This document provides details for two federal contracting opportunities. The first is a job order for work to be performed at the Hawaii Regional Maintenance Center in Pearl Harbor. The job order specifies standard work items to be completed throughout the ship, including maintenance of hazardous waste handling and carbon dioxide scrubber systems. It provides item numbers, descriptions, references, requirements, notes, and government furnished materials for the work.
The second opportunity is a sources sought notice seeking capability statements from contractors to provide technical assistance, removal, reinstallation, and operational testing for number one and two carbon dioxide scrubbers onboard a Virginia-class submarine. Interested parties are requested to submit organization information and a tailored capability statement by April 18, 2022 addressing their ability to perform the requirements in the attached draft performance work statement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
HAWAII RMC PEARL HARBOR HI
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: HRMC-506-22
INCLUDES ALL CHANGES THROUGH 4/9/2022
(b) (1) (A)
INDEX
SHIP: HRMC-506-22
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-22 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM NO. TITLE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 10/01/2019 Original
009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original
009-03 Toxic and Hazardous Substance; control 10/01/2019 Original
009-04 Quality Management System; provide 10/01/2019 Original
009-06 Maintaining Protection and Cleanliness from Non Radioactive Operations;
accomplish
03/06/2020 Original
009 07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;
accomplish
02/21/2021 CH 1
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 02/21/2021 CH-1
009 10 Asbestos Containing Material (ACM); control 10/01/2019 Original
009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original
009 19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original
009-20 Government Property; control 10/01/2017 Original
009 21 Logistics and Technical Data; provide 10/01/2018 Original
009-23 Interference; remove and install 10/01/2018 Original
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;
accomplish
10/01/2019 Original
009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original
009 39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish
10/01/2018 Original
009-40 Contractor Crane, Multi Purpose Machine and Material Handling Equipment at a Naval Facility; provide
10/01/2019 Original
009 60 Schedule and Associated Reports for CNO Availabilities; provide and manage 02/21/2021 CH 1
009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original
009 67 Integrated Total Ship Testing; manage 04/30/2018 Original
009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original
009 70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
10/01/2019 Original
009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original
009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
10/01/2018 Original
009-74 Occupational, Safety and Health Plan; accomplish 02/21/2021 CH-1
009 80 Ship Facilities; maintain 11/18/2016 Original
009-81 Compartment Closeout; accomplish 10/01/2019 Original
009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original
009-84 Threaded Fastener Requirements; accomplish 03/06/2020 Original
009 93 Emergency Planning and Community Right to Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
03/06/2018 Original
009-99 Ship Departure Report; provide 07/18/2014 Original
009 100 Ship's Stability; maintain 03/06/2018 Original
009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original
ITEM_NO. TITLE CHANGE DATE CHANGE
009 106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original
009-111 Schedule and Associated Reports for non CNO Availabilities; provide and manage
02/21/2021 CH-1
009 117 Combat Systems, Light Off Suport; provide 10/01/2019 Original
009-118 CG Deck Loading; accomplish 07/18/2014 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original
009-122 Temporary Padeye; install and remove 10/01/2018 Original
009 125 Boats Less Than 65 Feet Long; accomplish 07/11/2020 Original
CATEGORY II. FY-22 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.
TITLE CHANGE DATEITEM NO. CHANGE
009-90 Technical Representative; provide 07/24/2019 Original
ITEM NO. TITLE
Hazardous Waste Produced on Naval Vessels; control077-11-001
No. One and No. 2 CO2 Scrubber Maintenance; accomplish515-11-001
SHIP: ITEM NO: 077-11-001
COAR: 26 PCN: EX01-L139
CMP: NONE
PLANNER:
SSP: HRMC-506-22 1 of 5 ITEM NO: 077-11-001
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Resource Conservation and Recovery Act (RCRA)
2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103
2.3 Applicable Hazardous Waste Manifest Form
2.4 10 U.S.C. 7311
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.
3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or
(b) (6)
SHIP:
SSP: HRMC-506-22 2 of 5 ITEM NO: 077-11-001 structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.
3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) _____ ____________ __________
Sodium Hydroxide _____ ____________ __________
Cleaning Solvents _____ ____________ __________
SSP: HRMC-506-22 3 of 5 ITEM NO: 077-11-001
Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)
Fluorocarbons _____ ____________ __________
Morpholine _____ ____________ __________
Sodium Chromates _____ ____________ __________
Hydrazine _____ ____________ __________
Methyl Ethyl Ketone _____ ____________ __________
Spent Abrasive Blast Material _____ ____________ __________
(contaminated with a known hazardous waste)
Trichloroethane _____ ____________ __________
Miscellaneous Chemicals _____ ____________ __________
(Rust Preventative)
Miscellaneous Chemicals _____ ____________ __________
(Corrosive)
Miscellaneous Chemicals _____ ____________ __________
(TCLP Toxic)
Miscellaneous Chemicals _____ ____________ __________
(Reactive)
Oil (Synthetic) _____ ____________ __________
Paints (Enamel, Latex, _____ ____________ __________
Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)
Paints (May include lead, _____ ____________ __________ cadmium, or chrome)
Paint Strippers (phenols, _____ ____________ __________ lead, chromium)
Sludges (Contaminated with _____ ____________ __ a known hazardous waste)
Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)
Lube/Fuel Oil Soaked Rags _____ ____________ __________
Paint/Flakes (Pressure Washing _____ ____________ __________
Ext Hull Surfaces)
Fuel Oil(Residual) _____ ____________ __________
Bilge Water _____ ____________ __________
SSP: HRMC-506-22 4 of 5 ITEM NO: 077-11-001
Oil/Water _____ ____________ __________
AFFF/Water _____ ____________ __________
MEK Contaminated Rags _____ ____________ __________
3.5.1 Provide zero dollars for managing and disposing of all
hazardous waste listed in 3.5. Total cost greater or less than above dollar amount will be the subject of an equitable adjustment.
3.6 Submit one legible copy, in approved transferrable media of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.
3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in
3.5 does not preclude the contractor from taking action consistent with
2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.
Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.
SSP: HRMC-506-22 5 of 5 ITEM NO: 077-11-001
4.2.2 Reference to a Material Safety Data Sheet (MSDS), or
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: ITEM NO: 515-11-001
COAR: 26 PCN: EX01-L138
CMP: NONE
PLANNER:
SSP: HRMC-506-22 1 of 3 ITEM NO: 515-11-001
1. SCOPE:
1.1 Title: No. One and No. 2 CO2 Scrubber Maintenance; accomplish
1.2 Location of Work:
1.2.1 Auxiliary Machine Room (AMR)
1.3 Identification:
1.3.1 Quantity: (One EA) No. One Carbon Dioxide Removal Plant , Mark III-B units; Mfr: Cepeda Associates, Inc.
1.3.2 Quantity: (One EA) No. 2 Carbon Dioxide Removal Plant , Mark III-B units; Mfr: Cepeda Associates, Inc.
2. REFERENCES:
2.1 Standard Items, FY-22
2.2 S9515-AK-MMO-010, Carbon Dioxide Removal Plant, MARK III-B
2.3 SUBMEPP TEST, 51560-5-7228 CO2 Removal System Simulated Operation
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-90 of 2.1.
3.1.1 Provide the services of a qualified on-site representative to inspect, maintain and repair the equipment listed in 1.3, located in 1.2, in accordance with the requirements of 2.2 and Original Equipment Manufacturer's (OEM) proprietary drawings and specifications.
3.2 Accomplish the removal of existing, and installation of each refurbished component associated with the equipment listed in 1.3, in accordance with the requirements of 2.2 and Original Equipment Manufacturer's (OEM) proprietary drawings and specifications.
- Boiler Assembly
- Heater Boxes
3.3 Accomplish the removal of existing, and installation of each new component associated with the equipment listed in 1.3, in accordance with the requirements of 2.2 and Original Equipment Manufacturer's (OEM) proprietary drawings and specifications.
- Install new MEA heat exchangers
- Install new Level Control system
- Install new flex hoses
- Install new ground straps
- Install new master switches
(Q)(G) "OPERATIONAL TEST"
3.4 Accomplish an operational test of the equipment listed in 1.3, located in 1.2 and in accordance with the requirements of 2.2 and 2.3.
SSP: HRMC-506-22 2 of 3 ITEM NO: 515-11-001
3.4.1 Allowable system fluid leaks: None. All system fluid leaks resulting from the requirements of 3.1 through 3.3 shall be corrected by the contractor.
3.4.2 Submit one legible copy, in approved transferrable media, of a report certifying satisfactory work completion of this specification to the SUPERVISOR within 5 days of completion.
3.5 All reports with no time specific submission requirement, shall be submitted to the SUPERVISOR within 30 days of work completion.
4. NOTES:
4.1 Known Source for qualified Technical Representative:
Cepeda Associates, Inc.
11100 Decimal Dr.
Louisville, KY 40299
P.O.C:
Office:
Cell:
Email:
P.O.C:
Office:
Cell:
Email:
4.2 All contracted work shall be accomplished in accordance with the following Security Requirements and the contract’s Department of Defense Contractor Security Classification Specification, see Attachment 2 of the contract. Non-compliance with Attachment 2 will be considered a material violation of the contract.
4.2.1 The Contractor must have and maintain at least an interim DoD Secret Facility Clearance and current Certification of Eligibility from the Defense Logistics Agency (DLA), Joint Certification Office for access to export-controlled CUI, see Attachment 2. The contract does not allow the Contractor to remove classified or Controlled Unclassified Information (CUI) from the Shipyard. The Contractor will also require access to CUI including with developers or integrators.
4.2.2 Visiting contractor personnel will be required to have YELLOW Shipyard Access Control Badges (SACBs). The ship will be controlled as an Open Storage Area and it will be difficult to sanitize the area. Therefore contractor personnel may have access to Secret National Security Information (NSI) and Unclassified Naval Nuclear Propulsion Information (U-NNPI).
4.2.3 The Contractor shall ensure DISS records for visiting
personnel are updated to include at least interim Secret security access granted by their facility in addition to submitting a visit request form (see Attachment 2).
4.2.4 Contractor shall perform in accordance with all applicable Federal, State, County, City, and local statutes and regulations. The contractor is required to protect critical information associated
(b) (1) (A)
(b) (6)
(b) (6)
(b) (6)
(b) (6)
(b) (6)
(b) (6)
SSP: HRMC-506-22 3 of 3 ITEM NO: 515-11-001 with this contract to prevent unauthorized disclosure and shall observe Operations Security (OPSEC) requirements.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
File details come from the government source that posted it. Updated .