03_Sep_2015_Replacement_Attachment_J-16a_DPF_Incentive_Calculator_-_Notional_Values.xls

XLS spreadsheet 218 KB Posted

Attached to
TEAMS - Facilities, Logistics and Space Management
Solicitation number
HQ0147-15-R-0017
Issued by

About this file

Replacement Attachment J-16a DPF Incentive Calculator - Notional Values

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTAL ROLLUP

Cost Plus Incentive Fee (CPIF) Calculator for DPF Portal - Notional Values
TARGET CPIF VALUESBase PeriodOption 1Option 2Total, All Periods
Target Cost =$ 5,000,000$ 1,750,000$ 1,750,000$ 8,500,000
Cost Incentive Fee Pool =$ 135,000$ 47,250$ 47,250$ 229,500
Performance Incentive Fee Pool =$ 315,000$ 110,250$ 110,250$ 535,500
Total Target Fee =$ 450,000$ 157,500$ 157,500$ 765,000
Total Target CPIF =$ 5,450,000$ 1,907,500$ 1,907,500$ 9,265,000
ACTUAL CPIF at end of PeriodBase PeriodOption 1Option 2Total, All Periods
Actual Cost =$ 4,850,000$ 1,784,000$ 1,699,751$ 8,333,751
Cost Incentive Fee Earned =$ 180,000$ 37,050$ 62,325$ 279,375
Performance Incentive Fee Earned =$ 315,000$ 110,250$ 110,250$ 535,500
Total CPIF at end of Period =$ 5,345,000$ 1,931,300$ 1,872,326$ 9,148,626
Allocation of Incentive FeesShare RatiosUnderrunOverrun
Cost Incentive Share30.0%Contractor30%30%
Performance Incentive Share70.0%Govt70%70%Cost Incentive Fee Available, Base + Option Years
Optimistic CostMax FeeMax Fee Percentage
$ 7,990,000$ 382,5004.50%
Proposed FeeActual Fee
Percent Delta from Target Cost for RIE6.00%$ 765,000$ 814,875Target CostTarget FeeTarget Fee Percentage
ENTER9%9.78%$ 8,500,000$ 229,5002.70%
Pessimistic CostMin FeeMin Fee Percentage
$ 9,010,000$ 76,5000.90%

&C03 Septmber 2015

TOTAL ROLLUP

7990000799000090100000833375179900009010000850000079900009148625.70
85000004750000122500008333751833375179900009010000901000090100009148625.79148625.7

Max-Target-Min Max Fee Min Fee CPIF With Cost Incentive Only Final Vertical RIE Left RIE Right Target-Min Range of Incentive Effectiveness Performance Vertical CPIF+ Peformance Incentive Earned Labor Cost Total Incentive Fee Total Contract Incentive Fee 382500 382500 76500 279374.7 382500 76500 229500 45000 814874.7 229500 382500 76500 279374.7 279374.7 76500 45000 814874.7 814874.7

Perf Incentives

Performance Incentive Earned
PERFORMANCE INCENTIVE #1 - Customer SatisfactionShare of 70%Annual Pool - Base PeriodOption 1 PoolOption 2 Pool
Percentage Very Satisfied greater than than or equal to 75% =100%$ 105,000$ 110,250$ 110,250
Percentage Very Satisfied + Percentage Satisfied greater than or equal to 90% =75%$ 78,750$ 82,688$ 82,688
Percentage Very Satisfied + Percentage Satisfied Between 75% and 90% =50%$ 52,500$ 55,125$ 55,125
Percentage Very Satisfied + Percentage Satisfied less than 75% =0%$ - 0$ - 0$ - 0
ENTER Yr 1 Very Satisfied Percentage =80.00%
ENTER Yr 2 Very Satisfied Percentage =80.00%
ENTER Yr 3 Very Satisfied Percentage =80.00%
ENTER Yr 4 Very Satisfied Percentage =80.00%
ENTER Yr 5 Very Satisfied Percentage =80.00%
ENTER Yr 1 Satisfied Percentage Achieved =25.00%Incentive Earned Yr 1 =$ 105,000
ENTER Yr 2 Satisfied Percentage Achieved =35.00%Incentive Earned Yr 2 =$ 105,000
ENTER Yr 3 Satisfied Percentage Achieved =80.00%Incentive Earned Yr 3 =$ 105,000
ENTER Yr 4 Satisfied Percentage Achieved =45.00%Incentive Earned Yr 4 =$ 110,250
ENTER Yr 5 Satisfied Percentage Achieved =30.00%Incentive Earned Yr 5 =$ 110,250
Total Incentive Earned =$ 535,500
ENTER Yr 1 Very Satisfied + Satisfied Percentage =105.00%
ENTER Yr 2 Very Satisfied + Satisfied Percentage =115.00%
ENTER Yr 3 Very Satisfied + Satisfied Percentage =160.00%
ENTER Yr 4 Very Satisfied + Satisfied Percentage =125.00%
ENTER Yr 5 Very Satisfied + Satisfied Percentage =110.00%
2 of 2
1 of 2
0 of 2
0

&C03 Septmber 2015

Cost Incentive, Base

Cost Incentive Earned, Base Period
Cost Incentive Fee Available, Base Period
Optimistic CostMax FeeMax Fee Percentage
$ 4,700,000$ 225,0004.50%
Target CostTarget FeeTarget Fee Percentage
$ 5,000,000$ 135,0002.70%
Pessimistic CostMin FeeMin Fee Percentage
$ 5,300,000$ 45,0000.90%
Contractor Share of Under or Overrun =Ktr Share % * (Target - Cost)
If Contractor Share > Max Fee, then Pay Max Fee
If Contractor Share < Than Min Fee, then Pay Min Fee
If Contractor Share < Max Fee and > Min Fee, then Pay Contractor Share
(EXAMPLE) Cost Incentive Earned, Base Period
ENTER Actual Cost =$ 4,850,000
Share (based on Under or Overrun) =30%
Target Cost Incentive Fee =$ 135,000
+ Contractor Under/Overrun Share =$ 45,000
Calculated Total =$ 180,000
Cost Incentive Fee Earned, Base Period$ 180,000
CPI with: Target Cost $5,000,000; Target Fee $135,000; Min Fee $45,000; Max Fee $225,000. Contractor Share is 30%Underrun & 30%Overrun.

&C03 Septmber 2015

Cost Incentive, Base

470000047000005300000048500004700000530000050000004700000
500000023000007700000485000048500004700000530000053000005300000

Max-Target-Min Max Fee Min Fee CPIF With Cost Incentive Only Final Vertical RIE Left RIE Right Target-Min Range of Incentive Effectiveness Labor Cost Cost Incentive Fee DPF Portal Cost Incentive Fee, Base Period 225000 225000 45000 180000 225000 45000 135000 25000 135000 225000 45000 180000 180000 45000 25000

Cost Incentive, Option 1

Cost Incentive Earned, Option Period 1
Cost Incentive Fee Available, Option Period 1
Optimistic CostMax FeeMax Fee Percentage
$ 1,645,000$ 78,7504.50%
Target CostTarget FeeTarget Fee Percentage
$ 1,750,000$ 47,2502.70%
Pessimistic CostMin FeeMin Fee Percentage
$ 1,855,000$ 15,7500.90%
Contractor Share of Under or Overrun =Ktr Share % * (Target - Cost)
If Contractor Share > Max Fee, then Pay Max Fee
If Contractor Share < Than Min Fee, then Pay Min Fee
If Contractor Share < Max Fee and > Min Fee, then Pay Contractor Share
Cost Incentive Earned, Option Period 1
ENTER Actual Cost =$ 1,784,000
Share (based on Under or Overrun) =30%
Target Cost Incentive Fee =$ 47,250
+ Contractor Under/Overrun Share =$ (10,200)
Calculated Total =$ 37,050
Cost Incentive Earned, Option Period 1$ 37,050
CPI with: Target Cost $1,750,000; Target Fee $47,250; Min Fee $15,750; Max Fee $78,750. Contractor Share is 30%Underrun & 30%Overrun.

Manually Update Actual Cost at End of Performance Period &C03 Septmber 2015

Cost Incentive, Option 1

164500016450001855000017840001645000185500016450001750000
175000012250002275000178400017840001645000185500018550001855000

Max-Target-Min Max Fee Min Fee Final Final Vertical RIE Left RIE Right Range of Incentive Effectiveness Target-Min Labor Cost Cost Incentive Fee DPF Portal Cost Incentive Fee, Option Period 1 78750 78750 15750 37050 78750 15750 10000 47250 47250 78750 15750 37050 37050 10000 15750

Cost Incentive, Option 2

Cost Incentive Earned, Option Period 2
Cost Incentive Fee Available, Option Period 2
Optimistic CostMax FeeMax Fee Percentage
$ 1,645,000$ 78,7504.50%
Target CostTarget FeeTarget Fee Percentage
$ 1,750,000$ 47,2502.70%
Pessimistic CostMin FeeMin Fee Percentage
$ 1,855,000$ 15,7500.90%
Contractor Share of Under or Overrun =Ktr Share % * (Target - Cost)
If Contractor Share > Max Fee, then Pay Max Fee
If Contractor Share < Than Min Fee, then Pay Min Fee
If Contractor Share < Max Fee and > Min Fee, then Pay Contractor Share
Cost Incentive Earned, Option Period 2
ENTER Actual Cost =$ 1,699,751
Share (based on Under or Overrun) =30%
Target Cost Incentive Fee =$ 47,250
+ Contractor Under/Overrun Share =$ 15,075
Calculated Total =$ 62,325
Cost Incentive Earned, Option Period 2$ 62,325
CPI with: Target Cost $1,750,000; Target Fee $47,250; Min Fee $15,750; Max Fee $78,750. Contractor Share is 30%Underrun & 30%Overrun.

Manually Update Actual Cost at End of Performance Period &C03 Septmber 2015

Cost Incentive, Option 2

164500016450001855000016997511645000185500016450001750000
175000012250002275000169975116997511645000185500018550001855000

Max-Target-Min Max Fee Min Fee Final Final Vertical RIE Left RIE Right Range of Incentive Effectiveness Target-Min Labor Cost Cost Incentive Fee DPF Portal Cost Incentive Fee, Option Period 2 78750 78750 15750 62324.7 78750 15750 10000 47250 47250 78750 15750 62324.7 62324.7 10000 15750

Graph Data -DO NOT EDIT

ContractorGovernment
Underrun307030%Underrun
Overrun307030%Overrun
BaseOption 1Option 2Total
DollarDollarDollarDollar
Target Cost$5,000,000$1,750,000$1,750,000$ 8,500,000
Target Fee$135,000$47,250$47,250$ 229,500
Tentative Fee$180,000$37,050$62,325$ 279,375
Min-Fee$45,000$15,750$15,750$ 76,500
Max-Fee$225,000$78,750$78,750$ 382,500
Max-Target-MinMax-Target-MinMax-Target-MinMax-Target-Min
$ 4,700,000$ 1,645,000$ 1,645,000$ 7,990,000
$ 5,000,000$ 1,750,000$ 1,750,000$ 8,500,000
$ 225,000$ 78,750$ 78,750$ 382,500
$ 135,000$ 47,250$ 47,250$ 229,500
Target-MinTarget-MinTarget-MinTarget-Min
$ 5,000,000$ 1,750,000$ 1,750,000$ 8,500,000
$ 5,300,000$ 1,855,000$ 1,855,000$ 9,010,000
$ 135,000$ 47,250$ 47,250$ 229,500
$ 45,000$ 15,750$ 15,750$ 76,500
Left Scaler422
Max Fee$ 4,700,000$ 1,645,000$ 1,645,000$ 7,990,000
$ 2,300,000$ 1,225,000$ 1,225,000$ 4,750,000
$ 225,000$ 78,750$ 78,750$ 382,500
$ 225,000$ 78,750$ 78,750$ 382,500
$ 225,000$ 78,750$ 78,750$ 382,500
Right Scaler422
Min Fee$ 5,300,000$ 1,855,000$ 1,855,000$ 9,010,000
$ 7,700,000$ 2,275,000$ 2,275,000$ 12,250,000
$ 45,000$ 15,750$ 15,750$ 76,500
$ 45,000$ 15,750$ 15,750$ 76,500
$ 45,000$ 15,750$ 15,750$ 76,500
$ - 0
RIE Left$ 4,700,000$ 1,645,000$ 1,645,000$ 7,990,000
$ 4,700,000$ 1,645,000$ 1,645,000$ 7,990,000
$ 225,000$ 78,750$ 78,750$ 382,500
$ - 0$ - 0$ - 0$ - 0
$ - 0
RIE Right$ 5,300,000$ 1,855,000$ 1,855,000$ 9,010,000
$ 5,300,000$ 1,855,000$ 1,855,000$ 9,010,000
$ 45,000$ 15,750$ 15,750$ 76,500
$ - 0$ - 0$ - 0$ - 0
RIE$ 4,700,000$ 1,645,000$ 1,645,000$ 7,990,000
$ 5,300,000$ 1,855,000$ 1,855,000$ 9,010,000
$ 25,000$ 10,000$ 10,000$ 45,000
$ 25,000$ 10,000$ 10,000$ 45,000
$ - 0
Final Cost - Fee Vertical$ 4,850,000$ 1,784,000$ 1,699,751$ 8,333,751
$ 4,850,000$ 1,784,000$ 1,699,751$ 8,333,751
000$ - 0
$ 180,000$ 37,050$ 62,325$ 279,375
Final Cost - Fee Horizontal
$ - 0$ - 0$ - 0$ - 0
$ 4,850,000$ 1,784,000$ 1,699,751$ 8,333,751
$ 180,000$ 37,050$ 62,325$ 279,375
$ 180,000$ 37,050$ 62,325$ 279,375
Performance Incentive Bars
Performance Vertical Bar$ 5,345,000$ 1,931,300$ 1,872,326$ 9,148,626
$ 5,345,000$ 1,931,300$ 1,872,326$ 9,148,626
000$ - 0
$ 495,000$ 147,300$ 172,575$ 814,875
Performance Horizontal Bar$ - 0$ - 0$ - 0$ - 0
$ 5,345,000$ 1,931,300$ 1,872,326$ 9,148,626
$ 495,000$ 147,300$ 172,575$ 814,875
$ 495,000$ 147,300$ 172,575$ 814,875
Customer Satisfaction Rates for Performance Incentive
75%
90%
75%
0%

Manually Update Actual Cost at End of Performance Period &C03 Septmber 2015