HR001118S0035_Attachment_C_-_Proposal_Summary_Slide_Template.PPTX
PPTX presentation 439 KB Posted
- Attached to
- SIGMA+ Sensors Federal contract opportunity
- Solicitation number
- HR001118S0035
About this file
Not Listed
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix_B.pdf | ||
| HR001118S0035-Amendment-01.pdf | ||
| HR001118S0035_Attachment_B_-_Abstract_Template.docx | DOCX document | |
| HR001118S0035_Attachment_H_-_Proposal_Template_Vol._3-Admin_&_Natl_Policy_Requmts.docx | DOCX document | |
| HR001118S0035_Attachment_G_-_Cost_Summary_Spreadsheet.xlsx | XLSX spreadsheet | |
| HR001118S0035_Attachment_I_-_Teaming_Profile_Template.docx | DOCX document | |
| HR001118S0035_Attachment_E_-_Milestones_and_Deliverables_Table.docx | DOCX document | |
| HR001118S0035_Attachment_F_-_Proposal_Template_Vol_2_-_Cost.docx | DOCX document | |
| HR001118S0035.pdf | ||
| HR001118S0035_Attachment_A_-_Abstract_Summary_Slide_Template.pptx | PPTX presentation |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Provide graphic.
Describe need and problem being addressed.
Describe goal.
Describe new ideas.
Describe existing approaches/state of the art.
HR001118S0035 SIGMA+ Sensors BAA Proposal Summary Slide Template Source Selection Information – see FAR 2.101 & 3.104 Technical Area X: Title Organization Name(s); Technical POC Name(s)
CONCEPT
IMPACT
CONTEXT
APPROACH
Organization Name – Hardware Concept Describe How It Works/Innovative Claims Source Selection Information – see FAR 2.101 & 3.104
Organization Name – Software and Algorithms Concept Describe How It Works/Innovative Claims
Organization Name – Algorithms
| Name | Functional Description | Processing Platform | Input | Output | Expected Data Rates | IP/Data Restrictions | |
| LocalID | Isotope detection and identification | Android smartphone | Spectra, gps, time and date, temperature, battery life | isotope id, metrics, source location, errors | 1 kB/s | ||
| (Bluetooth) | unlimited rights | ||||||
| NetworkID | Enhanced isotope detection and identification | Cloud or local server | Spectra, gps, time and date, temperature, battery life | isotope id, metrics, source location, errors | 1 kB/s (Cellular) | unlimited rights | |
| Localization | Determine source location and generate object track | Cloud or local server | Groups of spectra, isotope ids | object track, metric | 20 kB/s (Backbone) | unlimited rights | |
| SensorFirmware | State information including, error handling, warnings, connection data, spectral | Sensor microprocessor | Settings from network (eg bias, calibration data, gain) | Spectra, temperature, health state, status, battery life | NA | unlimited rights | |
| VisualAnalytic | Fuses sensor and visual information to identify and track materials of interest | Embedded computer and cloud server | sensor and image data | object track, frames | Variable, data requested from external systems | unlimited rights |
**Example text, please include all anticipated algorithms
Organization Name – Schedule Tasks/Deliverables/Milestones/Time-Table (e.g. Gantt Chart)
Organization Name – Cost Summary
| Phase 1 | Phase 2 (ROM) | |
| Phase Length(Months) | ||
| Direct Labor ($) | ||
| # of FTEs/year* (Researcher) | ||
| # of FTEs/year* (Technician) | ||
| # of FTEs/year* (Business) | ||
| Indirect Costs/Overhead (as a percentage of direct labor) | ||
| Materials and Equipment ($) | ||
| Travel ($) | ||
| Total Proposal Cost ($) |
*Please include the total number of FTEs/year working on the project including subcontractors.
Organization Name – Cost Breakout (By Task)
| Phase 1 | Phase 2 (ROM) | |
| Labor + Indirect + Overhead (Task 1) | ||
| Labor + Indirect + Overhead (Task 2) | ||
| Labor + Indirect + Overhead (Task 3) | ||
| … |
*Please include the total number of FTEs/year working on the project including subcontractors.
Component Refinement Summary (All Proposals)
| Component Summary Matrix Table | ||||||
| Component Name | Metric(s) | Current Metric Value | End of Phase 2 Metric Value(s) | Measurement Method(s) | Highest Risk | Mitigation |
| Name* |
image2.png image4.png
File details come from the government source that posted it.