HS5 - Ad for Bid Canton HS and Plymouth HS.pdf
PDF 670 KB Posted
- Solicitation number
- RFP PCCS 270000000371 1
- Issued by
- Wayne County, Michigan
About this file
This is an Advertisement for Bids issued by Plymouth Canton Community Schools for Bid Package HS-5, which encompasses remodeling projects at Canton High School and Plymouth High School funded through the district's 2020 Bond program. Sealed bids will be received electronically through Building Connected until 1:00 PM on December 15, 2026, with public opening and reading of bids scheduled for the same date and time via Microsoft Teams. Bidding documents, prepared by TMP Architecture, will be available for public inspection beginning at 12:30 PM on Monday, November 23, 2026, through Building Connected and various plan rooms including the Construction Association of Michigan and Builder's Exchange. A non-mandatory pre-bid meeting is scheduled for Tuesday, December 1, 2026, at 3:00 PM at Plymouth High School Main Entrance (8400 N Beck Road, Canton Township, Michigan 48187), which will include a project site visit opportunity. All bids must include three sworn and notarized affidavits: Familial Disclosure Affidavit, Iran Linked Business Affidavit, and Criminal Background Check Affidavit.
Bid security in the amount of five percent (5%) of the total bid must be submitted with each bid in the form of a bid bond, cashier check, or certified check, payable to the School District. Cashier's checks must be scanned and submitted electronically through Building Connected by the due date and delivered physically to the E.J. McClendon Educational Center (454 South Harvey Street, Plymouth, Michigan 48170) within 48 hours of the due date. The successful bidder must execute the contract, provide required insurance certificates, and file required bonds within ten (10) days after notice of award but prior to work commencing. If awarded, the contractor may be required to furnish a Performance Bond and Labor and Material Payment Bond in the amount of 100% of the contract price. The School District reserves the right to accept or reject any and all bids in whole or in part, waive any informalities or irregularities, or award the contract to other than the low bidder at its sole discretion.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plymouth Canton Community Schools 2020 Bond
SECTION 00 11 13
ADVERTISEMENT FOR BIDS
Sealed Bids for the Plymouth Canton Community Schools, 2020 Bond, Bid Package HS-5 consisting of:
Canton High School Remodeling and Plymouth High School Remodeling
The School District requests Bids for the above-referenced Project. Bids will be received through Building Connected until (1:00) PM on December 15th, 2026
1. All Bids shall be submitted electronically on or before the Due Date through Building Connected: https://app.buildingconnected.com/public/5ae227ade0d395000fd24541 (McCarthy and Smith Plan Room)
2. For instructions on how to submit a Bid please go to the following link:
https://buildingconnected.zendesk.com/hc/en-us/articles/360010222793-How-to-submit-your- Bid-through-BuildingConnected-
Bids submitted after the Due Date will not be opened, considered or accepted by the School District.
Faxed and/or E-mail Bids will not be accepted by the Board of Education.
Sealed Bids will be publicly opened and read aloud and tabulated, beginning at approximately (1:00) PM on December 15th, 2026. Bid opening will be publicly conducted via a Teams meeting. Information regarding joining the Teams meeting for all Bidders interested in participating is as follows:
https://teams.microsoft.com/meet/232002304136801?p=NNMiBE70WpaGseeqeW
This Bid Package will consist of separate sealed Bids for the following Bid Divisions:
Bidding documents prepared by TMP Architecture will be available for public inspection at the main office of the Construction Manager, McCarthy & Smith, Inc., 24317 Indoplex Circle, Farmington Hills, MI 48335; the Construction Association of Michigan Plan Room, Bloomfield Hills; the Builder’s Exchange, Lansing and Washtenaw Contractors Association.
Bidding Documents will be available beginning at 12:30 p.m. on Monday, November 23rd, 2026 via Building Connected.
There will be a Pre-Bid Meeting on Tuesday, December 1st at 3:00 p.m. starting at Plymouth High School Main Entrance located at 8400 N Beck Rd, Canton Township, MI 48187. The purpose of the meeting will be to review the Project Bidding Documents & schedule, to answer any questions Bidders may have. Following the meeting, the Bidders will have the opportunity to visit the Project site. The pre-Bid meeting is not a mandatory meeting; however, Bidders are strongly encouraged to attend.
All Bids must include the following sworn and notarized statements:
- Familial Disclosure Affidavit (Section 004205)
- Iran Linked Business Affidavit (Section 004210)
- Criminal Background Check Affidavit (Section 004220) The Board of Education will not accept a Bid that does not include these sworn and notarized disclosure statements.
Bids shall be submitted electronically into Building Connected. Bid security by a quality surety in the form of a Bid bond, cashier check, or certified check in the amount of five percent (5%) of the Bid shall be submitted with each Bid, payable to School District, as a guarantee that if the Bid is accepted, the School District is secured from loss or damage by reason of the withdrawal of the Bid or the failure of the Bidder to enter into a Contract for performance. All cashier’s checks must be scanned and submitted electronically through Building Connected by the Due Date and be delivered to the E.J. McClendon Educational Center located at 454 South Harvey Street, Plymouth, MI 48170 to the attention of Pam Anstey, within 48 hours of the Due Date. The School District will not consider a Bid that does not include a Bid security. Further, the Bidder will execute the Contract, provide the required insurance certificate(s) and file the required bonds within ten (10) days after notice of award of Contract but prior to Work commencing.
If awarded a Contract, the successful Bidder may be required to furnish a Performance Bond and Labor and Material Payment Bond in the amount of 100% of the Contract price.
The School District reserves the right to accept or reject any and all Bids, either in whole or in part, to waive any informalities and irregularities therein, or to award the Contract to other than the Bidder (s) submitting the best financial Bid (low Bidder), in its sole and absolute discretion.
END OF SECTION
File details come from the government source that posted it. Updated .