SOW 20-0B4 MK1 ESD-Redacted 19Feb20.doc
DOC document 41 KB Posted
- Attached to
- MK1 ESD Upgrade
- Solicitation number
- HQ072720R0001
- Issued by
-
Defense Microelectronics Activity
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J&A 20-0B4 Redacted_19Feb20.pdf | ||
| Combined Synopsis and Solicitation 20-0B4 Revised 18Feb20.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
DMEA 20-0B4
Contract Officer Representative:
1.0 SCOPE:
1.1 TITLE: MK1Electrostatic Discharge (ESD) Upgrade for DMEA
1.2 APPLICABILITY: DMEA Thermo KeyTek, MK.1 ZapMaster HBM/MM
1.3 BACKGROUND: DMEA owns a Thermo KeyTek, MK1 ZapMaster Human Body Model/Machine Model (HBM/MM) test system used to test and characterize the Electrostatic Discharge (ESD) sensitivity of devices manufactured by DMEA’s foundry, as well as the commercial Trusted Flow Foundry. The system requires critical upgrades to meet current requirements.
1.4 PURPOSE: Upgrade and calibrate the MK1 Zap Master HBM.
2.0 REFERENCED GOVERNMENT PROVIDED RESOURCES: None
2.1 GOVERNMENT FURNISHED FACILITIES/ACCESS:
| Facility/Access |
| Date |
DMEA Facility, 4234 54th St., McClellan, CA 95652-2100
DMEA Building 620 Room 134 As scheduled under the contract
3.0 REQUIREMENTS:
3. 1 GENERAL REQUIREMENTS:
3.1.1 RESERVED
3.2 PROGRAM MANAGEMENT: None
3.3 TASK REQUIREMENTS: The contractor shall provide the services noted below for the MK.1 Zap-Master HBM/MM, Serial Number: 0912347, manufactured by Thermo KeyTek, LCC.
3.3.1 HARDWARE: The contractor shall install new hardware to allow use of the most current SCMITAR software. The new hardware consists of Central Processing Unit (CPU) board, CPU fan board, a card cage, and Ethernet card. The contractor shall update the currently installed current/voltage (V/I) and interface boards.
3.3.2 SOFTWARE: The contractor shall provide an updated SCIMITAR license. The license shall include one year unlimited performance and bug fix upgrades.
3.3.3 INSTALLATION: The contractor shall install the hardware described in 3.3.1 onsite at DMEA.
3.3.4 LOCATION: The contractor shall travel and deliver the service/materials to DMEA at the location listed in paragraph 2.1.
3.3.5 CALIBRATION: The contractor shall calibrate the MK.1 to Original Equipment Manufacturer (OEM) standards and recommendations after installing upgraded hardware.
3.3.6 SECURITY: The contractor shall provide advance notification prior to conducting any onsite calibration service. A forty-eight (48) hour minimum notice during normal business hours shall be given. All contractor work at DMEA shall be performed by US citizens. After hours and/or weekend work may be required for excepted personnel. Prior to being allowed entry, contractor personnel shall provide proof of citizenship in accordance with the DMEA visitor approval process in effect at the time the visit is requested. During periods of exceptionally heightened security, additional advance notice background investigations of contractor personnel may be required prior to gaining entry into DMEA.
4.0 POINTS OF CONTACT:
File details come from the government source that posted it. Updated .