Cost Roll-Up
| PRIME CONTRACTOR COST ROLL-UP | ||||||||||
| Contractor: | Insert contractor name | |||||||||
| HQ0147-18-R-0004 - Final Information Technical Management & Analysis | ||||||||||
| Stakeholder | CLIN | Description | CFY 1 | CFY 2 | CFY 3 | CFY 4 | CFY 5 | Total | Crosscheck | Unreconciled |
| ALL | All CLINs | Labor Hours | 800 | 1,600 | 800 | 800 | 800 | 4,800 | 4,800 | - 0 |
| Labor | $7,297 | $15,763 | $8,550 | $6,827 | $5,664 | $44,100 | $44,100 | $0 | ||
| IWTA | $5,055 | $11,301 | $6,327 | $6,706 | $8,573 | $37,962 | $44,384 | $0 | ||
| Subcontracts | $0 | $0 | $0 | $2,336 | $4,085 | $6,421 | ||||
| Subcontractor Fee | $0 | $0 | $0 | $70 | $145 | $215 | $215 | $0 | ||
| Procurement Overhead | $0 | $0 | $0 | $120 | $211 | $332 | $332 | $0 | ||
| G&A | $506 | $1,130 | $633 | $923 | $1,301 | $4,493 | $4,493 | $0 | ||
| Total Labor Cost | $12,858 | $28,194 | $15,510 | $16,982 | $19,980 | $93,523 | $93,523 | $0 | ||
| Fixed Fee | $643 | $1,410 | $775 | $846 | $992 | $4,665 | $4,665 | $0 | ||
| Total CPFF | $13,501 | $29,604 | $16,285 | $17,827 | $20,972 | $98,189 | $98,189 | $0 |
| 0101, 1101, 2101 | AB Travel | $1,269,000 | Surge break-out | |
| 0102, 1102, 2102 | GD Travel | $697,000 | Cost | $2,625,714 |
| 0103, 1103, 2103 | ICT Travel | $375,000 | Fee % | 5% |
| 0104, 1104, 2104 | GM Travel | $56,000 | Fixed Fee | $131,286 |
| Total Travel | $2,397,000 | Total CPFF | $2,757,000 | |
| 0005, 1005, 2005 | Total ITC ODC | $6,000 | ||
| 0004 | Total Surge | $2,757,000 | ||
| 0205, 1205, 2205 | Total FMS Labor Option | $2,757,000 | ||
| SUBTOTAL ALL CLINS | $8,015,189 | |||
| 3001 | Cost for Option to extend services (see FAR Clause 52.217-8) | $9,990 | ||
| 3001 | Fee for Option to extend services (see FAR Clause 52.217-8) | $496 | ||
| TOTAL ALL CLINS | $8,025,675 |
Error Check Good Good Good Good Good Good
| This tab rolls up the labor hours, labor cost, IWTA cost, subcontract cost, and subcontract fee by CLIN. | ||||||
| RFP-specified amounts are used for Travel, ODCs, and Surge. | ||||||
| Procurement, overhead, G&A and Fee rates are carried forward (linked) from the Rates tab. | ||||||
| Procurement overhead, G&A on non-labor costs, and fee is calculated on this tab. | ||||||
| Offerors, IWTAs and major subcontractors must correct and tailor to eliminate errors and to conform to their estimating and accounting systems so that each rate/factor calculation uses the correct allocation base. | ||||||
| Prime offerors may NOT propose fee on subcontractor fee. | ||||||
| Column Index Reference | 5 | 6 | 7 | 8 | 9 | |
| Rates Applied Below | Procurement Overhead | 5.00% | 5.00% | 5.00% | 5.00% | 5.00% |
| G&A | 10.00% | 10.00% | 10.00% | 10.00% | 10.00% | |
| Fixed Fee | 5.00% |
| AB | 0201 | Labor Hours | 200 | 400 | 200 | 0 | 0 | 800 |
| Labor | $2,033 | $4,356 | $2,344 | $0 | $0 | $8,733 | ||
| IWTA | $1,464 | $3,221 | $1,773 | $0 | $0 | $6,458 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | ||
| G&A | $146 | $322 | $177 | $0 | $0 | $646 | ||
| Total Labor Cost | $3,643 | $7,899 | $4,295 | $0 | $0 | $15,837 | ||
| Fixed Fee | $182 | $395 | $215 | $0 | $0 | $792 | ||
| Total CPFF | $3,825 | $8,294 | $4,509 | $0 | $0 | $16,629 |
| 1201 | Labor Hours | 0 | 0 | 0 | 200 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,912 | $0 | $1,912 | |
| IWTA | $0 | $0 | $0 | $2,068 | $0 | $2,068 | |
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | |
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | |
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | |
| G&A | $0 | $0 | $0 | $207 | $0 | $207 | |
| Total Labor Cost | $0 | $0 | $0 | $4,187 | $0 | $4,187 | |
| Fixed Fee | $0 | $0 | $0 | $209 | $0 | $209 | |
| Total CPFF | $0 | $0 | $0 | $4,397 | $0 | $4,397 |
| 2201 | Labor Hours | 0 | 0 | 0 | 0 | 200 | 200 |
| Labor | $0 | $0 | $0 | $0 | $2,221 | $2,221 | |
| IWTA | $0 | $0 | $0 | $0 | $1,266 | $1,266 | |
| Subcontracts | $0 | $0 | $0 | $0 | $1,117 | $1,117 | |
| Subcontractor Fee | $0 | $0 | $0 | $0 | $45 | $45 | |
| Procurement Overhead | $0 | $0 | $0 | $0 | $58 | $58 | |
| G&A | $0 | $0 | $0 | $0 | $249 | $249 | |
| Total Labor Cost | $0 | $0 | $0 | $0 | $4,956 | $4,956 | |
| Fixed Fee | $0 | $0 | $0 | $0 | $246 | $246 | |
| Total CPFF | $0 | $0 | $0 | $0 | $5,201 | $5,201 |
All Total CPFF $3,825 $8,294 $4,509 $4,397 $5,201 $26,227
| GD | 0202 | Labor Hours | 200 | 400 | 200 | 0 | 0 | 800 |
| Labor | $1,888 | $4,066 | $2,198 | $0 | $0 | $8,151 | ||
| IWTA | $1,361 | $3,025 | $1,692 | $0 | $0 | $6,079 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | ||
| G&A | $136 | $303 | $169 | $0 | $0 | $608 | ||
| Total Labor Cost | $3,385 | $7,393 | $4,059 | $0 | $0 | $14,837 | ||
| Fixed Fee | $169 | $370 | $203 | $0 | $0 | $742 | ||
| Total CPFF | $3,554 | $7,763 | $4,262 | $0 | $0 | $15,579 |
| 1202 | Labor Hours | 0 | 0 | 0 | 200 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,799 | $0 | $1,799 | |
| IWTA | $0 | $0 | $0 | $2,000 | $0 | $2,000 | |
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | |
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | |
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | |
| G&A | $0 | $0 | $0 | $200 | $0 | $200 | |
| Total Labor Cost | $0 | $0 | $0 | $3,999 | $0 | $3,999 | |
| Fixed Fee | $0 | $0 | $0 | $200 | $0 | $200 | |
| Total CPFF | $0 | $0 | $0 | $4,198 | $0 | $4,198 |
| 2202 | Labor Hours | 0 | 0 | 0 | 0 | 200 | 200 |
| Labor | $0 | $0 | $0 | $0 | $733 | $733 | |
| IWTA | $0 | $0 | $0 | $0 | $2,615 | $2,615 | |
| Subcontracts | $0 | $0 | $0 | $0 | $1,077 | $1,077 | |
| Subcontractor Fee | $0 | $0 | $0 | $0 | $43 | $43 | |
| Procurement Overhead | $0 | $0 | $0 | $0 | $56 | $56 | |
| G&A | $0 | $0 | $0 | $0 | $379 | $379 | |
| Total Labor Cost | $0 | $0 | $0 | $0 | $4,903 | $4,903 | |
| Fixed Fee | $0 | $0 | $0 | $0 | $243 | $243 | |
| Total CPFF | $0 | $0 | $0 | $0 | $5,146 | $5,146 |
All Total CPFF $3,554 $7,763 $4,262 $4,198 $5,146 $24,924
| ICT | 0203 | Labor Hours | 200 | 400 | 200 | 0 | 0 | 800 |
| Labor | $1,749 | $3,790 | $2,059 | $0 | $0 | $7,598 | ||
| IWTA | $1,171 | $2,635 | $1,477 | $0 | $0 | $5,284 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | ||
| G&A | $117 | $264 | $148 | $0 | $0 | $528 | ||
| Total Labor Cost | $3,037 | $6,689 | $3,684 | $0 | $0 | $13,410 | ||
| Fixed Fee | $152 | $334 | $184 | $0 | $0 | $671 | ||
| Total CPFF | $3,189 | $7,023 | $3,869 | $0 | $0 | $14,081 |
| 1203 | Labor Hours | 0 | 0 | 0 | 200 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,618 | $0 | $1,618 | |
| IWTA | $0 | $0 | $0 | $1,330 | $0 | $1,330 | |
| Subcontracts | $0 | $0 | $0 | $1,182 | $0 | $1,182 | |
| Subcontractor Fee | $0 | $0 | $0 | $35 | $0 | $35 | |
| Procurement Overhead | $0 | $0 | $0 | $61 | $0 | $61 | |
| G&A | $0 | $0 | $0 | $261 | $0 | $261 | |
| Total Labor Cost | $0 | $0 | $0 | $4,487 | $0 | $4,487 | |
| Fixed Fee | $0 | $0 | $0 | $223 | $0 | $223 | |
| Total CPFF | $0 | $0 | $0 | $4,709 | $0 | $4,709 |
| 2203 | Labor Hours | 0 | 0 | 0 | 0 | 200 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,392 | $1,392 | |
| IWTA | $0 | $0 | $0 | $0 | $2,383 | $2,383 | |
| Subcontracts | $0 | $0 | $0 | $0 | $968 | $968 | |
| Subcontractor Fee | $0 | $0 | $0 | $0 | $29 | $29 | |
| Procurement Overhead | $0 | $0 | $0 | $0 | $50 | $50 | |
| G&A | $0 | $0 | $0 | $0 | $343 | $343 | |
| Total Labor Cost | $0 | $0 | $0 | $0 | $5,166 | $5,166 | |
| Fixed Fee | $0 | $0 | $0 | $0 | $257 | $257 | |
| Total CPFF | $0 | $0 | $0 | $0 | $5,422 | $5,422 |
All Total CPFF $3,189 $7,023 $3,869 $4,709 $5,422 $24,212
| GM | 0204 | Labor Hours | 200 | 400 | 200 | 0 | 0 | 800 |
| Labor | $1,627 | $3,551 | $1,949 | $0 | $0 | $7,128 | ||
| IWTA | $1,059 | $2,420 | $1,385 | $0 | $0 | $4,863 | ||
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontractor Fee | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Procurement Overhead | $0 | $0 | $0 | $0 | $0 | $0 | ||
| G&A | $106 | $242 | $138 | $0 | $0 | $486 | ||
| Total Labor Cost | $2,792 | $6,213 | $3,472 | $0 | $0 | $12,477 | ||
| Fixed Fee | $140 | $311 | $174 | $0 | $0 | $624 | ||
| Total CPFF | $2,932 | $6,524 | $3,645 | $0 | $0 | $13,101 |
| 1204 | Labor Hours | 0 | 0 | 0 | 200 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,498 | $0 | $1,498 | |
| IWTA | $0 | $0 | $0 | $1,308 | $0 | $1,308 | |
| Subcontracts | $0 | $0 | $0 | $1,154 | $0 | $1,154 | |
| Subcontractor Fee | $0 | $0 | $0 | $35 | $0 | $35 | |
| Procurement Overhead | $0 | $0 | $0 | $59 | $0 | $59 | |
| G&A | $0 | $0 | $0 | $256 | $0 | $256 | |
| Total Labor Cost | $0 | $0 | $0 | $4,309 | $0 | $4,309 | |
| Fixed Fee | $0 | $0 | $0 | $214 | $0 | $214 | |
| Total CPFF | $0 | $0 | $0 | $4,523 | $0 | $4,523 |
| 2204 | Labor Hours | 0 | 0 | 0 | 0 | 200 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,319 | $1,319 | |
| IWTA | $0 | $0 | $0 | $0 | $2,308 | $2,308 | |
| Subcontracts | $0 | $0 | $0 | $0 | $923 | $923 | |
| Subcontractor Fee | $0 | $0 | $0 | $0 | $28 | $28 | |
| Procurement Overhead | $0 | $0 | $0 | $0 | $48 | $48 | |
| G&A | $0 | $0 | $0 | $0 | $331 | $331 | |
| Total Labor Cost | $0 | $0 | $0 | $0 | $4,955 | $4,955 | |
| Fixed Fee | $0 | $0 | $0 | $0 | $246 | $246 | |
| Total CPFF | $0 | $0 | $0 | $0 | $5,202 | $5,202 |
All Total CPFF $2,932 $6,524 $3,645 $4,523 $5,202 $22,826
GRAND TOTAL All $13,501 $29,604 $16,285 $17,827 $20,972 $98,189
Labor Resources
| PRIME LABOR RESOURCES AND COST | |||||||||||||||||||||||||||||||||||||||||||||||||
| Contractor: | Insert contractor name | ||||||||||||||||||||||||||||||||||||||||||||||||
| HQ0147-18-R-0004 - Final Information Technical Management & Analysis | |||||||||||||||||||||||||||||||||||||||||||||||||
| The prime offeror will combine their labor resources with submittals from all IWTAs and subcontractors on this one tab. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Contractors will populate this tab to include the proposed contractor labor resources for all CLINs excluding Surge. | |||||||||||||||||||||||||||||||||||||||||||||||||
| FBLRs are carried forward (linked) from the prime, IWTA, or subcontractor's FBLR tab. | |||||||||||||||||||||||||||||||||||||||||||||||||
| To protect proprietary data, the IWTA or subcontractor may elect to copy the FBLRs in columns V:AA and paste as values before submission to the prime contractor, with the result that the IWTA or major subcontractor rates may be hard-coded in the prime offeror’s EPW. | |||||||||||||||||||||||||||||||||||||||||||||||||
| For submission to the Government, the full detail of the IWTA or subcontractor direct/indirect rates and FBLR rates, and links to the IWTA's or subcontractor's FBLR tab will remain in-tact. | |||||||||||||||||||||||||||||||||||||||||||||||||
| The prime contractor will also add hours and cost for minor subcontractors TBD. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Columns B through I, M through R, and T should be populated by the offeror, to present the proposed resources for accomplishing the PWS requirements. | |||||||||||||||||||||||||||||||||||||||||||||||||
| The example data provided in Columns B through I, M through R, and T are there only for formula and link testing and should not influence the proposed EPW. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Calculations listed in Columns AS through CE are for Government evaluation purposes only. | |||||||||||||||||||||||||||||||||||||||||||||||||
| For Columns AS through CE, Offerors, IWTAs and major subcontractors must correct and tailor to eliminate errors and to conform to their estimating and accounting systems so that each rate/factor calculation uses the correct allocation base. | 5.00% | << Prime's procurement Overhead Rate | |||||||||||||||||||||||||||||||||||||||||||||||
| Use the drop-down arrows to populate the cells where possible. | 9 | 18 | 27 | 36 | 45 | 54 | Subcontractor fee, not prime offeror or IWTA | Prime offeror procurement overhead on subcontract cost | |||||||||||||||||||||||||||||||||||||||||
| PWS | Description | Prime/Subcontractor Name | Prime, IWTA or Subcontractor | Major or Minor | Labor Category | Location | Work Site | CLIN-Pd-ST | Stakeholder | CLIN | Period | CFY 1 Hours | CFY 2 Hours | CFY 3 Hours | CFY 4 Hours | CFY 5 Hours | CFY 6 Hours | Total | BOE Reference | Index Column | CFY 1 FBLR | CFY 2 FBLR | CFY 3 FBLR | CFY 4 FBLR | CFY 5 FBLR | CFY 6 FBLR | AB | CFY 1 Cost | CFY 2 Cost | CFY 3 Cost | CFY 4 Cost | CFY 5 Cost | CFY 6 Cost | Total Cost | AJ | CFY 1 Fee | CFY 2 Fee | CFY 3 Fee | CFY 4 Fee | CFY 5 Fee | CFY 6 Fee | Total Fee | AR | CFY 1 P/O | CFY 2 P/O | CFY 3 P/O | CFY 4 P/O | CFY 5 P/O | CFY 6 P/O |
| 3.1 | 3.1 Enterprise IT Architecture, Engineering, and Operations | Prime R Us | Prime | Contract Program Manager | Redstone Arsenal, AL | Gov't Site | 0201BaseAB | AB | 0201 | Base | 50 | 100 | 50 | 200 | Cost Volume page 10, BOE Number 123456.01 | Contract Program ManagerRedstone Arsenal, ALGov't Site | $21.78 | $23.23 | $24.91 | $26.37 | $27.84 | $29.30 | $1,089 | $2,323 | $1,245 | $0 | $0 | $0 | $4,658 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2 | 3.2 Unified Communications Services and Systems | Prime R Us | Prime | Analyst (Advanced) | Schriver AFB, CO | Gov't Site | 0202BaseGD | GD | 0202 | Base | 50 | 100 | 50 | 200 | Analyst (Advanced)Schriver AFB, COGov't Site | $20.33 | $21.78 | $23.44 | $24.91 | $26.37 | $27.84 | $1,016 | $2,178 | $1,172 | $0 | $0 | $0 | $4,367 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | AR | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.3 | 3.3 Regional IT, CIO, and Functional Operations | Prime R Us | Prime | Analyst (Intermediate) | Ft. Belvior, VA | Gov't Site | 0203BaseICT | ICT | 0203 | Base | 50 | 100 | 50 | 200 | Analyst (Intermediate)Ft. Belvior, VAGov't Site | $18.88 | $20.33 | $21.98 | $23.44 | $24.91 | $26.37 | $944 | $2,033 | $1,099 | $0 | $0 | $0 | $4,076 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.4 | 3.4 Knowledge and Information Management Execution and Operations | Prime R Us | Prime | Analyst (Basic) | Dahlgren, VA | Gov't Site | 0204BaseGM | GM | 0204 | Base | 50 | 100 | 50 | 200 | Analyst (Basic)Dahlgren, VAGov't Site | $17.42 | $18.88 | $20.51 | $21.98 | $23.44 | $24.91 | $871 | $1,888 | $1,026 | $0 | $0 | $0 | $3,784 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.5 | 3.5 Capital Planning and Investment Control, Portfolio Management, Project Management, and IT Policy and Planning | Prime R Us | Prime | Specialist (Advanced) | Redstone Arsenal, AL | Gov't Site | 1201Option 1AB | AB | 1201 | Option 1 | 50 | 50 | Specialist (Advanced)Redstone Arsenal, ALGov't Site | $15.97 | $17.42 | $19.05 | $20.51 | $21.98 | $23.44 | $0 | $0 | $0 | $1,026 | $0 | $0 | $1,026 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.1 | 3.1 Enterprise IT Architecture, Engineering, and Operations | Prime R Us | Prime | Specialist (Intermediate) | Schriver AFB, CO | Gov't Site | 1202Option 1GD | GD | 1202 | Option 1 | 50 | 50 | Specialist (Intermediate)Schriver AFB, COGov't Site | $14.52 | $15.97 | $17.58 | $19.05 | $20.51 | $21.98 | $0 | $0 | $0 | $952 | $0 | $0 | $952 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.2 | 3.2 Unified Communications Services and Systems | Prime R Us | Prime | Engineer (Advanced) | Ft. Belvior, VA | Gov't Site | 1203Option 1ICT | ICT | 1203 | Option 1 | 50 | 50 | Engineer (Advanced)Ft. Belvior, VAGov't Site | $13.07 | $14.52 | $16.12 | $17.58 | $19.05 | $20.51 | $0 | $0 | $0 | $879 | $0 | $0 | $879 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.3 | 3.3 Regional IT, CIO, and Functional Operations | Prime R Us | Prime | Engineer (Intermediate) | Dahlgren, VA | Gov't Site | 1204Option 1GM | GM | 1204 | Option 1 | 50 | 50 | Engineer (Intermediate)Dahlgren, VAGov't Site | $11.62 | $13.07 | $14.65 | $16.12 | $17.58 | $19.05 | $0 | $0 | $0 | $806 | $0 | $0 | $806 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.4 | 3.4 Knowledge and Information Management Execution and Operations | Prime R Us | Prime | Technician (Advanced) | Redstone Arsenal, AL | Gov't Site | 2201Option 2AB | AB | 2201 | Option 2 | 50 | 50 | Technician (Advanced)Redstone Arsenal, ALGov't Site | $10.16 | $11.62 | $13.19 | $14.65 | $16.12 | $17.58 | $0 | $0 | $0 | $0 | $806 | $0 | $806 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.5 | 3.5 Capital Planning and Investment Control, Portfolio Management, Project Management, and IT Policy and Planning | Prime R Us | Prime | Technician (Intermediate) | Schriver AFB, CO | Gov't Site | 2202Option 2GD | GD | 2202 | Option 2 | 50 | 50 | Technician (Intermediate)Schriver AFB, COGov't Site | $8.71 | $10.16 | $11.72 | $13.19 | $14.65 | $16.12 | $0 | $0 | $0 | $0 | $733 | $0 | $733 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.1 | 3.1 Enterprise IT Architecture, Engineering, and Operations | Prime R Us | Prime | Contract Program Manager | Ft. Belvior, VA | Gov't Site | 2203Option 2ICT | ICT | 2203 | Option 2 | 50 | 50 | Contract Program ManagerFt. Belvior, VAGov't Site | $21.78 | $23.23 | $24.91 | $26.37 | $27.84 | $29.30 | $0 | $0 | $0 | $0 | $1,392 | $0 | $1,392 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.2 | 3.2 Unified Communications Services and Systems | Prime R Us | Prime | Analyst (Advanced) | Dahlgren, VA | Gov't Site | 2204Option 2GM | GM | 2204 | Option 2 | 50 | 50 | Analyst (Advanced)Dahlgren, VAGov't Site | $20.33 | $21.78 | $23.44 | $24.91 | $26.37 | $27.84 | $0 | $0 | $0 | $0 | $1,319 | $0 | $1,319 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.3 | 3.3 Regional IT, CIO, and Functional Operations | Prime R Us | Prime | Analyst (Intermediate) | Redstone Arsenal, AL | Gov't Site | 0201BaseAB | AB | 0201 | Base | 50 | 100 | 50 | 200 | Analyst (Intermediate)Redstone Arsenal, ALGov't Site | $18.88 | $20.33 | $21.98 | $23.44 | $24.91 | $26.37 | $944 | $2,033 | $1,099 | $0 | $0 | $0 | $4,076 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.4 | 3.4 Knowledge and Information Management Execution and Operations | Prime R Us | Prime | Analyst (Basic) | Schriver AFB, CO | Gov't Site | 0202BaseGD | GD | 0202 | Base | 50 | 100 | 50 | 200 | Analyst (Basic)Schriver AFB, COGov't Site | $17.42 | $18.88 | $20.51 | $21.98 | $23.44 | $24.91 | $871 | $1,888 | $1,026 | $0 | $0 | $0 | $3,784 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.5 | 3.5 Capital Planning and Investment Control, Portfolio Management, Project Management, and IT Policy and Planning | Prime R Us | Prime | Specialist (Advanced) | Ft. Belvior, VA | Contractor Site | 0203BaseICT | ICT | 0203 | Base | 50 | 100 | 50 | 200 | Specialist (Advanced)Ft. Belvior, VAContractor Site | $16.11 | $17.57 | $19.21 | $20.68 | $22.34 | $23.83 | $805 | $1,757 | $960 | $0 | $0 | $0 | $3,522 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.1 | 3.1 Enterprise IT Architecture, Engineering, and Operations | Prime R Us | Prime | Specialist (Intermediate) | Dahlgren, VA | Contractor Site | 0204BaseGM | GM | 0204 | Base | 50 | 100 | 50 | 200 | Specialist (Intermediate)Dahlgren, VAContractor Site | $15.13 | $16.64 | $18.46 | $20.00 | $21.54 | $23.08 | $756 | $1,664 | $923 | $0 | $0 | $0 | $3,343 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.2 | 3.2 Unified Communications Services and Systems | Prime R Us | Prime | Engineer (Advanced) | Redstone Arsenal, AL | Contractor Site | 1201Option 1AB | AB | 1201 | Option 1 | 50 | 50 | Engineer (Advanced)Redstone Arsenal, ALContractor Site | $13.18 | $14.64 | $16.25 | $17.73 | $19.37 | $20.85 | $0 | $0 | $0 | $886 | $0 | $0 | $886 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.3 | 3.3 Regional IT, CIO, and Functional Operations | Prime R Us | Prime | Engineer (Intermediate) | Schriver AFB, CO | Contractor Site | 1202Option 1GD | GD | 1202 | Option 1 | 50 | 50 | Engineer (Intermediate)Schriver AFB, COContractor Site | $12.10 | $13.61 | $15.38 | $16.92 | $18.46 | $20.00 | $0 | $0 | $0 | $846 | $0 | $0 | $846 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.4 | 3.4 Knowledge and Information Management Execution and Operations | Prime R Us | Prime | Technician (Advanced) | Ft. Belvior, VA | Contractor Site | 1203Option 1ICT | ICT | 1203 | Option 1 | 50 | 50 | Technician (Advanced)Ft. Belvior, VAContractor Site | $10.25 | $11.71 | $13.30 | $14.77 | $16.39 | $17.88 | $0 | $0 | $0 | $739 | $0 | $0 | $739 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.5 | 3.5 Capital Planning and Investment Control, Portfolio Management, Project Management, and IT Policy and Planning | Prime R Us | Prime | Technician (Intermediate) | Dahlgren, VA | Contractor Site | 1204Option 1GM | GM | 1204 | Option 1 | 50 | 50 | Technician (Intermediate)Dahlgren, VAContractor Site | $9.08 | $10.59 | $12.31 | $13.85 | $15.38 | $16.92 | $0 | $0 | $0 | $692 | $0 | $0 | $692 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.1 | 3.1 Enterprise IT Architecture, Engineering, and Operations | Prime R Us | Prime | Contract Program Manager | Redstone Arsenal, AL | Contractor Site | 2201Option 2AB | AB | 2201 | Option 2 | 50 | 50 | Contract Program ManagerRedstone Arsenal, ALContractor Site | $21.96 | $23.43 | $25.12 | $26.59 | $28.30 | $29.79 | $0 | $0 | $0 | $0 | $1,415 | $0 | $1,415 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.2 | 3.2 Unified Communications Services and Systems | IWTA | IWTA | Analyst (Advanced) | Schriver AFB, CO | Contractor Site | 2202Option 2GD | GD | 2202 | Option 2 | 50 | 50 | Analyst (Advanced)Schriver AFB, COContractor Site | $21.18 | $22.69 | $24.62 | $26.15 | $27.69 | $29.23 | $0 | $0 | $0 | $0 | $1,385 | $0 | $1,385 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.3 | 3.3 Regional IT, CIO, and Functional Operations | IWTA | IWTA | Analyst (Intermediate) | Ft. Belvior, VA | Contractor Site | 2203Option 2ICT | ICT | 2203 | Option 2 | 50 | 50 | Analyst (Intermediate)Ft. Belvior, VAContractor Site | $19.03 | $20.50 | $22.16 | $23.64 | $25.32 | $26.81 | $0 | $0 | $0 | $0 | $1,266 | $0 | $1,266 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.4 | 3.4 Knowledge and Information Management Execution and Operations | IWTA | IWTA | Analyst (Basic) | Dahlgren, VA | Contractor Site | 2204Option 2GM | GM | 2204 | Option 2 | 50 | 50 | Analyst (Basic)Dahlgren, VAContractor Site | $18.15 | $19.66 | $21.54 | $23.08 | $24.62 | $26.15 | $0 | $0 | $0 | $0 | $1,231 | $0 | $1,231 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.5 | 3.5 Capital Planning and Investment Control, Portfolio Management, Project Management, and IT Policy and Planning | IWTA | IWTA | Specialist (Advanced) | Redstone Arsenal, AL | Contractor Site | 0201BaseAB | AB | 0201 | Base | 50 | 100 | 50 | 200 | Specialist (Advanced)Redstone Arsenal, ALContractor Site | $16.11 | $17.57 | $19.21 | $20.68 | $22.34 | $23.83 | $805 | $1,757 | $960 | $0 | $0 | $0 | $3,522 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.1 | 3.1 Enterprise IT Architecture, Engineering, and Operations | IWTA | IWTA | Specialist (Intermediate) | Schriver AFB, CO | Contractor Site | 0202BaseGD | GD | 0202 | Base | 50 | 100 | 50 | 200 | Specialist (Intermediate)Schriver AFB, COContractor Site | $15.13 | $16.64 | $18.46 | $20.00 | $21.54 | $23.08 | $756 | $1,664 | $923 | $0 | $0 | $0 | $3,343 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.2 | 3.2 Unified Communications Services and Systems | IWTA | IWTA | Engineer (Advanced) | Ft. Belvior, VA | Contractor Site | 0203BaseICT | ICT | 0203 | Base | 50 | 100 | 50 | 200 | Engineer (Advanced)Ft. Belvior, VAContractor Site | $13.18 | $14.64 | $16.25 | $17.73 | $19.37 | $20.85 | $659 | $1,464 | $813 | $0 | $0 | $0 | $2,936 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.3 | 3.3 Regional IT, CIO, and Functional Operations | IWTA | IWTA | Engineer (Intermediate) | Dahlgren, VA | Contractor Site | 0204BaseGM | GM | 0204 | Base | 50 | 100 | 50 | 200 | Engineer (Intermediate)Dahlgren, VAContractor Site | $12.10 | $13.61 | $15.38 | $16.92 | $18.46 | $20.00 | $605 | $1,361 | $769 | $0 | $0 | $0 | $2,735 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.4 | 3.4 Knowledge and Information Management Execution and Operations | IWTA | IWTA | Technician (Advanced) | Redstone Arsenal, AL | Contractor Site | 1201Option 1AB | AB | 1201 | Option 1 | 50 | 50 | Technician (Advanced)Redstone Arsenal, ALContractor Site | $10.25 | $11.71 | $13.30 | $14.77 | $16.39 | $17.88 | $0 | $0 | $0 | $739 | $0 | $0 | $739 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.5 | 3.5 Capital Planning and Investment Control, Portfolio Management, Project Management, and IT Policy and Planning | IWTA | IWTA | Technician (Intermediate) | Schriver AFB, CO | Contractor Site | 1202Option 1GD | GD | 1202 | Option 1 | 50 | 50 | Technician (Intermediate)Schriver AFB, COContractor Site | $9.08 | $10.59 | $12.31 | $13.85 | $15.38 | $16.92 | $0 | $0 | $0 | $692 | $0 | $0 | $692 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.1 | 3.1 Enterprise IT Architecture, Engineering, and Operations | IWTA | IWTA | Contract Program Manager | Ft. Belvior, VA | Contractor Site | 1203Option 1ICT | ICT | 1203 | Option 1 | 50 | 50 | Contract Program ManagerFt. Belvior, VAContractor Site | $21.96 | $23.43 | $25.12 | $26.59 | $28.30 | $29.79 | $0 | $0 | $0 | $1,330 | $0 | $0 | $1,330 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.2 | 3.2 Unified Communications Services and Systems | IWTA | IWTA | Analyst (Advanced) | Dahlgren, VA | Contractor Site | 1204Option 1GM | GM | 1204 | Option 1 | 50 | 50 | Analyst (Advanced)Dahlgren, VAContractor Site | $21.18 | $22.69 | $24.62 | $26.15 | $27.69 | $29.23 | $0 | $0 | $0 | $1,308 | $0 | $0 | $1,308 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.3 | 3.3 Regional IT, CIO, and Functional Operations | IWTA | IWTA | Analyst (Intermediate) | Redstone Arsenal, AL | Contractor Site | 2201Option 2AB | AB | 2201 | Option 2 | 50 | 50 | Analyst (Intermediate)Redstone Arsenal, ALContractor Site | $19.03 | $20.50 | $22.16 | $23.64 | $25.32 | $26.81 | $0 | $0 | $0 | $0 | $1,266 | $0 | $1,266 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.4 | 3.4 Knowledge and Information Management Execution and Operations | IWTA | IWTA | Analyst (Basic) | Schriver AFB, CO | Contractor Site | 2202Option 2GD | GD | 2202 | Option 2 | 50 | 50 | Analyst (Basic)Schriver AFB, COContractor Site | $18.15 | $19.66 | $21.54 | $23.08 | $24.62 | $26.15 | $0 | $0 | $0 | $0 | $1,231 | $0 | $1,231 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.5 | 3.5 Capital Planning and Investment Control, Portfolio Management, Project Management, and IT Policy and Planning | IWTA | IWTA | Specialist (Advanced) | Ft. Belvior, VA | Contractor Site | 2203Option 2ICT | ICT | 2203 | Option 2 | 50 | 50 | Specialist (Advanced)Ft. Belvior, VAContractor Site | $16.11 | $17.57 | $19.21 | $20.68 | $22.34 | $23.83 | $0 | $0 | $0 | $0 | $1,117 | $0 | $1,117 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.1 | 3.1 Enterprise IT Architecture, Engineering, and Operations | IWTA | IWTA | Specialist (Intermediate) | Dahlgren, VA | Contractor Site | 2204Option 2GM | GM | 2204 | Option 2 | 50 | 50 | Specialist (Intermediate)Dahlgren, VAContractor Site | $15.13 | $16.64 | $18.46 | $20.00 | $21.54 | $23.08 | $0 | $0 | $0 | $0 | $1,077 | $0 | $1,077 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.2 | 3.2 Unified Communications Services and Systems | IWTA | IWTA | Engineer (Advanced) | Redstone Arsenal, AL | Contractor Site | 0201BaseAB | AB | 0201 | Base | 50 | 100 | 50 | 200 | Engineer (Advanced)Redstone Arsenal, ALContractor Site | $13.18 | $14.64 | $16.25 | $17.73 | $19.37 | $20.85 | $659 | $1,464 | $813 | $0 | $0 | $0 | $2,936 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.3 | 3.3 Regional IT, CIO, and Functional Operations | IWTA | IWTA | Engineer (Intermediate) | Schriver AFB, CO | Contractor Site | 0202BaseGD | GD | 0202 | Base | 50 | 100 | 50 | 200 | Engineer (Intermediate)Schriver AFB, COContractor Site | $12.10 | $13.61 | $15.38 | $16.92 | $18.46 | $20.00 | $605 | $1,361 | $769 | $0 | $0 | $0 | $2,735 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.4 | 3.4 Knowledge and Information Management Execution and Operations | IWTA | IWTA | Technician (Advanced) | Ft. Belvior, VA | Contractor Site | 0203BaseICT | ICT | 0203 | Base | 50 | 100 | 50 | 200 | Technician (Advanced)Ft. Belvior, VAContractor Site | $10.25 | $11.71 | $13.30 | $14.77 | $16.39 | $17.88 | $512 | $1,171 | $665 | $0 | $0 | $0 | $2,349 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.5 | 3.5 Capital Planning and Investment Control, Portfolio Management, Project Management, and IT Policy and Planning | IWTA | IWTA | Technician (Intermediate) | Dahlgren, VA | Contractor Site | 0204BaseGM | GM | 0204 | Base | 50 | 100 | 50 | 200 | Technician (Intermediate)Dahlgren, VAContractor Site | $9.08 | $10.59 | $12.31 | $13.85 | $15.38 | $16.92 | $454 | $1,059 | $615 | $0 | $0 | $0 | $2,128 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.1 | 3.1 Enterprise IT Architecture, Engineering, and Operations | IWTA | IWTA | Contract Program Manager | Redstone Arsenal, AL | Contractor Site | 1201Option 1AB | AB | 1201 | Option 1 | 50 | 50 | Contract Program ManagerRedstone Arsenal, ALContractor Site | $21.96 | $23.43 | $25.12 | $26.59 | $28.30 | $29.79 | $0 | $0 | $0 | $1,330 | $0 | $0 | $1,330 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.2 | 3.2 Unified Communications Services and Systems | IWTA | IWTA | Analyst (Advanced) | Schriver AFB, CO | Contractor Site | 1202Option 1GD | GD | 1202 | Option 1 | 50 | 50 | Analyst (Advanced)Schriver AFB, COContractor Site | $21.18 | $22.69 | $24.62 | $26.15 | $27.69 | $29.23 | $0 | $0 | $0 | $1,308 | $0 | $0 | $1,308 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.3 | 3.3 Regional IT, CIO, and Functional Operations | Subcontract Z | Subcontractor | Major | Analyst (Intermediate) | Ft. Belvior, VA | Contractor Site | 1203Option 1ICT | ICT | 1203 | Option 1 | 50 | 50 | Analyst (Intermediate)Ft. Belvior, VAContractor Site | $19.03 | $20.50 | $22.16 | $23.64 | $25.32 | $26.81 | $0 | $0 | $0 | $1,182 | $0 | $0 | $1,182 | $0 | $0 | $0 | $35 | $0 | $0 | $35 | $0 | $0 | $0 | $61 | $0 | $0 | |||||||||
| 3.4 | 3.4 Knowledge and Information Management Execution and Operations | Subcontract Z | Subcontractor | Minor | Analyst (Basic) | Dahlgren, VA | Contractor Site | 1204Option 1GM | GM | 1204 | Option 1 | 50 | 50 | Analyst (Basic)Dahlgren, VAContractor Site | $18.15 | $19.66 | $21.54 | $23.08 | $24.62 | $26.15 | $0 | $0 | $0 | $1,154 | $0 | $0 | $1,154 | $0 | $0 | $0 | $35 | $0 | $0 | $35 | $0 | $0 | $0 | $59 | $0 | $0 | |||||||||
| 3.5 | 3.5 Capital Planning and Investment Control, Portfolio Management, Project Management, and IT Policy and Planning | Subcontract X | Subcontractor | Major | Specialist (Advanced) | Redstone Arsenal, AL | Contractor Site | 2201Option 2AB | AB | 2201 | Option 2 | 50 | 50 | Specialist (Advanced)Redstone Arsenal, ALContractor Site | $16.11 | $17.57 | $19.21 | $20.68 | $22.34 | $23.83 | $0 | $0 | $0 | $0 | $1,117 | $0 | $1,117 | $0 | $0 | $0 | $0 | $45 | $0 | $45 | $0 | $0 | $0 | $0 | $58 | $0 | |||||||||
| 3.1 | 3.1 Enterprise IT Architecture, Engineering, and Operations | Subcontract X | Subcontractor | Minor | Specialist (Intermediate) | Schriver AFB, CO | Contractor Site | 2202Option 2GD | GD | 2202 | Option 2 | 50 | 50 | Specialist (Intermediate)Schriver AFB, COContractor Site | $15.13 | $16.64 | $18.46 | $20.00 | $21.54 | $23.08 | $0 | $0 | $0 | $0 | $1,077 | $0 | $1,077 | $0 | $0 | $0 | $0 | $43 | $0 | $43 | $0 | $0 | $0 | $0 | $56 | $0 | |||||||||
| 3.2 | 3.2 Unified Communications Services and Systems | Subcontract Z | Subcontractor | Major | Engineer (Advanced) | Ft. Belvior, VA | Contractor Site | 2203Option 2ICT | ICT | 2203 | Option 2 | 50 | 50 | Engineer (Advanced)Ft. Belvior, VAContractor Site | $13.18 | $14.64 | $16.25 | $17.73 | $19.37 | $20.85 | $0 | $0 | $0 | $0 | $968 | $0 | $968 | $0 | $0 | $0 | $0 | $29 | $0 | $29 | $0 | $0 | $0 | $0 | $50 | $0 | |||||||||
| 3.3 | 3.3 Regional IT, CIO, and Functional Operations | Subcontract Z | Subcontractor | Major | Engineer (Intermediate) | Dahlgren, VA | Contractor Site | 2204Option 2GM | GM | 2204 | Option 2 | 50 | 50 | Engineer (Intermediate)Dahlgren, VAContractor Site | $12.10 | $13.61 | $15.38 | $16.92 | $18.46 | $20.00 | $0 | $0 | $0 | $0 | $923 | $0 | $923 | $0 | $0 | $0 | $0 | $28 | $0 | $28 | $0 | $0 | $0 | $0 | $48 | $0 |
FBLRs
| FULLY BURDENED LABOR RATE (FBLR) BUILD-UP | |||||||||||||||||||||||||||||||||||||||||||||||||
| Contractor: | Insert contractor name | ||||||||||||||||||||||||||||||||||||||||||||||||
| HQ0147-18-R-0004 - Final Information Technical Management & Analysis | |||||||||||||||||||||||||||||||||||||||||||||||||
| The prime contractor and each known subcontractor or IWTA will populate this tab to include the proposed FBLRs for their company. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Direct/Indirect rates are carried forward (linked) from the prime's, IWTA's or subcontractor's rates tab. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Offerors, IWTAs and major subcontractors must correct and tailor to eliminate errors and to conform to their estimating and accounting systems so that each rate/factor calculation uses the correct allocation base. | |||||||||||||||||||||||||||||||||||||||||||||||||
| For submission to the Government, the full detail of the direct/indirect rates and FBLR rates, and links to the rates tab will remain in-tact. | |||||||||||||||||||||||||||||||||||||||||||||||||
| To protect proprietary data, the IWTA or subcontractor may elect not to submit this tab to the prime contractor. | |||||||||||||||||||||||||||||||||||||||||||||||||
| RED Fringe Cost number means it doesn't meet the minimum fringe dollars per hour. | Contractor Fiscal Year | Contractor Fiscal Year | Contractor Fiscal Year | Contractor Fiscal Year | Contractor Fiscal Year | Contractor Fiscal Year | |||||||||||||||||||||||||||||||||||||||||||
| 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | ||||||||||||||||||||||||||||||||||||||||||||
| 2 | 5 | 2017 | 3 | 6 | 2017 | 4 | 7 | 2017 | 5 | 8 | 2017 | 6 | 9 | 2017 | 7 | 10 | 2017 | ||||||||||||||||||||||||||||||||
| Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | ||||
| Base Labor | Base Labor | Base Labor | Base Labor | Base Labor | Base Labor | ||||||||||||||||||||||||||||||||||||||||||||
| Labor Category | Location | Work Site | Index Column | Rate | Rate | Rate | Rate | Rate | Rate | ||||||||||||||||||||||||||||||||||||||||
| Contract Program Manager | Redstone Arsenal, AL | Gov't Site | Contract Program ManagerRedstone Arsenal, ALGov't Site | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 10.00% | $ 1.60 | 20.00% | $ 3.52 | 10.00% | $ 2.11 | $23.23 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% | $ 2.53 | $27.84 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Analyst (Advanced) | Redstone Arsenal, AL | Gov't Site | Analyst (Advanced)Redstone Arsenal, ALGov't Site | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% |
| Analyst (Intermediate) | Redstone Arsenal, AL | Gov't Site | Analyst (Intermediate)Redstone Arsenal, ALGov't Site | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% |
| Analyst (Basic) | Redstone Arsenal, AL | Gov't Site | Analyst (Basic)Redstone Arsenal, ALGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% |
| Specialist (Advanced) | Redstone Arsenal, AL | Gov't Site | Specialist (Advanced)Redstone Arsenal, ALGov't Site | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Specialist (Intermediate) | Redstone Arsenal, AL | Gov't Site | Specialist (Intermediate)Redstone Arsenal, ALGov't Site | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% |
| Engineer (Advanced) | Redstone Arsenal, AL | Gov't Site | Engineer (Advanced)Redstone Arsenal, ALGov't Site | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% |
| Engineer (Intermediate) | Redstone Arsenal, AL | Gov't Site | Engineer (Intermediate)Redstone Arsenal, ALGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% |
| Technician (Advanced) | Redstone Arsenal, AL | Gov't Site | Technician (Advanced)Redstone Arsenal, ALGov't Site | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% |
| Technician (Intermediate) | Redstone Arsenal, AL | Gov't Site | Technician (Intermediate)Redstone Arsenal, ALGov't Site | $6.00 | 10.00% | $ 0.60 | 20.00% | $ 1.32 | 10.00% | $ 0.79 | $8.71 | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $8.00 | 11.00% | $ 0.88 | 20.00% | $ 1.78 | 10.00% | $ 1.07 | $11.72 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% |
| Contract Program Manager | Schriver AFB, CO | Gov't Site | Contract Program ManagerSchriver AFB, COGov't Site | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 10.00% | $ 1.60 | 20.00% | $ 3.52 | 10.00% | $ 2.11 | $23.23 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% | $ 2.53 | $27.84 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Analyst (Advanced) | Schriver AFB, CO | Gov't Site | Analyst (Advanced)Schriver AFB, COGov't Site | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% |
| Analyst (Intermediate) | Schriver AFB, CO | Gov't Site | Analyst (Intermediate)Schriver AFB, COGov't Site | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% |
| Analyst (Basic) | Schriver AFB, CO | Gov't Site | Analyst (Basic)Schriver AFB, COGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% |
| Specialist (Advanced) | Schriver AFB, CO | Gov't Site | Specialist (Advanced)Schriver AFB, COGov't Site | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Specialist (Intermediate) | Schriver AFB, CO | Gov't Site | Specialist (Intermediate)Schriver AFB, COGov't Site | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% |
| Engineer (Advanced) | Schriver AFB, CO | Gov't Site | Engineer (Advanced)Schriver AFB, COGov't Site | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% |
| Engineer (Intermediate) | Schriver AFB, CO | Gov't Site | Engineer (Intermediate)Schriver AFB, COGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% |
| Technician (Advanced) | Schriver AFB, CO | Gov't Site | Technician (Advanced)Schriver AFB, COGov't Site | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% |
| Technician (Intermediate) | Schriver AFB, CO | Gov't Site | Technician (Intermediate)Schriver AFB, COGov't Site | $6.00 | 10.00% | $ 0.60 | 20.00% | $ 1.32 | 10.00% | $ 0.79 | $8.71 | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $8.00 | 11.00% | $ 0.88 | 20.00% | $ 1.78 | 10.00% | $ 1.07 | $11.72 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% |
| Contract Program Manager | Ft. Belvior, VA | Gov't Site | Contract Program ManagerFt. Belvior, VAGov't Site | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 10.00% | $ 1.60 | 20.00% | $ 3.52 | 10.00% | $ 2.11 | $23.23 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% | $ 2.53 | $27.84 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Analyst (Advanced) | Ft. Belvior, VA | Gov't Site | Analyst (Advanced)Ft. Belvior, VAGov't Site | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% |
| Analyst (Intermediate) | Ft. Belvior, VA | Gov't Site | Analyst (Intermediate)Ft. Belvior, VAGov't Site | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% |
| Analyst (Basic) | Ft. Belvior, VA | Gov't Site | Analyst (Basic)Ft. Belvior, VAGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% |
| Specialist (Advanced) | Ft. Belvior, VA | Gov't Site | Specialist (Advanced)Ft. Belvior, VAGov't Site | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Specialist (Intermediate) | Ft. Belvior, VA | Gov't Site | Specialist (Intermediate)Ft. Belvior, VAGov't Site | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% |
| Engineer (Advanced) | Ft. Belvior, VA | Gov't Site | Engineer (Advanced)Ft. Belvior, VAGov't Site | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% |
| Engineer (Intermediate) | Ft. Belvior, VA | Gov't Site | Engineer (Intermediate)Ft. Belvior, VAGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% |
| Technician (Advanced) | Ft. Belvior, VA | Gov't Site | Technician (Advanced)Ft. Belvior, VAGov't Site | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% |
| Technician (Intermediate) | Ft. Belvior, VA | Gov't Site | Technician (Intermediate)Ft. Belvior, VAGov't Site | $6.00 | 10.00% | $ 0.60 | 20.00% | $ 1.32 | 10.00% | $ 0.79 | $8.71 | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $8.00 | 11.00% | $ 0.88 | 20.00% | $ 1.78 | 10.00% | $ 1.07 | $11.72 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% |
| Contract Program Manager | Dahlgren, VA | Gov't Site | Contract Program ManagerDahlgren, VAGov't Site | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 10.00% | $ 1.60 | 20.00% | $ 3.52 | 10.00% | $ 2.11 | $23.23 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% | $ 2.53 | $27.84 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Analyst (Advanced) | Dahlgren, VA | Gov't Site | Analyst (Advanced)Dahlgren, VAGov't Site | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% |
| Analyst (Intermediate) | Dahlgren, VA | Gov't Site | Analyst (Intermediate)Dahlgren, VAGov't Site | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% |
| Analyst (Basic) | Dahlgren, VA | Gov't Site | Analyst (Basic)Dahlgren, VAGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% |
| Specialist (Advanced) | Dahlgren, VA | Gov't Site | Specialist (Advanced)Dahlgren, VAGov't Site | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Specialist (Intermediate) | Dahlgren, VA | Gov't Site | Specialist (Intermediate)Dahlgren, VAGov't Site | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% |
| Engineer (Advanced) | Dahlgren, VA | Gov't Site | Engineer (Advanced)Dahlgren, VAGov't Site | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% |
| Engineer (Intermediate) | Dahlgren, VA | Gov't Site | Engineer (Intermediate)Dahlgren, VAGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% |
| Technician (Advanced) | Dahlgren, VA | Gov't Site | Technician (Advanced)Dahlgren, VAGov't Site | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% |
| Technician (Intermediate) | Dahlgren, VA | Gov't Site | Technician (Intermediate)Dahlgren, VAGov't Site | $6.00 | 10.00% | $ 0.60 | 20.00% | $ 1.32 | 10.00% | $ 0.79 | $8.71 | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $8.00 | 11.00% | $ 0.88 | 20.00% | $ 1.78 | 10.00% | $ 1.07 | $11.72 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% |
| Contract Program Manager | Redstone Arsenal, AL | Contractor Site | Contract Program ManagerRedstone Arsenal, ALContractor Site | $15.00 | 10.00% | $ 1.50 | 21.00% | $ 3.47 | 10.00% | $ 2.00 | $21.96 | $16.00 | 10.00% | $ 1.60 | 21.00% | $ 3.70 | 10.00% | $ 2.13 | $23.43 | $17.00 | 11.00% | $ 1.87 | 21.00% | $ 3.96 | 10.00% | $ 2.28 | $25.12 | $18.00 | 11.00% | $ 1.98 | 21.00% | $ 4.20 | 10.00% | $ 2.42 | $26.59 | $19.00 | 11.00% | $ 2.09 | 22.00% | $ 4.64 | 10.00% | $ 2.57 | $28.30 | $20.00 | 11.00% | $ 2.20 | 22.00% | $ 4.88 | 10.00% |
| Analyst (Advanced) | Redstone Arsenal, AL | Contractor Site | Analyst (Advanced)Redstone Arsenal, ALContractor Site | $14.00 | 10.00% | $ 1.40 | 21.00% | $ 3.23 | 10.00% | $ 1.86 | $20.50 | $15.00 | 10.00% | $ 1.50 | 21.00% | $ 3.47 | 10.00% | $ 2.00 | $21.96 | $16.00 | 11.00% | $ 1.76 | 21.00% | $ 3.73 | 10.00% | $ 2.15 | $23.64 | $17.00 | 11.00% | $ 1.87 | 21.00% | $ 3.96 | 10.00% | $ 2.28 | $25.12 | $18.00 | 11.00% | $ 1.98 | 22.00% | $ 4.40 | 10.00% | $ 2.44 | $26.81 | $19.00 | 11.00% | $ 2.09 | 22.00% | $ 4.64 | 10.00% |
| Analyst (Intermediate) | Redstone Arsenal, AL | Contractor Site | Analyst (Intermediate)Redstone Arsenal, ALContractor Site | $13.00 | 10.00% | $ 1.30 | 21.00% | $ 3.00 | 10.00% | $ 1.73 | $19.03 | $14.00 | 10.00% | $ 1.40 | 21.00% | $ 3.23 | 10.00% | $ 1.86 | $20.50 | $15.00 | 11.00% | $ 1.65 | 21.00% | $ 3.50 | 10.00% | $ 2.01 | $22.16 | $16.00 | 11.00% | $ 1.76 | 21.00% | $ 3.73 | 10.00% | $ 2.15 | $23.64 | $17.00 | 11.00% | $ 1.87 | 22.00% | $ 4.15 | 10.00% | $ 2.30 | $25.32 | $18.00 | 11.00% | $ 1.98 | 22.00% | $ 4.40 | 10.00% |
| Analyst (Basic) | Redstone Arsenal, AL | Contractor Site | Analyst (Basic)Redstone Arsenal, ALContractor Site | $12.00 | 10.00% | $ 1.20 | 21.00% | $ 2.77 | 10.00% | $ 1.60 | $17.57 | $13.00 | 10.00% | $ 1.30 | 21.00% | $ 3.00 | 10.00% | $ 1.73 | $19.03 | $14.00 | 11.00% | $ 1.54 | 21.00% | $ 3.26 | 10.00% | $ 1.88 | $20.68 | $15.00 | 11.00% | $ 1.65 | 21.00% | $ 3.50 | 10.00% | $ 2.01 | $22.16 | $16.00 | 11.00% | $ 1.76 | 22.00% | $ 3.91 | 10.00% | $ 2.17 | $23.83 | $17.00 | 11.00% | $ 1.87 | 22.00% | $ 4.15 | 10.00% |
| Specialist (Advanced) | Redstone Arsenal, AL | Contractor Site | Specialist (Advanced)Redstone Arsenal, ALContractor Site | $11.00 | 10.00% | $ 1.10 | 21.00% | $ 2.54 | 10.00% | $ 1.46 | $16.11 | $12.00 | 10.00% | $ 1.20 | 21.00% | $ 2.77 | 10.00% | $ 1.60 | $17.57 | $13.00 | 11.00% | $ 1.43 | 21.00% | $ 3.03 | 10.00% | $ 1.75 | $19.21 | $14.00 | 11.00% | $ 1.54 | 21.00% | $ 3.26 | 10.00% | $ 1.88 | $20.68 | $15.00 | 11.00% | $ 1.65 | 22.00% | $ 3.66 | 10.00% | $ 2.03 | $22.34 | $16.00 | 11.00% | $ 1.76 | 22.00% | $ 3.91 | 10.00% |
| Specialist (Intermediate) | Redstone Arsenal, AL | Contractor Site | Specialist (Intermediate)Redstone Arsenal, ALContractor Site | $10.00 | 10.00% | $ 1.00 | 21.00% | $ 2.31 | 10.00% | $ 1.33 | $14.64 | $11.00 | 10.00% | $ 1.10 | 21.00% | $ 2.54 | 10.00% | $ 1.46 | $16.11 | $12.00 | 11.00% | $ 1.32 | 21.00% | $ 2.80 | 10.00% | $ 1.61 | $17.73 | $13.00 | 11.00% | $ 1.43 | 21.00% | $ 3.03 | 10.00% | $ 1.75 | $19.21 | $14.00 | 11.00% | $ 1.54 | 22.00% | $ 3.42 | 10.00% | $ 1.90 | $20.85 | $15.00 | 11.00% | $ 1.65 | 22.00% | $ 3.66 | 10.00% |
| Engineer (Advanced) | Redstone Arsenal, AL | Contractor Site | Engineer (Advanced)Redstone Arsenal, ALContractor Site | $9.00 | 10.00% | $ 0.90 | 21.00% | $ 2.08 | 10.00% | $ 1.20 | $13.18 | $10.00 | 10.00% | $ 1.00 | 21.00% | $ 2.31 | 10.00% | $ 1.33 | $14.64 | $11.00 | 11.00% | $ 1.21 | 21.00% | $ 2.56 | 10.00% | $ 1.48 | $16.25 | $12.00 | 11.00% | $ 1.32 | 21.00% | $ 2.80 | 10.00% | $ 1.61 | $17.73 | $13.00 | 11.00% | $ 1.43 | 22.00% | $ 3.17 | 10.00% | $ 1.76 | $19.37 | $14.00 | 11.00% | $ 1.54 | 22.00% | $ 3.42 | 10.00% |
| Engineer (Intermediate) | Redstone Arsenal, AL | Contractor Site | Engineer (Intermediate)Redstone Arsenal, ALContractor Site | $8.00 | 10.00% | $ 0.80 | 21.00% | $ 1.85 | 10.00% | $ 1.06 | $11.71 | $9.00 | 10.00% | $ 0.90 | 21.00% | $ 2.08 | 10.00% | $ 1.20 | $13.18 | $10.00 | 11.00% | $ 1.10 | 21.00% | $ 2.33 | 10.00% | $ 1.34 | $14.77 | $11.00 | 11.00% | $ 1.21 | 21.00% | $ 2.56 | 10.00% | $ 1.48 | $16.25 | $12.00 | 11.00% | $ 1.32 | 22.00% | $ 2.93 | 10.00% | $ 1.63 | $17.88 | $13.00 | 11.00% | $ 1.43 | 22.00% | $ 3.17 | 10.00% |
| Technician (Advanced) | Redstone Arsenal, AL | Contractor Site | Technician (Advanced)Redstone Arsenal, ALContractor Site | $7.00 | 10.00% | $ 0.70 | 21.00% | $ 1.62 | 10.00% | $ 0.93 | $10.25 | $8.00 | 10.00% | $ 0.80 | 21.00% | $ 1.85 | 10.00% | $ 1.06 | $11.71 | $9.00 | 11.00% | $ 0.99 | 21.00% | $ 2.10 | 10.00% | $ 1.21 | $13.30 | $10.00 | 11.00% | $ 1.10 | 21.00% | $ 2.33 | 10.00% | $ 1.34 | $14.77 | $11.00 | 11.00% | $ 1.21 | 22.00% | $ 2.69 | 10.00% | $ 1.49 | $16.39 | $12.00 | 11.00% | $ 1.32 | 22.00% | $ 2.93 | 10.00% |
This is the start of the file's text. The full file is on GovTribe.
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .