HQ0147-18-R-0004 Section L-09 ITMA Historical Information
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HQ147-18-R-0004
Attachment L-09 ITMA Historical Information
TECHNICAL, ENGINEERING, ADVISORY and
MANAGEMENT SUPPORT (TEAMS)
Historical Information for Information Technology Management and Analysis (ITMA)
TEAMS ITMA Historical Information—Attachment L-09
This document is provided as historical information, and may be used as an additional data point for industry's insight into the distribution of work among internal MDA stakeholders.
CURRENT STAFFING BY STAKEHOLDER (CLIN):
* Stakeholders are funding sources. Monthly Full Time Equivalent (FTE) per STK is the FTE executed per that individual funding line.
STAFFING BY LOCATION:
SECURITY CLASSIFICATION/CLEARANCE:
#1 #2 #3 #4 #5 #6
AEGIS Ashore AA 1 1
AEGIS BMD AB 1 1
Global Deployment GD 2 2 Ground-based Midcourse Defense (GMD) GM 1 1 Chief Information Officer (CIO) ICT 4 9 8 6 6 3 36 MDA Integration and Operations Center
(MDIOC) ICM 1 1
Current Total 4 11 12 6 6 42 Planned additional 2018 growth (for proposal purposes assume planned growth is within the IC CLIN)
1 1 2
2 Letter Designation
Current Monthly Full Time Equivalent (FTE)
Information Technology Management and Analysis (ITMA) Staffing by Stakeholder*
Total Stakeholder (STK)
Performance Objective
AA AB GD GM ICT ICM
Dahlgren, VA (DHL) 1 1 Fort Belvoir, VA (HQ) 1 1 Redstone Arsenal, AL (HSV) 2 1 16 19 Schriever AFB, CO (COS) 1 19 1 21
TOTALS 1 1 2 1 36 1 42
STAKEHOLDER ORGANIZATION FTE BY LOCATION
Information Technology Management and Analysis (ITMA) Government Onsite Accommodations by Location by Stakeholder*
LOCATIONS TOTALS
METRICS & PRODUCTS:
The tables on the following pages list the general metrics associated with and the product deliverables identified in the TEAMS ITMA Performance Work Statement (PWS). Each product deliverable has an associated nominal annual quantity (i.e. 3 / year). This attachment is for offeror proposal and Government evaluation purposes only and will not be incorporated into any contract resulting from this RFP.
Contract Labor Category Location
Security
Clearance STK #1 #2 #3 #4 #5 #6 Total
Contract Program ManagerHSV or COS Top Secret
Technician (Advanced) HSV or COS Secret ICT 1 1
Technician (Intermediate) HSV Secret ICT 3 3
Engineer (Advanced) COS TS/SCI ICT 1 1 2
Engineer (Intermediate) COS TS/SCI ICT 1 1 2
Specialist (Advanced) COS TS/SCI ICT 1 1 2
Specialist (Advanced) COS Secret ICT 2 1 3
Specialist (Advanced) HSV Secret ICT 1 1
Specialist (Intermediate) DHL Secret AB 1 1
Specialist (Intermediate) HQ Secret ICT 1 1
Specialist (Intermediate) HSV Secret ICT 3 1 2 2 8
Specialist (Intermediate) COS Secret ICT 1 2 1 1 5
Specialist (Intermediate) COS TS/SCI ICT 1 1 2
Specialist (Intermediate) COS Secret ICM 1 1
Specialist (Intermediate) HSV Secret GM 1 1
Specialist (Intermediate) HSV or COS Secret AA 1 1
Specialist (Intermediate) HSV or COS Secret GD 2 2
Analyst (Advanced) COS Secret ICT 2 2
Analyst (Intermediate) COS Secret ICT 3 3
Analyst (Basic) HSV Secret ICT 1 1
Totals 4 11 12 6 6 3 42
FY18 Additional Staff
Engineer (Intermediate) COS TS/SCI ICT 1 1 2
Staffing by Labor Category, Location, Clearance, Stakeholder, and Performance Objective
Performance Objective FTE
The contractor is to propose their method for staffing the Contractor Program Manager.
A location identified as 'HSV or COS' means it is the contractor's choice at either HSV or COS location.
Metric Quantity
Within the MDA IT and Major Application Systems Portfolio in DITPR, the number of systems tracked are over 140 Within the DITPR database, the number of host devices tracked are over 17,000 Within the DITPR database, the number of user accounts (regular and privileged) are over 23,400
Overall MDA Metrics for all Performance Objectives
Metrics Nominal Annual
Quantity
CLIN STK %
To ensure understanding of current environment, at least one A&E member is to actively participate in the MDA chartered CIO Portfolio Management and Integration Board (PMIB) defined process meetings: the Project Steering Committee (PSC) and Engineering and Architecture Board (EAB) reviews of the design and implementation.
Products Nominal Annual
Quantity
CLIN STK %
Annual Plans with supporting procedures 10 CIO CLIN 100%
Portal Sites – UMKO, CMKO, and JWICS – 3 per month– assume one Secret, one is Unclassified, and one TS/SCI
36 CIO CLIN 100%
Analysis and Recommendations: Network Management, IT systems and Data, Cybersecurity, and Strategic Architectural Weaknesses -- assume Secret with TS/SCI annex
4 CIO CLIN 100%
Enterprise Strategic Architecture Plan -- assume Secret with TS/SCI annex 1 CIO CLIN 100%
Enterprise Roadmap -- assume Secret 1 CIO CLIN 100%
Enterprise Roadmap Execution Tracking 12 CIO CLIN 100%
Metrics - assume monthly, metrics are unclassified. 12 CIO CLIN 100%
Schedule – assume monthly schedule is unclassified 12 CIO CLIN 100%
PWS paragraph 3.1 Performance Objective #1: Architecture & Engineering (A&E) Team Support
PWS paragraph 3.1 Performance Objective #1: Architecture & Engineering (A&E) Team Support
Annual
Quantity
CLIN STK %
Regional IT Service - Support the following regional IT service locations:
Headquarters, Huntsville, Colorado Springs, and Dahlgren
Executive Services -- Within the MDA CIO's organization, the annual number of E-Tasker responded to (to include tasking external to MDA) is over
Executive Services -- Orchestrate CIO Staff Meeting (every other week) 26
Executive Services -- CIO Technical and Financial communications over 10
CIO Office Governance and Management Services -- Technical Project board reviews over
CIO Office Governance and Management Services -- Governance Workflows over
CIO Office Governance and Management Services -- Service Level Agreements with other MDA 2LTRs
CIO Office Governance and Management Services -- Planning and PPBE reviews
MDA National, Multinational, and other Conferences Orchestration 3
PWS paragraph 3.2 Performance Objective #2: Executive, Regional, and IT Policy Services
Products
Annual
Quantity
CLIN STK %
Standard Operation Procedures (SOP) 10 CIO CLIN 100%
Portal Site – UMKO and CMKO – 2 per month– assume one Unclassified and one Secret
24 CIO CLIN 100%
CIO Technical and Financial communications -- communications may be a briefing, whiteboard, and/or whitepaper format for communicating with other executives, assume 5 interactions
50 CIO CLIN 100%
CIO Weekly Activity Report -- Establish the consolidated CIO weekly activity report, assume 2 iterations
104 CIO CLIN 100%
CIO Office Governance Workflows -- Maintain the workflows through biannual reviews and updates, assume 2 iterations per update cycle
20 CIO CLIN 100%
Service Level Agreements -- Establish and maintain annual Service Level Agreements between 2LTRS, assume 4 iteration per 2LTR with the last 2 iterations being reviewed at the Executive Level (by the 2LTR)
100 CIO CLIN 100%
MDA National, Multinational, and other Conferences Orchestration status briefings -- assume 4 briefings per conference
12 CIO CLIN 100%
Metrics - assume monthly, metrics are unclassified. 12 CIO CLIN 100%
Schedule – assume monthly schedule is unclassified 12 CIO CLIN 100%
PWS paragraph 3.2 Performance Objective #2: Executive, Regional, and IT Policy Services
Annual
Quantity
CLIN STK %
Special Access Program Central Office (SAPCO) Support -- oversees more than _____ configurations
Networks and Systems Projects -- oversees more than ____ total projects per year
Facility Outfitting/Retrofitting -- oversees no more than _____ projects occurring concurrently
CONUS Trips travel proposal assumptions –
• assume a trip is one individual traveling 4 nights per CONUS TDY to Vandenberg, CA
CONUS Trips per STK: AB 2 100% STK CLIN CONUS Trips per STK: GD 5 100% STK CLIN CONUS Trips per STK: GM 2 100% STK CLIN CONUS Trips per STK: IC 5 100% STK CLIN
OCONUS Trip travel proposal assumptions –
• assume a trip is one individual traveling 17 nights per OCONUS TDY to Gdansk, Poland
OCONUS Trips per STK: AB 8 100% STK CLIN OCONUS Trips per STK: GD 4 100% STK CLIN OCONUS Trips per STK: GM 0 100% STK CLIN OCONUS Trips per STK: IC 0 100% STK CLIN
Telecommunications Control -- Oversees and monitors over ___ circuits 50
PWS paragraph 3.3 Performance Objective #3: IT Network & Systems Services
Annual
Quantity
CLIN STK %
Standard Operation Procedures (SOP) 20 CIO CLIN 100%
Portal Site – UMKO, CMKO, SAP and JWICS – 4 per month– assume one Unclassified, one Secret, one SAP, and one JWICS
48 CIO CLIN 100%
Circuit Analysis Reports 15 CIO CLIN 100%
Acquisition Procurement Initiation Documents - assume:
Facilities Outfitting and Retrofitting - 6
SAPCO - 4
Networks and Systems - 15
25 100% STK CLIN
Monthly service / status / metrics – assume data covers all classification levels 48 CIO CLIN 100%
Trip Reports – assume Reports are SECRET 26 100% STK CLIN
Schedule – assume monthly schedules are SECRET 24 CIO CLIN 100%
PWS paragraph 3.3 Performance Objective #3: IT Network & Systems Services
Annual
Quantity
CLIN STK %
Data Services: Privacy Impact Assessments (PIA) and/or Systems of Records Notices (SORNs) processing
Data Services: Records Management file plan processing 150
Data Services: Physical Records Inventory box processing 180
Data Services: MDA Archives subject research processing 25
Data Services: Publications and Subscriptions processing 80
Business Automation: Unique Enterprise applications 35
Business Automation: Enterprise application instances, over 65
Business Automation: External applications, about 30
Business Automation: Applications in pipeline (projects), about 10
Business Automation: Overall unclassified enterprise application instance unique use in one month - 18,209 (not inclusive of all applications)
218,508
Business Automation: Overall unclassified enterprise application instance pages viewed in one month - 8,199,058 (not inclusive of all applications)
98,388,696
Business Automation: Overall classified enterprise application instance unique use in one month - 7,069 (not inclusive of all applications)
84,828
Business Automation: Overall classified enterprise application instance pages viewed in one month - 11,924,228 (not inclusive of all applications)
143,090,736
PWS paragraph 3.4 Performance Objective #4: Information Management Services
Annual
Quantity
CLIN STK %
Portal Services: Dashboards (Executive and 2LTR), over 70
Portal Services: Virtual servers, over 140
Portal Services: MDA Public website usage, unique users in one month - 28,230
338,760
Portal Services: MDA Public website usage, pages viewed in one month - 727,925
8,735,100
Products Nominal Annual
Quantity
CLIN STK %
Standard Operation Procedures (SOP) 30 CIO CLIN 100%
Portal Sites – UMKO and CMKO – 2 per month– assume one is Secret and one is Unclassified
24 CIO CLIN 100%
Monthly Service / Status / Metric Reports - Data Services has 5, Business Automation and Portal Services each have 1
84 CIO CLIN 100%
Acquisition PID packages - assume equal Business Automation and Portal Services each have 10
20 CIO CLIN 100%
Training package updates - assume each training package is updated annually 3 CIO CLIN 100%
Schedule – assume Monthly schedule is SECRET 36 CIO CLIN 100%
Record Boxes Stored 550
Facility Capacity 1,000 boxes of records
New Boxes Received 42 new boxes received via 21 transfer requests
Boxes Destroyed 21 boxes destroyed
Weight of Records Destroyed 7,000 pounds
Pages Scanned (digitized) over 20,000
Unclassified Electronic Records 1,000,000
Classified Electronic Records 55,000
Licenses/Accounts over 4,000
Effort to perform account maintenance, user training, and archival of electronic records
0.5 FTE
PWS paragraph 3.4.3.c(3)(f): Records Center Metrics
Approximate values for FY 2016
Annual
Quantity
CLIN STK %
MDA Enterprise Data Centers -- Trotti Data Center at Redstone Arsenal, and MDIOC Data Center at Schriever AFB
MDA Data Centers contain over ____ racks of equipment with less than 20% of the rack shelves unused
Within the total MDA organization, the average number of new Service Request Ticket count is over 2,000 tickets/week
104,000
Within the total MDA organization, the average number of new Service Restoration Ticket count is over 500 tickets/week
26,000
Within the MDA organization, the average number of days to close a service ticket is about
6.24 days
Change Management -- MDA other 2LTR non-Enterprise executes over 35 changes per month
Change Management -- MDA Enterprise executes over 400 changes per month 4,800
DPAS Tracked Inventory -- over ___ IT assets 101,400
Incoming Assets added monthly is over 1,275 15,300
OCONUS Trip travel proposal assumptions –
• assume a trip is one individual traveling 8 nights per OCONUS TDY to Kauai, HI
OCONUS Trips per STK: IC 2 CIO CLIN 100%
PWS paragraph 3.5 Performance Objective #5: Enterprise Operations & Engineering Services
Annual
Quantity
CLIN STK %
Standard Operation Procedures (SOP) 15 CIO CLIN 100%
Portal Sites – UMKO and CMKO – 2 per month– assume one is Secret and one is Unclassified
24 CIO CLIN 100%
Monthly Service / Status / Metric Reports - assume one for service line operations and one for engineering
28 CIO CLIN 100%
Acquisition PID packages 40 CIO CLIN 100%
Schedule – assume monthly schedules are SECRET 36 CIO CLIN 100%
PWS paragraph 3.5 Performance Objective #5: Enterprise Operations & Engineering Services
Annual
Quantity
CLIN STK %
Wired telephonic devices, over 12,400
Wireless telephonic devices (phones, blackberries, etc.), over 2,500
Wireless telephonic devices Service Restoration Tickets, over 240 tickets per month
2,880
Video Teleconferencing (VTC) configurations, over 675
-- Conference Rooms / War Rooms VTC configurations, over 400
-- Office VTC configurations, over 250
VTC Session - assume 5,452 monthly average 65,424
-- VTC Bridged Calls - assume 3,665 monthly average 43,980
-- VTC Point-to-Point Sessions - assume 1,653 monthly average 19,836
VTC Availability % 99.9999
Cables managed, over 125,088
Cable length (in miles) managed, over 1,845
PWS paragraph 3.6 Performance Objective #6: Unified Communications Services
Annual
Quantity
CLIN STK %
Standard Operation Procedures (SOP) - note the DRSN SOP will be classified 10 CIO CLIN 100%
Portal Sites – UMKO and CMKO – 2 per month– assume one is Secret and one is Unclassified
24 CIO CLIN 100%
Monthly Service / Status / Metric Reports - assume one for service line operations and one for engineering
28 CIO CLIN 100%
Acquisition PID packages 20 CIO CLIN 100%
Schedule – assume monthly schedules are SECRET 24 CIO CLIN 100%
PWS paragraph 3.6 Performance Objective #6: Unified Communications Services