HS0021-13-Q-0032_Sol_Amendment_0002.pdf

PDF 31 KB Posted

Attached to
Wiring cabling Federal contract opportunity
Solicitation number
HS0021-13-T-0032
Issued by
Defense Counterintelligence and Security Agency

About this file

This amendment extend closing and answer the questions submitt.

View the file

Other files for this federal contract opportunity

Other files attached to Wiring cabling, newest first.
File Type Posted
HS0021-13-Q-0032_Sol_Amendment_0003.pdf PDF
HS0021-13-Q-0032_Sol_Amendment_0001.pdf PDF
HS0021-13-Q-0032_Sol.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HS00213236

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

The purpose of this amendment is to extend due date for quote and answ er questions submitted.

Quotes dute date has been extend to May 1, 2013 at 2PM.

1. CONTRACT ID CODE PAGE OF PAGES

FAR (48 CFR) 53.243

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Apr-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HS0021-13-T-0032

X 9B. DATED (SEE ITEM 11)

03-Apr-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Apr-2013

CODE

DEFENSE SECURITY SERVICE

RUSSELL-KNOX BUILDING

27130 TELEGRAPH ROAD

CONTRACTING AND ACQUISITION

QUANTICO VA 22134-2253

HS0021 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

Shirley.Green@DSS.milEMAIL:703.617-2693TEL:

SHIRLEY GREEN / CONTRACT SPECIALIST

HS0021-13-T-0032

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 17-Apr-2013 05:00 PM to 01-May-2013 05:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

ANSWER TO QUESIONS PART 2

Questions Part 2

(a). What is your preference for submitting the bid?

Answer: Bids should be submitted via email Shirley.green@dss.mil no later than 2pm closing date.

All quotes received after 2pm will be consider late quotes.

Would you like us to mail it to the contracting office at the address below in Quantico, VA?

Answer: NO

Or do you have a method for us to submit it electronically or can we just email it to you?

Answer: Email

1. The quote mentions that Power Poles may be needed but there's no line item for them.

Answer: Power poles are only needed if the vendor feels they need them in order to maintain the 12” separation requirement. Power poles are suggested as a means to accomplish this task, but if they have a better way, then by all means bid it.

2. The quote also mention that the vendor will have to supply panduit molding and there's no line item for the molding.

Answer: Not sure what they mean by a line item. Our statement of work clearly states that they must provide the Panduit solution on the perimeter walls in order to keep the cabling internal to the suite (not inside the walls).

3. How much additional panduits we would need to be provided for DSS use?

Answer: At least 25 feet of additional Panduit will be required.

4. Could we used any manufacture for the jacks, patch panel, wall mounted cabinet and cable?

Answer: As long as the jacks, patch panel and cabinet will be able to hold shielded cabling, yes.

5. On the labor you ask for 40 hours. Are you calculating that this job will take Two Men 40 hours to complete?

mailto:Shirley.green@dss.mil

Answer: However you want to do it. The calculation of 40 hours is an estimated time. Bid what time you think it will take to accomplish the job.

6. When is the DUE date for this QUOTE? and could we fax it in.

Answer: Due date may change depend on the on-site visit.

7. Is there a specific manufacturer for the material specified?

Answer:

8. CLIN 0005 mentions a 36 port patch panel, however, the scope of work, on p 8, mentions "A twenty-four (24) port cat5e Ethernet patch panel must be installed to the top of the new server cabinet" - should we quote the 24-port? (24 or 48 port is also most commonly available and more cost effective)

Answer: To be safe, I would quote a 48 port.

9. The scope of work mentions POWER POLES may be needed and INSTALLED. Since the pricing if FFP, has a quantity been determined for this task? Also, is this to be included under CLIN 0012 or elsewhere?

Answer: Power poles are only needed if the vendor feels they need them in order to maintain the 12” separation requirement. Power poles are suggested as a means to accomplish this task, but if they have a better way, then by all means bid it.

10. The scope of work mentions the POWER POLES must match the aethetics of the furniture. Does the furniture vendor have a POWER POLE accessory to your specific model that can be purchased? If so, what part number / manufacturer?

Answer: The vendor of the furniture only sells to government furnished vendors. I recommend buying a third party power pole and using that as long as it matches the aesthetics of the furniture.

11. Is there a color preference for faceplates - IVORY or WHITE?

Answer: I recommend red faceplates. This way we can distinguish red drops from the blue and white ones throughout the office.

12. For the perimeter walls, it mentions the Panduit solution must match the color of the suite. What color is that?

Answer: A site visit will be required to answer this.

13. Similar to question 2) - has the length/amount of Connectrac Wire System been determined? Is this to be included under CLIN 0013 or elsewhere?

Answer: About 8 feet.

14. LABOR for CLIN 0014 is most likely more than 40 technician hours for the tasks involved. Do we reflect that by changing the quantity or would you like us to divide our FPP pricing by 40?

Answer: Bid as many hours as you think it will take to accomplish the job.

15. We are not clear if the scope of work is stating that there is existing conduit with pullstring above the ceiling for the cable path?

Answer: There is an existing conduit, but we found out that is no longer needed. In fact, we can have you put the rack and red cable termination in the LAN room rather than the office that was shown in the statement of work.

16. Is the jobsite accessible between 7am-4:30pm Monday through Friday?

Answer: The hours will need to be coordinated with the local office personnel. It will most likely be either 7-3:30, or 8-4:30.

17. Is this an active construction site? Are the walls currently open? Is there a general contractor onsite, and if so will other tasks be taking place simultanteously in the working space?

Answer: No this is not an active construction site. You will have to work around existing walls, which means you will have to be delicate on how you handle the install.

18. Are the cubicles in place? Are DSS personnel working at these desks?

Answer: The cubicles are currently in place, and the DSS personnel are working in these offices.

19. I was wondering if there is a site walk scheduled for this site in the coming days, I don’t see it in the solicitation.

Answer: I am planning for the Parsippany site walkthroughs April 24 from 8-11 am

21. Connectrac has many cabling solutions and varieties of product. Can you be specific on what Connectrac System is required for this bid and applicable quantities and lengths required of the components?

The RFP states that existing conduits will be used, so need guidance on how the Connectrac System will be utilized.

Answer: Connectrac is recommended, but not a final solution. If you feel that this is needed, then bid it. As far as length goes, we can all determine that during the site walk through.

(End of Summary of Changes)