P07 OSW CAPE MS Consolidated Phase I Questions With Answers.pdf

PDF 143 KB Posted

Attached to
Area of Interest: OSW Cost Assessment and Program Evaluation (CAPE) Modeling and Simulation
Solicitation number
HQ003427AOI5
Issued by

About this file

This document is a Questions and Answers (Q&A) file for the Office of the Secretary of War (OSW) CAPE Modeling & Simulation Phase I solicitation dated November 10, 2026.

The Government seeks a turnkey, managed IL6 (DoD Impact Level 6) platform and infrastructure to support modeling and simulation, artificial intelligence, and machine learning capabilities. Offerors must provide compute hardware and base software infrastructure to build, deploy, maintain, and orchestrate AFSIM (Air Force Simulation) mission and campaign models, an emulation layer for surrogate models, and supporting analytical tools. The solution must support approximately 100 total users with 10s of concurrent users, accommodate light-case workloads of 1,200 individual simulations and heavy-case workloads of 150,000 simulations with typical per-run requirements of 8 hours wall time and 30GB RAM, facilitate CPU/GPU architecture for machine learning model training and LLM integration, and enable approximately 100 terabytes of storage. The platform must operate at IL6 accreditation levels, interface with external SECRET-level networks including SIPRNet, connect to OSW-furnished databases and War Data Platform repositories, and support data transfer in both directions between classified and unclassified networks. Offerors may propose Government-hosted/vendor-managed solutions within existing Government-accredited facilities or commercial IL6 environments; an active Facility Clearance is not required at Phase I submission but must be obtained or sponsored before classified performance. The Government will furnish AFSIM software, GAMS licenses, scenario decks, and simulation models at zero cost; offerors are responsible for all COTS and custom software procurement, licensing, patching, and IL6 compliance hardening. Initial Operational Capability is targeted for FY27, with Full Operational Capability in FY28. The Government anticipates awarding one or more Prototype Other Transaction Agreements under 10 U.S.C. § 4022 (Commercial Solutions Opening authority) with a budgeted range of $3–$22 million, reserves the right to make single, multiple, or no awards, and will evaluate Phase I submissions based on relevance to the Area of Interest including technical ability, security/accreditation posture, scalability, implementation approach, innovation, and sustainment strategy rather than cost.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Number Question Answer

IL6 hosting: Will the Government consider solutions where the provider installs and operates hardware inside an existing

Government-accredited SECRET facility or enclave (Government-hosted, vendor-managed)? Or must the offeror provide an environment that already holds a DoD IL6 Provisional Authorization?

Yes. The Government will consider both Government-hosted/vendor-managed solutions and commercial environments holding a DoW Impact Level 6 (IL6) Provisional Authorization (PA).

Offerors may propose deploying software onto existing Government-furnished accredited infrastructure or delivering vendor-provided hardware for installation within Government-accredited facilities, provided space, power, cooling, and supply-chain constraints are met.

Offerors are not strictly required to hold an independent commercial IL6 PA, but any proposed environment must either possess an active IL6 PA, inherit controls from an existing DoD System ATO, or provide a viable path to accreditation prior to operational performance.

2 Clearances: Is a facility clearance required at the time of the Phase 1 or Phase 3 submission, or only before performance? Will the Government sponsor an FCL for a selected company?

An active Facility Clearance (FCL) is NOT required at the time of Phase 1 submission. Phase 1 submissions and initial technical evaluations will be conducted at the UNCLASSIFIED // CUI level.

For Phase 3 (Request for Prototype Proposals / Award), the selected offeror must either:

Possess an active Facility Security Clearance (at the required SECRET level) prior to the commencement of classified performance; OR Propose a teaming arrangement with an established, cleared partner entity capable of safeguarding classified materials and hosting classified development; OR Request Government sponsorship. The Government is willing to sponsor an FCL, provided the offeror demonstrates the ability to meet baseline compliance requirements and an initial operational capability can be executed in an unclassified / CUI development posture while clearance processing is underway.

3 Workload profile: For the heavy case (150,000 runs), what are the typical per-run wall time, core count and memory? Is the AOI's figure of 1 hour and 20 GB per run representative of both the light and heavy cases?

Typical per-run wall time is approximately 8 hours through single threading on our current HPC. Typical RAM requirements are approximately 30GB on our current HPC.

4 Utilization: Should the heavy-case capacity be resident, or may it be provisioned for scheduled campaign windows?

Both the light and heavy case will require dynamic access to compute depending on analytical needs at the time. In order to facilitate proper execution of Layer 2 (the surrogate emulation layer) initial large runs on the order of 1K to 100K must be conducted. As analysts use and query the emulation layer, there will be a need to supplement the emulations validity envelope to facilitate initial out-of-scope, uncertain, or out boundary questions by adding simulation runs and retraining the models. If the offer solution provides compute through scheduled campaign windows at a cheaper cost while still maintaining CAPEs required compute, that would be acceptable.

5 Software and licensing: Will AFSIM and GAMS licenses be Government-furnished? AFSIM, GAMS, or any other required software/tool licenses required will be government furnished based on OSW operational and technical needs.

6 Submission: Should the solution brief be emailed as a single PDF to both of you, and is there a file-size limit? The solutions submission can be in PDF, Word, or PowerPoint format. Size limit is set by Outlook

(25MB).

7 Is the desired solution targeting on-premises datacenters (private cloud), commercial cloud (AWS or Azure), or some type of hybrid cloud solution to support scaling?

CAPE does not have an opinion on what the compute architecture looks like so long at it operates at IL6 accreditation, can interface with external IL6 networks, and facilitates CAPEs requirements for M&S, AI, and ML.

8 Will the system be exposed to SIPRNet and/or JWICS, or operate on an isolated network?

The system must be able to interface with external SECRET (IL6) level networks to enable transfer of data in accordance with applicable security access and control. This could include SIPRNet, but must include external connections to OSW and mission related data sources, including OSW furnished databases and other authorized repositories, as applicable. Interface with JWICS or other IL7 networks is not a requirement.

Authorization

Who will serve as the Authorizing Official for the IL6 environment? Would the Government accept a solution that inherits from an existing IL6 authorization held by another DoW organization or from an IL6 Provisional Authorization?

1. The formal Authorizing Official (AO) for the target environment will be the Office of the Secretary of War (OSW) / Washington Headquarters Services (WHS) Authorizing Official.

2. Yes. The Government not only accepts, but strongly encourages, solutions that leverage control inheritance and reciprocity from existing accreditations.

Authorization

Is an IL6 ATO required at award, or may authorization be completed during the prototype period, with early development on unclassified data at IL5?

If there is no IL6 ATO available immediately, a roadmap to accreditation would be required. Early development could be done at IL5

Authorization

Which classified network will analysts at the Pentagon and Mark Center use to reach the environment? Does the Government have a preferred or required network for the IL6 environment, and is connection through a network that peers with it acceptable?

The Government will use SIPRNet to access the environment.

Authorization The AOI requires HTTPS connectivity to OSW CAPE-furnished databases and other authorized repositories such as the War Data

Platform. Will the solution reach these sources at the SECRET level, or should unclassified data be brought in through a cross-domain solution?

The solution will reach these sources strictly at the SECRET level but must facilitate the ability to move unclassified data, software, and tools onto the network.

Cross-domain The AOI requires data and software movement into and out of the environment. Does this include cross-domain transfer between IL6 and unclassified networks in both directions, low to high and high to low? If so, will the Government furnish or designate the cross-domain solution, or should the proposed solution include one?

The solution will reach these sources strictly at the SECRET level but must facilitate the ability to move unclassified data, software, and tools onto the network. Low to high movement for unclassified data transfers.

Compute

Does the Government intend the solution to use IL6 cloud, Government on-premises HPC, or both? If cloud, will the Government furnish the tenancy, and if not, may the solution use an existing IL6 cloud tenant?

The solution is intended to use IL6 cloud and to migrate away from current Government on-premise HPC capability.

Compute

Should the solution connect to SECRET compute or data systems outside the provider-managed environment, including CAPE's current HPC environment and other existing CAPE enclaves?

The system must be able to interface with external SECRET (IL6) level networks to enable transfer of data in accordance with applicable security access and control. This could include SIPRNet, but must include external connections to OSW and mission related data sources, including OSW furnished databases and other authorized repositories, as applicable. Interface with JWICS or other IL7 networks is not a requirement. The solution is not meant to connect to CAPEs current HPC environment as CAPE intends to migrate away from this solution.

Compute

Will the Government furnish AFSIM, the scenarios, and any other simulation models in scope? How many CPU cores does a typical AFSIM run use, and what drives the one-year heavy-case runtime in the current environment?

Yes, each AFSIM run takes a single core (single-threading). Runtime is driven by the quantity of agents and their decision logic.

Compute

Please confirm that the Government will furnish licenses for the commercial software the AOI names, such as GAMS and its solvers.

AFSIM, GAMS, or any other required software/tool licenses required will be Government furnished based on OSW operational and technical needs.

Compute The AOI states that CAPE will develop its surrogate models in-house. Which modeling approaches and frameworks should the hosting layer support, and will training require GPUs? Should the solution provide Design of Experiments tooling, or will CAPE supply its own?

The Government will provide, build, and maintain the emulation layer and models in-house. Techniques span the gamut of ML and deep learning methodologies which can technically be done through CPU only architectures but a CPU/GPU architecture is desired to accelerate model training and development. A CPU/GPU architecture is also required to facilitate the Governments desire to integrate LLM into analytical workflows and processes. Design of Experiments tooling or solutions will be conducted through Government developed methodologies and supplied software/tooling.

Users and roles How many CAPE analysts and supporting performers will use AFSIM and the analysis tools, and how many at once? Does the Government expect the provider to furnish user support, such as help desk or workflow assistance, in addition to platform IT operations?

Intent is to have this scale for 10s of users at once. All CAPE analysts should be able to access the environment when needed, approximately 100 users in total.

Users and roles

Does Government responsibility for container orchestration mean CAPE selects and schedules containers on a runtime the provider operates?

CAPE will schedules all operations within the environment. The desire is for the environment to provide hardware, and software that allows analysts to develop to their needs

Submission

Does the Government expect a rough order of magnitude estimate of cost and schedule in the Phase 1 solution brief, or only at the pitch phase?

While it is permissible for submissions to include an initial estimate in Phase I, the only evaluating factor used in Phase I is relevance to the AOI. Costs are assessed in Phase II, either through pitches or requests for proposals. Government ROM is between $3-$22M

Cloud Architecture & Enclave Demarcation Will the Government furnish or permit access to an existing Government-authorized DoD Impact Level 6 (IL6) cloud tenancy (for example, through the Joint Warfighting Cloud Capability [JWCC]), or must the offeror supply and manage an accredited operational IL6 hosting environment end-to-end? Additionally, does the Government desire or envision a lower impact level staging enclave (e.g., IL4/IL5) for initial software onboarding prior to promotion to IL6?

CAPE does not have an opinion on how the environment is furnished at IL6. We require access to a computing environment at IL6, however that construct is created, as long as it's tenable, is up to the candidates to determine.

Phase I: OSW CAPE Modeling & Simulation - Questions - November 10, 2026

AFSIM Execution Baseline & Workload Assumptions Must the commercial provider execute existing CAPE AFSIM mission and campaign models strictly as-is without modification, or is code refactoring and headless containerization permitted? For the heavy case (150,000 runs), should offerors assume campaigns match the discrete mission baseline of 1 hour runtime and 20 GB RAM per run, or does the cited 1-year legacy runtime reflect greater multi-core, CPU, memory, and data I/O overhead per simulation run?

The Government will provide, build, and maintain the AFSIM mission and campaign models, emulation layer construction and persistence, and software/tools/licenses required. The commercial provider must provide the necessary compute hardware and base software infrastructure necessary to build, deploy, maintain, and orchestrate the models, tools, and techniques. The heavy case is meant to convey scenarios where agents being simulated are an order of magnitude greater than the light case. These come with more intensive RAM, and processing needs.

Government-Furnished Assets & Engine Scope Will CAPE provide official baseline AFSIM software distributions, scenario decks, threat architectures, input/output schemas, and analysis measures as Government-Furnished Information / Software (GFI/GFS)? Which specific AFSIM release version will serve as the benchmark, and are other combat simulation engines or custom physics models currently within scope for this platform?

The Government will provide, build, and maintain the AFSIM mission, campaign, or other domain models along with the software/tools/licenses required. The commercial provider must provide the necessary compute hardware and base software infrastructure necessary to build, deploy, maintain, and orchestrate the models, tools, and techniques. The minimum requirement for AFSIM versioning is whatever the current Long Term Stable (LTS) version is. Currently, that is 2505.2.

Surrogate Emulation Interfaces & Validation Governance What specific model interfaces, runtime frameworks (e.g., PyTorch, ONNX, TorchScript), and hosting controls does CAPE expect for in-house surrogate emulators? Furthermore, is the out-of-sample query detection capability expected to be developed by the Government alongside the emulators, or provided by the offeror as part of the core hosting framework?

The Government will provide, build, and maintain the emulation layer construction and persistence, and software/tools/licenses required. The commercial provider must provide the necessary compute hardware and base software infrastructure necessary to build, deploy, maintain, and orchestrate the models, tools, and techniques. If the offeror has experience in implementing mathematical approaches to out-of-sample detection then the government consider that as part of the software layer that is acquired.

Analyst Concurrency & Sizing Parameters

How many concurrent analysts are anticipated to access the self-service quantitative analysis and trade-space layer, and what dedicated GPU capacity does the Government estimate for surrogate training pipelines and language model execution?

Intent is to have this scale for 10s of users at once. All CAPE analysts should be able to access the environment when needed, approximately 100 total users.

Prototype Success & Acceptance Criteria How will Phase 1 and follow-on prototype performance be formally measured and validated: batch throughput/runtime compression, simulation fidelity preservation, analyst workflow productivity, decision cycle turnaround time, or a weighted combination?

The primary evaluation factor for Phase I is the relevance of the submission to the AOI, which includes but is not limited to technical ability, security/accreditation posture, scalability and implementation approach, innovative solutions, and sustainment strategy.

Turnkey IT Operations & System Access To execute the mandated turnkey IT operations (patching, backups, cybersecurity hardening), will contractor personnel be authorized remote administrative access into the IL6 virtual infrastructure, or will system maintenance mandate cleared, on-site personnel at the Pentagon or Mark Center?

If the solution provided by the vendor requires remote access, then that should be noted. The IL6 solution that is provided will drive the requirements for the offeror to maintain the accreditation and cybersecurity requirements.

External Interfaces & Secure Data Transport Will connectivity to external repositories (e.g., OSW-furnished databases, War Data Platform) occur entirely across secure

IL6/SIPRNet transport, or will external cross-domain guards (CDS) be required for ingestion from repositories at other security classifications?

This will depend on the IL6 environment provided by the offeror. If CDS is required, the contractor will need to manage the required encryption and data transfer protocols for data to be ingested and exported from the IL6 environment.

30 Can a current CAPE IDIQ contractor respond to this AOI? Yes

Can the Government clarify the expected location and hosting requirements for the “turnkey, managed platform and infrastructure, including hardware”? Is the expectation that the commercial provider will directly provide and manage the required IT infrastructure? Are cloud-hosted solutions, such as Microsoft Azure, acceptable?

Yes, the offeror will provide all of the environment IT responsibilities required to maintain an ATO at IL6. Microsoft Azure solutions operating at IL6 are acceptable.

32 Can the Government provide additional information regarding the anticipated scale of the effort, including the estimated overall value or potential funding range? ROM = $3-$22M

33 Does the Government have an estimated number of users for the platform? Additionally, should the commercial provider anticipate supporting 24/7 operations, or will operations be limited to defined hours or periods?

Intent is to have this scale for 10s of users at once. All CAPE analysts should be able to access the environment when needed (~100). Typical user support should be available from 0600-1700 on M-F.

Any downtime needed for patching, maintenance, etc. would ideally happen during off hours but CAPE understands that isn't always possible. The provided solution should have a plan to alert CAPE staff of how to handle planned system downtime.

34 Which CAPE organization owns platform architecture and technical acceptance, and which owns surrogate methods and analytical assurance? The CAPE Analysis & Innovation (A&I) directorate will own all of it.

35 What IL6 hosting, network access, and authorization assets are government-furnished or available for inheritance?

The Government could provide the following Government-Furnished Equipment (GFE): Local Development Hardware & sandbox, network pathways to OSW data repositories and War Data Platform, Secure cryptographic Hardware (e.g., TACLANEs), Thin Clients, and possibly others.

Government would like the candidates to be flexible between what the Government provides vs possible streamlined solutions from submitting companies

36 What representative workloads will establish compliance with the light and heavy throughput targets? The light option must facilitate on the order of 1,200 individual simulations while the heavy option must facilitate on the order of 150,000 simulations.

37 What is the exact boundary between government-controlled orchestration and provider-managed platform operations with respect to both the simulation environment and the hardware that it runs on?

CAPE will schedule all operations within the environment. The desire is for the environment to provide hardware, and software that allows analysts to develop to their needs

38 What interfaces and artifacts will the government supply for its surrogate models and WDP/CAPE data connections? CAPE will provide AFSIM scenario artifacts, models, and existing interfaces required. Existing connections to WDP, and a sandbox development network

39 What must be operational at the first demonstration, and what adaptation period is expected? The adaptation for CAPE is intended to be in FY27 40 What funding range and sustainment model should inform the proposed capacity options? ROM = $3-$22M

Evaluation Criteria and Relative Weighting Question: Please clarify the primary evaluation criteria and relative weighting associated with Phase I submissions, including the relative importance of technical performance, security/accreditation posture, scalability, implementation approach, innovation, cost considerations, and sustainment strategy.

The primary evaluation factor for Phase I is the relevance of the submission to the AOI, which includes but is not limited to technical ability, security/accreditation posture, scalability and implementation approach, innovative solutions, and sustainment strategy. While initial estimates are permissible in Phase I, costs are assessed in Phase 2 either through pitches or requests for proposals.

IL6 Accreditation, Classified Connectivity, and COMSEC Responsibilities Question: Please clarify the Government's expectations regarding IL6 accreditation, classified connectivity, and communications security (COMSEC) responsibilities. Specifically, does the proposed solution need to possess an existing IL6 authorization boundary at the time of proposal submission or award, or will solutions with a defined path to authorization be considered?

Additionally, please clarify Government and contractor responsibilities for classified network infrastructure, COMSEC accounts, encryption devices, cryptographic key management, and associated security services, including whether such capabilities will be

Government-furnished, contractor-provided, or supported through existing Government-managed services.

CAPE does not have an opinion on how the environment is furnished at IL6. We require access to a computing environment at IL6, however that construct is created, as long as it's tenable, is up to the candidates to determine.

Deployment Model

Question: What are the Government's anticipated timelines for Initial Operational Capability (IOC), Full Operational Capability (FOC), and transition from the current modeling and simulation environment?

IOC in FY27. FOC in FY28. Transition from M&S environment should begin in FY27.

Workload Characterization Question: Beyond the light and heavy performance examples identified in the AOI, can CAPE provide additional workload characterization information, including anticipated user populations, concurrency requirements, storage growth projections, GPU utilization expectations, and the anticipated balance between full-fidelity simulation execution and surrogate-model execution?

Intent is to have this scale for 10s of users at once. All CAPE analysts should be able to access the environment when needed, approximately 100 users. Additional workloads include heavy ML and deep learning frameworks for developing and building the surrogate layer and AI/LLM workflows. Total storage demands are expected on the order of 100s TB.

Deployment Timeline

Question: What are the Government's anticipated timelines for Initial Operational Capability (IOC), Full Operational Capability (FOC), and migration from existing M&S environments?

IOC in FY27. FOC in FY28. Transition from M&S environment should begin in FY27.

Turnkey versus Modular Solutions

Question: Will CAPE consider modular or phased approaches, including platform-only, compute-only, analytics-only, or integrated best-of-breed solutions through teaming arrangements, or is a complete turnkey solution required?

Modular phased solution is acceptable in building towards the desired end state "turnkey" solution but would require a roadmap to IOC/FOC.

Data Rights / Intellectual Property Question: Please clarify the Government's anticipated rights regarding contractor-developed software, architecture, automation, workflows, interfaces, proprietary methodologies, technical data, and documentation proposed or developed under this effort, including the treatment of pre-existing contractor intellectual property incorporated into a proposed solution.

The Government will provide, build, and maintain the AFSIM mission and campaign models, surrogate layer construction and persistence, and software/tools/licenses required. The commercial provider must provide the necessary compute hardware and base software infrastructure necessary to build, deploy, maintain, and orchestrate the models, tools, and techniques. If the offeror has experience in implementing methodologies relevant to the AOI then the government consider that pathway.

Contracting Strategy and Award Structure Question: Please clarify the Government's anticipated acquisition and award strategy for this effort, including the contemplated award instrument(s) (e.g., Other Transaction Agreement, Prototype OT, Follow-on Production OT, FAR-based procurement contract, BPA, services agreement, or other vehicle), the anticipated path from Phase I through subsequent phases, and any key factors that will influence down-select and award decisions

The Government anticipates awarding one or more Prototype Other Transaction (OT) Agreements pursuant to 10 U.S.C. § 4022, solicited under the Commercial Solutions Opening (CSO) authority of 10 U.S.C. § 3458. The Government reserves the right to make single, multiple, or no awards based on the technical merit of received proposals and the availability of funds

Foreign Ownership / Control / Influence (FOCI)

Question: Please clarify any eligibility restrictions, disclosure requirements, or participation considerations associated with foreign ownership, control, or influence (FOCI), including the use of affiliated entities, subcontractors, teammates, or technology partners.

In accordance with federal law and DoD policy, entities that are owned, controlled, or influenced by governments or corporations of countries of concern (specifically the People's Republic of China, the Russian Federation, the Democratic People's Republic of Korea, the Islamic Republic of Iran, or other entities designated under FY21 NDAA Section 1260H) are strictly prohibited from participating in this effort in any capacity (e.g., as a prime, subcontractor, teammate, or software component provider).

Allied & Partner Nation Commercial Tech: Commercial software, tools, and technical architectures developed by entities headquartered in allied and partner nations (e.g., NATO member nations, Five

Eyes, or major non-NATO allies) are eligible for consideration, provided they meet the disclosure and security mitigation requirements.

Offerors must explicitly disclose in their Phase I Solution Brief any known or potential FOCI conditions affecting the prime contractor, key subcontractors, teaming partners, or proposed commercial software products.

Disclosures must identify:

The ultimate foreign parent company, ownership percentages, and foreign equity holders (including foreign venture capital or private equity backing);

The presence of any foreign nationals who will access technical data or participate in development under this agreement; and Any existing DCSA-approved FOCI mitigation agreements (e.g., Special Security Agreement [SSA], Proxy Agreement, Voting Trust, or Security Control Agreement [SCA]).

Software Licensing, Administration, and Compliance Responsibilities Question: Please clarify the division of responsibility between the Government and the performer for procurement, licensing, installation, configuration, administration, maintenance, and lifecycle support of commercial, Government-furnished, and contractor-developed software utilized within the modeling and simulation environment. Additionally, please clarify responsibility for determining and maintaining IL6 compliance for COTS, GOTS, and contractor-developed applications, tools, and software components.

The performer is responsible for procuring, licensing, installing, maintaining, and patching all proposed commercial (COTS) and custom-developed software, including delivering all hardening artifacts (STIGs, vulnerability remediation) required to achieve IL6 compliance.

The Government will furnish all core government-owned software (GOTS) and baselines (AFSIM, JCOFA, WDP) at zero cost to the performer, provide the accredited hosting enclaves from which the platform inherits baseline security controls, and retain exclusive tenant administration over user access and workload execution.

While the performer is contractually responsible for the software’s security posture, the final determination of IL6 compliance and the authority to grant an Authorization to Operate (ATO) rests solely with the Government Authorizing Official.

Sustainment, Technology Refresh, and Availability Expectations Question: Please clarify the Government's expectations regarding system sustainment, technology refresh, availability, maintenance, and lifecycle management. Specifically, should offerors assume periodic hardware refresh, performance modernization, and replacement of obsolete components during the period of performance, or should proposed solutions be sized and maintained without major technology refresh events? Additionally, please clarify expectations regarding system uptime, maintenance windows, patching authority, and operational downtime.

The expectation is the sustainment and maintenance of the system, but solutions that provide the flexibility to evolve the system over time would be considered.

Shared Infrastructure and Cost-Sharing Considerations Question: If a solution includes contractor-owned or contractor-operated infrastructure, may proposed compute resources be shared with other Government programs, reimbursed through separate funded tasking, or otherwise leveraged as part of a cost-sharing approach? If such arrangements are permissible, are there limitations regarding resource allocation, ownership, prioritization, security segregation, or non-Government usage?

CAPE does not have an opinion on how proposed infrastructure is utilized by other Government entities.

CAPE however would want assurance to their compute requirements and access and would require ownership, prioritization, and security segregation. Non-government usage would not be authorized if that means usage outside government agencies or government contracted work.