Cost Roll-Up
| PRIME CONTRACTOR COST ROLL-UP | ||||||||||
| Contractor: | Insert contractor name | |||||||||
| HQ0147-18-R-0004 | Information Technical Management & Analysis (ITMA) | |||||||||
| Stakeholder | CLIN | Description | CFY 1 | CFY 2 | CFY 3 | CFY 4 | CFY 5 | Total | Crosscheck | Unreconciled |
| ALL | All CLINs | Labor Hours | 800 | 1,600 | 800 | 800 | 800 | 4,800 | 4,800 | - 0 |
| Labor | $7,308 | $15,784 | $8,563 | $7,882 | $3,751 | $43,288 | $43,288 | $0 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | $40,745 | $0 | ||
| Subcontracts | $4,848 | $10,886 | $6,121 | $9,042 | $9,849 | $40,745 | ||||
| Subcontractor Fee | $174 | $390 | $219 | $318 | $342 | $1,443 | $1,443 | $0 | ||
| Procurement Overhead | $251 | $564 | $317 | $468 | $510 | $2,109 | $2,109 | $0 | ||
| G&A | $527 | $1,184 | $666 | $983 | $1,070 | $4,430 | $4,430 | $0 | ||
| Total Labor Cost | $13,108 | $28,808 | $15,885 | $18,692 | $15,522 | $92,014 | $92,014 | $0 | ||
| Fixed Fee | $647 | $1,421 | $783 | $919 | $759 | $4,529 | $4,529 | $0 | ||
| Total CPFF | $13,755 | $30,229 | $16,668 | $19,610 | $16,281 | $96,543 | $96,543 | $0 |
| 0101, 1101, 2101 | AB Travel | $410,000 | Surge break-out | |
| 0102, 1102, 2102 | GD Travel | $654,000 | Cost | $2,734,286 |
| 0103, 1103, 2103 | ICT Travel | $570,000 | Fee % | 5% |
| 0104, 1104, 2104 | GM Travel | $25,000 | Fixed Fee | $136,714 |
| Total Travel | $1,659,000 | Total CPFF | $2,871,000 | |
| 0005, 1005, 2005 | ICT ODC | $6,000 | ||
| 0006, 1006, 2006 | AB ODC | $10,000 | ||
| Total ODC | $16,000 | |||
| 0004 | Total Surge | $2,871,000 | ||
| 0205, 1205, 2205 | Total FMS Labor Option | $2,871,000 | ||
| SUBTOTAL ALL CLINS | $7,513,543 | |||
| Cost for Option to Extend Services (see FAR Clause 52.217-8) | $7,760.79 | |||
| Fee for Option to Extend Services (see FAR Clause 52.217-8) | $379.48 | |||
| Total Option to Extend Services | $8,140.27 | |||
| TOTAL ALL CLINS | $7,521,683 |
Error Check Good Good Good Good Good Good
| This tab rolls up the labor hours, labor cost, IWTA cost, subcontract cost, and subcontract fee by CLIN. | ||||||
| RFP-specified amounts are used for Travel, ODCs, and Surge. | ||||||
| Procurement, overhead, G&A and Fee rates are carried forward (linked) from the Rates tab. | ||||||
| Procurement overhead, G&A on non-labor costs, and fee is calculated on this tab. | ||||||
| Offerors, IWTAs and major subcontractors must correct and tailor to eliminate errors and to conform to their estimating and accounting systems so that each rate/factor calculation uses the correct allocation base. | ||||||
| Prime offerors may NOT propose fee on subcontractor fee. | ||||||
| Column Index Reference | 5 | 6 | 7 | 8 | 9 | |
| Rates Applied Below | Procurement Overhead | 5.00% | 5.00% | 5.00% | 5.00% | 5.00% |
| G&A | 10.00% | 10.00% | 10.00% | 10.00% | 10.00% | |
| Fixed Fee | 5.00% |
| AB | 0201 | Labor Hours | 200 | 400 | 200 | 0 | 0 | 800 |
| Labor | $1,379 | $3,049 | $1,685 | $0 | $0 | $6,114 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $659 | $1,611 | $960 | $0 | $0 | $3,230 | ||
| Subcontractor Fee | $26 | $64 | $38 | $0 | $0 | $129 | ||
| Procurement Overhead | $34 | $84 | $50 | $0 | $0 | $168 | ||
| G&A | $72 | $176 | $105 | $0 | $0 | $353 | ||
| Total Labor Cost | $2,171 | $4,984 | $2,839 | $0 | $0 | $9,993 | ||
| Fixed Fee | $107 | $246 | $140 | $0 | $0 | $493 | ||
| Total CPFF | $2,278 | $5,230 | $2,979 | $0 | $0 | $10,486 |
| 1201 | Labor Hours | 0 | 0 | 0 | 200 | 0 | 200 |
| Labor | $0 | $0 | $0 | $2,134 | $0 | $2,134 | |
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | |
| Subcontracts | $0 | $0 | $0 | $2,438 | $0 | $2,438 | |
| Subcontractor Fee | $0 | $0 | $0 | $98 | $0 | $98 | |
| Procurement Overhead | $0 | $0 | $0 | $127 | $0 | $127 | |
| G&A | $0 | $0 | $0 | $266 | $0 | $266 | |
| Total Labor Cost | $0 | $0 | $0 | $5,062 | $0 | $5,062 | |
| Fixed Fee | $0 | $0 | $0 | $248 | $0 | $248 | |
| Total CPFF | $0 | $0 | $0 | $5,310 | $0 | $5,310 |
| 2201 | Labor Hours | 0 | 0 | 0 | 0 | 200 | 200 |
| Labor | $0 | $0 | $0 | $0 | $1,700 | $1,700 | |
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | |
| Subcontracts | $0 | $0 | $0 | $0 | $2,085 | $2,085 | |
| Subcontractor Fee | $0 | $0 | $0 | $0 | $83 | $83 | |
| Procurement Overhead | $0 | $0 | $0 | $0 | $108 | $108 | |
| G&A | $0 | $0 | $0 | $0 | $228 | $228 | |
| Total Labor Cost | $0 | $0 | $0 | $0 | $4,205 | $4,205 | |
| Fixed Fee | $0 | $0 | $0 | $0 | $206 | $206 | |
| Total CPFF | $0 | $0 | $0 | $0 | $4,411 | $4,411 |
All Total CPFF $2,278 $5,230 $2,979 $5,310 $4,411 $20,207
| GD | 0202 | Labor Hours | 200 | 400 | 200 | 0 | 0 | 800 |
| Labor | $2,105 | $4,501 | $2,418 | $0 | $0 | $9,024 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $605 | $1,513 | $923 | $0 | $0 | $3,041 | ||
| Subcontractor Fee | $18 | $45 | $28 | $0 | $0 | $91 | ||
| Procurement Overhead | $31 | $78 | $48 | $0 | $0 | $157 | ||
| G&A | $65 | $164 | $100 | $0 | $0 | $329 | ||
| Total Labor Cost | $2,825 | $6,301 | $3,516 | $0 | $0 | $12,641 | ||
| Fixed Fee | $140 | $313 | $174 | $0 | $0 | $628 | ||
| Total CPFF | $2,965 | $6,613 | $3,690 | $0 | $0 | $13,269 |
| 1202 | Labor Hours | 0 | 0 | 0 | 200 | 0 | 200 |
| Labor | $0 | $0 | $0 | $2,029 | $0 | $2,029 | |
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | |
| Subcontracts | $0 | $0 | $0 | $2,385 | $0 | $2,385 | |
| Subcontractor Fee | $0 | $0 | $0 | $84 | $0 | $84 | |
| Procurement Overhead | $0 | $0 | $0 | $123 | $0 | $123 | |
| G&A | $0 | $0 | $0 | $259 | $0 | $259 | |
| Total Labor Cost | $0 | $0 | $0 | $4,880 | $0 | $4,880 | |
| Fixed Fee | $0 | $0 | $0 | $240 | $0 | $240 | |
| Total CPFF | $0 | $0 | $0 | $5,120 | $0 | $5,120 |
| 2202 | Labor Hours | 0 | 0 | 0 | 0 | 200 | 200 |
| Labor | $0 | $0 | $0 | $0 | $806 | $806 | |
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | |
| Subcontracts | $0 | $0 | $0 | $0 | $2,846 | $2,846 | |
| Subcontractor Fee | $0 | $0 | $0 | $0 | $96 | $96 | |
| Procurement Overhead | $0 | $0 | $0 | $0 | $147 | $147 | |
| G&A | $0 | $0 | $0 | $0 | $309 | $309 | |
| Total Labor Cost | $0 | $0 | $0 | $0 | $4,204 | $4,204 | |
| Fixed Fee | $0 | $0 | $0 | $0 | $205 | $205 | |
| Total CPFF | $0 | $0 | $0 | $0 | $4,410 | $4,410 |
All Total CPFF $2,965 $6,613 $3,690 $5,120 $4,410 $22,799
| ICT | 0203 | Labor Hours | 200 | 400 | 200 | 0 | 0 | 800 |
| Labor | $1,969 | $4,229 | $2,281 | $0 | $0 | $8,478 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $1,391 | $3,075 | $1,699 | $0 | $0 | $6,165 | ||
| Subcontractor Fee | $42 | $92 | $51 | $0 | $0 | $185 | ||
| Procurement Overhead | $72 | $158 | $87 | $0 | $0 | $317 | ||
| G&A | $150 | $333 | $184 | $0 | $0 | $667 | ||
| Total Labor Cost | $3,623 | $7,887 | $4,302 | $0 | $0 | $15,812 | ||
| Fixed Fee | $179 | $390 | $213 | $0 | $0 | $781 | ||
| Total CPFF | $3,802 | $8,276 | $4,515 | $0 | $0 | $16,593 |
| 1203 | Labor Hours | 0 | 0 | 0 | 200 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,913 | $0 | $1,913 | |
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | |
| Subcontracts | $0 | $0 | $0 | $2,142 | $0 | $2,142 | |
| Subcontractor Fee | $0 | $0 | $0 | $64 | $0 | $64 | |
| Procurement Overhead | $0 | $0 | $0 | $110 | $0 | $110 | |
| G&A | $0 | $0 | $0 | $232 | $0 | $232 | |
| Total Labor Cost | $0 | $0 | $0 | $4,461 | $0 | $4,461 | |
| Fixed Fee | $0 | $0 | $0 | $220 | $0 | $220 | |
| Total CPFF | $0 | $0 | $0 | $4,681 | $0 | $4,681 |
| 2203 | Labor Hours | 0 | 0 | 0 | 0 | 200 | 200 |
| Labor | $0 | $0 | $0 | $0 | $659 | $659 | |
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | |
| Subcontracts | $0 | $0 | $0 | $0 | $2,532 | $2,532 | |
| Subcontractor Fee | $0 | $0 | $0 | $0 | $76 | $76 | |
| Procurement Overhead | $0 | $0 | $0 | $0 | $130 | $130 | |
| G&A | $0 | $0 | $0 | $0 | $274 | $274 | |
| Total Labor Cost | $0 | $0 | $0 | $0 | $3,672 | $3,672 | |
| Fixed Fee | $0 | $0 | $0 | $0 | $180 | $180 | |
| Total CPFF | $0 | $0 | $0 | $0 | $3,852 | $3,852 |
All Total CPFF $3,802 $8,276 $4,515 $4,681 $3,852 $25,126
| GM | 0204 | Labor Hours | 200 | 400 | 200 | 0 | 0 | 800 |
| Labor | $1,854 | $4,005 | $2,179 | $0 | $0 | $8,039 | ||
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | ||
| Subcontracts | $2,193 | $4,689 | $2,538 | $0 | $0 | $9,420 | ||
| Subcontractor Fee | $88 | $188 | $102 | $0 | $0 | $377 | ||
| Procurement Overhead | $114 | $244 | $132 | $0 | $0 | $490 | ||
| G&A | $239 | $512 | $277 | $0 | $0 | $1,029 | ||
| Total Labor Cost | $4,489 | $9,637 | $5,229 | $0 | $0 | $19,355 | ||
| Fixed Fee | $220 | $472 | $256 | $0 | $0 | $949 | ||
| Total CPFF | $4,709 | $10,110 | $5,485 | $0 | $0 | $20,304 |
| 1204 | Labor Hours | 0 | 0 | 0 | 200 | 0 | 200 |
| Labor | $0 | $0 | $0 | $1,806 | $0 | $1,806 | |
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | |
| Subcontracts | $0 | $0 | $0 | $2,077 | $0 | $2,077 | |
| Subcontractor Fee | $0 | $0 | $0 | $72 | $0 | $72 | |
| Procurement Overhead | $0 | $0 | $0 | $107 | $0 | $107 | |
| G&A | $0 | $0 | $0 | $226 | $0 | $226 | |
| Total Labor Cost | $0 | $0 | $0 | $4,288 | $0 | $4,288 | |
| Fixed Fee | $0 | $0 | $0 | $211 | $0 | $211 | |
| Total CPFF | $0 | $0 | $0 | $4,499 | $0 | $4,499 |
| 2204 | Labor Hours | 0 | 0 | 0 | 0 | 200 | 200 |
| Labor | $0 | $0 | $0 | $0 | $586 | $586 | |
| IWTA | $0 | $0 | $0 | $0 | $0 | $0 | |
| Subcontracts | $0 | $0 | $0 | $0 | $2,385 | $2,385 | |
| Subcontractor Fee | $0 | $0 | $0 | $0 | $87 | $87 | |
| Procurement Overhead | $0 | $0 | $0 | $0 | $124 | $124 | |
| G&A | $0 | $0 | $0 | $0 | $260 | $260 | |
| Total Labor Cost | $0 | $0 | $0 | $0 | $3,441 | $3,441 | |
| Fixed Fee | $0 | $0 | $0 | $0 | $168 | $168 | |
| Total CPFF | $0 | $0 | $0 | $0 | $3,608 | $3,608 |
All Total CPFF $4,709 $10,110 $5,485 $4,499 $3,608 $28,411
GRAND TOTAL All $13,755 $30,229 $16,668 $19,610 $16,281 $96,543
Surge & Mod Rates Surge/Mod FBLR Rates per labor hour by CLIN (automatically calculated)
| Base | Surge/Mod Rates | Option 1 | Surge/Mod Rates | ||||
| CLIN | Cost | Fee | Total | CLIN | Cost | Fee | Total |
| 0201 | $12.49 | $0.62 | $13.11 | 1201 | $25.31 | $1.24 | $26.55 |
| 0202 | $15.80 | $0.78 | $16.59 | 1202 | $24.40 | $1.20 | $25.60 |
| 0203 | $19.77 | $0.98 | $20.74 | 1203 | $22.31 | $1.10 | $23.41 |
| 0204 | $24.19 | $1.19 | $25.38 | 1204 | $21.44 | $1.05 | $22.50 |
| Option 2 | Surge/Mod Rates | ||
| CLIN | Cost | Fee | Total |
| 2201 | $21.02 | $1.03 | $22.05 |
| 2202 | $21.02 | $1.03 | $22.05 |
| 2203 | $18.36 | $0.90 | $19.26 |
| 2204 | $17.20 | $0.84 | $18.04 |
Labor Resources
| PRIME LABOR RESOURCES AND COST | |||||||||||||||||||||||||||||||||||||||||||||||||
| Contractor: | Insert contractor name | ||||||||||||||||||||||||||||||||||||||||||||||||
| HQ0147-18-R-0004 | |||||||||||||||||||||||||||||||||||||||||||||||||
| The prime offeror will combine their labor resources with submittals from all IWTAs and subcontractors on this one tab. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Contractors will populate this tab to include the proposed contractor labor resources for all CLINs excluding Surge. | |||||||||||||||||||||||||||||||||||||||||||||||||
| FBLRs are carried forward (linked) from the prime, IWTA, or subcontractor's FBLR tab. | |||||||||||||||||||||||||||||||||||||||||||||||||
| To protect proprietary data, the IWTA or subcontractor may elect to copy the FBLRs in columns V:AA and paste as values before submission to the prime contractor, with the result that the IWTA or major subcontractor rates may be hard-coded in the prime offeror’s EPW. | |||||||||||||||||||||||||||||||||||||||||||||||||
| For submission to the Government, the full detail of the IWTA or subcontractor direct/indirect rates and FBLR rates, and links to the IWTA's or subcontractor's FBLR tab will remain in-tact. | |||||||||||||||||||||||||||||||||||||||||||||||||
| The prime contractor will also add hours and cost for minor subcontractors TBD. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Columns B through I, M through R, and T should be populated by the offeror, to present the proposed resources for accomplishing the PWS requirements. | |||||||||||||||||||||||||||||||||||||||||||||||||
| The example data provided in Columns B through I, M through R, and T are there only for formula and link testing and should not influence the proposed EPW. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Calculations listed in Columns AS through CE are for Government evaluation purposes only. | |||||||||||||||||||||||||||||||||||||||||||||||||
| For Columns AS through CE, Offerors, IWTAs and major subcontractors must correct and tailor to eliminate errors and to conform to their estimating and accounting systems so that each rate/factor calculation uses the correct allocation base. | 5.00% | << Prime's procurement Overhead Rate | |||||||||||||||||||||||||||||||||||||||||||||||
| Use the drop-down arrows to populate the cells where possible. | 9 | 18 | 27 | 36 | 45 | 54 | Subcontractor fee, not prime offeror or IWTA | Prime offeror procurement overhead on subcontract cost | |||||||||||||||||||||||||||||||||||||||||
| PWS | Description | Prime/Subcontractor Name | Prime, IWTA or Subcontractor | Major or Minor | Labor Category | Location | Work Site | CLIN-Pd-ST | Stakeholder | CLIN | Period | CFY 1 Hours | CFY 2 Hours | CFY 3 Hours | CFY 4 Hours | CFY 5 Hours | CFY 6 Hours | Total | BOE Reference | Index Column | CFY 1 FBLR | CFY 2 FBLR | CFY 3 FBLR | CFY 4 FBLR | CFY 5 FBLR | CFY 6 FBLR | AB | CFY 1 Cost | CFY 2 Cost | CFY 3 Cost | CFY 4 Cost | CFY 5 Cost | CFY 6 Cost | Total Cost | AJ | CFY 1 Fee | CFY 2 Fee | CFY 3 Fee | CFY 4 Fee | CFY 5 Fee | CFY 6 Fee | Total Fee | AR | CFY 1 P/O | CFY 2 P/O | CFY 3 P/O | CFY 4 P/O | CFY 5 P/O | CFY 6 P/O |
| 3.1 | 3.1 Architecture & Engineering (A&E) Team Support | Prime R Us | Prime | Contract Program Manager | Redstone Arsenal, AL | Gov't Site | 0201BaseAB | AB | 0201 | Base | 50 | 100 | 50 | 200 | Cost Volume page 10, BOE Number 123456.01 | Contract Program ManagerRedstone Arsenal, ALGov't Site | $21.78 | $23.23 | $24.91 | $26.37 | $27.84 | $29.30 | $1,089 | $2,323 | $1,245 | $0 | $0 | $0 | $4,658 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.2 | 3.2 Executive, Regional, and IT Policy Services | Prime R Us | Prime | Analyst (Advanced) | Schriver AFB, CO | Gov't Site | 0202BaseGD | GD | 0202 | Base | 50 | 100 | 50 | 200 | Analyst (Advanced)Schriver AFB, COGov't Site | $20.33 | $21.78 | $23.44 | $24.91 | $26.37 | $27.84 | $1,016 | $2,178 | $1,172 | $0 | $0 | $0 | $4,367 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | AR | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 3.3 | 3.3 IT Networks & Systems Services | Prime R Us | Prime | Analyst (Intermediate) | Ft. Belvior, VA | Gov't Site | 0203BaseICT | ICT | 0203 | Base | 50 | 100 | 50 | 200 | Analyst (Intermediate)Ft. Belvior, VAGov't Site | $18.88 | $20.33 | $21.98 | $23.44 | $24.91 | $26.37 | $944 | $2,033 | $1,099 | $0 | $0 | $0 | $4,076 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.4 | 3.4 Information Management Services | Prime R Us | Prime | Analyst (Basic) | Dahlgren, VA | Gov't Site | 0204BaseGM | GM | 0204 | Base | 50 | 100 | 50 | 200 | Analyst (Basic)Dahlgren, VAGov't Site | $17.42 | $18.88 | $20.51 | $21.98 | $23.44 | $24.91 | $871 | $1,888 | $1,026 | $0 | $0 | $0 | $3,784 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.5 | 3.5 Enterprise Operations & Engineering Services | Prime R Us | Prime | Specialist (Advanced) | Redstone Arsenal, AL | Gov't Site | 1201Option 1AB | AB | 1201 | Option 1 | 50 | 50 | Specialist (Advanced)Redstone Arsenal, ALGov't Site | $15.97 | $17.42 | $19.05 | $20.51 | $21.98 | $23.44 | $0 | $0 | $0 | $1,026 | $0 | $0 | $1,026 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.6 | 3.6 Unified Communications Services | Prime R Us | Prime | Specialist (Intermediate) | Schriver AFB, CO | Gov't Site | 1202Option 1GD | GD | 1202 | Option 1 | 50 | 50 | Specialist (Intermediate)Schriver AFB, COGov't Site | $14.52 | $15.97 | $17.58 | $19.05 | $20.51 | $21.98 | $0 | $0 | $0 | $952 | $0 | $0 | $952 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.1 | 3.1 Architecture & Engineering (A&E) Team Support | Prime R Us | Prime | Specialist (Intermediate) | Ft. Belvior, VA | Gov't Site | 1203Option 1ICT | ICT | 1203 | Option 1 | 50 | 50 | Specialist (Intermediate)Ft. Belvior, VAGov't Site | $14.52 | $15.97 | $17.58 | $19.05 | $20.51 | $21.98 | $0 | $0 | $0 | $952 | $0 | $0 | $952 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.2 | 3.2 Executive, Regional, and IT Policy Services | Prime R Us | Prime | Engineer (Advanced) | Dahlgren, VA | Gov't Site | 1204Option 1GM | GM | 1204 | Option 1 | 50 | 50 | Engineer (Advanced)Dahlgren, VAGov't Site | $11.62 | $13.07 | $14.65 | $16.12 | $17.58 | $19.05 | $0 | $0 | $0 | $806 | $0 | $0 | $806 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.3 | 3.3 IT Networks & Systems Services | Prime R Us | Prime | Engineer (Intermediate) | Redstone Arsenal, AL | Gov't Site | 2201Option 2AB | AB | 2201 | Option 2 | 50 | 50 | Engineer (Intermediate)Redstone Arsenal, ALGov't Site | $10.16 | $11.62 | $13.19 | $14.65 | $16.12 | $17.58 | $0 | $0 | $0 | $0 | $806 | $0 | $806 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.4 | 3.4 Information Management Services | Prime R Us | Prime | Engineer (Intermediate) | Schriver AFB, CO | Gov't Site | 2202Option 2GD | GD | 2202 | Option 2 | 50 | 50 | Engineer (Intermediate)Schriver AFB, COGov't Site | $10.16 | $11.62 | $13.19 | $14.65 | $16.12 | $17.58 | $0 | $0 | $0 | $0 | $806 | $0 | $806 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.5 | 3.5 Enterprise Operations & Engineering Services | Prime R Us | Prime | Technician (Advanced) | Ft. Belvior, VA | Gov't Site | 2203Option 2ICT | ICT | 2203 | Option 2 | 50 | 50 | Technician (Advanced)Ft. Belvior, VAGov't Site | $7.26 | $8.71 | $10.26 | $11.72 | $13.19 | $14.65 | $0 | $0 | $0 | $0 | $659 | $0 | $659 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.6 | 3.6 Unified Communications Services | Prime R Us | Prime | Technician (Intermediate) | Dahlgren, VA | Gov't Site | 2204Option 2GM | GM | 2204 | Option 2 | 50 | 50 | Technician (Intermediate)Dahlgren, VAGov't Site | $5.81 | $7.26 | $8.79 | $10.26 | $11.72 | $13.19 | $0 | $0 | $0 | $0 | $586 | $0 | $586 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.1 | 3.1 Architecture & Engineering (A&E) Team Support | Prime R Us | Prime | Technician (Intermediate) | Redstone Arsenal, AL | Gov't Site | 0201BaseAB | AB | 0201 | Base | 50 | 100 | 50 | 200 | Technician (Intermediate)Redstone Arsenal, ALGov't Site | $5.81 | $7.26 | $8.79 | $10.26 | $11.72 | $13.19 | $290 | $726 | $440 | $0 | $0 | $0 | $1,456 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.2 | 3.2 Executive, Regional, and IT Policy Services | Prime R Us | Prime | Contract Program Manager | Schriver AFB, CO | Gov't Site | 0202BaseGD | GD | 0202 | Base | 50 | 100 | 50 | 200 | Contract Program ManagerSchriver AFB, COGov't Site | $21.78 | $23.23 | $24.91 | $26.37 | $27.84 | $29.30 | $1,089 | $2,323 | $1,245 | $0 | $0 | $0 | $4,658 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.3 | 3.3 IT Networks & Systems Services | Prime R Us | Prime | Analyst (Advanced) | Ft. Belvior, VA | Contractor Site | 0203BaseICT | ICT | 0203 | Base | 50 | 100 | 50 | 200 | Analyst (Advanced)Ft. Belvior, VAContractor Site | $20.50 | $21.96 | $23.64 | $25.12 | $26.81 | $28.30 | $1,025 | $2,196 | $1,182 | $0 | $0 | $0 | $4,403 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.4 | 3.4 Information Management Services | Prime R Us | Prime | Analyst (Intermediate) | Dahlgren, VA | Contractor Site | 0204BaseGM | GM | 0204 | Base | 50 | 100 | 50 | 200 | Analyst (Intermediate)Dahlgren, VAContractor Site | $19.66 | $21.18 | $23.08 | $24.62 | $26.15 | $27.69 | $983 | $2,118 | $1,154 | $0 | $0 | $0 | $4,254 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| 3.5 | 3.5 Enterprise Operations & Engineering Services | Prime R Us | Prime | Analyst (Basic) | Redstone Arsenal, AL | Contractor Site | 1201Option 1AB | AB | 1201 | Option 1 | 50 | 50 | Analyst (Basic)Redstone Arsenal, ALContractor Site | $17.57 | $19.03 | $20.68 | $22.16 | $23.83 | $25.32 | $0 | $0 | $0 | $1,108 | $0 | $0 | $1,108 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.6 | 3.6 Unified Communications Services | Prime R Us | Prime | Specialist (Advanced) | Schriver AFB, CO | Contractor Site | 1202Option 1GD | GD | 1202 | Option 1 | 50 | 50 | Specialist (Advanced)Schriver AFB, COContractor Site | $16.64 | $18.15 | $20.00 | $21.54 | $23.08 | $24.62 | $0 | $0 | $0 | $1,077 | $0 | $0 | $1,077 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.1 | 3.1 Architecture & Engineering (A&E) Team Support | Prime R Us | Prime | Specialist (Intermediate) | Ft. Belvior, VA | Contractor Site | 1203Option 1ICT | ICT | 1203 | Option 1 | 50 | 50 | Specialist (Intermediate)Ft. Belvior, VAContractor Site | $14.64 | $16.11 | $17.73 | $19.21 | $20.85 | $22.34 | $0 | $0 | $0 | $960 | $0 | $0 | $960 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.2 | 3.2 Executive, Regional, and IT Policy Services | Prime R Us | Prime | Specialist (Intermediate) | Dahlgren, VA | Contractor Site | 1204Option 1GM | GM | 1204 | Option 1 | 50 | 50 | Specialist (Intermediate)Dahlgren, VAContractor Site | $15.13 | $16.64 | $18.46 | $20.00 | $21.54 | $23.08 | $0 | $0 | $0 | $1,000 | $0 | $0 | $1,000 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.3 | 3.3 IT Networks & Systems Services | Prime R Us | Prime | Engineer (Advanced) | Redstone Arsenal, AL | Contractor Site | 2201Option 2AB | AB | 2201 | Option 2 | 50 | 50 | Engineer (Advanced)Redstone Arsenal, ALContractor Site | $11.71 | $13.18 | $14.77 | $16.25 | $17.88 | $19.37 | $0 | $0 | $0 | $0 | $894 | $0 | $894 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 3.4 | 3.4 Information Management Services | Subcontract Z | Subcontractor | Major | Engineer (Intermediate) | Schriver AFB, CO | Contractor Site | 2202Option 2GD | GD | 2202 | Option 2 | 50 | 50 | Engineer (Intermediate)Schriver AFB, COContractor Site | $10.59 | $12.10 | $13.85 | $15.38 | $16.92 | $18.46 | $0 | $0 | $0 | $0 | $846 | $0 | $846 | $0 | $0 | $0 | $0 | $25 | $0 | $25 | $0 | $0 | $0 | $0 | $44 | $0 | |||||||||
| 3.5 | 3.5 Enterprise Operations & Engineering Services | Subcontract Z | Subcontractor | Minor | Engineer (Intermediate) | Ft. Belvior, VA | Contractor Site | 2203Option 2ICT | ICT | 2203 | Option 2 | 50 | 50 | Engineer (Intermediate)Ft. Belvior, VAContractor Site | $10.25 | $11.71 | $13.30 | $14.77 | $16.39 | $17.88 | $0 | $0 | $0 | $0 | $819 | $0 | $819 | $0 | $0 | $0 | $0 | $25 | $0 | $25 | $0 | $0 | $0 | $0 | $42 | $0 | |||||||||
| 3.6 | 3.6 Unified Communications Services | Subcontract X | Subcontractor | Major | Technician (Advanced) | Dahlgren, VA | Contractor Site | 2204Option 2GM | GM | 2204 | Option 2 | 50 | 50 | Technician (Advanced)Dahlgren, VAContractor Site | $7.56 | $9.08 | $10.77 | $12.31 | $13.85 | $15.38 | $0 | $0 | $0 | $0 | $692 | $0 | $692 | $0 | $0 | $0 | $0 | $28 | $0 | $28 | $0 | $0 | $0 | $0 | $36 | $0 | |||||||||
| 3.1 | 3.1 Architecture & Engineering (A&E) Team Support | Subcontract X | Subcontractor | Minor | Technician (Intermediate) | Redstone Arsenal, AL | Contractor Site | 0201BaseAB | AB | 0201 | Base | 50 | 100 | 50 | 200 | Technician (Intermediate)Redstone Arsenal, ALContractor Site | $5.86 | $7.32 | $8.86 | $10.34 | $11.92 | $13.41 | $293 | $732 | $443 | $0 | $0 | $0 | $1,468 | $12 | $29 | $18 | $0 | $0 | $0 | $59 | $15 | $38 | $23 | $0 | $0 | $0 | |||||||
| 3.2 | 3.2 Executive, Regional, and IT Policy Services | Subcontract Z | Subcontractor | Major | Technician (Intermediate) | Schriver AFB, CO | Contractor Site | 0202BaseGD | GD | 0202 | Base | 50 | 100 | 50 | 200 | Technician (Intermediate)Schriver AFB, COContractor Site | $6.05 | $7.56 | $9.23 | $10.77 | $12.31 | $13.85 | $303 | $756 | $462 | $0 | $0 | $0 | $1,520 | $9 | $23 | $14 | $0 | $0 | $0 | $46 | $16 | $39 | $24 | $0 | $0 | $0 | |||||||
| 3.3 | 3.3 IT Networks & Systems Services | Subcontract Z | Subcontractor | Minor | Contract Program Manager | Ft. Belvior, VA | Contractor Site | 0203BaseICT | ICT | 0203 | Base | 50 | 100 | 50 | 200 | Contract Program ManagerFt. Belvior, VAContractor Site | $21.96 | $23.43 | $25.12 | $26.59 | $28.30 | $29.79 | $1,098 | $2,343 | $1,256 | $0 | $0 | $0 | $4,696 | $33 | $70 | $38 | $0 | $0 | $0 | $141 | $57 | $121 | $65 | $0 | $0 | $0 | |||||||
| 3.4 | 3.4 Information Management Services | Subcontract X | Subcontractor | Major | Analyst (Advanced) | Dahlgren, VA | Contractor Site | 0204BaseGM | GM | 0204 | Base | 50 | 100 | 50 | 200 | Analyst (Advanced)Dahlgren, VAContractor Site | $21.18 | $22.69 | $24.62 | $26.15 | $27.69 | $29.23 | $1,059 | $2,269 | $1,231 | $0 | $0 | $0 | $4,558 | $42 | $91 | $49 | $0 | $0 | $0 | $182 | $55 | $118 | $64 | $0 | $0 | $0 | |||||||
| 3.5 | 3.5 Enterprise Operations & Engineering Services | Subcontract X | Subcontractor | Minor | Analyst (Intermediate) | Redstone Arsenal, AL | Contractor Site | 1201Option 1AB | AB | 1201 | Option 1 | 50 | 50 | Analyst (Intermediate)Redstone Arsenal, ALContractor Site | $19.03 | $20.50 | $22.16 | $23.64 | $25.32 | $26.81 | $0 | $0 | $0 | $1,182 | $0 | $0 | $1,182 | $0 | $0 | $0 | $47 | $0 | $0 | $47 | $0 | $0 | $0 | $61 | $0 | $0 | |||||||||
| 3.6 | 3.6 Unified Communications Services | Subcontract Z | Subcontractor | Major | Analyst (Basic) | Schriver AFB, CO | Contractor Site | 1202Option 1GD | GD | 1202 | Option 1 | 50 | 50 | Analyst (Basic)Schriver AFB, COContractor Site | $18.15 | $19.66 | $21.54 | $23.08 | $24.62 | $26.15 | $0 | $0 | $0 | $1,154 | $0 | $0 | $1,154 | $0 | $0 | $0 | $35 | $0 | $0 | $35 | $0 | $0 | $0 | $59 | $0 | $0 | |||||||||
| 3.1 | 3.1 Architecture & Engineering (A&E) Team Support | Subcontract Z | Subcontractor | Minor | Specialist (Advanced) | Ft. Belvior, VA | Contractor Site | 1203Option 1ICT | ICT | 1203 | Option 1 | 50 | 50 | Specialist (Advanced)Ft. Belvior, VAContractor Site | $16.11 | $17.57 | $19.21 | $20.68 | $22.34 | $23.83 | $0 | $0 | $0 | $1,034 | $0 | $0 | $1,034 | $0 | $0 | $0 | $31 | $0 | $0 | $31 | $0 | $0 | $0 | $53 | $0 | $0 | |||||||||
| 3.2 | 3.2 Executive, Regional, and IT Policy Services | Subcontract X | Subcontractor | Major | Specialist (Intermediate) | Dahlgren, VA | Contractor Site | 1204Option 1GM | GM | 1204 | Option 1 | 50 | 50 | Specialist (Intermediate)Dahlgren, VAContractor Site | $15.13 | $16.64 | $18.46 | $20.00 | $21.54 | $23.08 | $0 | $0 | $0 | $1,000 | $0 | $0 | $1,000 | $0 | $0 | $0 | $40 | $0 | $0 | $40 | $0 | $0 | $0 | $52 | $0 | $0 | |||||||||
| 3.3 | 3.3 IT Networks & Systems Services | Subcontract X | Subcontractor | Minor | Specialist (Intermediate) | Redstone Arsenal, AL | Contractor Site | 2201Option 2AB | AB | 2201 | Option 2 | 50 | 50 | Specialist (Intermediate)Redstone Arsenal, ALContractor Site | $14.64 | $16.11 | $17.73 | $19.21 | $20.85 | $22.34 | $0 | $0 | $0 | $0 | $1,043 | $0 | $1,043 | $0 | $0 | $0 | $0 | $42 | $0 | $42 | $0 | $0 | $0 | $0 | $54 | $0 | |||||||||
| 3.4 | 3.4 Information Management Services | Subcontract Z | Subcontractor | Major | Engineer (Advanced) | Schriver AFB, CO | Contractor Site | 2202Option 2GD | GD | 2202 | Option 2 | 50 | 50 | Engineer (Advanced)Schriver AFB, COContractor Site | $12.10 | $13.61 | $15.38 | $16.92 | $18.46 | $20.00 | $0 | $0 | $0 | $0 | $923 | $0 | $923 | $0 | $0 | $0 | $0 | $28 | $0 | $28 | $0 | $0 | $0 | $0 | $48 | $0 | |||||||||
| 3.5 | 3.5 Enterprise Operations & Engineering Services | Subcontract Z | Subcontractor | Minor | Engineer (Intermediate) | Ft. Belvior, VA | Contractor Site | 2203Option 2ICT | ICT | 2203 | Option 2 | 50 | 50 | Engineer (Intermediate)Ft. Belvior, VAContractor Site | $10.25 | $11.71 | $13.30 | $14.77 | $16.39 | $17.88 | $0 | $0 | $0 | $0 | $819 | $0 | $819 | $0 | $0 | $0 | $0 | $25 | $0 | $25 | $0 | $0 | $0 | $0 | $42 | $0 | |||||||||
| 3.6 | 3.6 Unified Communications Services | Subcontract X | Subcontractor | Major | Engineer (Intermediate) | Dahlgren, VA | Contractor Site | 2204Option 2GM | GM | 2204 | Option 2 | 50 | 50 | Engineer (Intermediate)Dahlgren, VAContractor Site | $10.59 | $12.10 | $13.85 | $15.38 | $16.92 | $18.46 | $0 | $0 | $0 | $0 | $846 | $0 | $846 | $0 | $0 | $0 | $0 | $34 | $0 | $34 | $0 | $0 | $0 | $0 | $44 | $0 | |||||||||
| 3.1 | 3.1 Architecture & Engineering (A&E) Team Support | Subcontract X | Subcontractor | Minor | Technician (Advanced) | Redstone Arsenal, AL | Contractor Site | 0201BaseAB | AB | 0201 | Base | 50 | 100 | 50 | 200 | Technician (Advanced)Redstone Arsenal, ALContractor Site | $7.32 | $8.78 | $10.34 | $11.82 | $13.41 | $14.90 | $366 | $878 | $517 | $0 | $0 | $0 | $1,762 | $15 | $35 | $21 | $0 | $0 | $0 | $70 | $19 | $46 | $27 | $0 | $0 | $0 | |||||||
| 3.2 | 3.2 Executive, Regional, and IT Policy Services | Subcontract Z | Subcontractor | Major | Technician (Intermediate) | Schriver AFB, CO | Contractor Site | 0202BaseGD | GD | 0202 | Base | 50 | 100 | 50 | 200 | Technician (Intermediate)Schriver AFB, COContractor Site | $6.05 | $7.56 | $9.23 | $10.77 | $12.31 | $13.85 | $303 | $756 | $462 | $0 | $0 | $0 | $1,520 | $9 | $23 | $14 | $0 | $0 | $0 | $46 | $16 | $39 | $24 | $0 | $0 | $0 | |||||||
| 3.3 | 3.3 IT Networks & Systems Services | Subcontract Z | Subcontractor | Minor | Technician (Intermediate) | Ft. Belvior, VA | Contractor Site | 0203BaseICT | ICT | 0203 | Base | 50 | 100 | 50 | 200 | Technician (Intermediate)Ft. Belvior, VAContractor Site | $5.86 | $7.32 | $8.86 | $10.34 | $11.92 | $13.41 | $293 | $732 | $443 | $0 | $0 | $0 | $1,468 | $9 | $22 | $13 | $0 | $0 | $0 | $44 | $15 | $38 | $23 | $0 | $0 | $0 | |||||||
| 3.4 | 3.4 Information Management Services | Subcontract X | Subcontractor | Major | Contract Program Manager | Dahlgren, VA | Contractor Site | 0204BaseGM | GM | 0204 | Base | 50 | 100 | 50 | 200 | Contract Program ManagerDahlgren, VAContractor Site | $22.69 | $24.20 | $26.15 | $27.69 | $29.23 | $30.77 | $1,134 | $2,420 | $1,308 | $0 | $0 | $0 | $4,862 | $45 | $97 | $52 | $0 | $0 | $0 | $194 | $59 | $126 | $68 | $0 | $0 | $0 | |||||||
| 3.5 | 3.5 Enterprise Operations & Engineering Services | Subcontract X | Subcontractor | Minor | Analyst (Advanced) | Redstone Arsenal, AL | Contractor Site | 1201Option 1AB | AB | 1201 | Option 1 | 50 | 50 | Analyst (Advanced)Redstone Arsenal, ALContractor Site | $20.50 | $21.96 | $23.64 | $25.12 | $26.81 | $28.30 | $0 | $0 | $0 | $1,256 | $0 | $0 | $1,256 | $0 | $0 | $0 | $50 | $0 | $0 | $50 | $0 | $0 | $0 | $65 | $0 | $0 | |||||||||
| 3.6 | 3.6 Unified Communications Services | Subcontract X | Subcontractor | Minor | Analyst (Intermediate) | Schriver AFB, CO | Contractor Site | 1202Option 1GD | GD | 1202 | Option 1 | 50 | 50 | Analyst (Intermediate)Schriver AFB, COContractor Site | $19.66 | $21.18 | $23.08 | $24.62 | $26.15 | $27.69 | $0 | $0 | $0 | $1,231 | $0 | $0 | $1,231 | $0 | $0 | $0 | $49 | $0 | $0 | $49 | $0 | $0 | $0 | $64 | $0 | $0 | |||||||||
| 3.1 | 3.1 Architecture & Engineering (A&E) Team Support | Subcontract Z | Subcontractor | Major | Analyst (Basic) | Ft. Belvior, VA | Contractor Site | 1203Option 1ICT | ICT | 1203 | Option 1 | 50 | 50 | Analyst (Basic)Ft. Belvior, VAContractor Site | $17.57 | $19.03 | $20.68 | $22.16 | $23.83 | $25.32 | $0 | $0 | $0 | $1,108 | $0 | $0 | $1,108 | $0 | $0 | $0 | $33 | $0 | $0 | $33 | $0 | $0 | $0 | $57 | $0 | $0 | |||||||||
| 3.2 | 3.2 Executive, Regional, and IT Policy Services | Subcontract Z | Subcontractor | Minor | Specialist (Advanced) | Dahlgren, VA | Contractor Site | 1204Option 1GM | GM | 1204 | Option 1 | 50 | 50 | Specialist (Advanced)Dahlgren, VAContractor Site | $16.64 | $18.15 | $20.00 | $21.54 | $23.08 | $24.62 | $0 | $0 | $0 | $1,077 | $0 | $0 | $1,077 | $0 | $0 | $0 | $32 | $0 | $0 | $32 | $0 | $0 | $0 | $55 | $0 | $0 | |||||||||
| 3.3 | 3.3 IT Networks & Systems Services | Subcontract X | Subcontractor | Major | Specialist (Intermediate) | Redstone Arsenal, AL | Contractor Site | 2201Option 2AB | AB | 2201 | Option 2 | 50 | 50 | Specialist (Intermediate)Redstone Arsenal, ALContractor Site | $14.64 | $16.11 | $17.73 | $19.21 | $20.85 | $22.34 | $0 | $0 | $0 | $0 | $1,043 | $0 | $1,043 | $0 | $0 | $0 | $0 | $42 | $0 | $42 | $0 | $0 | $0 | $0 | $54 | $0 | |||||||||
| 3.4 | 3.4 Information Management Services | Subcontract X | Subcontractor | Minor | Specialist (Intermediate) | Schriver AFB, CO | Contractor Site | 2202Option 2GD | GD | 2202 | Option 2 | 50 | 50 | Specialist (Intermediate)Schriver AFB, COContractor Site | $15.13 | $16.64 | $18.46 | $20.00 | $21.54 | $23.08 | $0 | $0 | $0 | $0 | $1,077 | $0 | $1,077 | $0 | $0 | $0 | $0 | $43 | $0 | $43 | $0 | $0 | $0 | $0 | $56 | $0 | |||||||||
| 3.5 | 3.5 Enterprise Operations & Engineering Services | Subcontract Z | Subcontractor | Major | Engineer (Advanced) | Ft. Belvior, VA | Contractor Site | 2203Option 2ICT | ICT | 2203 | Option 2 | 50 | 50 | Engineer (Advanced)Ft. Belvior, VAContractor Site | $11.71 | $13.18 | $14.77 | $16.25 | $17.88 | $19.37 | $0 | $0 | $0 | $0 | $894 | $0 | $894 | $0 | $0 | $0 | $0 | $27 | $0 | $27 | $0 | $0 | $0 | $0 | $46 | $0 | |||||||||
| 3.6 | 3.6 Unified Communications Services | Subcontract Z | Subcontractor | Major | Engineer (Intermediate) | Dahlgren, VA | Contractor Site | 2204Option 2GM | GM | 2204 | Option 2 | 50 | 50 | Engineer (Intermediate)Dahlgren, VAContractor Site | $10.59 | $12.10 | $13.85 | $15.38 | $16.92 | $18.46 | $0 | $0 | $0 | $0 | $846 | $0 | $846 | $0 | $0 | $0 | $0 | $25 | $0 | $25 | $0 | $0 | $0 | $0 | $44 | $0 |
FBLRs
| FULLY BURDENED LABOR RATE (FBLR) BUILD-UP | |||||||||||||||||||||||||||||||||||||||||||||||||
| Contractor: | Insert contractor name | ||||||||||||||||||||||||||||||||||||||||||||||||
| HQ0147-18-R-0004 | |||||||||||||||||||||||||||||||||||||||||||||||||
| The prime contractor and each known subcontractor or IWTA will populate this tab to include the proposed FBLRs for their company. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Direct/Indirect rates are carried forward (linked) from the prime's, IWTA's or subcontractor's rates tab. | |||||||||||||||||||||||||||||||||||||||||||||||||
| Offerors, IWTAs and major subcontractors must correct and tailor to eliminate errors and to conform to their estimating and accounting systems so that each rate/factor calculation uses the correct allocation base. | |||||||||||||||||||||||||||||||||||||||||||||||||
| For submission to the Government, the full detail of the direct/indirect rates and FBLR rates, and links to the rates tab will remain in-tact. | |||||||||||||||||||||||||||||||||||||||||||||||||
| To protect proprietary data, the IWTA or subcontractor may elect not to submit this tab to the prime contractor. | |||||||||||||||||||||||||||||||||||||||||||||||||
| RED Fringe Cost number means it doesn't meet the minimum fringe dollars per hour. | Contractor Fiscal Year | Contractor Fiscal Year | Contractor Fiscal Year | Contractor Fiscal Year | Contractor Fiscal Year | Contractor Fiscal Year | |||||||||||||||||||||||||||||||||||||||||||
| 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | ||||||||||||||||||||||||||||||||||||||||||||
| 2 | 5 | 2018 | 3 | 6 | 2018 | 4 | 7 | 2018 | 5 | 8 | 2018 | 6 | 9 | 2018 | 7 | 10 | 2018 | ||||||||||||||||||||||||||||||||
| Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | G&A Cost | FBLR (no fee/profit) | Base Labor Rate | Fringe Benefits | Fringe Cost | Labor Overhead | Overhead Cost | G&A | ||||
| Base Labor | Base Labor | Base Labor | Base Labor | Base Labor | Base Labor | ||||||||||||||||||||||||||||||||||||||||||||
| Labor Category | Location | Work Site | Index Column | Rate | Rate | Rate | Rate | Rate | Rate | ||||||||||||||||||||||||||||||||||||||||
| Contract Program Manager | Redstone Arsenal, AL | Gov't Site | Contract Program ManagerRedstone Arsenal, ALGov't Site | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 10.00% | $ 1.60 | 20.00% | $ 3.52 | 10.00% | $ 2.11 | $23.23 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% | $ 2.53 | $27.84 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Analyst (Advanced) | Redstone Arsenal, AL | Gov't Site | Analyst (Advanced)Redstone Arsenal, ALGov't Site | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% |
| Analyst (Intermediate) | Redstone Arsenal, AL | Gov't Site | Analyst (Intermediate)Redstone Arsenal, ALGov't Site | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% |
| Analyst (Basic) | Redstone Arsenal, AL | Gov't Site | Analyst (Basic)Redstone Arsenal, ALGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% |
| Specialist (Advanced) | Redstone Arsenal, AL | Gov't Site | Specialist (Advanced)Redstone Arsenal, ALGov't Site | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Specialist (Intermediate) | Redstone Arsenal, AL | Gov't Site | Specialist (Intermediate)Redstone Arsenal, ALGov't Site | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% |
| Engineer (Advanced) | Redstone Arsenal, AL | Gov't Site | Engineer (Advanced)Redstone Arsenal, ALGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% |
| Engineer (Intermediate) | Redstone Arsenal, AL | Gov't Site | Engineer (Intermediate)Redstone Arsenal, ALGov't Site | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% |
| Technician (Advanced) | Redstone Arsenal, AL | Gov't Site | Technician (Advanced)Redstone Arsenal, ALGov't Site | $5.00 | 10.00% | $ 0.50 | 20.00% | $ 1.10 | 10.00% | $ 0.66 | $7.26 | $6.00 | 10.00% | $ 0.60 | 20.00% | $ 1.32 | 10.00% | $ 0.79 | $8.71 | $7.00 | 11.00% | $ 0.77 | 20.00% | $ 1.55 | 10.00% | $ 0.93 | $10.26 | $8.00 | 11.00% | $ 0.88 | 20.00% | $ 1.78 | 10.00% | $ 1.07 | $11.72 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% |
| Technician (Intermediate) | Redstone Arsenal, AL | Gov't Site | Technician (Intermediate)Redstone Arsenal, ALGov't Site | $4.00 | 10.00% | $ 0.40 | 20.00% | $ 0.88 | 10.00% | $ 0.53 | $5.81 | $5.00 | 10.00% | $ 0.50 | 20.00% | $ 1.10 | 10.00% | $ 0.66 | $7.26 | $6.00 | 11.00% | $ 0.66 | 20.00% | $ 1.33 | 10.00% | $ 0.80 | $8.79 | $7.00 | 11.00% | $ 0.77 | 20.00% | $ 1.55 | 10.00% | $ 0.93 | $10.26 | $8.00 | 11.00% | $ 0.88 | 20.00% | $ 1.78 | 10.00% | $ 1.07 | $11.72 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% |
| Contract Program Manager | Schriver AFB, CO | Gov't Site | Contract Program ManagerSchriver AFB, COGov't Site | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 10.00% | $ 1.60 | 20.00% | $ 3.52 | 10.00% | $ 2.11 | $23.23 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% | $ 2.53 | $27.84 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Analyst (Advanced) | Schriver AFB, CO | Gov't Site | Analyst (Advanced)Schriver AFB, COGov't Site | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% |
| Analyst (Intermediate) | Schriver AFB, CO | Gov't Site | Analyst (Intermediate)Schriver AFB, COGov't Site | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% |
| Analyst (Basic) | Schriver AFB, CO | Gov't Site | Analyst (Basic)Schriver AFB, COGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% |
| Specialist (Advanced) | Schriver AFB, CO | Gov't Site | Specialist (Advanced)Schriver AFB, COGov't Site | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Specialist (Intermediate) | Schriver AFB, CO | Gov't Site | Specialist (Intermediate)Schriver AFB, COGov't Site | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% |
| Engineer (Advanced) | Schriver AFB, CO | Gov't Site | Engineer (Advanced)Schriver AFB, COGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% |
| Engineer (Intermediate) | Schriver AFB, CO | Gov't Site | Engineer (Intermediate)Schriver AFB, COGov't Site | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% |
| Technician (Advanced) | Schriver AFB, CO | Gov't Site | Technician (Advanced)Schriver AFB, COGov't Site | $5.00 | 10.00% | $ 0.50 | 20.00% | $ 1.10 | 10.00% | $ 0.66 | $7.26 | $6.00 | 10.00% | $ 0.60 | 20.00% | $ 1.32 | 10.00% | $ 0.79 | $8.71 | $7.00 | 11.00% | $ 0.77 | 20.00% | $ 1.55 | 10.00% | $ 0.93 | $10.26 | $8.00 | 11.00% | $ 0.88 | 20.00% | $ 1.78 | 10.00% | $ 1.07 | $11.72 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% |
| Technician (Intermediate) | Schriver AFB, CO | Gov't Site | Technician (Intermediate)Schriver AFB, COGov't Site | $4.00 | 10.00% | $ 0.40 | 20.00% | $ 0.88 | 10.00% | $ 0.53 | $5.81 | $5.00 | 10.00% | $ 0.50 | 20.00% | $ 1.10 | 10.00% | $ 0.66 | $7.26 | $6.00 | 11.00% | $ 0.66 | 20.00% | $ 1.33 | 10.00% | $ 0.80 | $8.79 | $7.00 | 11.00% | $ 0.77 | 20.00% | $ 1.55 | 10.00% | $ 0.93 | $10.26 | $8.00 | 11.00% | $ 0.88 | 20.00% | $ 1.78 | 10.00% | $ 1.07 | $11.72 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% |
| Contract Program Manager | Ft. Belvior, VA | Gov't Site | Contract Program ManagerFt. Belvior, VAGov't Site | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 10.00% | $ 1.60 | 20.00% | $ 3.52 | 10.00% | $ 2.11 | $23.23 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% | $ 2.53 | $27.84 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Analyst (Advanced) | Ft. Belvior, VA | Gov't Site | Analyst (Advanced)Ft. Belvior, VAGov't Site | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% |
| Analyst (Intermediate) | Ft. Belvior, VA | Gov't Site | Analyst (Intermediate)Ft. Belvior, VAGov't Site | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% |
| Analyst (Basic) | Ft. Belvior, VA | Gov't Site | Analyst (Basic)Ft. Belvior, VAGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% |
| Specialist (Advanced) | Ft. Belvior, VA | Gov't Site | Specialist (Advanced)Ft. Belvior, VAGov't Site | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Specialist (Intermediate) | Ft. Belvior, VA | Gov't Site | Specialist (Intermediate)Ft. Belvior, VAGov't Site | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% |
| Engineer (Advanced) | Ft. Belvior, VA | Gov't Site | Engineer (Advanced)Ft. Belvior, VAGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% |
| Engineer (Intermediate) | Ft. Belvior, VA | Gov't Site | Engineer (Intermediate)Ft. Belvior, VAGov't Site | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% |
| Technician (Advanced) | Ft. Belvior, VA | Gov't Site | Technician (Advanced)Ft. Belvior, VAGov't Site | $5.00 | 10.00% | $ 0.50 | 20.00% | $ 1.10 | 10.00% | $ 0.66 | $7.26 | $6.00 | 10.00% | $ 0.60 | 20.00% | $ 1.32 | 10.00% | $ 0.79 | $8.71 | $7.00 | 11.00% | $ 0.77 | 20.00% | $ 1.55 | 10.00% | $ 0.93 | $10.26 | $8.00 | 11.00% | $ 0.88 | 20.00% | $ 1.78 | 10.00% | $ 1.07 | $11.72 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% |
| Technician (Intermediate) | Ft. Belvior, VA | Gov't Site | Technician (Intermediate)Ft. Belvior, VAGov't Site | $4.00 | 10.00% | $ 0.40 | 20.00% | $ 0.88 | 10.00% | $ 0.53 | $5.81 | $5.00 | 10.00% | $ 0.50 | 20.00% | $ 1.10 | 10.00% | $ 0.66 | $7.26 | $6.00 | 11.00% | $ 0.66 | 20.00% | $ 1.33 | 10.00% | $ 0.80 | $8.79 | $7.00 | 11.00% | $ 0.77 | 20.00% | $ 1.55 | 10.00% | $ 0.93 | $10.26 | $8.00 | 11.00% | $ 0.88 | 20.00% | $ 1.78 | 10.00% | $ 1.07 | $11.72 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% |
| Contract Program Manager | Dahlgren, VA | Gov't Site | Contract Program ManagerDahlgren, VAGov't Site | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 10.00% | $ 1.60 | 20.00% | $ 3.52 | 10.00% | $ 2.11 | $23.23 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% | $ 2.53 | $27.84 | $20.00 | 11.00% | $ 2.20 | 20.00% | $ 4.44 | 10.00% |
| Analyst (Advanced) | Dahlgren, VA | Gov't Site | Analyst (Advanced)Dahlgren, VAGov't Site | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 10.00% | $ 1.50 | 20.00% | $ 3.30 | 10.00% | $ 1.98 | $21.78 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% | $ 2.40 | $26.37 | $19.00 | 11.00% | $ 2.09 | 20.00% | $ 4.22 | 10.00% |
| Analyst (Intermediate) | Dahlgren, VA | Gov't Site | Analyst (Intermediate)Dahlgren, VAGov't Site | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 10.00% | $ 1.40 | 20.00% | $ 3.08 | 10.00% | $ 1.85 | $20.33 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% | $ 2.26 | $24.91 | $18.00 | 11.00% | $ 1.98 | 20.00% | $ 4.00 | 10.00% |
| Analyst (Basic) | Dahlgren, VA | Gov't Site | Analyst (Basic)Dahlgren, VAGov't Site | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 10.00% | $ 1.30 | 20.00% | $ 2.86 | 10.00% | $ 1.72 | $18.88 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% | $ 2.13 | $23.44 | $17.00 | 11.00% | $ 1.87 | 20.00% | $ 3.77 | 10.00% |
| Specialist (Advanced) | Dahlgren, VA | Gov't Site | Specialist (Advanced)Dahlgren, VAGov't Site | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 10.00% | $ 1.20 | 20.00% | $ 2.64 | 10.00% | $ 1.58 | $17.42 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% | $ 2.00 | $21.98 | $16.00 | 11.00% | $ 1.76 | 20.00% | $ 3.55 | 10.00% |
| Specialist (Intermediate) | Dahlgren, VA | Gov't Site | Specialist (Intermediate)Dahlgren, VAGov't Site | $10.00 | 10.00% | $ 1.00 | 20.00% | $ 2.20 | 10.00% | $ 1.32 | $14.52 | $11.00 | 10.00% | $ 1.10 | 20.00% | $ 2.42 | 10.00% | $ 1.45 | $15.97 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% | $ 1.73 | $19.05 | $14.00 | 11.00% | $ 1.54 | 20.00% | $ 3.11 | 10.00% | $ 1.86 | $20.51 | $15.00 | 11.00% | $ 1.65 | 20.00% | $ 3.33 | 10.00% |
| Engineer (Advanced) | Dahlgren, VA | Gov't Site | Engineer (Advanced)Dahlgren, VAGov't Site | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 10.00% | $ 0.90 | 20.00% | $ 1.98 | 10.00% | $ 1.19 | $13.07 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% | $ 1.60 | $17.58 | $13.00 | 11.00% | $ 1.43 | 20.00% | $ 2.89 | 10.00% |
| Engineer (Intermediate) | Dahlgren, VA | Gov't Site | Engineer (Intermediate)Dahlgren, VAGov't Site | $7.00 | 10.00% | $ 0.70 | 20.00% | $ 1.54 | 10.00% | $ 0.92 | $10.16 | $8.00 | 10.00% | $ 0.80 | 20.00% | $ 1.76 | 10.00% | $ 1.06 | $11.62 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% | $ 1.33 | $14.65 | $11.00 | 11.00% | $ 1.21 | 20.00% | $ 2.44 | 10.00% | $ 1.47 | $16.12 | $12.00 | 11.00% | $ 1.32 | 20.00% | $ 2.66 | 10.00% |
| Technician (Advanced) | Dahlgren, VA | Gov't Site | Technician (Advanced)Dahlgren, VAGov't Site | $5.00 | 10.00% | $ 0.50 | 20.00% | $ 1.10 | 10.00% | $ 0.66 | $7.26 | $6.00 | 10.00% | $ 0.60 | 20.00% | $ 1.32 | 10.00% | $ 0.79 | $8.71 | $7.00 | 11.00% | $ 0.77 | 20.00% | $ 1.55 | 10.00% | $ 0.93 | $10.26 | $8.00 | 11.00% | $ 0.88 | 20.00% | $ 1.78 | 10.00% | $ 1.07 | $11.72 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% | $ 1.20 | $13.19 | $10.00 | 11.00% | $ 1.10 | 20.00% | $ 2.22 | 10.00% |
| Technician (Intermediate) | Dahlgren, VA | Gov't Site | Technician (Intermediate)Dahlgren, VAGov't Site | $4.00 | 10.00% | $ 0.40 | 20.00% | $ 0.88 | 10.00% | $ 0.53 | $5.81 | $5.00 | 10.00% | $ 0.50 | 20.00% | $ 1.10 | 10.00% | $ 0.66 | $7.26 | $6.00 | 11.00% | $ 0.66 | 20.00% | $ 1.33 | 10.00% | $ 0.80 | $8.79 | $7.00 | 11.00% | $ 0.77 | 20.00% | $ 1.55 | 10.00% | $ 0.93 | $10.26 | $8.00 | 11.00% | $ 0.88 | 20.00% | $ 1.78 | 10.00% | $ 1.07 | $11.72 | $9.00 | 11.00% | $ 0.99 | 20.00% | $ 2.00 | 10.00% |
| Contract Program Manager | Redstone Arsenal, AL | Contractor Site | Contract Program ManagerRedstone Arsenal, ALContractor Site | $15.00 | 10.00% | $ 1.50 | 21.00% | $ 3.47 | 10.00% | $ 2.00 | $21.96 | $16.00 | 10.00% | $ 1.60 | 21.00% | $ 3.70 | 10.00% | $ 2.13 | $23.43 | $17.00 | 11.00% | $ 1.87 | 21.00% | $ 3.96 | 10.00% | $ 2.28 | $25.12 | $18.00 | 11.00% | $ 1.98 | 21.00% | $ 4.20 | 10.00% | $ 2.42 | $26.59 | $19.00 | 11.00% | $ 2.09 | 22.00% | $ 4.64 | 10.00% | $ 2.57 | $28.30 | $20.00 | 11.00% | $ 2.20 | 22.00% | $ 4.88 | 10.00% |
| Analyst (Advanced) | Redstone Arsenal, AL | Contractor Site | Analyst (Advanced)Redstone Arsenal, ALContractor Site | $14.00 | 10.00% | $ 1.40 | 21.00% | $ 3.23 | 10.00% | $ 1.86 | $20.50 | $15.00 | 10.00% | $ 1.50 | 21.00% | $ 3.47 | 10.00% | $ 2.00 | $21.96 | $16.00 | 11.00% | $ 1.76 | 21.00% | $ 3.73 | 10.00% | $ 2.15 | $23.64 | $17.00 | 11.00% | $ 1.87 | 21.00% | $ 3.96 | 10.00% | $ 2.28 | $25.12 | $18.00 | 11.00% | $ 1.98 | 22.00% | $ 4.40 | 10.00% | $ 2.44 | $26.81 | $19.00 | 11.00% | $ 2.09 | 22.00% | $ 4.64 | 10.00% |
| Analyst (Intermediate) | Redstone Arsenal, AL | Contractor Site | Analyst (Intermediate)Redstone Arsenal, ALContractor Site | $13.00 | 10.00% | $ 1.30 | 21.00% | $ 3.00 | 10.00% | $ 1.73 | $19.03 | $14.00 | 10.00% | $ 1.40 | 21.00% | $ 3.23 | 10.00% | $ 1.86 | $20.50 | $15.00 | 11.00% | $ 1.65 | 21.00% | $ 3.50 | 10.00% | $ 2.01 | $22.16 | $16.00 | 11.00% | $ 1.76 | 21.00% | $ 3.73 | 10.00% | $ 2.15 | $23.64 | $17.00 | 11.00% | $ 1.87 | 22.00% | $ 4.15 | 10.00% | $ 2.30 | $25.32 | $18.00 | 11.00% | $ 1.98 | 22.00% | $ 4.40 | 10.00% |
| Analyst (Basic) | Redstone Arsenal, AL | Contractor Site | Analyst (Basic)Redstone Arsenal, ALContractor Site | $12.00 | 10.00% | $ 1.20 | 21.00% | $ 2.77 | 10.00% | $ 1.60 | $17.57 | $13.00 | 10.00% | $ 1.30 | 21.00% | $ 3.00 | 10.00% | $ 1.73 | $19.03 | $14.00 | 11.00% | $ 1.54 | 21.00% | $ 3.26 | 10.00% | $ 1.88 | $20.68 | $15.00 | 11.00% | $ 1.65 | 21.00% | $ 3.50 | 10.00% | $ 2.01 | $22.16 | $16.00 | 11.00% | $ 1.76 | 22.00% | $ 3.91 | 10.00% | $ 2.17 | $23.83 | $17.00 | 11.00% | $ 1.87 | 22.00% | $ 4.15 | 10.00% |
| Specialist (Advanced) | Redstone Arsenal, AL | Contractor Site | Specialist (Advanced)Redstone Arsenal, ALContractor Site | $11.00 | 10.00% | $ 1.10 | 21.00% | $ 2.54 | 10.00% | $ 1.46 | $16.11 | $12.00 | 10.00% | $ 1.20 | 21.00% | $ 2.77 | 10.00% | $ 1.60 | $17.57 | $13.00 | 11.00% | $ 1.43 | 21.00% | $ 3.03 | 10.00% | $ 1.75 | $19.21 | $14.00 | 11.00% | $ 1.54 | 21.00% | $ 3.26 | 10.00% | $ 1.88 | $20.68 | $15.00 | 11.00% | $ 1.65 | 22.00% | $ 3.66 | 10.00% | $ 2.03 | $22.34 | $16.00 | 11.00% | $ 1.76 | 22.00% | $ 3.91 | 10.00% |
| Specialist (Intermediate) | Redstone Arsenal, AL | Contractor Site | Specialist (Intermediate)Redstone Arsenal, ALContractor Site | $10.00 | 10.00% | $ 1.00 | 21.00% | $ 2.31 | 10.00% | $ 1.33 | $14.64 | $11.00 | 10.00% | $ 1.10 | 21.00% | $ 2.54 | 10.00% | $ 1.46 | $16.11 | $12.00 | 11.00% | $ 1.32 | 21.00% | $ 2.80 | 10.00% | $ 1.61 | $17.73 | $13.00 | 11.00% | $ 1.43 | 21.00% | $ 3.03 | 10.00% | $ 1.75 | $19.21 | $14.00 | 11.00% | $ 1.54 | 22.00% | $ 3.42 | 10.00% | $ 1.90 | $20.85 | $15.00 | 11.00% | $ 1.65 | 22.00% | $ 3.66 | 10.00% |
| Engineer (Advanced) | Redstone Arsenal, AL | Contractor Site | Engineer (Advanced)Redstone Arsenal, ALContractor Site | $8.00 | 10.00% | $ 0.80 | 21.00% | $ 1.85 | 10.00% | $ 1.06 | $11.71 | $9.00 | 10.00% | $ 0.90 | 21.00% | $ 2.08 | 10.00% | $ 1.20 | $13.18 | $10.00 | 11.00% | $ 1.10 | 21.00% | $ 2.33 | 10.00% | $ 1.34 | $14.77 | $11.00 | 11.00% | $ 1.21 | 21.00% | $ 2.56 | 10.00% | $ 1.48 | $16.25 | $12.00 | 11.00% | $ 1.32 | 22.00% | $ 2.93 | 10.00% | $ 1.63 | $17.88 | $13.00 | 11.00% | $ 1.43 | 22.00% | $ 3.17 | 10.00% |
| Engineer (Intermediate) | Redstone Arsenal, AL | Contractor Site | Engineer (Intermediate)Redstone Arsenal, ALContractor Site | $7.00 | 10.00% | $ 0.70 | 21.00% | $ 1.62 | 10.00% | $ 0.93 | $10.25 | $8.00 | 10.00% | $ 0.80 | 21.00% | $ 1.85 | 10.00% | $ 1.06 | $11.71 | $9.00 | 11.00% | $ 0.99 | 21.00% | $ 2.10 | 10.00% | $ 1.21 | $13.30 | $10.00 | 11.00% | $ 1.10 | 21.00% | $ 2.33 | 10.00% | $ 1.34 | $14.77 | $11.00 | 11.00% | $ 1.21 | 22.00% | $ 2.69 | 10.00% | $ 1.49 | $16.39 | $12.00 | 11.00% | $ 1.32 | 22.00% | $ 2.93 | 10.00% |
| Technician (Advanced) | Redstone Arsenal, AL | Contractor Site | Technician (Advanced)Redstone Arsenal, ALContractor Site | $5.00 | 10.00% | $ 0.50 | 21.00% | $ 1.16 | 10.00% | $ 0.67 | $7.32 | $6.00 | 10.00% | $ 0.60 | 21.00% | $ 1.39 | 10.00% | $ 0.80 | $8.78 | $7.00 | 11.00% | $ 0.77 | 21.00% | $ 1.63 | 10.00% | $ 0.94 | $10.34 | $8.00 | 11.00% | $ 0.88 | 21.00% | $ 1.86 | 10.00% | $ 1.07 | $11.82 | $9.00 | 11.00% | $ 0.99 | 22.00% | $ 2.20 | 10.00% | $ 1.22 | $13.41 | $10.00 | 11.00% | $ 1.10 | 22.00% | $ 2.44 | 10.00% |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.