HR001119S0023_Att_2_Proposal_Summary_Chart_Template.pptx
PPTX presentation 354 KB Posted
- Attached to
- Digital RF Battlespace Emulator (DRBE) Federal contract opportunity
- Solicitation number
- HR001119S0023
About this file
This document contains a template slide for proposals in response to a Broad Agency Announcement (BAA) soliciting the creation of a Digital RF Battlespace Emulator (DRBE) system.
The DRBE program seeks to develop a new type of high performance computer called a "Real-time HPC" that can balance computational throughput with extremely low latency. This would enable the first large-scale virtual radiofrequency test range, allowing numerous real RF systems to interact in a fully closed loop RF environment. The template provides guidance for submitting a one-slide summary of proposals, including the proposing organization, proposed budget and cost breakout for four phases, technical approach identifying existing and new components, and claims of innovation. Proposals should quantify performance against metrics in the BAA and identify key system components, proposed semiconductor fabrication process, and accelerator architecture.
Not Listed
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HR001119S0023_Att_3_Task_Staffing_Summary_Template.xlsx | XLSX spreadsheet | |
| HR001119S0023.pdf | ||
| HR001119S0023_Att1_Proposer_Checklist.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Distribution Statement Follow the general guidance in each of the following quadrants.
Provide a concise and informative summary of your proposal.
Unclassified information only.
Maximum of one slide.
Include images and figures where appropriate.
Please submit in MS PowerPoint (preferred) or equivalent file format.
Guidance for Digital RF Battlespace Emulator (DRBE) proposal summary slide
SOURCE SELECTION SENSITIVE – SEE FAR 2.101 AND 3.104
Proposing organization (prime only, do not list subs here) Proposed budget total over all four phases Technical Area [1 or 2] Above, indicate whether you are proposing to TA1 or TA2 Insert a table quantifying your proposed performance against each of the BAA metrics (see TA1 and TA2 requirements tables in the BAA) Cost breakout and team organization Insert a table showing the proposed cost breakout, for each of four program phases (table rows), for the prime contractor and each sub-contractor (table columns) Identify the key roles for the prime and each sub-contractor
Technical Approach
TA1
Identify key system components for which you propose to adapt existing solutions. Identify the existing source.
Identify the key system components requiring new development and your proposed approach
TA2
Identify the proposed semiconductor fabrication process and post-fabrication integration process (if any) Illustrate the accelerator architecture and identify technologies for compute, memory, and data transport Technical Rationale and Innovative Claims Identify key innovations in your proposed solution Identify major advantages of your approach over alternatives image2.png image4.png
File details come from the government source that posted it. Updated .