Amendment_0001_-_18R0121.pdf
PDF 223 KB Posted
- Attached to
- Industrial Hygience Service Contract Federal contract opportunity
- Solicitation number
- HQ0034-18-R-0121
- Issued by
- DOD Washington Headquarters Service
About this file
Amendment 0001: Extend POP and Solicitation Corrections
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment__8_Key_Personnel_Qualifications__10092018.docx | DOCX document | |
| Amendment_0002_QA_response.pdf | ||
| Amend_No_2_Questions_20181009.pdf | ||
| Attachment___I_PWS_Final_revised_10092018.pdf | ||
| Attachment__3_Past_Performance_Questionnaire_rev.pdf | ||
| HQ003418R0121-0001_Conformed_Copy.pdf | ||
| Attachment__6_DD_254.pdf | ||
| Attachment__1_PWS_Final.pdf | ||
| Attachment__2_PP_Datasheet.pdf | ||
| Attachment__4_Pricing_Submission_Worksheet.xlsx | XLSX spreadsheet | |
| HQ0034-18-R-0121_Final.pdf | ||
| Attachment__5_Laboratory_Analysis_Pricing_Schedule.pdf | ||
| Attachment__8_Key_Personnel_Qualifications_Sheet.pdf | ||
| Attachment__3_Past_Performance_Questionnaire.pdf | ||
| Attachment__7__Non_Disclosure_Agreement.pdf | ||
| Synopsis.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PURPOSE: See continuation page for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HQ003418R0121
X 9B. DATED (SEE ITEM 11)
11-Sep-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Sep-2018
CODE
WHS - ACQUISITION DIRECTORATE
4800 MARK CENTER DRIVE, SUITE 09F09
ALEXANDRIA VA 22202-2900
HQ0034 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HQ003418R0121
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
PURPOSE OF THE AMENDMENT
PURPOSE: The purpose of the amendment is for the following:
1) Extend the closing date of the solicitation.
2) Correct the email address on Attachment #3 Past Performance Questionnaire.
3) The extended description of each CLINs was corrected to reflect 11 September 2018.
4) FAR 52.216-22, Indefinite Quantity, (d) -- was corrected to reflect 30 November 2023.
5) Factor III: Past Performance, iii) was corrected to reflect Attachment 2 Past Performance Data Sheet and Attachment 3 Past Performance Questionnaire.
6) Responses to questions for clarity received are corrected herein. The remaining questions will be answered and posted via amendment 0002.
REQUESTED CORRECTIONS TO THE SOLICITATION
SF1449, Pages 3-23- Please note the PWS date referenced within each CLIN needs to be updated to 11
SEP 2018.
SF1449, Pages 3-23 were corrected to reflect 11 September 2018 on the extended description of each CLINs.
RFP Page 82 of 85, Rating Methods, 2nd paragraph.
The first sentence of this paragraph should read as, “Volume III and IV…”
SF1449, page 72 was corrected to reflect the first sentence of this paragraph reads, “Volume III and IV…”
RFP Page 56 of 85, FAR 52.216-22, Indefinite Quantity, (d). The date of 01 November 2018 appears to be an error.
SF1449, page 56 was corrected to reflect 30 November 2023.
RFP Page 74 of 85, Proposal Content Chart, Volume VI
– Factor VI. This should read as Volume VI – Factor
IV.
SF1449, page 74 was corrected to reflect Volume VI – Factor IV.
RFP Page 78 of 85, d) Volume V – Factor III: Past Performance, iii). The names of Attachments 2 and 3 are reversed compared to how they are labeled on fbo.gov – Attachment 2 should be the Past Performance Data Sheet and Attachment 3 should be Past Performance Questionnaire.
SF1449, page 78 was corrected to reflect Attachment 2 Past Performance Data Sheet and Attachment 3 Past Performance Questionnaire.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 05-Oct-2018 11:00 AM to 12-Oct-2018 10:00 AM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
Per attached Performance Work Statement (PWS) date 09 July 2018.
To:
Per attached Performance Work Statement (PWS) date 11 September 2018.
CLIN 0002
Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 09 July 2018.
Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 11 September 2018.
CLIN 0003
CLIN 0004
CLIN 0005
CLIN 0006
RRMC Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 09 July 2018.
RRMC Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 11
CLIN 0007
Special Event and Project Services (RRMC and Pentagon per attached Performance Work Statement (PWS) date 09 July 2018.)
Special Event and Project Services (RRMC and Pentagon per attached Performance Work Statement (PWS) date 11 September 2018.)
CLIN 1001
CLIN 1002
Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 09 July
CLIN 1003
CLIN 1004
CLIN 1005
CLIN 1006
RRMC Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 09
RRMC Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 11
CLIN 1007
Special Event and Project Services (RRMC and Pentagon per attached Performance Work Statement (PWS) date 09
Special Event and Project Services (RRMC and Pentagon per attached Performance Work Statement (PWS) date 11
CLIN 2001
CLIN 2002
Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 09 July
CLIN 2003
CLIN 2004
CLIN 2005
CLIN 2006
RRMC Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 09
RRMC Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 11
CLIN 2007
Special Event and Project Services (RRMC and Pentagon per attached Performance Work Statement (PWS) date 09
Special Event and Project Services (RRMC and Pentagon per attached Performance Work Statement (PWS) date 11
CLIN 3001
CLIN 3002
Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 09 July
CLIN 3003
CLIN 3004
CLIN 3005
CLIN 3006
RRMC Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 09
RRMC Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 11
CLIN 3007
Special Event and Project Services (RRMC and Pentagon per attached Performance Work Statement (PWS) date 09
Special Event and Project Services (RRMC and Pentagon per attached Performance Work Statement (PWS) date 11
CLIN 4001
CLIN 4002
Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 09 July
CLIN 4003
CLIN 4004
CLIN 4005
CLIN 4006
RRMC Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 09
RRMC Calibration & Maintenance of Govt IH Equipment per attached Performance Work Statement (PWS) date 11
CLIN 4007
Special Event and Project Services (RRMC and Pentagon per attached Performance Work Statement (PWS) date 09
Special Event and Project Services (RRMC and Pentagon per attached Performance Work Statement (PWS) date 11
CLIN 5001
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension. Per attached Performance Work Statement (PWS) date 09 July 2018.
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension. Per attached Performance Work Statement (PWS) date 11 September 2018.
CLIN 5002
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension.Per attached
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension.Per attached
CLIN 5003
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension.Per attached
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension.Per attached
CLIN 5004
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension. Per attached
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension. Per attached
CLIN 5005
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension. Per attached
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension. Per attached
CLIN 5006
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension. Per attached
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension. Per attached
CLIN 5007
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension. (RRMC and Pentagon per attached Performance Work Statement (PWS) date 09 July 2018.)
NOTE: Pricing Purpose for FAR 52.217-8- Option to Extend Services--Six (6) month extension. (RRMC and Pentagon per attached Performance Work Statement (PWS) date 11 September 2018.)
The following have been modified:
FAR 52.212-1 ADDENDUM
FAR 52.212-1 ADDENDUM
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JAN 2017)
ADDENDUM
GENERAL
In order to maximize efficiency and ensure fairness during the evaluation process, all Contractors must comply with the following instructions for the proposal format and content. Proposals that do not comply with these instructions may be considered non-responsive and may render the Contractor ineligible for award. The Government may reject any or all proposals if such action is in the public interest, accept a proposal other than the lowest priced, and waive informalities and minor irregularities in proposals received. The Contractor shall submit documentation illustrating its approach for satisfying the requirements of this solicitation. Proposals must be clear, coherent, and prepared in sufficient detail for effective evaluation of the Contractor’s proposal against the evaluation criteria.
Proposals containing exceptions to the terms and conditions of the solicitation or any other deviation to the solicitation’s terms shall be rejected and considered ineligible for award. The response shall consist of six (6) separately bound parts:
Volume I: Administrative Volume II: Security Clearance Requirement/Certification Volume III: Factor I (Key Personnel/Staffing Plan) Volume IV: Factor II (Technical/Management Capability) Volume V: Factor III (Past Performance) Volume VI: Factor IV (Price)
Pursuant to FAR 52.212-1(g), the Government may evaluate offers and award without discussions, but reserves the right to conduct discussions if determined to be in the Government’s best interest. If discussions are held the government may establish a competitive range for efficiency purposes.
DEADLINE FOR RECEIPT OF QUESTIONS FROM PROSPECTIVE CONTRACTORS
a) Contractors shall submit questions in writing, regarding the performance work statement; the terms and conditions of this solicitation by email to the both contracting personnel listed below. Telephone inquiries will not be entertained.
b) Questions shall be emailed before/by Wednesday, September 19, 2018 at 11:00 AM Eastern Time. Submit questions to:
Primary point of contact: Mrs. Myra M. Freeberg at myra.m.freeberg.civ@mail.mil “AND” Secondary point of contract: Ms. Brittney Cowan at brittney.j.cowan.civ@mail.mil
c) Contractors shall affix the following as the email’s subject line:
Questions_ PROPOSAL: HQ0034-18-R-0121 Industrial Hygiene Service Contract
PROPOSAL SUBMISSION DUE DATE
a) Contractors must submit four (4) hard copies, one (1) original copy and one (1) electronic of their proposal in accordance with (IAW) the following details:
Volume I: Administrative Volume II: Security Clearance Requirement/Certification Volume III: Factor I (Key Personnel/Staffing Plan) Volume IV: Factor II (Technical/Management Capability) Volume V: Factor III (Past Performance) Volume VI: Factor IV (Price)
1) Hard copies:
(A) Binder clips are the preferred method of binding proposal volumes. However, three ring binders are also acceptable. All proposal submissions to the solicitation shall be in separate volumes corresponding to the evaluation factors identified in the Proposal Content Chart (See Table Below).
mailto:myra.m.freeberg.civ@mail.mil mailto:brittney.j.cowan.civ@mail.mil
(B) The preferred method of submission is by a courier delivery services (E.g.. FEDEX, UPS) or another commercial carrier; the use of United States Postal Service (USPS) is not the preferred method of submission.
(C) Proposals shall be submitted before/by the date/time indicated on page 1, block 8 of the solicitation (SF1449)) to the address below:
Package delivery via courier delivery services (E.g... FEDEX, UPS) use the following address:
Washington Headquarters Services, Acquisition Directorate (WHS, AD) Enterprise, Facilities & Construction Division (EFCD) Facility Operations & Management Branch (FOMB) ATTN: Mrs. Myra M. Freeberg & Ms. Brittney Cowan 4800 Mark Center Drive, Suite 09F09-02 Alexandria, VA 22350-3400
2) Electronic:
(A) Submission of proposals shall be emailed before/by date/time indicated on page 1, block 8 of the solicitation (SF1449)) to:
Primary point of contact: Mrs. Myra M. Freeberg at myra.m.freeberg.civ@mail.mil “AND” Secondary point of contract: Ms. Brittney Cowan at brittney.j.cowan.civ@mail.mil
(B) Contractors shall affix the following as the email’s subject line:
PROPOSAL: HQ0034-18-R-0121 Industrial Hygiene Service Contract
SOLICITATION CONTRACTING OFFICIALS
All electronic information (questions, site visit names, proposal submissions) shall be sent to the following:
Primary point of contact: Mrs. Myra M. Freeberg at myra.m.freeberg.civ@mail.mil “AND” Secondary point of contract: Ms. Brittney Cowan at brittney.j.cowan.civ@mail.mil
Any proposals received after the exact time specified for receipt shall be treated as a late submission IAW the Federal Acquisition Regulation (FAR) 52.212-1. The proposals volumes shall be submitted as attachments in the email. There is a 10MB limit for all electronic submissions per email. All email submission MUST be before/by the indicated due date indicated on page 1, block 8 of the solicitation (SF1449). Text and graphics portions of the electronic copies shall be in a format readable by Adobe (PDF), MS Word, and/or MS Excel. All proposals submissions to the solicitation shall be in separate volumes corresponding to the evaluation factors identified in the Proposal Content Chart (below).
****NOTE: The date and time of the HARD COPIES received shall be considered the official on-time receipt. *****Hard copies received after the due date and time shall be considered untimely and shall render the entire proposal ineligible for award. *****
PROPOSAL CONTENT CHART
PROPOSAL CONTENT CHART
VOLUME I
No Page Limit (Cover letter limited to two (2) pages) mailto:myra.m.freeberg.civ@mail.mil mailto:brittney.j.cowan.civ@mail.mil mailto:myra.m.freeberg.civ@mail.mil mailto:brittney.j.cowan.civ@mail.mil
ADMINISTRATIVE - Cover Letter, Representations & Certifications, Tax Identification Number, CAGE Code, DUNS Number, and completed FAR/DFARS clauses/provisions
VOLUME II – Security Clearance Requirement/Certification
Security Clearance Requirement/Certification - Maximum of 5 pages
VOLUME III – FACTOR I
KEY PERSONNEL/STAFFING PLAN
Staffing plan - Maximum of 5 pages
Resumes, Commitment Letters, and Certificates are NOT included in the overall page count.
Key Personnel Qualifications Sheet
VOLUME IV – FACTOR II
TECHNICAL/MANAGEMENT CAPABILITY
Technical Capability – shall not exceed 25 pages including the following elements:
o Organization Chart o Operational Plan o Quality Control Plan
VOLUME V – FACTOR III
PAST PERFORMANCE
Past Performance Questionnaire (3
References) Past Performance Datasheet
No page limit
VOLUME VI – FACTOR IV
PRICE
Completed SF1449 Pricing Submission Worksheet Professional Employee Compensation
Plan Laboratory Analysis Pricing Schedule
No page limit
INSTRUCTIONS
1) All proposals must clearly and convincingly demonstrate that the Contractor has a thorough understanding of the requirements and associated risks, and is able, willing, and competent to devote the resources necessary to meet or exceed the requirements. Proposals shall demonstrate ability to comply with all requirements in the solicitation. General statements that the Contractor can or will comply with the requirements, that standard procedures will be used, that well known techniques will be used, or paraphrases of the Performance Work Statement (PWS), will not constitute compliance, and will be determined unacceptable.
2) Each page shall be 8 ½ x 11 inches, single-spaced, no less than 11-point font Times New Roman, with one
(1) inch margin requirements. Bolding, underlining, and italics may be used to identify topic demarcations or points of emphasis. Graphic presentations, including tables, though not subject to the same font size and spacing requirements, shall have spacing and text that is easily readable.
3) Pages shall be numbered and paragraphs identified by a commonly used and consistent system to assist in referencing specific areas of the proposal. Pages shall also have a header or footer that contains at a minimum: contractor name, point of contract, cage number, and solicitation number. Enclosures must be identified on all pages. Pages that exceed the page limitations shall be removed from the proposal and not considered or evaluated.
4) Labeling – Each volume shall be submitted in separate PDF, MS Word and/or MS Excel (files), identified by the Volume Number.
5) The Government reserves the right to not evaluate or consider any incomplete proposal. An incomplete proposal is defined as one that is lacking the information required below and will be considered unacceptable. Contractors shall assume that the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the Contractor’s proposal.
6) Ensure that all confidential information within the submission is marked IAW the paragraph below entitled, “Confidential Information.”
7) Register in the System for Award Management (www.sam.gov) and complete all representations and certifications required by this solicitation.
8) Confidential Information: The Freedom of Information Act (FOIA) and its amendments have resulted in an increasing number of requests from outside the Government for copies of contract qualifications and proposals submitted to federal agencies. If the Contractor’s submissions contain information that he/she believes should be withheld from such requestors under FOIA on the grounds that they contain “trade secrets and commercial or financial information” [5 USC§552(b)(4)], the Contractor should mark its submissions in the following manner:
The following notice should be placed on the title page: “Some parts of this document, as identified on individual pages, are considered by the submitter to be privileged or confidential trade secrets or commercial or financial information not subject to mandatory disclosure under the Freedom of Information Act. Material considered privileged or confidential on such grounds is contained on page(s) _______”.
Each individual item considered privileged or confidential under FOIA should be marked with the following notice: “The data or information is considered confidential or privileged, and is not subject to mandatory disclosure under the Freedom of Information Act”.
VOLUME CONTENT
a) Volume I – Administrative:
Contractor shall provide a cover letter. The cover letter shall identify solicitation number, date of submittal, and acknowledgement of any (and all) amendments, the Contractor’s name, address, Taxpayer ID number, CAGE code, http://www.sam.gov/ and representative’s contact information. Cover letters will not count against any page limitation. The cover letter shall clearly state the length that the proposal remains open and in effect, which shall be at least 120 days from the proposal due date. The Administrative Volume shall include all FAR and DFARS clauses identified in the Proposal Content Chart.
The Non-disclosure agreement (NDA) is not required to be submitted with the proposal. Contractor employees must complete a NDA form prior to commencement of work.
b) Volume II – Security Clearance Requirement/Certification
c) Volume III – Factor I : Key Personnel/Staffing Plan:
Contractor shall submit their proposed Key Personnel to meet the PWS requirements in their Staffing Plan. The Staffing Plan shall demonstrate how the Contractor will ensure qualified personnel coverage during the absence of sick and personal leave of employees. The Staffing Plan must also address the Contractor’s ability to meet security requirements.
The Staffing Plan shall outline the following elements within this volume.
i) Identify the personnel’s proposed role/title.
ii) State and demonstrate how the proposed personnel’s experience meets or/and exceeds the PWS requirements.
iii) State and demonstrate how the proposed personnel’s education, training, and certification level meets or/and exceeds the PWS requirements.
iii) Identify what the personnel’s PWS tasks assigned by PWS section (as a cross-section reference).
iv) State the estimated number of annual hours proposed for each personnel.
v) State the proposed personnel’s position duties/responsibilities.
Enclosures: There is a mandatory requirement for Contractors to include the following for each proposed key personnel designated within this volume.
Key Personnel Resumes: Resumes for each proposed key personnel designated shall depict relevant education, training, experience, and responsibilities in similar projects, specific professional or technical accomplishments, and other applicable/required certificates/licenses outlined in PWS sections 1.6.11.1, through 1.6.11.8; demonstrating the depth, technical ability, and work experience to meet or exceed the performance requirements outlined in the PWS
PART 5.
Key Personnel Qualifications Sheet: The contractor shall submit a completed key personnel qualifications sheet for each proposed key personnel.
Commitment Letters: A signed Letter of Commitment from each of the proposed Key Personnel designated in PWS 1.6.11.
d) Volume VI – Factor II: Technical/Management Capability:
Contractor shall submit sufficient information for the Government to make a comprehensive evaluation of the contractor’s technical and management capability in meeting the requirements listed in the PWS for successful performance.
Required elements to address:
A. Organization Chart – The offeror’s proposal will first have an organization chart with the Key Personnel positions shown. The chart will be in a format that shows the reporting chain with the top individual being corporate management for that company. If more than one company is involved (i.e. a joint venture or prime and subcontractor) then list that specific company with that position on the organization chart.
B. Operating Plan- The offeror shall submit an operating plan that demonstrates their capability and strategies to proactively and reactively manage real and potential industrial hygiene issues as to this PWS. The proposed operating plan shall include how they intend to mitigate risks and maintain consistently high performance. The overall plan should demonstrate how the Contractor’s proposal will meet or exceed the PWS requirements (specifically PWS sections 1.3, 1.4, and 5). The proposal must provide a clear concept of the PWS in regards to managing personnel to have seamless coverage from the main business hours as listed in 1.6.4 Hours of Operation.
C. Quality Control Plan- The Contractor shall submit a QC Plan (PWS sections 1.6.1) discussing its approach to quality control, resource management, and possible performance issues related to PWS PARTS 5. The Contractor shall:
1. Demonstrate its ability to perform the requirements of the PWS at a high level while managing resources in an efficient and effective manner. Details to include the Quality Assurance Manager and that individual’s duties; indoor air quality assessments, “Hot Calls” (responding to tenant complaints immediately), safety audits, lab testing, construction safety reports, calibration of instruments P Detail the report review process and Standard Operating Procedures (SOP’s).
2. Discuss how its QC Plan will meet/exceed each of the PWS section 5.
3. Discuss the relationship between its QC Inspector and the Government COR.
d) Volume V – Factor III: Past Performance
i) Contractor’s past performance must address the corporate past performance in performing projects similar in size and scope to the effort required by Attachment# 1 Performance Work Statement (PWS). The projects referenced by the contractor must have been completed within five (5) years from the date of this solicitation is issued or currently ongoing and have completed at least six (6) months of performance. Past Performance data must be received before the due date and time for this solicitation. The Contractor's relevant Past Performance will be evaluated to assess the extent of the Contractor’s ability to perform the contract successfully (quality of product or service, accuracy and completeness, timeliness of delivery/work, business relations, customer satisfaction, key personnel and staffing, including subcontractors/partners). The evaluation may include information in Government databases such as Past Performance Information Retrieval System (PPIRS) and Contractor Performance Assessment Reports System (CPARS).
ii) The Contractor shall submit completed Attachment# 3 Past Performance Questionnaire for no more than three (3) Government or commercial contracts for services directly related or similar to the services required in Attachment# 1: Performance Work Statement. If submitting proposal as a Joint Venture, the contractor shall submit three (3) Attachment # 3 Past Performance Questionnaire by each individual firm, within a Joint Venture. The Contractor shall submit information for relevant contracts or subcontracts currently in process at least six months before the due date for responses to this solicitation or completed within the past five (5) years from the date of this RFP.
Each past performance submission shall specifically address the following items:
• The nature of the effort
• The tasks performed, including the deliverables, as they relate to Attachment 1: Performance Work
Statement
• Timeliness of deliveries
• The extent of involvement (as a prime versus a subcontractor)
• The period of performance
• The utilization of subcontractor technical support versus in-house technical support
• Point of contact, phone and fax number for each contact listed
• Describe why the contract is relevant to this requirement
iii) The Contractor shall complete the top portion of page 1 of, Attachment# 2 Past Performance Data Sheet and send it to each of the three (3) customers for the contracts identified above in Attachment# 3 Past Performance Questionnaire. As stated in Attachment# 2 Past Performance Data Sheet, the reference will complete this form and return it directly to the Government by the solicitation closing date.
iv) In accordance with FAR 15.305(a) (2)(iv), an Offeror without a record of relevant past performance or for whom information on past performance is not available will not be evaluated favorably or unfavorably on past performance (neutral evaluation).
v) The Government may consider past or current contracts (including Federal, State and local Government and private) for efforts similar to the Government requirement. The Government may consider information provided on problems encountered on the identified contracts and associated corrective actions. Contractors with a negative past performance rating will be afforded an opportunity to address alleged deficiencies. The Government may also consider information obtained from any other sources when evaluating past performance. Failure of a contractor to disclose a relevant Government contract with poor past performance may affect the contractor's past performance rating.
vi) The Government may consider past performance information regarding predecessor companies, key personnel who have relevant experience or subcontractors that will perform major or critical aspects of the requirement when such information is relevant. Past performance information about the proposal as a prime contractor may be considered more significant and given more weight in the past performance evaluation.
e) Volume VI – Factor IV: Price
i) The offeror shall complete the Schedule of Supplies/Services page(s) of the Standard Form (SF) 1449 of the solicitation with pricing for the base and each Option Period. The offeror shall provide a firm fixed price. The pricing volume shall be submitted as a separate document in PDF. The pricing volume must differentiate between prime, subcontractor, and teaming partner labor. The Offerors price proposal should include a breakout of the proposed labor categories and the rates for each category.
ii) The offeror shall complete Blocks 12, 17, 23, 24, and 30 of the solicitation, (SF) 1449. In doing so, the Offeror accedes to the contract terms and conditions as written in the solicitation. The Offeror shall ensure that Attachment # 4 Pricing Submission Worksheet is filled out using the proposed unit price, the extended total price per CLIN, and the total price for the base and option years. The pricing volume shall be submitted as a separate document in PDF. The pricing volume must differentiate between prime, subcontractor, and teaming partner labor; include labor category, proposed hours, and wage/salary. No adjectival ratings will be used to evaluate Price.
iii) The Contractor shall complete the necessary fill-ins and certifications in CLAUSES INCORPORATED BY FULL TEXT. The Contractor shall return the solicitation completed in its entirety.
iv) The offeror shall provide a Professional Employee Compensation Plan (PECP) in accordance with
FAR 52.222-46.
v) The offeror shall complete the Attachment #5 Laboratory Analysis Pricing Schedule for evaluation. This attachment shall be used to support pricing in accordance with the Optional Unforeseen Events/Projects CLIN(s) as a baseline for future task orders.
(End of provision)
FAR 52.212-2 ADDENDUM
FAR 52.212.2 ADDENDUM
ADDENDUM 52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014) ADDENDUM
(A) Authority: This solicitation is entered into under the authority of 10 USC 2304 and the Federal Acquisition Regulation (FAR) subpart 12.1 Acquisition of Commercial Items – General and FAR Part 15—Contracting by Negotiation.
(B) Basis for Award. The Government will award a contract resulting from this solicitation, to the responsible 8(a) contractor whose offer conforms to the solicitation and is determined to be the best value to the Government, technical, key personnel, past performance, management, price and other factors considered. The Government reserves the right to reject all proposals or to make an award to other than the lowest priced proposal. The Government also reserves the right to award a contract based upon initial proposals. The Government will make a single award resulting from this solicitation. The Government intends to award without discussions but reserves the right to conduct discussions if determined to be in the Government’s best interest.
(C) Attachments:
Attachment # 1 Performance Work Statement (PWS); for detailed information on the Pentagon Industrial Hygiene Service Contract dated 11 September 2018.
Attachment # 2 Past Performance Datasheet Attachment # 3 Past Performance Questionnaire Attachment # 4 Pricing Submission Worksheet Attachment # 5 Laboratory Analysis Pricing Schedule Attachment # 6 DD 254 Attachment # 7 Non-Disclosure Agreement (NDA) Attachment # 8 Key Personnel Qualifications Sheets
(D) Facility Clearance Requirement: To be eligible for contract award, 8(a) Offerors must certify that the offeror possesses on the proposal due date a current/active DoD Industrial Facility Security Clearance at the SECRET level or above. There will be no exceptions or extensions to this requirement. All companies aligning as a Joint Venture (JV) candidate must have an active secret clearance individually by proposal due date. This security clearance is a PASS/FAIL requirement to be verified by the Government no later than proposal due date. Washington Headquarters Services/Acquisition Directorate will NOT sponsor potential offerors for the facility clearance requirement. Any Offeror who cannot be verified as having an active/current DoD Industrial Facility Security Clearance, at the SECRET level, at proposal due date, shall be deemed ineligible for award and their proposal will not be further considered by the Government. This is a pass/fail factor.
E) General: Relative Importance of the Evaluation Factors- Factor I (Key Personnel/Staffing Plan), Factor II (Technical/Management Capability) and Factor III (Past Performance) are equal and when combined are significantly more important than Factor IV (Price).
To be eligible for contract award, Offerors must certify, that, on the proposal due date, they possess a current/active DoD Industrial Facility Security Clearance at the SECRET level or above. If the offeror passes the Facility Clearance Requirement, the offeror will then be evaluated under Factor I (Key Personnel/Staffing Plan) and provided an adjectival rating.
If an offeror receives an “Unacceptable” rating under Factor I (Key Personnel/Staffing Plan), the offeror shall be ineligible for award and shall not be further evaluated. If an offeror receives a rating greater than “Unacceptable”, the offeror will be evaluated under Factor II (Technical/Management Capability).
If an offeror receives an “Unacceptable” rating under Factor II (Technical/Management Capability), the offeror shall be ineligible for award and shall not be further evaluated. If an offeror receives a rating greater than “Unacceptable”, the offeror will be evaluated under Factor III (Past Performance).
If the offeror receives a “No Confidence” rating under Factor III (Past Performance), the offeror shall be ineligible for award and shall not be further considered. If an offeror receives a rating greater than “No Confidence” under Factor III (Past Performance, then the offeror’s price shall be evaluated under Factor VI (Price).
Security Clearance Requirement/Certification:
To be eligible for contract award, Offerors must certify, that, on the proposal due date, the offeror has a current/active DoD Industrial Facility Security Clearance at the SECRET level or above. There will be no exceptions or extensions to this requirement. All companies aligning as a Joint Venture (JV) candidate must have an active secret clearance individually by proposal due date. This security clearance is a PASS/FAIL requirement to be verified by the Government no later than proposal due date. Washington Headquarters Services/Acquisition Directorate will NOT sponsor potential offerors for the facility clearance requirement. Any Offeror who cannot be verified as having an active/current DoD Industrial Facility Security Clearance, at the SECRET level, at proposal due date, shall be deemed ineligible for award and their proposal will not be further considered by the Government.
Factor I Key Personnel/Staffing Plan: The Contractor shall provide a general overview of its proposed Key Personnel along with the following:
A. The Offeror shall provide its corporate and management organizational structure as well as the relevant experience, qualifications, and ability of those proposed to perform under this contract. The Contractor shall describe how it plans to manage and supervise the work utilizing the proposed organizational structure. PWS PARTS 1.2, 1.3, 1.4, 1.6.11, 5 and other relevant sections of the PWS.
B. The Offeror shall provide its methods of obtaining, retaining, and training key personnel, staff, and additional laborers and/or specialists, and describe how its personnel strategy/approach will meet/exceed the PWS requirements. PWS PART 5.
C. The Offeror shall identify any sub-contractors assigned to this project, and detail their proposed role(s). PWS PARTS 1.2, 1.3, 1.4, 1.6.11, 5 and other relevant sections of the PWS .
D. A resume for each proposed Key Personnel depicting relevant education, training, experience, and responsibilities in similar projects, specific professional or technical accomplishments, and other applicable/required certificates/licenses outlined in PWS sections 1.6.11.1 through 1.6.11.8; demonstrating the depth, technical ability, and work experience to meet or exceed the performance requirements outlined in PWS PART 5.
E. A signed Letter of Commitment from each of the Key Personnel designated, as referenced in PWS section
1.6.11. All Resumes, Letters of Commitment, and Certificates submitted for the Key Personnel designated to perform on this contract must be current and included in the proposal. There is no page limit on Resumes, Letters of Commitment.
Missing submittals will result in proposal failure.
Factor II Technical/Management Capability: The Contractor shall summarize its abilities and strategies to proactively and reactively manage real and potential issues as related to the PWS, as well as mitigate risks and maintain consistently high performance. The overall plan should demonstrate how the Contractor’s proposal will meet or exceed the PWS (PWS PARTS 1.2, 1.3, 1.4, 1.6.11, 5 and other relevant sections of the PWS) requirements and the following:
A. Organization Chart – The offeror’s proposal will first have an organization chart with the Key Personnel positions shown. The chart will be in a format that shows the reporting chain with the top individual being corporate management for that company. If more than one company is involved (i.e. a joint venture or prime and subcontractor) then list that specific company with that position on the organization chart.
B. Operating Plan- The offeror shall submit an operating plan that demonstrates their capability and strategies to proactively and reactively manage real and potential industrial hygiene issues as to this PWS. The proposed operating plan shall include how they intend to mitigate risks and maintain consistently high performance. The overall plan should demonstrate how the Contractor’s proposal will meet or exceed the PWS requirements (PWS sections 1.3, 1.4, 5 and other relevant sections ). The proposal must provide a clear concept of the PWS in regards to managing personnel to have seamless coverage from the main business hours as listed in 1.6.4 Hours of Operation.
C. Quality Control Plan- The Offeror shall submit a QC Plan (PWS sections 1.6.1) discussing its approach to quality control, resource management, and possible performance issues related to PWS PARTS 5. The Offeror shall:
1. Demonstrate its ability to perform the requirements of the PWS at a high level while managing resources in an efficient and effective manner. Details to include the Quality Assurance Manager and that individual’s duties; indoor air quality assessments, “Hot Calls” (responding to tenant complaints immediately), safety audits, lab testing, construction safety reports, calibration of instruments P Detail the report review process and Standard Operating Procedures (SOP’s).
2. Discuss how its QC Plan will meet/exceed each of the PWS section 5.
3. Discuss the relationship between its QC Inspector and the Government COR.
Rating Methods:
Factor I Key Personnel/Staffing Plan and Factor II Technical/Management Capability shall be evaluated using the below adjectival ratings:
Volume III and IV of each proposal shall be given a rating identified in Table 1 that reflects the degree to which the proposed approach satisfies the requirements through an assessment of the relative strengths, weaknesses, deficiencies, significant weaknesses, and risks of a proposal.
Combined Technical/Risk Rating Method
Combined Technical/Risk Rating Method:
Color Rating Description
BLUE
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
PURPLE
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
GREEN
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
YELLOW
Marginal
Proposal had not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
RED
Unacceptable
Proposal does not meet requirements of the solicitation, and thus contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
Factor III Past Performance:
(a) Past performance will be evaluated as detailed below.
(b) To be determined recent the projects referenced by the contractor must have been completed within five (5) years from the date of solicitation issuance or currently ongoing and have completed at least six (6) months of performance by solicitation issuance. If currently ongoing, the extent of actual performance will be considered in determining the project’s relevance.
(c) The government may utilize some or all the following sources of past performance information for evaluation.
• Past Performance Questionnaire submitted by contractor’s client for the referenced project(s)
• Past Performance Information Retrieval System (PPIRS)
• Federal Awardee Performance and Integrity Information System (FAPIIS)
• Other sources or databases available to the Government such as interviews with program managers, contracting officer, and commercial available websites
(d) Contractors with a No Confidence past performance rating may be afforded an opportunity to address alleged deficiencies. Failure of a contractor to disclose a relevant Government contract with poor past performance may affect the contractor's past performance rating.
(e) The Government may consider past performance information regarding predecessor companies or subcontractor companies if the predecessor’s performance is relevant to the Contractor’s performance under this solicitation. The Government reserves the right to determine the prime Contractor’s past performance as more significant than other partnerships.
Past Performance Relevancy shall be determined using the following adjectival ratings:
Past Performance Relevancy Ratings:
Adjectival Rating Description
VERY RELEVANT Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
RELEVANT Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
SOMEWHAT RELEVANT Present/past performance effort involved some scope and magnitude of effort and complexities this solicitation requires.
NOT RELEVANT Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Performance Confidence Assessments Rating Method shall be evaluated using the following adjectival ratings:
Performance Confidence Assessments Evaluation Ratings:
Rating Description
Substantial Confidence Based on the Contractor’s recent/relevant performance record, the Government has a high expectation that the Contractor’s will successfully perform the required effort.
Satisfactory Confidence Based on the Contractor’s recent/relevant performance record, the Government has a reasonable expectation that the Contractor’s will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the Contractor’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Contractor’s may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the Contractor’s recent/relevant performance record, the Government has a low expectation that the Contractor’s will successfully perform the required effort.
No Confidence Based on the Contractor’s recent/relevant performance record, the Government has a no expectation that the Contractor’s will successfully perform the required effort.
Contractors that receive a ‘No Confidence’ past performance rating shall be deemed ineligible for award regardless of price or technical acceptability.
Offerors will receive a single, overall confidence rating based on the relevance and confidence ratings for each submitted project and based on other information that may be considered by the Government.
In the case of a contractor without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the contractor may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv).
Factor VI Price:
The evaluated price includes all CLINs and option CLINs for the base year and all options. The price will be evaluated for completeness and reasonableness using the techniques in FAR 15.404- 1. No adjectival ratings will be used to evaluate Price. The six (6) month extension will be evaluated during contract negotiations. In submitting the pricing information, the Contractor’s shall provide the following information:
• Reasonableness: The Contractor shall provide a firm fixed price. In support of its prices, the contractor shall provide a spreadsheet identifying the total labor hours, and labor categories. The pricing volume shall be submitted as a separate document. In addition, the pricing volume must differentiate between prime, subcontractor, and teaming partner labor. Fair and reasonable pricing will be evaluated in accordance with the price evaluation techniques in FAR 15.404-1. If a fair and reasonable price cannot be determined from price analysis, the Government will request cost and pricing data in accordance with FAR 15.403-4.
• Extension of Services: For purposes of evaluating overall pricing and the potential use of FAR 52.217-8, continuity of services, the Contractor’s total proposed price for one (1) twelve (12) months base plus four
(4) twelve (12) months option years and a six (6) months extension will include a period of performance not to exceed 66-Month period. The total proposed price for the base and option years plus the price for the continuity of services will, for evaluation purposes, be considered the Contractor’s total proposed price.
• Unbalanced Pricing: The offeror’s total price and each sub-CLIN and each option CLIN may be evaluated for Unbalanced Pricing in accordance with FAR 15.404-1(g). A proposed may be rejected and the offeror deemed ineligible for award (or the risks due to unbalanced pricing considered in the offeror’s evaluation) if the Government determines that the risks posed by unbalanced pricing are unacceptable.
(End of provision)
52.216-22 INDEFINITE QUANTITY. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.