Attachment 10 OMC IT Questions and Response Solicitation HQ0034-20-R-0004.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- OMC Information Technology Support Services
- Solicitation number
- HQ0034-20-R-0004
- Issued by
-
DOD Washington Headquarters Service
About this file
This solicitation seeks proposals for Information Technology Support Services for the Office of Military Commissions. The services include a transition to a Virtual Desktop Infrastructure utilizing thick/thin clients, implementation of a Public Key Infrastructure authentication solution, and IT support from approximately 18 full time equivalents. The period of performance is a 30 day phase-in period, eleven-month base period, and four twelve-month option periods. The solicitation is a competitive set-aside for Service-Disabled Veteran Owned Small Businesses and involves work at locations in the National Capital Region and U.S. Naval Station Guantanamo Bay, Cuba. The incumbent contractors are NetCentrics Corporation and Ironclad Technology Services. The proposal submission deadline is January 10, 2020.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| OMC IT Question and Responses Solicitation No. HQ0034-20-R-0004 Amendment 001 | ||||
| Question No. | Reference | Question Category | Question | Response |
| 1 | General | Solicitation | We would like to officially request that the government allow a 2 week extension from the current due dates of all volumes due to allow sufficient time to all bidders/industry. The current submission deadline of Jan 7th 2020 does not allow bidders/industry enough to be complaint and review current and future QAs with the current timeline allowed. | The proposal submission due date has been extended to January 10, 2020 2:00PM. Please see Amended Solicitation HQ0034-20-R-0004 |
| 2 | A.1.6 Electronic Submission | Solicitation | The RFP states "All offerors shall submit electronic proposals by January 7, 2019 by 10:00 AM, EST.' Would the government consider a one week extension to January 14, 2019, given the holiday season? | Please see response to Question 1 |
| 3 | General | Solicitation | We would like to request and extension because we are not able to complete Past Performance Questionnaires in time with the current holiday schedule. Most of our GPOCs (government point of contacts) are currently out on leave until next year. In addition, we’d like clarification if the government will accept CPARs in lieu of PPQs submitted prior to 10/27/2019 at 10:00am? | The PPQ submission due date has been revised. Please see revised Attachment 6 dated December 30, 2019. The Government will review Contractor Performance Assessment Report for Offeror' s contract reference. Please refer to Solicitation Far Clause 52.212-1 INSTRUCTIONS TO OFFEROR-COMMERICAL ITEMS (OCT 2018) “ADDENDUM" Section F. |
| 4 | Solicitation RFP | Solicitation | Due to the release of the RFP during holiday leave for many government and contractor staff, we request a one-week extension to the proposal due date to allow for sufficient time for completion of past performance questionnaires and quality preparation of competitive proposals. | Please see response to Questions 1 and 3 |
| 5 | NA | Solicitation | Can the Government specify the number of contract staff working onsite within the National Capital Region and the number working onsite at U.S. Naval Station Guantanamo Bay, Cuba? | Please see revised PWS dated December 30, 2019 Technical Exhibit 3. NSGB is U.S. Naval Station Guantanamo Bay, Cuba and NCR is for the National Capital Region. |
| 6 | PWS Section 1.3 and Technical Exhibit 3 | Technical | Page 1 of the PWS indicates that the work required has historically been accomplished "by approximately 18 full time equivalents (FTEs) as represented in Technical Exhibit 3." However, the hours shown in Technical Exhibit 3 equate to 20 FTEs. Can the government please clarify the number of FTEs that have historically provided support? | 18 has been the historical amount, but more FTEs have been added for increased disciplines required for the current requirement. The PWS Technical Exhibit 3 accounts for the increased disciplines and estimates 20 FTEs for the current requirement. |
| 7 | PWS Section 1.5 | Technical | Section 1.5 specifies a Base Period of 12 months but specified a based period from 29 MAR 2021 to 28 FEB 2022. Can the government confirm that the base period is expected to be approximately 11 months? | The Government confirms an 11 month base period. Please see revised PWS dated December 30, 2019 Section 1.5 Period of Performance. |
| 8 | Solicitation RFP and PWS | Technical | Section 5.1.7 of the PWS includes a single task requirement for Communications Security. However, the CLIN Structure for the RFP does not include a corresponding CLIN for this task. Should offerors include this requirement as part of Surge Support for IT Support Services? | Please see to revised PWS December 30, 2019 Technical Exhibit 3 which list the 5.1.7 as one of the task for the Network Engineer labor category. Also please see the Amended RFP CLIN description for Network Engineer Support Services. |
| 9 | Solicitation RFP | Solicitation | Can the Government specify in which volume bidders should provide the SF1449? | The SF1449 should be included in Volume I. Please see revised Solicitation FAR Clause 52.212-1 INSTRUCTIONS TO OFFEROR-COMMERICAL ITEMS (OCT 2018) “ADDENDUM". |
| 10 | General | Pricing | Would the Government provide guidance on how the offeror should price housing and insurance for the personnel located on Guantánamo Bay in Cuba? | Information can be obtained through the housing office at NSGB. Their contact information is e-mail: usn.gtmo.navstagtmobaycu.mbx.n93-housing@mail.mil or call (757) 458.4172/4063. Also, please see PWS section 1.6.13 for the housing office website address. |
| 11 | PWS | Technical | Would the Government consider changing the System Administrator/Task Lead certification requirement from having both the VCP and MCSE Core Infrastructure certifications to having a VCP or MCSE certification? | No, the requirement is critical to implementation and maintenance of the VDI infrastructure. |
| 12 | PPQ Attachment | Solicitation | Would the Government consider extending the Due date for PPQ submission from December 27th, 2019, to the data of submission January 7, 2020? | Please see response to Question 3. |
| 13 | RFP SF1449 (Pg. 1), Box 8 | Solicitation | Will the government consider providing additional time for offers to be submitted in response to this requirement? | Please see response to Question 1. |
| 14 | RFP SF1449 (Pg. 1), Box 28 | Solicitation | Does the government require two (2) copies of the proposal as indicated in Box 28? If so, please clarify. | The Government does not require 2 copies of the Proposal. Please see amended Solicitation Box 28. |
| 15 | RFP Section A.1.5, "Indexing" (Pg. 75), first paragraph | Solicitation | What does the government mean by "Tab indexing shall be used to identify sections"? | Tab indexing refers to lettering or numbering system to identify sections. |
| 16 | PWS Section 1.5, "Period of Performance" (Pg. 2), fourth paragraph on page | Technical | Will the government clarify the expected period of performance? The first sentence in the referenced section states "one (1) Base Period of 12 months", but the list that follows in this section includes dates that indicate an eleven month Base Period (as does Section B of the RFP). | Please see response to Question 7. |
| 17 | PWS Part 7.3, "Estimated Workload Data" (Pg. 21), first table | Technical | Since there appear to be two incumbent positions in place historically for the Senior System Administrator/Task Lead, does the government require that offerors provide two key personnel resumes for the Senior System Administrator/Task Lead labor category? | Yes, The Government requires the offeror to provide two separate Key personnel resumes for the Senior System Administrator/Task Lead labor category. Please see revised PWS dated December 30, 2019. |
| 18 | Attachment 1 - PWS, Technical Exhibit 3 and Section 1.6.11 Key Personnel and Solicitation Section E. Technical Approach & Capability (Volume IV) Key Personnel | Solicitation | In Section 1.6.11 Key Personnel, the PWS lists the following Positions as Key: Program Manager, System Administrator/Task Lead, Cyber Security, and Network Engineering. In Technical Exhibit 3, the following estimated FTE are Senior System Administrator (2 FTE) and Information Security Specialist (3 FTE). Section E (Instructions to Offerors) Key Personnel paragraph states the offeror shall submit resumes for Key Personnel. How many Key Personnel resumes should be submitted? | There are (4) four Key Personnel, based on section 1.6.11 Key Personnel (1) one for the Program Manager, (2) for the System Administrator and (1) one for the Network Engineer. The Information Security Specialist was not included as key Personnel in the PWS for the official Solicitation. Please see revised PWS dated December 30, 2019. |
| 19 | Instructions to Offerors Section C. Pass/Fail (Volume II) subpara 2 | Solicitation | What type of documents will the Government accept as proof of corresponding to the small business size standards? | The Government will use SAM.gov and the SBA Dynamic Small Business Search (DSBS) database to verify small business size standard. Documents from these sources are permissible as proof of business size standard. Please refer to FAR Clause 52.212-1 INSTRUCTIONS TO OFFEROR-COMMERICAL ITEMS (OCT 2018) “ADDENDUM" Section C Pass Fail. |
| 20 | Instructions to Offerors Section E. Technical Approach & Capability (Volume IV) Para 1 | Solicitation | Solicitation states: The Offeror shall submit sufficient information for the Government to make a comprehensive evaluation of the Offeror’s technical approach and capability in meeting the performance work statement requirements listed in the solicitation for successful performance. Is the Government looking for offerors to respond to the entire PWS or only the technical requirements present in Section 5. Requirements of the PWS? | Please refer to FAR Clause 52.212-1 INSTRUCTIONS TO OFFEROR-COMMERICAL ITEMS (OCT 2018) “ADDENDUM" and FAR Clause 52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014) ADDENDUM. |
| 21 | Instructions to Offerors Section E. Technical Approach & Capability (Volume IV) Para 1 | Solicitation | Solicitation states: The Offeror shall submit sufficient information for the Government to make a comprehensive evaluation of the Offeror’s technical approach and capability in meeting the performance work statement requirements listed in the solicitation for successful performance. If the answer to the previous question is the offeror shall respond to the entire PWS, we respectfully request that the Government allow for 45 pages in Volume IV to allow for sufficient information to allow for comprehensive evaluation of the response. | The Volume IV page limit remains the same. Please refer to FAR Clause 52.212-1 INSTRUCTIONS TO OFFEROR-COMMERICAL ITEMS (OCT 2018) “ADDENDUM" Section A "Proposal Volume Requirements. |
| 22 | Instructions to Offerors A.1.4.1 Page and Font Size | Solicitation | Solicitation states: Proprietary statements, security markings, and page numbers shall be placed within the defined margin area. Can these items use a legible reduced font size to fit within the 1-inch margin? | Please refer to FAR Clause 52.212-1 Instructions to Offerors- Commercial Items section A.1.4.1 for information regarding font size. |
| 23 | Due Date | Solicitation | Given that this FRFP was released prior to the holiday, would the Government consider an extension of one week? This would allow maximum response to PPQs from our customers, who are also on leave during this time. | Please see response to Questions 1 and 3 |
| 24 | PWS 1.6.11 Key Personnel, pages 4 and 5 | Solicitation | Please confirm that a total of 3 FTEs are considered as key personnel. | Please see response to Question 18. |
| 25 | RFP Page 76 of 83 - C. Pass/Fail (Volume II) | Solicitation | The Government states that "the Contractor shall submit evidence that their small business size standard corresponds to the NAICS code assigned to this solicitation". The solicitation further states that the Government will independently verify this information with the SBA DSBS and SAM. Typically, offerors would use these two sources in their submissions as evidence of their socio-economic status as it corresponds to the solicitation NAICS. Will the Government clarify what documentation offerors should submit to provide evidence of their SDVOSB status? | Please see response to Question 19. |
| 26 | PWS 1.6.11 Key Personnel, page 5, System Administrator/Task Lead | Solicitation | The Key System Administrator/Task Lead role requires an MCSE Core Infrastructure certification. This certification is less than a year old and is still very uncommon. The requirement for this certification significantly and unduly restricts the pool of qualified and available personnel for this role. |
a. Will the Government expand the requirement for the MCSE Core Infrastructure certification to include any MCSE or related certification (such as Server+)?
| b. If a related certification is not acceptable, will the Government allow offerors to certify that their proposed personnel will obtain the MCSE Core Infrastructure certification within 6 months of contract award? | The Government will not revise the MCSE Core Infrastructure Certification qualification. This requirement is critical to implementation and maintenance of the VDI infrastructure. | |||
| 27 | General | Solicitation | Will the Government confirm that the following items are reimbursable under the ODC/Travel CLINs? |
A. Defense Base Act Insurance B. Hardship Pay C. Dependent education D. Family relocation travel to and from NSGB (upon completion of a year of service)
| E. Accompanied/family housing | Please refer to the revised PWS dated December 30, 2019 section 1.6.13 Contractor Travel and 1.6.14 Other Direct Cost. | ||||
| 28 | PWS 5.1.3.19, page 14 | Technical | This PWS task states that the contractor will be responsible for transportation, delivery, and setup of IT assets throughout the NCR and NSGB. It provides further details on equipment transportation in the NSGB using Government vehicles. However, no other information is provided for the NCR. Will the Government allow the use of Government vehicles for the movement and transport of IT assets within the NCR? If not, will the Contractor be reimbursed for reasonable costs associated with the transport? | The Government will allow minimal use of Government vehicles for the movement and transport of IT assets in the NCR. Equipment is typically transported within the NCR by the Joint Service Provider (JSP). The Contractor will not be reimbursed for travel costs within the NCR. | |
| 29 | Attachment 5 - Pricing Template | Solicitation | On each tab of the Pricing Template, the Government is requesting the Number of FTEs (indicating that offerors should include a single LCAT/CLIN per line, regardless of the number of FTEs). The spreadsheet also requests the Unburdened Labor Rates (indicating that offerors should break out each individual FTE onto separate lines). Will the Government clarify which approach is preferred? | Please provide all requested information in the Pricing Template. Please use the approach that will accurately reflect the requested information. Please see Attachment 5. | |
| 30 | Attachment 4 - Personnel Matrix | Solicitation | Will the Government clarify if the offerors should complete the Personnel Matrix with: |
a. The unique qualifications of each of their proposed personnel, or
| b. The proposed general qualifications/requirements for each labor category? | The Personnel Matrix shall include the Qualifications for each non-key personnel. For Key Personnel, the Personnel Matrix shall include the specific qualifications for each of the proposed personnel. Please refer to FAR Clause 52.212-1 INSTRUCTIONS TO OFFEROR-COMMERICAL ITEMS (OCT 2018) “ADDENDUM" Section E Technical Approach and Capability. | ||||
| 31 | General | Solicitation | Will the Government provide a full list of the Q&A from the draft RFP? | The questions from the Draft Solicitation were used to better define the official Solicitation. The official Solicitation reflects changes made as a result of the questions received. The Government does not intend to provide a list of Questions and Responses to the Draft Solicitation. | |
| 32 | PWS 1.6.13 Contractor Travel, page 6, paragraphs 1 and 3 | Solicitation | When discussing local travel to and from the Pentagon and in the surrounding NCR area, the PWS states "The contractor will only be reimbursed for travel expenses; not for any labor hours arising from the travel, as labor is included in the LH CLIN. The contractor will not receive an hourly payment for the time contractor personnel spend in travel." Separately, the PWS discusses required travel to NSGB or other overseas locations. However, it is unclear if the Government intends to reimburse labor hours arising from the travel for these trips. |
a. Will the Government confirm that all labor hours expended during travel to and from NSGB (and other overseas locations) will be billed to the LH CLIN?
| b. If labor hours expended during travel to and from NSGB (and other overseas locations) are not billable, will the Government quantify the number, frequency, and average duration of the trips so that offerors may consider these costs as they prepare their price proposals? | A: Travel hours are not billable to the LH CLIN. B: NCR Based Contractors will each travel approximately 8 trips per year, each leg of the trip (e.g. Inbound/Outbound) is approximately 6-hours, trip duration is generally 1-2 weeks. GTMO Based Contractors travel infrequently, approximately 1 trip per year, with each leg being approximately 6-hours. | ||||
| 33 | PWS Page 1, paragraph 5 & PWS Technical Exhibit 3 | Technical | Page 1 of the PWS states that the work has historically been accomplished by approximately 18 FTEs. Technical Exhibit 3 displays 20 FTEs for the base period. May the Government explain this discrepancy? | Please see response to Question 6. | |
| 34 | PWS Page 2 paragraph 2 | Technical | Page 2 of the PWS states "There are two major IT Projects the Contractor will be required to design, implement, manage, and maintain solutions. This first project requires the Contractor to transition NSGB based NIPRNET and SIPRNET systems from a traditional client-server infrastructure to Virtual Desktop Infrastructure (VDI) utilizing thick/thin clients. The second project requires the Contractor to provide a complete Public Key Infrastructure (PKI) based authentication solution in accordance with Intelligence Community Standard (ISC) 500-26 for the Special Access networked system." When does the Government intend to complete this project? | Please refer to revised PWS dated December 30, 2019 Techinical Exhibit 2 Deliverable Schedule. | |
| 35 | PWS section 1.6.4, paragraph 1, page 3 | Technical | The PWS states “Surge hours in excess of 40 hours per week may occasionally be required to support the OMC Mission” – How much is funded in the Surge CLIN and will be funded at contract award? | The PWS, SF1449 CLINs, and Attachment 5 -Pricing Template indicate hours for each Labor Hour CLIN in support of the surge effort. The amount funded will depend on the Labor Hour rate proposed by the Offeror. Please refer to the Solicitation. | |
| 36 | PWS section 1.6.13, page 6, paragraph 1 | Technical | The PWS states “Contractors will be required to travel to U.S. Naval Station Guantanamo Bay (NSGB), Cuba or other overseas locations. While in NSGB, contractors may be required to work up to 120 days. While deployed to NSGB on a temporary status, contractors shall reside in a containerized housing unit (CHU) trailer. In the event the CHU trailer is unavailable, with the COR’s approval, the contractor shall reside in the Navy Lodge, BOQ or other Government provided accommodations. Contractors will not be reimbursed for the cost of transient housing not previously approved by the COR.” – What does “other” overseas locations mean? Also, where are the CHU’s located? | The "other" is a provision that may not be exercised, but leaves open the possibility to deploy to other locations (maybe Middle East or Malaysia) for mission requirements. While this would be rare or even none at all, we need the ability to deploy world wide. The CHUs are located at NSGB near the main complex. | |
| 37 | PWS section 1.6.13, page 6, paragraph 4 | Technical | The PWS states “The Government will provide contractors transportation while in NSGB; contractors shall possess the required licenses to operate all vehicles or equipment necessary to perform under this contract. Contractors permanently assigned to NSGB are authorized leased housing. The Contractor is responsible for providing leased housing through the Housing Service Center (HSC).” – Does this mean contractors will receive take home vehicles or vehicles they’re permitted to use during work hours? Also, may the Government provide the rules and regulations for usage ahead of time? | Govt. Vehicle will be available for Official Use Only. This does not include communte to/from their residence. Please refer to PWS Section 1.6.13 | |
| 38 | Solicitation section E, phase-in plan, page 76 | Solicitation | The draft solicitation included a 15-calendar day administrative period and a 15-calendar day overlap period. The final solicitation does not include this language. Does the Government still anticipate the phase-in plan to include the aforementioned administrative period and overlap period? | Yes. The Government anticipate the phase-in plan to include the administrative period and overlap period. Please refer to the PWS section 1.6.17. | |
| 39 | PWS section Part 4, section 4.1, page 12 | Technical | May the Government define what all facilities should be included as a contractor-furnished responsibility? And may the Government disclose if the current incumbent leases any office space to support this contract? | Please refer to PWS Part Part 4 Contractor Furnished Items and Responsibilty. There is no provision in the RFP for leasing office space. | |
| 40 | Solicitation section A.1.6, page 75 | Solicitation | May the Government provide an extension for this proposal due date? | Please see response to Question 1 | |
| 41 | 52.212-1 Addendum, Section F, Page 77, first paragraph (Past Performance (Volume V) | Solicitation | Can a prime submit past performance as a sub when the workshare was 35% or greater? | The Solicitation requires Past Performance contract references in which the Prime Offeror and/or the Subcontractor performed as the Prime Contractor. Please refer to FAR Clause 52.212-1 INSTRUCTIONS TO OFFEROR-COMMERICAL ITEMS (OCT 2018) “ADDENDUM" Section F Past Performance. | |
| 42 | 52.212-1 Addendum, Section E, Page 77, Second Paragraph labeled Key Personnel states, "The Offeror shall submit resumes for Key Personnel, listing the individual’s name, education, experience, certifications and security clearance level. Each resume shall specify which PWS tasks the individual will perform, and it shall specify the individual’s proposed duties and responsibilities. All Key Personnel are required to submit a commitment letter that is signed within five days of the proposal submission." | Solicitation | Will the government accept Letters of Commitment dated prior to 5 days from submission? | This requirement has been changed to within 10 days of proposal due date. Please see revised FAR Clause 52.212-1 INSTRUCTIONS TO OFFEROR-COMMERICAL ITEMS (OCT 2018) “ADDENDUM" Section E Technical Approach and Capability. | |
| 43 | 52.212-1 Addendum, Section E, Page 77, Second Paragraph labled Key Personnel states, "The Offeror shall submit resumes for Key Personnel, listing the individual’s name, education, experience, certifications and security clearance level. Each resume shall specify which PWS tasks the individual will perform, and it shall specify the individual’s proposed duties and responsibilities. All Key Personnel are required to submit a commitment letter that is signed within five days of the proposal submission." | Solicitation | Will the government accept Letters of Commitment dated up to the day prior to submission? | Please see response to question 42. | |
| 44 | Solicitation HQ003420R004, Section 52.212-1. Instructions to Offeror, Subsection Past Performance (Volume V) | Solicitation | Government states offeror shall provide Past Performance Questionnaires (PPQ) to its customer references and instruct them to submit them in accordance with the instructions in the PPQ. Is the Government willing to accept Contractor Performance Assessment Report (CPAR) in lieu of a PPQ to measure the degree to which the Offeror satisfied its customer? | Yes. Please see revised FAR Clause 52.212-1 INSTRUCTIONS TO OFFEROR-COMMERICAL ITEMS (OCT 2018) “ADDENDUM" Section F Past Performance. | |
| 45 | Attachment 6 - Past Performance Questionnaire - Page 1 | Past Performance | Per “Attachment 6 Past Performance Questionnaire HQ003” Page 1 regarding “Instructions to Person Providing Reference”, the submission date of the questionnaire is listed as December 27, 2019 10:00am Eastern; however per the attachment “Solicitation HQ0034-20-R-0004…” on page 72, all questions, concerns, or requests for clarification is also listed for the same date and time of December 27, 2019 10:00am eastern with a proposal due date listed for January 7, 2020 the government willing to alter the submission date for the Past Performance Questionnaire by the references for the same date of the proposal submission which is January 7, 2020? | Please see response to Question 3. | |
| 46 | Attachment 5 - Pricing Template - Tab 2 - Labor Category (8-FFP) | Pricing | The solicitation does not provide CLINs or period of performance dates for the 6 month option. Should offerors consider the CLIN # to be 5001 - 5009 for Tab 2 - Labor Category (-8 FFP) | Yes. CLIN # 5001-5009 in the Pricing Template refers to the FAR Clause 52.217-8 6 month extension. Please refer to Attachment 5 . | |
| 47 | Page 35 "Definitions" | Solicitation | On the solicitation order, the request is for a Service Disabled Veteran Owned Small Business however on Page 35 the definition is for Economically Disadvantaged Woman Owned Small Business. On page 37/38 it then goes back to SDVOSB. Does page 35 needs to be change to reflect page 1 and page 37/38? | No. Solicitation page 35 reflects the current language in FAR Clause 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (OCT 2018) ALTERNATE I (OCT 2014) and shall not be changed. | |
| 48 | Solicitation Page 76, para 4 | Solicitation | The solicitation states that salaries found on salary.com will be used for compensation plan comparison/evaluation however, the survey information found in Attachment 8 "Compensation Information" shows that all salary are based on a Washington, DC work location. Will the Government allow for significant deviation from these OCONUS rates due to staffing difficulties for TS/SCI cleared personnel as no salary.com information exist for the Guantanamo Bay, Cuba work location? | The salary information in Attachment 8 does not represent minimum or maximum salaries an offeror can proposed. The offeror proposed compensation should reflect a clear understanding of work to be performed and should indicate the capability of the proposed compensation structure to obtain and keep suitably qualified personnel to meet mission objectives. Please refer to Solicitation FAR Clause 52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014) ADDENDUM Section 2.1 | |
| 49 | Solicitaion Instructions | Solicitation | Will the government increase the current page count limit for technical from 20 pages to 25 pages. | Please see response to Question 21. | |
| 50 | PWS | Solicitation | The current key personnel listed are as shown: |
i. PM
ii. System Administrator/Task Lead iii. Network Engineer Will the government please clarify out of the three key personnel listed which will be located on island in OMC-GTMO and which will be in National Capital Region (NCR).
| Please see response to Question 18 .Please see revised PWS dated December 30, 2019 Technical Exhibit 3 for location of Key Personnel. | |||||
| 51 | General | Pricing | We request the Government provide guidance on how to determine cost build up for on island OMC-GTMO housing, insurance, car rental and moving of personnel located on Guantánamo Bay in Cuba? | Information may be obtained through the housing office at NSGB. Their contact information is e-mail: usn.gtmo.navstagtmobaycu.mbx.n93-housing@mail.mil or call (757) 458.4172/4063 | |
| 52 | General | Solicitation | We have not seen the Dec 5th DRFP (Draft) questions/answers posted and noticed that the government released the Final RFP on a different sam.beta.gov link then the original link posted. We request due to lack of timeline during holiday season and no QAs for the draft being released and a potential delay for any final QAs posted that the government allow a 2 week extension for all volumes due from the current due date. | Please see response to Questions 1 and 31. | |
| 53 | PWS | Technical | Will the government clarify what VDI systems/tools/technologies are approved to use by Joint Service Provider (JSP) Will OMC accept a cloud based VDI or Citrix based VDI solution. We need more clarification on the VDI element | The system will be a Dell/CISCO VDI solution with Unity SAN solution. | |
| 54 | OCI Attachment | Solicitation | We believe given the current firewall of the current incumbents supporting the two components for OMC-CA and MCDO there may be an OCI if the current incumbents decide to do a JV (Joint Venture), CTA (Contractor Teaming Agreement) and/or Prime/Sub or Sub/Prime position. Does this raise for a potential OCI? | Please refer to Attachment 7 Organization Conflict of Interest for definition. | |
| 55 | Solicitation, Section K | Solicitation | Please confirm that Offerors can submit the first statement/ paragraph under 52.212-3 if the Offeror's Reps and Certs on sam.gov are up-to-date. | Please complete 52.212-3 Representations and Certification in accordance with clause instructions. | |
| 56 | Solicitation, B. | ||||
| Administrative (Volume I), page 75 | Solicitation | If the answer to question 1 is yes, then do Offerors need to completed any other "Clauses/Provisions such as FAR 52.212-3 and FAR 52.219-1 Alt | Please complete Representations and Certifications in accordance with FAR 52.212-3 and FAR 52.219-1 Alt instructions. | ||
| 57 | General | Solicitation | Please extend the current due date for PPQs. We have been unable to have our government reps complete them during the holiday season. We request an extension for PPQs from current due date. | Please see response to Questions 3. | |
| 58 | PPQ Attachment | Solicitation | Please extend the current due date from Jan 7th and allow more time due to the holiday and for potential questions/answers to be released. | Please see response to Question 1. | |
| 59 | Solicitation HQ003420R004, Section 52.212-1. Instructions to Offeror, Subsection Past Performance (Volume V) | Solicitation | Government states offeror shall provide Past Performance Questionnaires (PPQ) to its customer references and instruct them to submit them in accordance with the instructions in the PPQ. Is the Government willing to accept Contractor Performance Assessment Report (CPAR) in lieu of a PPQ to measure the degree to which the Offeror satisfied its customer? | Yes, the Government will review Contractor Performance Assessment Reports for Offeror' s contract references. Please refer to Solicitation Far Clause 52.212-1 INSTRUCTIONS TO OFFEROR-COMMERICAL ITEMS (OCT 2018) “ADDENDUM" Section F Past Performance. | |
| 60 | Attachment 6 - Past Performance Questionnaire - Page 1 | Past Performance | Per “Attachment 6 Past Performance Questionnaire HQ003” Page 1 regarding “Instructions to Person Providing Reference”, the submission date of the questionnaire is listed as December 27, 2019 10:00am Eastern; however per the attachment “Solicitation HQ0034-20-R-0004…” on page 72, all questions, concerns, or requests for clarification is also listed for the same date and time of December 27, 2019 10:00am eastern with a proposal due date listed for January 7, 2020s the government willing to alter the submission date for the Past Performance Questionnaire by the references for the same date of the proposal submission which is January 7, 2020? | Please see response to Questions 3. | |
| 61 | Attachment 1 Performance Work Statement OMC Information Technology Support Services, Technical Exhibit 1: Performance Requirements Summary | Technical | In an effort to provide an accurate staffing structure and most cost-effective solution for OMC, will the Government please map work locations to the labor categories along with approximate work hours at each location? | Please refer PWS Technical Exhibit 3. |