HR001119S0040_Attachment_2_Cost_Summary.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Manta Ray
Solicitation number
HR001119S0040
Issued by

About this file

This document contains a cost proposal template and summary for a federal contract opportunity with the Defense Advanced Research Projects Agency. The template provides guidance on submitting costs for labor hours, materials, equipment, travel, and other direct costs across multiple phases. It requests the prime contractor name, proposal title, subcontractor names, type of contract, cost share details if applicable, animal and human use information, individual phase costs and periods of performance with proposed dates, intellectual property assertions by phase, and totals rolled up by project. The related federal contract opportunity seeks innovative proposals to develop a new class of long duration autonomous undersea vehicles called Manta Ray capable of transporting and deploying large payloads over long distances without maintenance or refueling. Key aspects of the program are classified and only proposals addressing the classified work will be eligible for funding. DARPA seeks a rapid demonstration of program objectives.

Not Listed

View the file

Other files

File Type Posted
Q&A_Manta_Ray.docx DOCX document
HR001119S0040.pdf PDF
HR001119S0040_Attachment_1_SCG_Request_Form.pdf PDF
HR001119S0040_Attachment_5_Cost_Breakdown.xlsx XLSX spreadsheet
HR001119S0040_Attachment_3_Proposal_Template_Adm_National_Policy_v2.docx DOCX document
HR001119S0040_Attachment_4_Summary_Slides_v2.PPTX PPTX presentation

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Information

Summary of Key Information
DescriptionPage Number and volume (Technical or Cost Volume)

Provide file name if multiple files are submited as part of your cost volume

Prime Name:
Proposal Title:
Subcontractor Name(s):
Type of Contract Requested (Firm Fixed Price(FFP), Cost Plus Fixed Fee (CPFF), etc.):
Cost Share (Yes or No). Please provide detail if Yes:
Animal Use (Yes or No):
Human Use (Yes or No):
Phase 1 Cost:
Phase 1 Travel Cost:
Phase 1 Other Direct Costs (ODC).

Include Equipment:

Phase 1 Period of Performance (POP) Length (months):

Phase 1 Proposed Dates of POP:
Material/Equipment Cost Phase 1:
Phase 1 IP Assertions:
Phase 2 ROM:
Phase 2 Period of Performance (POP)

Length (months):

Phase 2 IP Assertions:
Phase 3 ROM:
Phase 3 Period of Performance (POP)

Length (months):

Phase 3 IP Assertions:

In addition to a summary description, please include page number and file name to locate where the requested information is described in your proposal.

Example BAA LOE Template

Company name:
DurationIntensityLabor Hours
SOW Task(months)(hrs/mo)SrMidJrTotalSubCConsltTotal
1<Phase 1 Task 1 name>615724068024944- 02001,144Notes
1.1<Subtask 1.1 name>57280280- 0360- 02005601Numbers are illustrative
1.2<Subtask 1.2 name>319516040024584- 0- 05842Numbers in blue are inputs; numbers in black are computed by formulas
2<Phase 1 Task 2 name>63851084001,8002,3081,400- 03,7083Task lines roll-up subtask numbers, so each Total Hours row should only sum the task lines
2.1<Subtask 2.1 name>2984483201,6001,968600- 02,568Adding more tasks will require editing the Total Hours formulas
2.2<Subtask 2.2 name>4856080200340800- 01,1404Pasting into proposal as a picture will produce the best results; please also submit as excel
:::::::::::5Company Name should be the PRIME name, and the Sub and consultant lines should include
Phase 1 Total Hours3481,0801,8243,2521,4002004,852ALL work from Subs and consultants. Subs and Consultants should submit their own summary
Phase 1 Costs Column "I" for prime, Column "J" isTravel$ 44,000$ 12,000$ 2,000$ 58,000
total subcontractor, Column "K" is total consultantMaterials & Equipment$ 8,000$ - 0$ - 0$ 8,000
1<Phase 1 Opt 1 Task 1 name>8100176560648001001001,000
1.1<Subtask 1.1 name>7519624024360100100560
1.2<Subtask 1.2 name>41108032040440- 0- 0440
2<Phase 1 Opt 1 Task 2 name>64171805201,8002,5001,240- 03,740
2.1<Subtask 2.1 name>44351404001,2001,740400- 02,140
2.2<Subtask 2.2 name>419040120600760840- 01,600
:::::::::::
Option 1 Total Hours3561,0801,8643,3001,3401004,740
Phase 1 Opt 1 Costs Column "I" for prime, Column "J" isTravel$ 47,000$ 12,000$ 2,000$ 61,000
total subcontractor, Column "K" is total consultantMaterials & Equipment$ 4,000$ - 0$ - 0$ 4,000
Project Total Hours7042,1603,6886,5522,7403009,592
Project Total CostsTravel$ 91,000$ 24,000$ 4,000$ 119,000
Materials & Equipment$ 12,000$ - 0$ - 0$ 12,000
1<Phase 2 Task 1 name>8100176560648001001001,000May delete these rows if not proposing Phase 2 ROM, or based on the level of detail of the proposed ROM
1.1<Subtask 1.1 name>7519624024360100100560
1.2<Subtask 1.2 name>41108032040440- 0- 0440
2<Phase 2 Task 1 name>64171805201,8002,5001,240- 03,740
2.1<Subtask 2.1 name>44351404001,2001,740400- 02,140
2.2<Subtask 2.2 name>419040120600760840- 01,600
:::::::::::
Phase 2 Total Hours3561,0801,8643,3001,3401004,740
(If needed) Phase 2 Costs Column "I" for prime, Column "J" isTravel$ 47,000$ 12,000$ 2,000$ 61,000
total subcontractor, Column "K" is total consultantMaterials & Equipment$ 4,000$ - 0$ - 0$ 4,000
Project Total Hours1,0603,2405,5529,8524,08040014,332
Project Total CostsTravel$ 138,000$ 36,000$ 6,000$ 180,000
Materials & Equipment$ 16,000$ - 0$ - 0$ 16,000
1<Phase 3 Task 1 name>8100176560648001001001,000May delete these rows if not proposing Phase 3 ROM, or based on the level of detail of the proposed ROM
1.1<Subtask 1.1 name>7519624024360100100560
1.2<Subtask 1.2 name>41108032040440- 0- 0440
2<Phase 3 Task 1 name>64171805201,8002,5001,240- 03,740
2.1<Subtask 2.1 name>44351404001,2001,740400- 02,140
2.2<Subtask 2.2 name>419040120600760840- 01,600
:::::::::::
Phase 3 Total Hours3561,0801,8643,3001,3401004,740
(If needed) Phase 3 Costs Column "I" for prime, Column "J" isTravel$ 47,000$ 12,000$ 2,000$ 61,000
total subcontractor, Column "K" is total consultantMaterials & Equipment$ 4,000$ - 0$ - 0$ 4,000
Project Total Hours1,4164,3207,41613,1525,42050018,572
Project Total CostsTravel$ 185,000$ 48,000$ 8,000$ 241,000
Materials & Equipment$ 20,000$ - 0$ - 0$ 20,000

Example Material Table

Company name:
BOM numberPhase numberPart NumberPart DescriptionManufacturerQuantity requiredUnit PriceTotal Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total Material$0.00

Example Travel Table

Company name:
Trip NumberPhase NumberDestinationPurpose of Trip#people#nightsTotal Cost

Total Travel $0.00