HSCG-23-10-R-MOT005 (RB-S II)

Q&A MATRIX 4

# Section Page No. RFQ Text Question Response

1 Spec. 200-1.6 45

The manufacturer shall provide certification that the engine complies with exhaust emission regulations of MARPOL (73/78) Annex VI (www.imo.org). The manufacturer shall certify that the engine complies with exhaust emission regulations of 40 CFR 91 (Clean Air Act marine spark ignition emissions) and all state regulations. A national security exemption will not be authorized for these engines.

Does the MARPOL regulation apply to outboard motors? If so, request USCG provide more specific reference.

No OBM Manufacturers have been able to provide certification of compliance with

MARPOL.

OBM manufacturers are stating 40 CFR 91 is an old emissions standard. All are citing 40 CFR 1045, 1065, and 1068.

Please confirm 40 CFR 91 is correct regulation.

1a) That requirement is not valid and will be removed from the Spec.

1b) 40 CFR 1045 is the correct reference for Marine spark-ignition engines for the 2010 model year. The Specification will be updated to reflect that change.

2 SF-1449 –

CLIN x00008 3 Delivery to any location in Continental

United States

May the vessels be delivered over the road on their own trailer?

If not, will the USCG arrange for crane services as needed to offload the boat from the delivery trailer?

2a) Yes.

2b) The USCG will not arrange for crane services.

# Section Page No. RFQ Text Question Response

3 SF-1449 – 5) (a) 7

The Contracting Officer or designated representative will provide the Contractor with a list of all discrepancies discovered during Government testing, along with their corresponding specification references. All discrepancies shall be corrected before shipment, unless the discrepancy does not pose a threat of safety and mutual agreement is reached by the Contractor and the Contracting Officer to authorize an exception in writing. In such an event, the Contractor is not relieved from its responsibilities to correct all discrepancies. The Contracting Officer will take acceptance of all supplies delivered at the destination, unless otherwise directed in the delivery order.

Does the USCG plan to perform an inspection at the builder’s facility before shipment of every vessel (with issues resolved by the builder before delivery), such that the post delivery inspection should only reveal damage caused during shipment?

3) Yes, the USCG desires the opportunity to perform an inspection as well as witness testing at the builder’s facility in an effort to streamline deliveries and reduce the time needed to conduct acceptance testing once the boats are delivered.

RFP Provisions

(AMD 2) –

FAR 52.212-2

7 EVALUATION-COMMERCIAL ITEMS

Does the USCG plan to self-insure the boats during construction, or must the successful builder include the vessels on their builder’s risk policy?

4) No, the USCG will not self-insure the boats during construction.

Builders must include the vessels on their risk policy.

5 Spec 042-3.6.2 8 COMDTINST M10360.3C

Appendix D paragraph L.3.b requires “the shipyard is required to arrange for an independent Paint and Coatings Inspector certified as a “Specialist” in accordance with NACE or other recognized standard”.

Does the USCG mean the contractor is required to hire a subcontract inspection agency to inspect the bead blast profile required by 631-2 and painting required by sections 114-1.5 and 582-4.4? Since there is no such designation as “Specialist” in NACE, please clarify.

5) Yes, the independent paint inspector that is required has to be certified to the following standards: NACE - Coating Inspector Level 2 (www.nace.org).

http://www.nace.org/

# Section Page No. RFQ Text Question Response

6 Spec 042-5.1 9

The following structures and systems listed below shall be warranted against defects, structural degradation, leaks, and other defects on materials, parts, and services as listed in Table 042-1:

For the 4 RB-S systems requiring warranty of “service” (hull, propulsion, fender, SINS, and trailer), is the USCG only directing that the labor required to affect the warranty repair needs to be included in the price?

Will the USCG accept the responsibility for shipping these items to the original manufacturer (if that is their warranty policy), or reimbursing the original manufacturer for travel required to service the item at the USCG station?

6a) The USCG requires a warranty for the entire boat and warranties for various sub-systems. It is in the offerors’ best interest to price the likely cost of these warranties into their proposal.

6b) Yes.

7 Spec 083-5.1 25

A special tool is defined as any tool not found on the current 25 foot RB-S standard tool list that is required to perform all organizational-level maintenance.

Can the USCG provide the current RB-S tool list?

7) Yes, the USCG will provide the current RB-S tool list – please see attached list.

However, this is purely for informational purposes and may not reflect the actual need of the replacement RB-S.

# Section Page No. RFQ Text Question Response

8 Spec 083-9.1 26 The 3-D software model (see Section

085) shall be delivered 120 days after CLIN x001 is exercised.

The Computer Model is included in CLIN x0014 along with the drawings. Since the spec links the delivery of the software model to 120 days after CLIN x0001 is exercised, is the USCG guaranteeing that every builder given a CLIN 10001 (qty=1) award for a test boat will also get a CLIN 10014 award?

Will every builder that is granted a CLIN 10001 (qty=1) award also be granted 10005A (trailer), 10006 (lifting straps), 10008 (delivery), 10015 (Tech pubs), 10018 (packaging), 10019 (warranty)… each with a qty=1?

If the USCG does not plan to issue CLIN 10014/10015 awards to all builders chosen to build a test boat, does the USCG intend for the test boat to be delivered without technical documentation?

8a) No, awarding CLIN 10014 will only be made to the winner of the down select phase of the evaluation.

8b) Every CLIN 10001 award will also include CLINs 10001, 10005A, 10006, 10008, 10015, 10018 and 10019.

8c) Yes, the USCG intends award CLIN 10015 with the “test boat” order.

9 Spec 083-7.1 26

Contractor shall provide spare outboard engine(s). Quantity, rotation, and ship to destination will be determined by the Coast Guard as needed.

Should each outboard engine be delivered with a propeller?

Will the USCG pay separately for shipping of the spare outboards at the time of order, or does the USCG intend for the offerors to include the shipping cost in CLINs x0010A/B?

9a) A spare outboard engine does not need to be delivered with a propeller.

9b) The USCG intends for the offerors to include the shipping cost in CLINs x0010A/B.

10 Spec 083-5.2 26

The list of special tools should include all rigging equipment needed to hoist an RB-S via crane, as well as lift and tow it by forklift.

Can the USCG provide information on the model of forklift intended to lift the RBS and the method intended for the lift?

10) The CG is not specifying a lifting method or required machinery.

# Section Page No. RFQ Text Question Response

11 Spec 084-2.1 27

A disposable shrink wrap cover shall be provided to protect the boat and engines during shipping to the designated delivery location. Cover shall have vents to prevent moisture and vapor buildup.

If the vessels may not be delivered over the road on their own trailer, must the trailers be shrink-wrapped for delivery as well?

11) Since the trailers can be used to deliver the vessels, they do not need to be shrink wrapped but they can be.

12 Spec 100-2.2 41

Plating fairness shall be in accordance with NAVSEA 0900-LP-060-4010, Change 2, dated 17 March 1980, Figures 12-6 and 12-7.

The reference tables are applicable to steel structure. Does the USCG intend for tables 12-8 and 12-9 to apply for aluminum structures instead?

12) The government’s intent is that the figures labeled as applicable to aluminum shall be used.

Note that the same figures are also numbered 28 and 29 in the 1992 revision of

TO300-AU-SPN-010 A.

13 Spec 114-1.5 42

The portion of the hull that comes in contact with the fendering system shall be coated with a high-build epoxy coating system to prevent crevice corrosion.

Would the USCG accept an adhesive backed vinyl tape in lieu of epoxy coating?

Such tapes may provide advantages for corrosion prevention, longevity, and maintenance.

13) The USCG would accept an adhesive backed vinyl tape in lieu of epoxy coating but only if it actually does provide an advantage for corrosion prevention, longevity, and maintenance over an epoxy coating.

14 Spec 114-1.4 42 The fendering shall not gain weight from water absorption in accordance with 33

CFR 183.114.

There is no requirement in 33 CFR

183.114 for a water absorption test. Does a 30 day water test suffice (worst case)?

14) The water absorption test referred to is ASTM D2842, which is required by the cited CFR to be performed after conditioning the material by soaking in various liquids as detailed in the

CFR.

# Section Page No. RFQ Text Question Response

15 Spec 191-1.1 43

Flotation material shall be closed cell resilient foam compliant with all requirements of 33 CFR 183.114 (regardless of where located in the boat) and the flammability requirements of 49 CFR 571.302 (sometimes referred to as FMVSS 302). Foam may be either expanded and consolidated bead type or continuous type.

If the fendering foam doubles as flotation foam and is not "in" the vessel, but attaches on the outside perimeter of the vessel, then are the requirements of 114-

1.4 the only applicable standard?

What is the boundary to which the flammability requirement applies? 49 CFR

571.302 restricts this requirement to occupant compartments. Is it correct to assume that only areas in way of the deckhouse would be subjected to this rule?

15a) Yes, all flotation foam shall meet the requirement in 49 CFR

571.302 regardless of the location on the boat.

15b) The boundary of the flammability requirement is only applicable to the flotation foam that is used to meet the requirement of Section 191 of the Specification.

This may include the fendering foam if it is used to meet the floatation foam requirement as per Section 079-1.1 of the Specification.

15c) No; see answer 15b.

16 Spec 407-1.2 51

All RF transmission lines and cables shall be electrically bonded and shall be routed within the RB-S structure to protect against EMI. Cables that must be routed topside or in exposed locations shall be shielded in accordance with the requirements of NAVSEA S9407-AB-HBK-010, either by use of shielded cables or by use of single or multi-cable conduit, or both.

Will the USCG accept electronics and RF transmission line and cables that are unshielded on the PH roof where personnel do not have routine access, assuming the builder takes responsibility to avoid EMI and RFI problems?

16) No, the requirement stands as written.

# Section Page No. RFQ Text Question Response

17 Spec 512-1.3 59 Calculations for fan sizing shall consider the insulation of the crew space…

Will the USCG accept spray-on thermal insulation for the inside of the cabin?

17) The USCG does not have a specific requirement for insulation inside the cabin. The decision to use or not use spray-on thermal insulation or any other type of insulation is the offeror’s only.

18 Spec 512-1.3 and 512-1.4 59

Contractor shall perform analyses and provide supporting calculations for the boat fan system to ensure that it meets these performance requirements

Can open windows be considered air intake vents for summer ventilation if exhaust fans are provided to force-ventilate the space?

18) No, windows cannot be considered air intake vents for summer ventilation.

19 Spec 631-2.1 66

Aluminum surfaces on the entire exterior of the craft shall be unpainted aluminum, treated in accordance with the Color and Coatings Manual (COMDTINST 10360.3C Change 1) as required in Appendix A for Freeboard and Superstructure, Unpainted Aluminum.

The reference directs the builder to bead-blast the freeboard and superstructure to a satin finish.

Does the USCG require that all external aluminum surfaces be so finished (including below the waterline, handrails, etc)?

19) Yes, the USCG requires that all external aluminum surfaces be finished in accordance with the Color and Coatings Manual

(COMDTINST 10360.3C

Change 1) as required in Appendix A for Freeboard and Superstructure, Unpainted Aluminum.

This includes below the waterline, handrails, etc.

# Section Page No. RFQ Text Question Response

20 Spec. 910 & 920 69-70

910 TRAILER (Road Transport)

920 TRAILER (C-130 Aircraft Transport and Road Transport) Are there two different types of trailers being requested; one for the road and one for the C-130?

20) It is acceptable for an offeror to propose a trailer that meets the requirements of both Section 910 AND 920 of the Specification. If that cannot be done, then two different types of trailers would be needed. Those Sections of the Specification document have been revised to allow for that provision.

21 Spec. 042-5 and 042-6 9-10

042-5 Product Warranties 042-6 Warranty Plan

Is a five year limited warranty acceptable?

Limited meaning that the warranty is not valid if the proper PMS has not been completed.

21) Offerors shall provide product warranty information IAW RB-S Spec. 042-5.

22 Spec 710-1.6 68

The RB-S shall have a seat (shock mitigating not required) in the vicinity of each MG weapon mount to allow a gunner to sit when not actively operating a MG.

The specification calls out for a 5th seat – is this seat for the front gunner?

22) No, the 5th shock mitigating seat in Section 070-3.4.2 is an objective requirement for a crew member. It is not a gunner sear as required in Section 710-1.6., but it may be used as a gunner seat to meet the fifth seat objective.

23 Spec. 163 43 164 Ballistic Panels Should there be ballistic protection for the fwd and aft gunner position?

23) Ballistic protection is only required in the crew enclosure. Gunner positions outside the crew enclosure do not require ballistic protection.

# Section Page No. RFQ Text Question Response

24 Spec. 070-2.1 (Note 1) 13-14

Length (overall): Overall length of the boat on the trailer shall be measured from the forward-most extremity of the trailer or boat to the aft-most extremity including the propulsion unit trimmed down in the stowed position and the fendering system. When measuring overall length, the fendering system shall be fully deployed and ready for operation.

What is the maximum overall length allowed?

Are engines considered to be part of the defined length overall?

24) The maximum overall length of the boat and trailer, while on the trailer is 37’. The length includes the aft most extremity with the engines in the trimmed down, stowed position.

25 710-1.5 88 The arc of fire of all the MG mounts combined shall be unobstructed for a field of fire of 360 degrees.

The specification requires a 360 degree field of fire. Is the vendor to assume there are more than one gun mount?

25) No. The decision to use more than one gun mount to meet the requirement in Spec 710-

1.5 is up to the boat builder.

26 Spec. 083-1.1 21 Logistics Deliverables

The RB-S Specification says the deliverables in the Logistics section (083) shall be provided to the Coast Guard after the first production delivery order.

Please clarify if this is post-Phase II?

28) Yes, this is pos- Phase II.

27 SF-1449, CLIN

10009 3/24

Training at any INCONUS delivery location, Qty: 26 EA

NOTE: OCONUS Deliveries and training to be separately negotiated.

RFP Section B indicates training deliveries (CLIN 10009) will be separately negotiated.

Does this mean training and training materials will not be required until after the first production delivery order (post-Phase

II)?

27a) Clarification: CLIN 10009 states that OCONUS (Outside the Continental U.S.) will be separately negotiated.

27b) No, training and training materials are required upon delivery of vessels selected for the Phase II evaluation.

# Section Page No. RFQ Text Question Response

28 SF-1449, CLIN

10015 4/24 Technical Publications and Manuals, Qty: 1 EA

Will Technical Publications and Manuals (CLIN 10015) not be required until after the first production deliver order (post- Phase II)?

28) Technical Publications and Manuals (CLIN 10015) will be required for each boat ordered.

29 Spec. 070-4 16

Design Maturity – The RB-S shall be a mature, proven design. A parent craft with modifications in material, arrangements, or dimensions could satisfy the requirements of this Specification. The RB-S design in terms of the hull form shall be directly traceable to five or more production boats of the same design, or same family of designs, with at least one of these boats having a minimum of two

(2) years in commercial or Government service.

The boat(s) from which the RB-S’s design is derived shall be considered the parent craft.

Can a company that has corporately restructured present its prior portfolio of crafts?

(It is the same personnel and facilities building the same boats)

29) Yes, but only if the craft meets the parent craft definition in Section 070-4.

# Description QTY Eteching Brand Part # Warranty 1 PROTO RATCHET STD 1/2 1 Tool(s) only PROTO J5449XL Lifetime 2 PROTO RATCHET STD 3/8 1 Tool(s) only PROTO J5249XL Lifetime 3 PROTO RATCHET STD 1/4 1 Tool(s) only PROTO J4749XL Lifetime 4 WR COMB 7MM 6 PT 1 Tool(s) only PROTO J1207MHA Lifetime 5 WR COMB 8MM 6 PT 1 PROTO J1208MHA Lifetime 6 WR COMB 9MM 6 PT 1 PROTO J1209MHA Lifetime 7 WR COMB 10MM 6 PT 1 PROTO J1210MHASD Lifetime 8 WR COMB 11MM 6 PT 1 PROTO J1211MHASD Lifetime 9 WR COMB 12MM 6 PT 1 PROTO J1212MHASD Lifetime

10 WR COMB 13MM 6 PT 1 PROTO J1213MHASD Lifetime 11 WR COMB 14MM 6 PT 1 PROTO J1214MHASD Lifetime 12 WR COMB 15MM 6 PT 1 PROTO J1215MHASD Lifetime 13 WR COMB 16MM 6 PT 1 PROTO J1216MHASD Lifetime 14 WR COMB 17MM 6 PT 1 PROTO J1217MHASD Lifetime 15 WR COMB 18MM 6 PT 1 PROTO J1218MHASD Lifetime 16 WR COMB 19MM 6 PT 1 PROTO J1219MHASD Lifetime 17 SKT 3/8 DR 8MM 6 PT 1 Tool(s) only PROTO J5208MH Lifetime 18 SKT 3/8 DR 9MM 6 PT 1 Tool(s) only PROTO J5209MH Lifetime 19 SKT 3/8 DR 10MM 6 PT 1 Tool(s) only PROTO J5210MH Lifetime 20 SKT 3/8 DR 11MM 6 PT 1 Tool(s) only PROTO J5211MH Lifetime 21 SKT 3/8 DR 12MM 6 PT 1 Tool(s) only PROTO J5212MH Lifetime 22 SKT 3/8 DR 13MM 6 PT 1 Tool(s) only PROTO J5213MH Lifetime 23 SKT 3/8 DR 14MM 6 PT 1 T l( ) l PROTO J5214MH Lif ti

RBS/TANB Kit

HSCG23-09-A-ELT029

23 SKT 3/8 DR 14MM 6 PT 1 Tool(s) only PROTO J5214MH Lifetime 24 SKT 3/8 DR 15MM 6 PT 1 Tool(s) only PROTO J5215MH Lifetime 25 SKT 3/8 DR 16MM 6 PT 1 Tool(s) only PROTO J5216MH Lifetime 26 SKT 3/8 DR 17MM 6 PT 1 Tool(s) only PROTO J5217MH Lifetime 27 SKT 3/8 DR 18MM 6 PT 1 Tool(s) only PROTO J5218MH Lifetime 28 SKT 3/8 DR 19MM 6 PT 1 Tool(s) only PROTO J5219MH Lifetime 29 SKT 3/8 DR 6MM 6 PT 1 Tool(s) only PROTO J5206MH Lifetime 30 SKT 3/8 DR 7MM 6 PT 1 Tool(s) only PROTO J5207MH Lifetime 31 SKT 3/8 DR 20MM 6 PT 1 Tool(s) only PROTO J5220MH Lifetime 32 SKT 3/8 DR 21MM 6 PT 1 Tool(s) only PROTO J5221MH Lifetime 33 SKT 1/2 DR 10MM 12 PT 1 Tool(s) only PROTO J5410M Lifetime 34 SKT 1/2 DR 11MM 12 PT 1 PROTO J5411M Lifetime 35 SKT 1/2 DR 12MM 12 PT 1 PROTO J5412M Lifetime 36 SKT 1/2 DR 13MM 12 PT 1 PROTO J5413M Lifetime 37 SKT 1/2 DR 14MM 12 PT 1 PROTO J5414M Lifetime 38 SKT 1/2 DR 15MM 12 PT 1 PROTO J5415M Lifetime 39 SKT 1/2 DR 16MM 12 PT 1 PROTO J5416M Lifetime 40 SKT 1/2 DR 17MM 12 PT 1 PROTO J5417M Lifetime 41 SKT 1/2 DR 18MM 12 PT 1 PROTO J5418M Lifetime 42 SKT 1/2 DR 19MM 12 PT 1 PROTO J5419M Lifetime 43 SKT 1/2 DR 20MM 12 PT 1 Tool(s) only PROTO J5420M Lifetime 44 SKT 1/2 DR 22MM 12 PT 1 Tool(s) only PROTO J5422M Lifetime 45 SKT 1/4 DR 5MM 6 PT 1 Tool(s) only PROTO J4705M Lifetime 46 SKT 1/4 DR 5.5MM 6 PT 1 Tool(s) only PROTO J47055M Lifetime 47 SKT 1/4 DR 6MM 6 PT 1 Tool(s) only PROTO J4706M Lifetime

RBS/TANB Kit

HSCG23-09-A-ELT029

48 SKT 1/4 DR 7MM 6 PT 1 Tool(s) only PROTO J4707M Lifetime 49 SKT 1/4 DR 8MM 6 PT 1 Tool(s) only PROTO J4708M Lifetime 50 SKT 1/4 DR 9MM 6 PT 1 Tool(s) only PROTO J4709M Lifetime 51 SKT 1/4 DR 10MM 6 PT 1 Tool(s) only PROTO J4710M Lifetime 52 SKT 1/4 DR 11MM 6 PT 1 Tool(s) only PROTO J4711M Lifetime 53 SKT 1/4 DR 12MM 6 PT 1 Tool(s) only PROTO J4712M Lifetime 54 SKT 1/4 DR 13MM 6 PT 1 Tool(s) only PROTO J4713M Lifetime 55 SKT 1/4 DR 14MM 6 PT 1 Tool(s) only PROTO J4714M Lifetime 56 SKT 1/4 DR 15MM 6 PT 1 Tool(s) only PROTO J4715M Lifetime 57 SKT 3/8 DR 6MM 6 PT DEEP 1 Tool(s) only PROTO J5006MH Lifetime 58 SKT 3/8 DR 7MM 6 PT DEEP 1 Tool(s) only PROTO J5007MH Lifetime 59 SKT 3/8 DR 8MM 6 PT DEEP 1 Tool(s) only PROTO J5008MH Lifetime 60 SKT 3/8 DR 9MM 6 PT DEEP 1 Tool(s) only PROTO J5009MH Lifetime 61 SKT 3/8 DR 10MM 6 PT DEEP 1 Tool(s) only PROTO J5010MH Lifetime 62 SKT 3/8 DR 11MM 6 PT DEEP 1 Tool(s) only PROTO J5011MH Lifetime 63 SKT 3/8 DR 12MM 6 PT DEEP 1 Tool(s) only PROTO J5012MH Lifetime 64 SKT 3/8 DR 13MM 6 PT DEEP 1 Tool(s) only PROTO J5013MH Lifetime 65 SKT 3/8 DR 14MM 6 PT DEEP 1 Tool(s) only PROTO J5014MH Lifetime 66 SKT 3/8 DR 15MM 6 PT DEEP 1 Tool(s) only PROTO J5015MH Lifetime 67 SKT 3/8 DR 16MM 6 PT DEEP 1 Tool(s) only PROTO J5016MH Lifetime 68 SKT 3/8 DR 17MM 6 PT DEEP 1 Tool(s) only PROTO J5017MH Lifetime 69 SKT 3/8 DR 18MM 6 PT DEEP 1 Tool(s) only PROTO J5018MH Lifetime 70 SKT 3/8 DR 19MM 6 PT DEEP 1 T l( ) l PROTO J5019MH Lif i70 SKT 3/8 DR 19MM 6 PT DEEP 1 Tool(s) only PROTO J5019MH Lifetime 71 NUT DRIVER 6MM 1 Tool(s) only PROTO J9206M Lifetime 72 NUT DRIVER 7MM 1 Tool(s) only PROTO J9207M Lifetime 73 NUT DRIVER 8MM 1 Tool(s) only PROTO J9208M Lifetime 74 NUT DRIVER 9MM 1 Tool(s) only PROTO J9209M Lifetime 75 NUT DRIVER 10MM 1 Tool(s) only PROTO J9210M Lifetime 76 NUT DRIVER 11MM 1 Tool(s) only PROTO J9211M Lifetime 77 NUT DRIVER 12MM 1 Tool(s) only PROTO J9212M Lifetime 78 SKT 3/8 DR 5/8 SPARK PLUG 1 Tool(s) only PROTO J5020-50 Lifetime 79 SKT 3/8 DR 13/16 SPARK PL 1 Tool(s) only PROTO J5026HPA Lifetime 80 WR COMB 1/4 12 PT 1 Tool(s) only PROTO J1208A Lifetime 81 WR COMB 5/16 ASD FP 12 PT 1 Tool(s) only PROTO J1210-T500 Lifetime 82 WR COMB 3/8 ASD FP 12 PT 1 Tool(s) only PROTO J1212-T500 Lifetime 83 WR COMB 7/16 ASD FP 12 PT 1 Tool(s) only PROTO J1214-T500 Lifetime 84 WR COMB 1/2 ASD FP 12 PT 1 Tool(s) only PROTO J1216-T500 Lifetime 85 WR COMB 9/16 ASD FP 12 PT 1 Tool(s) only PROTO J1218-T500 Lifetime 86 WR COMB 5/8 ASD FP 12 PT 1 Tool(s) only PROTO J1220-T500 Lifetime 87 WR COMB 11/16 ASD FP 12PT 1 Tool(s) only PROTO J1222-T500 Lifetime 88 WR COMB 3/4 ASD FP 12 PT 1 Tool(s) only PROTO J1224-T500 Lifetime 89 WR COMB 13/16 ASD FP 12 P 1 Tool(s) only PROTO J1226-T500 Lifetime 90 WR COMB 7/8 ASD FP 12 PT 1 Tool(s) only PROTO J1228-T500 Lifetime 91 SKT 1/4 DR 5/32 6 PT 1 Tool(s) only PROTO J4705 Lifetime 92 SKT 1/4 DR 3/16 6 PT 1 Tool(s) only PROTO J4706 Lifetime 93 SKT 1/4 DR 7/32 6 PT 1 Tool(s) only PROTO J4707 Lifetime 94 SKT 1/4 DR 1/4 6 PT 1 Tool(s) only PROTO J4708 Lifetime

HSCG23-09-A-ELT029

95 SKT 1/4 DR 9/32 6 PT 1 Tool(s) only PROTO J4709 Lifetime 96 SKT 1/4 DR 5/16 6 PT 1 Tool(s) only PROTO J4710 Lifetime 97 SKT 1/4 DR 11/32 6 PT 1 Tool(s) only PROTO J4711 Lifetime 98 SKT 1/4 DR 3/8 6 PT 1 Tool(s) only PROTO J4712 Lifetime 99 SKT 1/4 DR 7/16 6 PT 1 Tool(s) only PROTO J4714 Lifetime

100 SKT 1/4 DR 1/2 6 PT 1 Tool(s) only PROTO J4716 Lifetime 101 SKT 1/4 DR 9/16 6 PT 1 Tool(s) only PROTO J4718 Lifetime 102 SKT 1/2 DR 9/16 12 PT DEE 1 Tool(s) only PROTO J5318 Lifetime 103 SKT 1/2 DR 5/8 12 PT DEEP 1 Tool(s) only PROTO J5320 Lifetime 104 SKT 1/2 DR 11/16 12 PT DE 1 Tool(s) only PROTO J5322 Lifetime 105 SKT 1/2 DR 3/4 12 PT DEEP 1 Tool(s) only PROTO J5324 Lifetime 106 SKT 1/2 DR 13/16 12 PT DE 1 Tool(s) only PROTO J5326 Lifetime 107 SKT 1/2 DR 7/8 12 PT DEEP 1 Tool(s) only PROTO J5328 Lifetime 108 SKT 1/2 DR 15/16 12 PT DE 1 Tool(s) only PROTO J5330 Lifetime 109 SKT 1/2 DR 1 12 PT DEEP 1 Tool(s) only PROTO J5332 Lifetime 110 SKT 1/4 DR 3/16 6 PT DEEP 1 Tool(s) only PROTO J4706L Lifetime 111 SKT 1/4 DR 7/32 6 PT DEEP 1 Tool(s) only PROTO J4707L Lifetime 112 SKT 1/4 DR 1/4 6 PT DEEP 1 Tool(s) only PROTO J4708L Lifetime 113 SKT 1/4 DR 9/32 6 PT DEEP 1 Tool(s) only PROTO J4709L Lifetime 114 SKT 1/4 DR 5/16 6 PT DEEP 1 Tool(s) only PROTO J4710L Lifetime 115 SKT 1/4 DR 11/32 6 PT DEE 1 Tool(s) only PROTO J4711L Lifetime 116 SKT 1/4 DR 3/8 6 PT DEEP 1 Tool(s) only PROTO J4712L Lifetime 117 SKT 1/4 DR 7/16 6 PT DEEP 1 T l( ) l PROTO J4714L Lif i117 SKT 1/4 DR 7/16 6 PT DEEP 1 Tool(s) only PROTO J4714L Lifetime 118 SKT 1/4 DR 1/2 6 PT DEEP 1 Tool(s) only PROTO J4716L Lifetime 119 SKT 1/4 DR 9/16 6 PT DEEP 1 Tool(s) only PROTO J4718L Lifetime 120 SKT 3/8 DR 5/16 6 PT 1 Tool(s) only PROTO J5210H Lifetime 121 SKT 3/8 DR 11/32 6 PT 1 Tool(s) only PROTO J5211H Lifetime 122 SKT 3/8 DR 3/8 6 PT 1 Tool(s) only PROTO J5212H Lifetime 123 SKT 3/8 DR 7/16 6 PT 1 Tool(s) only PROTO J5214H Lifetime 124 SKT 3/8 DR 1/2 6 PT 1 Tool(s) only PROTO J5216H Lifetime 125 SKT 3/8 DR 9/16 6 PT 1 Tool(s) only PROTO J5218H Lifetime 126 SKT 3/8 DR 5/8 6 PT 1 Tool(s) only PROTO J5220H Lifetime 127 SKT 3/8 DR 11/16 6 PT 1 Tool(s) only PROTO J5222H Lifetime 128 SKT 3/8 DR 3/4 6 PT 1 Tool(s) only PROTO J5224H Lifetime 129 SKT 3/8 DR 13/16 6 PT 1 Tool(s) only PROTO J5226H Lifetime 130 SCREWDRIVER SLOT SQUARE 4 1 Tool(s) only PROTO J9804C Lifetime 131 SCREWDRIVER SLOT SQUARE 6 5/16 1 Tool(s) only PROTO J9806C Lifetime 132 SCREWDRIVER PHILLIPS 2PT #2 1 Tool(s) only PROTO J9684C Lifetime 133 SCREWDRIVER PHILLIPS 2PT #2 1 Tool(s) only PROTO J9685C Lifetime 134 EXTENSION 3/8 DR 6 1 Tool(s) only PROTO J5260-06 Lifetime 135 EXTENSION 3/8 DR 3 1 Tool(s) only PROTO J5260 Lifetime 136 EXTENSION 1/2 DR 5 1 Tool(s) only PROTO J5461 Lifetime 137 EXTENSION 1/2 DR 2-1/2 1 Tool(s) only PROTO J5460 Lifetime 138 EXTENSION 1/4 DR 2 1 Tool(s) only PROTO J4759 Lifetime 139 EXTENSION 1/4 DR 3 1 Tool(s) only PROTO J4760 Lifetime 140 PLIER LOCKING CURVED 5 W/ 1 Tool(s) only PROTO J293WR Lifetime 141 PLIER LOCKING CURVED 7 W/ 1 Tool(s) only PROTO J294WR Lifetime

HSCG23-09-A-ELT029

142 PLIER LOCKING CURVED 10 W 1 Tool(s) only PROTO J292WR Lifetime 143 PLIER DIAGONAL W/GRIP 1 Tool(s) only PROTO J210G Lifetime 144 PLIER DIAGONAL W/GRIP 1 Tool(s) only PROTO J206G Lifetime 145 PLIER NEEDLE NOSE W/GRIP 1 Tool(s) only PROTO J228G Lifetime 146 WR RAT BOX 9MM X 10MM 6 P 1 Tool(s) only PROTO J1192M-A Lifetime 147 WR METRIC RAT BOX 11MM X 1 PROTO J1193MA-A Lifetime 148 WR METRIC RAT BOX 12MM X 1 PROTO J1194MA-A Lifetime 149 WR RAT BOX 15MM X 17MM 12 1 PROTO J1195M-A Lifetime 150 WR RAT BOX 16MM X 18MM 12 1 PROTO J1196M Lifetime 151 WR RAT BOX 3/8 X 7/16 12 1 Tool(s) only PROTO J1192T-A Lifetime 152 WR RAT BOX 1/2 X 9/16 12 1 Tool(s) only PROTO J1193T-A Lifetime 153 WR RAT BOX 5/8 X 11/16 12 1 Tool(s) only PROTO J1194-A Lifetime 154 WR RAT BOX 3/4 X 7/8 12 P 1 Tool(s) only PROTO J1195-A Lifetime

STANLEY® COMPO-CAST® BALL PEIN HAMMER – 24

OZ 1 Tool(s) only STANLEY 54-524 Lifetime

156 HEX KEY 12MM SHORT ARM 5/ 1

Container/bag only PROTO J46324 Lifetime

157 WR ADJUSTABLE 12 1 Tool(s) only PROTO J712 Lifetime

Set, Socket Driver, Metric, Ball Hex, Standard, 1/4"-3/8" Drive, 3 to 10mm (8 pcs) 1 Tool(s) only Snap-On 208EFTABMY Lifetime

159 SKT 1/2 DR 1-1/16 6 PT DE 1 Tool(s) only PROTO J5334H Lifetime To be replaced with a 1/2 DR 27MM socket instead of the 1-1/16th

160 G G 1 T l( ) l Li l 67870 MFR D f t160 Gage Gapper 1 Tool(s) only Lisle 67870 MFR Defect 161 ADAPTER 3/8 F X 1/2 M 1 Tool(s) only PROTO J5253 Lifetime

Wrench, Metric, Box, Standard Length, 60° Deep Offset, 8- 10 mm, 12-Point 1 Tool(s) only Snap-On XOM810 Lifetime

163 WR COMB RCH SPL 14MM 1 Tool(s) only Armstrong 54-814 Lifetime 164 WR COMB RCH SPL 10MM 1 Tool(s) only Armstrong 54-810 Lifetime 165 SKT HEX BIT 3/8 DR 5/16 1 Tool(s) only PROTO J49905/16 Lifetime 166 Torque Head, Metric, Box End, 14 mm, 12 pt. 1 Tool(s) only Williams TCQJXM14A Lifetime

167 Ratchet, Fine Tooth (75 - 80 Tooth), Torque Head, 3/8 Drive 1 Tool(s) only Williams TCQJD12A Lifetime

168 SKT HEX BIT 3/8 DR 6MM 1 Tool(s) only PROTO J4990-6M Lifetime

The RB-S/TANB case: heavy duty plastic case that is water proof when closed and large enough to hold the required tools/ pallets.

1 N/A Stormcase IM2950 Lifetime

Add the following to this box Socket Bit, ¼” drive. 1 Bit, Phillips, #2 1

Q&A Matrix 4 (Tool List)_MOT005.pdf
Sheet1

Other files

File Type Posted
Q A Matrix 6 —
SF 30 —
SF 30 —
Q A Matrix 5 —
SF 30 —
RFP- 7 —
SF 30 —
SF 30 —
Q A Matrix 3 —
Q A Matrix 2 —
SF 1449 —
RFP- 5 —
RFP- 2 —
RFP- 3 —
Q A Matrix 1 —
RFP- 3 —
RFP- 5 —
RFP- 2 —
RFP_MOT005.pdf PDF
RFP- 5 —
RFP- 6 Attch 1 —
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .