel.nist.gov/oles/Publications/NIJ-0108.01.pdf.
042-3.6.12 United States Coast Guard Boat Management Manual, COMDTINST M16114.4A, available at: http://www.uscg.mil/directives/cim/16000- 16999/CIM_16114_4A.pdf.
042-3.6.13 Extended Ship Work Breakdown Structure (ESWBS) scheme in organization of drawings per Appendix A-1 of “Weight Estimating and Margin Manual For Marine Vehicles,” Society of Allied Weight Engineers Recommended Practice 14, May 22, 2001.
USCG RB-S 8 of 71 SPECIFICATION http://www.abycinc.org/ http://www.uscg.mil/directives/cim/10000-10999/CIM_10360_3C.pdf http://www.uscg.mil/directives/cim/10000-10999/CIM_10360_3C.pdf http://www.uscg.mil/directives/cim/16000-16999/CIM_16672_2D.pdf http://www.uscg.mil/directives/cim/16000-16999/CIM_16672_2D.pdf http://www.uscg.mil/directives/cim/9000-9999/CIM_9000_6E.pdf http://www.iso.org/ http://www.sawe.org/ http://www.gpoaccess.gov/cfr/index.html http://www.astm.org/ http://www.aws.org/ http://www.eeel.nist.gov/oles/Publications/NIJ-0108.01.pdf http://www.uscg.mil/directives/cim/16000-16999/CIM_16114_4A.pdf http://www.uscg.mil/directives/cim/16000-16999/CIM_16114_4A.pdf
042-3.6.14 MIL-DTL-31000C (formerly Level 3 of DOD-D-1000), available at:
https://acc.dau.mil/CommunityBrowser.aspx?id=201408
042-3.6.15 Naval Engineering Computer Aided Design Standards, COMDTINST M9085.1B, available at: http://www.uscg.mil/directives/cim/9000- 9999/CIM_9085_1B.pdf.
042-3.6.16 Cargo Loading Manual, All USAF Series C-130J Aircraft, TO 1C-130J-9.
042-3.6.17 Defender Class Operator’s Handbook, COMDTINST 16114.37.B Chapter 6, Section J, http://www.uscg.mil/directives/cim/16000- 16999/CIM_16114_37B.pdf
042-4 Access for Government Representatives
042-4.1 Access to production facilities shall be granted to the Government’s representatives in accordance with the Contract terms and conditions or mutual agreement of both parties. This is to include pre-award surveys should the Government deem them necessary.
042-5 Product Warranties
042-5.1 The workmanship, performance, and operation of each RB-S and all installed systems not specified below shall be warranted by the Contractor against any defects or failures, under anticipated operating conditions as defined in this Specification, for a period of one (1) year from the date of acceptance.
The following structures and systems listed below shall be warranted against defects, structural degradation, leaks, and other defects on materials, parts, and services as listed in Table 042-1:
Table 042-1: Product Warranties
RB-S System Warranty Period
Hull, Deck, Enclosure Structure Against defects or structural degradation for a period of five (5) years
Propulsion System For two (2) years (threshold), three (3) years (objective) on parts and service
Fuel Tank Against leaks or other defects for a period of ten
(10) years
Fendering System For three (3) years on materials, parts and service
Scalable Integrated Navigation System (SINS) Furuno Package For three (3) years on materials, parts and service
Trailers For three (3) years on materials, parts and service
042-5.2 All commercial warranties offered shall be passed through to the Government. A complete list of those affected warranties shall be included in the proposal and shall be incorporated into any resultant contract. Warranties that are passed through to the Government will be managed and monitored by the successful offeror.
042-5.3 Warranties will not be voided if properly trained Coast Guard personnel effect repairs while RB-S’s are operational outside the continental U.S. (OCONUS).
USCG RB-S 9 of 71 SPECIFICATION https://acc.dau.mil/CommunityBrowser.aspx?id=201408 http://www.uscg.mil/directives/cim/9000-9999/CIM_9085_1B.pdf http://www.uscg.mil/directives/cim/9000-9999/CIM_9085_1B.pdf http://www.uscg.mil/directives/cim/16000-16999/CIM_16114_37B.pdf http://www.uscg.mil/directives/cim/16000-16999/CIM_16114_37B.pdf http://www.uscg.mil/directives/cim/16000-16999/CIM_16114_37B.pdf
042-6 Warranty Plan
042-6.1 The Contractor shall utilize the Boat Forces Fleet Management Information System (FMIS) to keep the Coast Guard informed of all real time warranty information, which includes, at a minimum, the following items:
042-6.1.1 Summarization of warranty issues over the period to include:
042-6.1.2 Date of report of claim
042-6.1.3 Date of remediation
042-6.1.4 Parts affected, including serial number (where tracked)
042-6.1.5 Nature of casualty
042-6.1.6 Actions taken
042-6.1.7 If claim is still open, intended action
042-6.1.8 U.S. Coast Guard boat number
042-6.1.9 U.S. Coast Guard unit
042-6.2 In addition, the Contractor shall use FMIS to document specific information pertaining to each RB-S. This includes, but is not limited to, all serial numbers for serialized components installed on a specific hull that apply to the RB-S. Components for which serial numbers are to be provided include:
042-6.2.1 Hull
042-6.2.2 Outboard Engines
042-6.2.3 Outboard Engine Lower Units
042-6.2.4 Engine Hour Meters
042-6.2.5 Engine Electronic Control Modules (ECMs)
042-6.2.6 Trailer (VIN)
042-6.2.7 Radios
042-6.2.8 Navigation System Equipment
042-6.2.9 Fendering
042-6.2.10 Machine Gun Mounts
042-6.2.11 Those components with an acquisition cost greater than $2,500
042-6.2.12 All electronics components (regardless of cost), including electronic systems outfit
042-6.2.13 All repairable components (as defined in Section 082)
042-7 Equipment Substitutions
042-7.1 The intent of the RB-S acquisition is to provide a supportable platform for SAR and PWCS operations, with standardized equipment and maintenance. The production of the RB-S’ must be in accordance with the written proposal. During Operational Test and Evaluation (OT&E), and prior to placing the first production delivery order, the Coast Guard will certify the configuration of the boat as the Production Configuration Baseline (PCB). Any subsequent changes to hull, machinery, or equipment will follow the Time Compliance Technical Order (TCTO) Process Guide.
042-7.2 Equipment substitutions or relocation of items in subsequent boats shall be approved by the Government prior to any changes being made and documented in accordance with the TCTO Process Guide, to include completing a draft TCTO and Supply Item
USCG RB-S 10 of 71 SPECIFICATION
Change Record (SICR) form indicating the OEM Part Number, Cage Code, End Item Description, link to configuration, and functional purpose. A copy of the TCTO Process Guide and instructions for completing an SICR will be provided as GFI.
042-7.3 The Contractor will bear all costs associated with substituting any equipment where the reason for substitution is that the component can no longer be obtained. The Contractor must provide a minimum of 120 days’ notice of any equipment substitution.
044 RB-S OPERATION
044-1 Concept of Operations
044-1.1 The RB-S will be operated in shallow water, port, and coastal areas throughout the United States. Typical missions include Defense Operations; Port, Waterways, and Coastal Security (PWCS); Maritime Law Enforcement (MLE); and Search and Rescue
(SAR).
044-1.2 The RB-S will operate with a minimum complement of two (2) – a coxswain and a crew member who are qualified in accordance with the U.S. Coast Guard Boat Manual.
However, typical operations will consist of a crew of four (4). Total personnel capacity shall be not less than twelve (12), including passengers and crew. Not all 12 personnel require seats or environmental protection.
044-1.3 When used in PWCS or Defense Operations, the RB-S crew will be required to operate a machine gun mounted on the vessel. Operations involving machine gun use could involve the RB-S approaching a target directly or at an angle requiring arc of fire as specified in Section 710-1.4.
044-1.4 When used as a SAR platform, the RB-S is expected to execute standard search patterns for vessels or persons in the water utilizing installed electronics systems and crew lookouts. The RB-S shall provide the crew with the capability to reach down in the water and retrieve a person with no more than two (2) crew members at normal operating conditions. The RB-S shall provide for unassisted self-recovery of able-bodied crew members from the water.
044-2 Operating Conditions
044-2.1 RB-S employment can occur at any time day or night, and will be operated in bayous, lakes, rivers, bays, oceans and other waters subject to the jurisdiction of the Coast Guard. The RB-S will operate in both salt and fresh water, and at the ends of U.S. Sea Lines of Communication (SLOC), which are normally commercial or military seaports, the seaward approaches to the port and adjacent coastal waters within 15 nautical miles (nm) of shore.
044-2.2 The RB-S will be based at shore stations and may be berthed in the water, at a pier or slip, or on the boat’s trailer. The RB-S may be launched via boat ramps or lifted from the trailer to the water via crane or other hoisting device.
044-2.3 The RB-S may be transported via flat-bed truck, ship, aircraft (C-130), or rail. The RB-S must be able to be lifted by the RB-S’s padeyes/lifting eyes with lifting gear provided by the OEM (at full load). Furthermore, the boat and trailer must be suitable for simultaneous rigging, so that the trailer may be lifted with the boat on the trailer.
044-3 Annual Hours of Operation
044-3.1 The RB-S is anticipated to operate between 500 and 1,000 hours per year over its service life. The RB-S may be stored uncovered in the water or on a trailer for the remainder of the time.
USCG RB-S 11 of 71 SPECIFICATION
051 RB-S SYSTEM REQUIREMENTS
051-1 General
051-1.1 Unless otherwise specified, performance requirements apply to operations in the normal operating condition (see Section 096) in calm water conditions. Calm water is defined as a sea state less than or equal to one foot and winds less than 15 knots.
051-1.2 Specified speed, range, and endurance requirements, as well as maneuvering, sea keeping, launch, and recovery requirements, shall be met with the RB-S operating with all required equipment and accessories installed.
051-1.3 Sustained as used in this section means for at least one hour.
051-2 Speed, Range Acceleration and Endurance
051-2.1 The RB-S shall be capable of achieving 40 knots in the normal operating condition as defined in Section 096. The RB-S must be capable of 25 knots sustained cruising speed.
051-2.2 The RB-S shall have sufficient fuel capacity and a 10% usable reserve so that it can operate continuously for 150 nautical miles at cruising speed (threshold)/200 nautical miles at cruising speed (objective) in the normal operating condition. This test shall be based on operating the RB-S at 25 knots for one (1) hour as required in Section 094- 4.1.
051-2.3 The RB-S shall be capable of accelerating and on a plane in seven (7) seconds or less under normal operating conditions as defined in Section 096.
051-3 Maneuvering and Sea Keeping
051-3.1 The RB-S shall be controllable at all speeds up to the maximum attainable speed and under all specified loading conditions. (See Section 096.) Controllable operation shall constitute operation where craft orientation, motions, and accelerations do not pose a hazard to the crew or passengers and which are not otherwise controllable by good seamanship and boat handling.
051-3.2 At all speeds and loading conditions, the RB-S shall be able to maintain a straight course for thirty seconds in calm conditions without corrective steering or personnel movement and with no more than 1/2 degree of list.
051-3.3 In turns at all speeds and loading conditions, the RB-S shall maintain a steady turn rate without skidding, or any other effects of dynamic instability. Inboard heel shall be maintained throughout turns at speeds above 15 knots. When coming out of a turn, the boat shall respond to the steering command without the need for excessive force.
051-3.4 The boat shall meet the requirements of the ABYC avoidance line test (H-26.8.3.2) and the 33 CFR 183.53 "Quick Turn" and "Test Course" tests.
051-3.5 The astern performance shall be such that the RB-S can be maneuvered in reverse in a straight course and perform backing turns to port and starboard. Minimal evidence of deck flooding is acceptable when operating the engines at up to 1/3 of the engine’s maximum RPM.
051-3.6 The RB-S shall be capable of performing emergency stops by decelerating from 40 knots to dead in the water in a maximum of twelve (12) seconds. In performing this stop, the propulsion system may be put into reverse.
051-4 Launch and Recovery
051-4.1 The RB-S shall be capable of being launched or recovered from a boat ramp by only two people in no more than 15 minutes using a trailer. Launch is when the boat is in
USCG RB-S 12 of 71 SPECIFICATION the water and no longer making contact with the trailer. Recovery is when the boat is out of the water.
070 GENERAL REQUIREMENTS FOR DESIGN AND CONSTRUCTION
070-1 General
070-1.1 All material and equipment entering into the construction and outfitting of the boat shall be new.
070-1.2 Unless otherwise specified, construction of the RB-S and installation of all equipment and systems shall be in accordance with the American Boat and Yacht Council (ABYC) “Standards and Technical Information Reports for Small Craft.”
070-1.3 Hull scantlings shall be determined in accordance with ISO 12215-5:2, “Small Craft – Hull Construction and Scantlings – Part 5: Design Pressures, Design Stresses, Scantling Determination.”
070-1.4 Watertight: Watertight means designed and constructed to withstand a static head of water without any leakage, except that “watertight” for the purposes of electrical equipment means enclosed so that water does not enter the equipment when a stream of water from a hose with a nozzle one inch in diameter that delivers at least 246 liters (65 gallons) per minute is sprayed on the enclosure from any direction from a distance of ten feet for five minutes.
070-1.5 Weathertight: Weathertight means that water will not penetrate in any sea condition, except that “weathertight equipment” means equipment constructed or protected so that exposure to a beating rain will not result in the entrance of water.
070-2 Principal Characteristics
070-2.1 The RB-S shall meet the general characteristics as shown in Table 070-1:
Table 070-1: RB-S Principal Characteristics
Characteristic Threshold Objective
Length, overall 1 Maximum length, while on trailer, must not exceed 37’0”
Beam 2 102 inches maximum (when trailered for towing)
Height 3
• Road Height shall not exceed 10’6”
• Height for transporting aboard a C-130 shall not exceed 107”
Weight (fully outfitted with trailer) 4 10,000 lbs maximum
Static Draft 5 39 inches maximum (with engines trimmed down)
Speed, Normal Operating Condition
40 knots maximum speed 25 knots cruising speed
Propulsion Outboard Counter Rotating Engines
Endurance, Normal Operating Condition 150 nm at Cruising Speed 200 nm at Cruising
Speed
Towing Capacity Capable of towing astern and alongside vessels with a displacement of up to 10 tons
Note 1 Length (overall): Overall length of the boat on the trailer shall be measured from the forward-most extremity of the trailer or boat to the aft-most extremity including the
USCG RB-S 13 of 71 SPECIFICATION propulsion unit trimmed down in the stowed position and the fendering system. When measuring overall length, the fendering system shall be fully deployed and ready for operation.
Note 2 Beam: The beam shall be measured from the outer most fixed extremities of the boat with the fendering system fully deployed, including all appendages and fittings. To meet statutory towing width requirements, it is permissible to require the deflation of an inflatable fendering system, provided that fendering can be re-inflated in less than 15 minutes by a two (2) person crew and is protected while in transit. The trailered beam measurement for towing purposes shall not be the overall beam measurement. The boat width, while on the RB-S’s designed trailer, shall not exceed the width where a Commercial Drivers License (CDL) or other special license is needed to move the boat on trailer towed by a truck or primary mover used by the Coast Guard on state and federal roads within the United States.
Note 3 Height: For road transport purposes, the height while resting on the trailer shall not exceed ten feet six inches (10’6”) to allow the boat to fit into existing facilities. It is permissible to adjust the height of the RB-S to meet trailering and air transport height requirements, provided the adjustments can be made in less than fifteen (15) minutes for trailering and one (1) hour for air transport by a two person crew and is protected while in transit. For loading into the C-130, the boat on trailer shall not exceed 107 inches fixed height. A special purpose trailer shall be used to meet this requirement.
See Section 920.
Note 4 Weight: The weight of the boat and the trailer, including trailer outfit, shall not exceed 10,000 pounds in the fully outfitted condition.
Note 5 Draft: The static draft shall be measured in the normal operating condition from the waterline to the deepest point of the RB-S with the engines trimmed fully down.
070-3 Arrangements
070-3.1 The RB-S shall have a rigid hull construction. The hull may have spray and lifting strakes.
070-3.2 The RB-S shall have a prominent fendering system capable of absorbing extreme impact loading and abrasion to protect it from damage during alongside operations with another vessel. The fendering system shall extend around the complete perimeter of the RB-S except that the transom need not be fitted with fendering. The RB-S should be able to withstand, with no damage, a collision at 5 knots while conducting normal small boat operations (i.e., personnel transfers or alongside tows).
070-3.3 The arrangement of seating, electronics, and lighting shall maximize system functionality while minimizing crew fatigue. Arrangement of windows and doors shall maximize visibility and the overall effectiveness of the craft, including emergency egress. Walkways outboard of the crew space enclosure shall be a minimum of four inches without stepping on the fendering system and shall provide access to the bow and stern.
070-3.4 The RB-S will operate in a wide range of environmental conditions (see Section 070-6), from freezing to extreme heat. In order to protect the crew and electronics in these conditions, a crew space shall be provided incorporating the following features:
070-3.4.1 The RB-S shall have the ability to enclose the crew space on deck providing shelter for the crew.
070-3.4.2 Seating: The crew space shall include four shock mitigating seats.
(threshold) and one additional shock mitigating seat that does not need to be but could be within the crew space. (objective). (See Section 660.)
070-3.4.3 Standing Space: The crew space shall have deck space to accommodate two additional crew members.
USCG RB-S 14 of 71 SPECIFICATION
TWBlose Highlight
070-3.4.4 Controls: The crew space shall incorporate a forward console that incorporates the required controls, navigation, and communication equipment for the safe and efficient operation of the RB-S. The port, forward-most seat shall be designated for the coxswain and shall include all engine and steering controls. The starboard, forward-most seat shall be designated for a navigator and shall provide navigation equipment that is shared with the coxswain.
070-3.4.5 Overhead: The overhead of the crew space shall be solid structure and may be used to mount antennas, lights and other equipment. Standing headroom inside the crew space shall not be less than 78 inches.
070-3.4.6 Front: The forward face of the crew space shall have windows with windshield wipers and defrosters. (See Section 625.)
070-3.4.7 Structure: The structure or portions of the structure can be permanent or removable, with sides and overhead extending aft from the console providing protection for the crew and all equipment located in the console. The structure of the crew space shall be strong enough to support crew members standing on the top.
070-3.4.8 Weather Protection: The crew space shall allow the crew to be protected from cold, wet, and icy environments and take advantage of the installed heating system. (See Section 512.)
070-3.4.9 Ventilation: Life-cycle cost considerations preclude the RB-S from having installed air conditioning. With this in mind, the crew space and installed ventilation system (see Section 512) shall maximize ventilation and natural cooling for the crew.
070-3.4.10 Visibility (Lines of Sight): The crew space shall allow for maximum lines of sight for the crew in both seated and standing positions, including lines of sight when coming alongside larger vessels and structures, as well as lines of sight when in turns. All around visibility outside the boat from the conning station with not greater dead visibility sector of two (2) degrees in any one direction and not more than fifteen (15) degrees total loss of visibility in 360 degrees. The crew space shall not be subject to glare from external light sources up to fifteen (15) degrees above the horizontal plane.
070-3.4.11 Normal Egress: The crew space shall allow for the crew to quickly and easily access the exterior of the RB-S.
070-3.4.12 Emergency Egress: During the life of RB-S fleet, there is a high likelihood that one or more boats will capsize due to unexpected environmental conditions, interaction with other vessels, hostile intent of others, or human error. The RB-S shall have egress means for all crew in the crew space to quickly and safely exit the crew space. In addition, air pockets that are available in the inverted position are highly desired to allow the crew extra time in performing egress.
070-3.4.13 Weapons Operations: During law enforcement missions, the RB-S may be required to fire upon other vessels from inside the crew space using small arms. Typically this is done from the seated position, and the small arms are fired at vessels that are directly abeam of the RB-S or slightly forward. The crew space shall provide openings that can be used for this purpose.
070-3.5 The RB-S shall have an aft deck area suitable for firing weapons and conducting towing operations. The aft deck shall have space and tie down points to store a P-6 pump. The RB-S shall have a forward deck area suitable for a crew member to safely handle mooring and towing lines. Access ways shall be provided around the crew
USCG RB-S 15 of 71 SPECIFICATION space on both sides to allow the rapid transit of crew and equipment from aft to forward deck areas. Sufficient handholds/handrails shall be provided along the route to allow the crew to safely conduct this transit under all operating conditions.
070-3.6 Crew restraint holds/rings shall be provided throughout the boat to connect restraint harness lanyards to prevent crew member ejections. All crew restraint holds/rings shall comply with the standards provided in 29 CFR 1910.66 Appendix C. All crew restraint holds/rings shall be accompanied by a “crew restraint” label in visible block lettering, indicating the intended use to boat crews. The tether used by the crew will have an adjustable length from six (6) inches to three (3) feet.
070-3.7 The RB-S shall be arranged to allow for recovery of people and objects from the water and shall have provisions to allow for the self recovery (re-boarding as defined by ABYC H-41) of crew members from the water.
070-4 Design Maturity
070-4.1 The RB-S shall be a mature, proven design. A parent craft with modifications in material, arrangements, or dimensions could satisfy the requirements of this Specification. The RB-S design in terms of the hull form shall be directly traceable to five or more production boats of the same design, or same family of designs, with at least one of these boats having a minimum of two (2) years in commercial or Government service.
070-4.2 The boat(s) from which the RB-S’s design is derived shall be considered the parent craft.
070-5 Service Life
070-5.1 The RB-S hull, deck, console, and enclosure shall have an expected service life of at least ten (10) years before the boat is replaced or undergoes a midlife service extension. During this time, the RB-S is expected to be capable of operating between 500 and 1,000 hours per year over its service life. The RB-S will be stored uncovered in the water or on trailer for the remainder of the time.
070-5.2 The fendering system shall have a service life of at least five (5) years before requiring major overhaul or replacement. The fendering system must be proven in commercial or Government service for a minimum of two (2) years, and be fully supportable (i.e., can be procured commercially within 30 days) by the Contractor for the duration of the boat life-cycle.
070-5.3 The propulsion system shall have an average mean time between failures (MTBF) of 1,000 hours before requiring major repair/overhaul and 4,000 hours before requiring replacement based on the projected maximum of 1,000 hours of annual use. Major repair/overhaul is defined as “depot level” repairs/overhauls that cannot be performed at the organizational (Station or Sector) level and are typically performed at an OEM authorized repair/overhaul facility. Lower units/gear cases shall have a MTBF of at least 900 hours. The Coast Guard will use Asset Logistics Management Information System (ALMIS) to track this reliability data to ensure contract compliance.
070-5.4 The trailer shall have a service life of ten (10) years at 12,000 miles per year.
070-6 Operating Environment
070-6.1 The RB-S and all of its equipment shall be capable of operating continuously in the following combined environmental conditions:
070-6.1.1 Temperatures:
a. Outside Air (Dry Bulb) 135°F (maximum) to 0°F (minimum)
b. Sea Water Temperature 105°F (maximum) to 28°F (minimum)
USCG RB-S 16 of 71 SPECIFICATION
070-6.1.2 Wind Conditions (concurrent with the above temperatures):
a. 30 knots (maximum)
070-6.1.3 Sea Conditions:
a. Survivable – Eight (8) foot seas (threshold); ten (10) foot seas (objective)
b. Operations – Six (6) foot seas (threshold); Eight (8) foot seas (objective)
c. Surf and Breaking Waves - The RB-S is not intended to be operated in surf or breaking waves.
070-6.1.4 Ice: The RB-S will not normally conduct operations in ice.
070-6.1.5 Helo operations: The RB-S is not intended to conduct helo operations.
070-6.1.6 Water Quality: The RB-S will operate in various types of waters. This water is expected to include sand and sea grasses and may be aerated.
070-7 General Requirements for Equipment, Machinery and Materials
070-7.1 All material, equipment, and machinery shall be installed in accordance with the OEM’s recommendations.
070-7.2 To achieve ready replacement of parts, the Contractor shall standardize on selection of equipment, fittings, and fabrication methods within all boats manufactured under its respective contract.
071 ACCESS
071-1 General
071-1.1 Access to compartments containing equipment, machinery, or spare parts shall be provided such that it allows for removal of the item without disassembly. Access shall be arranged to be clear of piping, wireways, ducts, and other obstructions.
071-1.2 Bilge areas are those that are below the static waterline in the full load condition as defined in Section 096-2.4. Bilge access points shall provide access to the lowest point of the bilge when the RB-S rests in a level position. Bilge flotation material (i.e., foam) shall not be permanently affixed to the hull. Access shall be provided to bilge areas to ensure that bilges can be checked for water content and completely dewatered and wiped clean of any residue. The crew shall be able to access bilges for inspection and damage control without the use of tools. Sealed voids in bilge areas may be provided and do not require routine access; however, these voids shall be provided with a means to check for water content, and access hatches for depot level maintenance.
Tools can be used to open access hatches for sealed voids.
071-1.3 Access to fuel tanks, hoses and fittings shall be provided for repair and maintenance without removing any permanent structural component in accordance with ABYC Project H-24, Gasoline Fuel Systems.
071-1.4 Check points that require routine maintenance checks on a daily basis or underway, such as dipsticks, site glasses, gauges, and strainers, shall be located so that they are readily accessible to the crew.
073 NOISE AND VIBRATION
073-1 General
073-1.1 The onboard A-weighted noise level in the RB-S’ crew space at all speeds in calm water conditions shall not exceed 85 decibels (dBA). Sound measurements shall be taken at the various crew positions while operating the RB-S.
USCG RB-S 17 of 71 SPECIFICATION
073-1.2 Any sound attenuating material shall (1) not hinder inspection of the interior hull and hull structure; (2) be resistant to absorbing any type of liquid or vapors; (3) not cause any corrosion to the hull material; and (4) not be combustible/flammable below 400 degrees Fahrenheit.
073-1.3 No component shall rattle. Mounts for removable components and accessories, including items moved for towing or transport, shall be provided with resilient material as necessary to prevent rattling. Gaskets shall be used and self-locking fasteners shall be provided to prevent loosening of fasteners under vibration.
073-1.4 No component shall have a natural period of vibration with the range of 70% to 140% of the propeller blade passing rate at any speed, or otherwise vibrate in resonance with any engine or propeller induced vibration. An example of calculation is provided.
For example, Blade Rate (Hz) is RPM * No. of blades / 60.
If the boat runs at 2,000 RPM (idle) to 4,500 with 3 blades, nothing rattles between 70 Hz through 315 Hz as calculated below:
RPM 2,000 4,500
Blades 3 3
Blade Rate / min 6,000 13,500
Blade Rate, Hz 100 Hz 225 Hz
70% 70 Hz 157.5 Hz
140% 140 Hz 315 Hz
074 WELDING
074-1 General
074-1.1 All welding, brazing and related procedures, including joint design, joint strength calculations, edge preparation, fabrication, and records, shall be in accordance with the standards set forth by the American Welding Society (AWS) for the materials being welded and the intended service, except as specifically directed herein. Weld procedures and welder qualifications shall be in accordance with D1.1 and D1.2 welding standards.
074-1.2 For aluminum, all recommendations and information in AWS D3.7-90: 2004 “Guide for Aluminum Hull Welding” shall be followed.
074-1.3 Procedure qualification, welder's qualification, and nondestructive test personnel qualification for all welders and welding inspectors shall be in accordance with the American Welding Society (AWS).
075 FASTENERS
075-1 General
075-1.1 All fasteners shall be of corrosion resistant materials.
075-1.2 Dissimilar metals shall be isolated to prevent the formation of a couple or galvanic cell in accordance with ABYC standard T-1 Aluminum Applications for Boats and Yachts.
075-1.3 Fasteners shall not be threaded directly into aluminum alloys or composite materials.
Backing plates, alloy 304 stainless steel Helicoil inserts, or pressed-in, galvanically compatible threaded inserts shall be used when direct threading is required.
075-1.4 Cadmium-plated parts and fasteners, including washers, shall not be used.
USCG RB-S 18 of 71 SPECIFICATION
075-1.5 Where nuts will become inaccessible after construction of the RB-S, nuts shall be captured to allow re-assembly and prevent backing off. Unless otherwise specified, self-locking nuts of plastic insert type or all-metal left-locking nuts of distorted type shall be provided to prevent loosening of bolts due to shock and vibration.
075-1.6 Fasteners in deck traffic areas shall be flush mounted to eliminate tripping hazards.
076 RELIABILITY, MAINTAINABILITY AND AVAILABILITY
076-1 General
076-1.1 The Contractor shall obtain from the OEM certification that all equipment provided shall be repairable or replaceable within 30 days for the duration of the life-cycle of the boat.
Use of equipment and components already in the Federal Stock System or available through General Services Administration (GSA) Schedule is encouraged. It is preferred that items not available through Federal Stock System or GSA be available from national marine equipment suppliers.
076-1.2 Components requiring routine maintenance should be readily accessible and removable with hand tools wherever possible. Examples include changing/checking oil, fuel air filters, removable fuel tanks, and electronics.
076-1.3 The Contractor shall affix serial numbers using metal tags to indicate configuration and numbering system specified by the Coast Guard unless already serialized by the manufacturer. The Coast Guard will provide an example tag to the Contractor upon contract Award. The Contractor shall provide a list of all serial number tracked components to the Coast Guard prior to delivery of each boat to the field so that this information may be loaded into the Coast Guard’s Enterprise Logistics IT System.
Serial numbers shall be assigned to the following components:
076-1.3.1 Hull
076-1.3.2 Engines
076-1.3.3 Lower Units
076-1.3.4 Engine Hour Meters
076-1.3.5 Engine Electronic Control Modules (ECMs)
076-1.3.6 Trailer (VIN)
076-1.3.7 Radios
076-1.3.8 Navigation System Equipment
076-1.3.9 Electronics Equipment
076-1.3.10 Fendering System - “each section”
076-1.3.11 Machine Gun Mounts
076-1.3.12 Those components with an acquisition cost greater than $2,500
076-1.3.13 All electronics components (regardless of cost), including electronic systems outfit
076-1.3.14 All repairable components (as defined in Section 083-1.6.4)
078 MATERIALS
078-1 General
078-1.1 All materials normally subjected to sunlight shall be highly resistant to degradation caused by ultraviolet radiation.
USCG RB-S 19 of 71 SPECIFICATION
078-1.2 Aluminum alloy surfaces intended for contact with porous material shall be coated.
Joints and crevices where water may collect shall be sealed with bedding compound.
Pockets too large to be bedded shall be coated. Copper alloys shall not be attached to aluminum.
078-1.3 In order to minimize moisture from joints, joining surfaces between mechanically fastened metal components and between metals and laminates shall be protected by the use of bedding compound or structural adhesive, as applicable.
078-1.4 When Aluminum, Stainless Steel and Bedding Compounds are referred to in this Specification without further identification, they shall conform to their respective sections in Section 078.
078-1.5 The use of doubler plates shall not be used in the construction of the RB-S.
078-2 Aluminum
078-2.1 Tube: ASTM B221 (Extruded) 5086-H111, or (Drawn) 5083-H112 ASTM B210 5086- H32.
078-2.2 Plate and Sheet: ASTM B928 Alloy 5086- H116 or H321 or Alloy 5456- H116 or H321 or 5083-H116 or H321.
078-2.3 Shapes: ASTM B221 (Extruded) Alloy 5086-H111 or H112 or 5083- H111 or H112 or Alloy 5456-H111 or H112.
078-2.4 Alloy 5052 of SAE AMS-QQ-A-250/8 may be used for unwelded sheathing, expanded aluminum and trim for a thickness less than 1/8 inch.
078-2.5 Alloy 6061 or 6063 of ASTM B241 may be used for pipes, special structural extrusions and hollow shapes as structural components. If so used, allowable stresses shall be based on the zero temper condition.
078-2.6 Non-structural items of trim and outfit such as windows and doorframes, castings, and hardware items may be alloy 6063 or alloy 6061 of ASTM B221 or alloy 356.1, 356.2 or A356.2 of ASTM B179.
078-3 Stainless Steel
078-3.1 Wrought: AISI 316L, AISI 302, or AISI 304.
078-3.2 Pipe or Tubing: ASTM A312 or ASTM A269, Grade 316L, 321 or 347.
078-3.3 Bars and Shapes: ASTM A276-2a, Grade 316L.
078-3.4 Wherever stainless steel, corrosion resistant steel or “CRES” is used or required, it shall be as follows: Stainless steel 316L shall be used for welded fittings, couplings, etc. on the exterior of the vessel above and below the waterline of the hull that is exposed directly to sea water and for all applications on the weather decks unless stated elsewhere in this Specification. If stainless steel is used, 316L shall also be used on all interior welded applications in sea water handling systems where direct exposure to sea water is possible. Stainless steel 316 shall be used in non-welded applications where direct contact with sea water or spray is possible. Use of 302 or 304 is restricted to interior, non-welded applications where exposure to sea water is not anticipated.
078-4 Bedding Compounds
078-4.1 Polysulfide and polyurethane sealants may be used above and below the waterline.
Where waterproof adhesive bonds are required, a polyurethane compound shall be used.
USCG RB-S 20 of 71 SPECIFICATION
078-5 Prohibited Materials
078-5.1 Any prohibited material listed in the referenced documents listed in Section 042-4 shall not be used in constructing the RB-S. This shall include, but not be limited to, wood, mercury, lead paint, and cadmium-plated washers and fasteners.
078-5.2 Materials which contain asbestos and refractory fiber materials (also termed ceramic fiber and aluminum-silica material) shall not be used.
078-5.3 Two part products containing isocyanates shall not be used as specified by
COMDTINST 6260.30A.
079 STABILITY
079-1 General
079-1.1 The boat shall be stable under all operating and loading conditions and shall meet the stability and buoyancy requirements of ISO Standard 12217-1:2002, design category C, option 4, except that the weight of the crew or other persons aboard shall be in accordance with Section 096-2, instead of 65 kg. Note that to meet option 4 under this standard, the boat has to meet the flotation requirements of ISO 12217-1, 6.5. Any foam in the fendering system may contribute to meeting this requirement provided it meets the foam material requirements as defined in Section 191.
079-1.2 Note also that this section of the Specification is not intended to supersede any specific requirements for the fendering promulgated elsewhere in this Specification, but defines the requirements for using the buoyancy of the fendering to satisfy the requirements of Section 079-1.2.
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Q A Matrix 6 | — | |
| SF 30 | — | |
| SF 30 | — | |
| Q A Matrix 5 | — | |
| SF 30 | — | |
| RFP- 7 | — | |
| SF 30 | — | |
| Q A Matrix 4 | — | |
| SF 30 | — | |
| Q A Matrix 3 | — | |
| Q A Matrix 2 | — | |
| SF 1449 | — | |
| RFP- 5 | — | |
| RFP- 2 | — | |
| Q A Matrix 1 | — | |
| RFP- 3 | — | |
| RFP- 5 | — | |
| RFP- 2 | — | |
| RFP_MOT005.pdf | ||
| RFP- 5 | — | |
| RFP- 6 Attch 1 | — |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .