Revised Synopsis Amendment 0002

View the file

Other files

File Type Posted
Q&As_HQ0034-17-R-0026.pdf PDF
Amendment_0001.pdf PDF
HQ0034-17-R-0026_A-E_Synopsis_Notice.pdf PDF
Attachment_(B)_Past_Performance_Questionnaire.pdf PDF
Attachment_(A)_SF330-16.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE: AMENDMENT 0002

HQ0034-17-R-0026 INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT FOR

ARCHITECT AND ENGINEERING DESIGN SERVICES FOR WASHINGTON HEADQUARTERS

SERVICES, 1155 DEFENSE PENTAGON, WASHINGTON, DC 20301-1155.

ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT A STANDARD FORM (SF) 330, ARCHITECT-ENGINEER QUALIFICATIONS IS CONTAINED IN THIS NOTICE/SYNOPSIS. THERE IS NO

SEPARATE REQUEST FOR PROPOSALS (RFP) PACKAGE TO DOWNLOAD. THIS IS NOT A REQUEST

FOR PROPOSALS.

This notice and evaluation will result in a single-award Indefinite Delivery/Indefinite Quantity (IDIQ) contract for Architect and Engineering (A-E) services in support of design and construction activities related to Government planning, programming, and execution of projects on the Pentagon Reservation in Arlington, VA, the Mark Center campus in Alexandria, VA, federally-owned and DoD/WHS controlled leased buildings in the Washington, D. C.

Metropolitan Area, and Raven Rock Mountain Complex (RRMC) and related facilities in Pennsylvania and Maryland. This contract is being procured in accordance with the Brooks Architect-Engineer (A-E) Act as implemented by FAR Subpart 36.6-Architect-Engineer Services.

The IDIQ contract will be for a base period of one year and four one-year option periods. The contract’s total dollar amount shall not exceed $18,000,000.00 per year, and the minimum dollar amount for any task order shall not be less than $3,500.00. The guaranteed minimum for the entire contract term (including all option years) is $5,000.00 and will be satisfied by award of the initial task order. The options may be exercised within the time frame specified in the resultant contract at the sole discretion of the Government subject to availability of funds and the satisfaction of the performance requirements under the subject contract. Firm-fixed price task orders will be negotiated for this contract.

The proposed contract is being solicited on an UNRESTRICTED basis; therefore, replies to this notice are requested from all business concerns. The Small Business size standard classification is NAICS 541330, Engineering Services (Size Standard: $15,000,000.00). The firm selected will be the most highly qualified, eligible firm to perform the required services, based on the demonstrated competence and qualifications, in accordance with the evaluation criteria. The Government makes no representations as to the number of task orders, the options to be exercised or the quantity of work to be ordered.

If a large business firm is selected for award, a Small Business Participation Plan will be required to be submitted by the proposed offeror. The large business firm selected for award shall demonstrate the plan to meet the small business goals established by Washington Headquarters Services for this acquisition. Small Business 5%; Small Disadvantaged Business

5%; Woman-Owned Small Business 5%; Service Disabled Veteran-Owned Small Business 3%;

and HUBZone 3% . The WHS small business goal is at least 38% small business participation in the work awarded under the contract. To be considered for award, the Small Business Participation Plan shall demonstrate how the offeror, for each task order exceeding $100,000 awarded under this contract, shall meet a minimum 35% of the total task order value being performed by small business concerns.

A small business, if selected for award, is not required to submit a Small Business Participation Plan.

After award, the Small Business participation requirement may be waived by the Government on an individual task order basis.

The type of task-orders expected to be performed under this contract include: master planning; facility system engineering, structural engineering, environmental engineering, transportation planning/engineering, and space use studies; design of new facilities and maintenance, repair, restoration, and/or alteration of existing facilities/utilities/pavements; and post construction award services.

Architect-Engineering and Engineering Services that may be required under this contract include: preparation/updating project pre-planning / programmatic documentation (economic analysis, feasibility study, cost estimates and DD Form 1390/1391s), Design-Build and Design- Bid-Build RFP packages in the Pentagon RFP template (including CADD, GIS, BIM, plans, specifications, cost estimates (using the Pentagon template), permitting requirements, proposed schedules and phasing), related studies, field investigations, surveying and mapping, tests, evaluations, consultations, conceptual designs, soil borings, hazardous materials identification, energy computation, life safety code studies, interior space comprehensive planning/design, value engineering, other associated engineering services, shop drawing review, as-built preparation, Operation and Maintenance Support (OMSI), commissioning, construction inspection and engineering consolation services during construction, and other related services.

The offeror must have an active/current Facility Clearance at the SECRET level when the response to this synopsis is submitted. Offerors that do not have the required facility clearance on the response due date shall not be eligible for award and will not be considered. WHS will not sponsor any offeror for a facility clearance.

SELECTION CRITERIA AND SUBMITTAL REQUIREMENTS – Standard Form 330 (SF 330) (Attachment (A)) – All information is to be submitted on the SF 330. The Offeror is required to complete Part I Contract Specific Qualifications and Part II Architect – Engineer Qualifications.

The A-E firm must demonstrate the team’s qualification with respect to the published evaluation criteria for all services as described above. Failure to provide complete submission information defined in the evaluation factors may affect a firm’s qualification evaluation.

Selection shall be based on the following criteria listed in descending order of importance (sub-items listed under a criteria are of equal importance).

1. Specialized Experience and Technical Competence

2. Professional Qualification

3. Past Performance

4. Capacity and Location

5. Design Capability

6. Cost Control Effectiveness

7. CADD, GIS, BIM, P6 Capability

8. Volume of Work

Evaluation Factor 1. Specialized Experience (SF 330 Part 1, Section F): Firms will be evaluated on specialized experience and technical competence of performance similar to those anticipated under this contract through evaluation of:

a) experience with design of renovation, alteration, repair and new construction of relevant commercial and government facilities.

b) experience with historic preservation (the Pentagon is a registered Historic Building), DoD anti-terrorism/force protection regulations, project risk analysis, project consultation with the National Capital Planning Commission, Commission of Fine Arts, and State Historical Preservation Office.

c) experience with energy conservation, pollution prevention, waste reduction, use of recovered materials, low impact development, MS4 Storm Water Management, and sustainable design using SPIRIT or LEED reporting tools;

d) experience in field investigations, surveys, and subsurface investigations

Submission requirements: Provide up to 5 total relevant projects with the design completed within the past 7 years from the date of this Notice.

• Submit one (1) renovation design with a construction cost over $1,000,000.

• Submit one (1) historic preservation design of relevant commercial or government facility, which has project consultation with NCPC, CFA, and SHPO.

• Submit one (1) new construction design that demonstrates experience with design bid-build (DBB) with a construction cost over $10,000,000.

• Submit at least one (1) exterior relevant project (such as pavements, lighting, or utilities) with a construction cost of $400,000 or more.

• Submit one (1) campus/installation-wide master planning, sustainability, or energy audit project.

The Government prefers that separate projects be submitted for each of the above five categories. The same project may be submitted for any or all of the above five categories;

however, the same project submitted multiple times will count as multiple projects toward the total five allowed. Thus, for example, if a single project is submitted in response to two categories it will be counted as two projects of the total five allowed.

Firms that submit projects where construction has been successfully completed and client accepted the final design package for DBB or DB in accordance with the offeror’s design, will be rated more favorably. A floor plan, site plan, or other appropriate drawing, and a minimum of two photographs shall be included for each project where construction has been successfully completed.

Do not utilize experience of a proposed subcontractor to demonstrate experience.

All projects provided in the SF 330 must be completed by the office/branch/regional office/individual team member actually proposed to manage and perform work under this contract. Projects not meeting this requirement will be excluded from evaluation. To enable verification, firms should include the DUNS number along with each firm name in the SF 330 part 1 Section F Item 25 “Firms from Section C Involved in this Project,” block (1). Include a contract number or project identification number in block 21. Include an e-mail address, and phone number for the point of contact in block 23(c). Include in the project description the contract period of performance, award contract value, current contract value, and a summary of the work performed that demonstrates relevance to specialized experience as outlined above.

If the offeror served as a subcontractor on a submitted project, indicate the value and significance of the work the offeror provided as a subcontractor toward the performance of the overall project. The description should clearly describe the work actually performed by the offeror/team member as a subcontractor and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole.

If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the significance of the work performed by the joint venture partner offering/teaming on this contract.

If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration.

Projects submitted on the SF 330 in Part 1 Section F shall be completed design projects (client accepted the final design package for DBB or DB). Projects where the design was not completed will be excluded from evaluation consideration. If the client accepted the final design package but chose not to construct; provide reason(s) in Section F. Do not list an IDIQ contract as an example project. Instead, list relevant task orders or standalone contract awards.

NOTE: If the Offeror is a joint venture, information must be submitted as a joint venture;

however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of five (5) projects.

NOTE: Firms who demonstrate performance of relevant projects within the NCR to include, Washington, DC, Virginia, Maryland, and Pennsylvania will be rated more favorably.

Evaluation Factor 2. Professional Qualification and Technical Competence (SF 330 Part 1, Section E & Section G): Firms will be evaluated on professional qualifications necessary for satisfactory performance through evaluation of:

a) professional qualifications and technical competence, by discipline, of the key personnel proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unique expertise and shall include as a minimum: program manager, architect, licensed fire protection engineer, civil engineer, structural engineer, mechanical engineer, electrical engineer, landscape architect, cost estimator, and scheduler;

b) education, experience, registration, management ability of key personnel assigned to the contract and any applicable outside consultants;

c) assurances that the proposed key personnel will be available to perform the contract such as proposing current employees, proposing a plan to hire/retain the proposed key personnel or furnishing letters of commitment from the proposed key personnel

Failure to provide a balanced cadre of personnel in the areas and disciplines listed above will result in the firm being considered not qualified. Firms may submit additional key personnel which will be evaluated.

Submission Requirements: Complete one Section E for each key person. Relevant projects submitted in Section E shall, at a minimum, demonstrate relevant experience within the five

(5) years prior to the date of issuance of this notice.

Evaluation Factor 3. Past Performance (SF 330 Part I, Section H): Firms will be evaluated on recent past performance for up to five total contracts with Government agencies or private industry in terms of cost control, quality of work, responsiveness to issues and changes and compliance with performance schedules. Recent Past Performance is defined as projects completed up to seven (7) years from the original date of this synopsis. Evaluation Factor 1 projects may be submitted under this Evaluation factor. If the project submitted was not also submitted under Factor 1 then the offeror must submit the information required under Factor 1 for that project. The same limitations/requirements concerning subcontractors, projects performed by joint venture partners or projects performed by the offeror as a subcontractor apply to projects that were not also submitted under Evaluation Factor 1.

Evaluating past performance will include information provided in completed Past Performance Questionnaires (PPQs) (Attachment (B)) and/or completed CPARS/ACASS Evaluations. The evaluation may include information other than that provided by the offeror to include Government databases (PPIRS). Failure to provide the requested data may render the firm less qualified. Indication of awards, and repeat clientele in Section H of the SF330 is recommended.

NOTE: Indication of superior performance evaluations on recently completed DoD contracts may be rated more favorably.

NOTE: Firms who demonstrate performance of relevant projects within the NCR to include, Washington, DC, Virginia, Maryland, and Pennsylvania may be rated more favorably.

Submission Requirements: Submit a completed CPARS/ACASS Evaluation (if available) for each project. Firms that do not have a completed CPARS/ACASS Evaluation for a project, are required to submit a Past Performance Questionnaire (PPQ). The Past Performance Questionnaire (PPQ) (Attachment B) included in this notice is provided to the offeror or its team members to submit to the client for each project.

Clients of the offeror shall submit completed PPQs no later than January 26, 2017 at 2:00 pm EST, directly to the Government’s points of contacts, Ms. Kimberly Darby via email at kimberly.h.darby.civ@mail.mil and Ms. Connie Arline via email at connie.p.arline.civ@mail.mil.

Evaluation Factor 4. Capacity and Location (SF 330 Part 1, Section H): Firm shall demonstrate capacity and staffing to accomplish the work in the required time and the capacity to accomplish multiple simultaneous task orders within the required timeframe. Offerors may be working in controlled areas and are expected to ensure personnel (prime and sub- contractor) badging, access requests, and permits are kept current for duration of task-orders.

Submission Requirements

a) Provide a staffing and management plan for this contract. Provide an organizational chart of the firm that fulfills the personnel roles within the organization.

b) Describe the firm’s present workload and availability of the project team for the specified contract performance period. Describe the ability of the firm to provide qualified backup staffing for key personnel to ensure continuity of services;

mailto:kimberly.h.darby.civ@mail.mil mailto:connie.p.arline.civ@mail.mil

c) Describe the ability of the firm to manage and accomplish multiple simultaneous task orders.

d) Describe how surge workload would be managed.

e) As a minimum, list the following disciplines: architecture, civil engineering, structural engineering, electrical engineering (power distribution, lighting, and controls), mechanical engineering (facility HVAC and central boiler/chiller plant), landscape architecture, and sustainable development personnel.

Location (SF 330 Part I, Section H): Firms will be evaluated on location in the general geographical area of Washington, DC and National Capital Region (NCR). The prime contractor and consultants shall be located within a 50 mile radius of the Pentagon Reservation located in Arlington, VA or propose to establish office(s) (with the requisite FCL) within that radius.

Submission Requirement: Describe the proposed location of the program management office and other office locations and how this will be advantageous to the Government.

Evaluation Factor 5. Design Capability (SF 330 Part 1, Section H): Firms shall demonstrate innovative design capability indicated by receipt of a design award from a nationally or regionally recognized professional architecture or engineering organization within the past five years from the date of this Notice; or publication within the last five years from the date of this Notice in a nationally or regionally recognized professional architecture or engineering journal.

Evaluation Factor 6. Cost Control Effectiveness (SF 330 Part 1, Section H): Firms shall demonstrate cost control effectiveness as a percentage deviation between the final estimate and low bid/offer on at least five projects in the past five (5) years. The projects may include those identified in response to Evaluation Factors 1 and/or 3.

Evaluation Factor 7. CADD, GIS, BIM, and P6 Capability (SF 330 Part 1 Section H): Firms shall demonstrate the ability of the design team to provide data in the specified formats, on-time delivery of designs for DoD and similar projects and to complete the project as scheduled.

Computer drawing data shall be provided on electronic media compatible with Bentley MicroStation V8i SELECT Series 2 (.dgn). Scheduling shall be provided in electronic media compatible with Microsoft Project Primavera (P6) The following file formats, if applicable, shall be submitted only in the as-built and record submissions, including all supporting documents:

AutoCAD 2007 -2013 (.dwg); Industry Foundation Class (.ifc); Revit 2015 (.rvt); GIS (Geospatial Data / Shape files).

Evaluation Factor 8. Volume of Work (SF 330, Part 1, Section H): Firms will be evaluated in accordance with DoD Federal Acquisition Regulation Supplement (DFARS) Procedures, Guidance and Information (PGI) 236.602-1, from data extracted from the Federal Procurement Data System (FPDS). Firms will be evaluated in terms of work previously awarded to the firm by DoD within the past twelve months with the objective of effecting an equitable distribution of contracts among qualified A-E firms including small, disadvantaged business firms, and firms that have not had prior DoD A-E contracts.

Firms do not submit data for this factor.

SF 330, Part II—General Qualifications – Information is also required from the offeror concerning the firm’s general professional qualifications. Professional Qualifications:

Professional qualifications necessary for satisfactory performance as demonstrated by education, experience, registration, management ability of personnel assigned to the contract and any applicable outside consultants.

SELECTION INTERVIEW:

Interviews may be scheduled with firms slated as the most highly qualified. Firms slated for interviews may be asked to explain or expand on information contained in the SF 330 submission. Elaborate presentations are not required or desired.

Information submitted or obtained during the interview process will be considered part of the offeror’s response to this Notice and evaluated as part of the selection process to determine the most highly qualified offeror.

In accordance with the Brooks Act, the A-E Firm must be registered/licensed architectural and/or engineering firm to be eligible for award. Provide proof that firm is permitted by law to practice the professions of architecture or engineering, (i.e., state registration number).

Failure to submit the required proof could result in the firm’s elimination from consideration.

Firms who are offering as a Joint Venture should include with their submission a copy of the joint venture agreement. Failure to include the joint venture agreement will result in the firm’s elimination from further evaluation.

SUBMISSION REQUIREMENTS: Architect-Engineer firms desiring to be considered for this contract must submit a completed SF 330 package. The SF 330 shall be typed, one sided, at least 11 point font or higher. Part 1 shall not exceed 75 single-sided 8.5X11 pages.

CPARS/ACASS, PPQs, Proof of Licensure, Letters of Commitment and Cover Letter are not included in the page limit. Please include the DUNS and CAGE numbers in Block 30 (Section H Additional Information). Interested firms shall submit five (5) hard copies of the SF 330 submission to: Washington Headquarters Services, Acquisition Directorate, ATTN: Ms. Kimberly Darby (Contract Specialist), 1225 South Clark Street, Enterprise Facilities Construction Division, Suite 1202, Arlington, VA 22206. Responses shall be marked clearly with the solicitation number on the outside of the submission/package. Responses are due no later than January 26, 2017 at 2:00 pm EST. Late responses will be handled in accordance with FAR 52.215-1.

Electronic submissions of the SF 330 via email are not permitted. The points of contract are Ms.

Kimberly Darby, Contract Specialist at kimberly.h.darby.civ@mail.mil or Ms. Connie Arline, Contracting Officer at connie.p.arline.civ@mail.mil.

Questions shall be directed to Ms. Connie Arline via email at connie.p.arline.civ@mail.mil by December 22, 2016 at 3:00 pm EST.

THIS IS NOT A REQUEST FOR PROPOSAL

mailto:kimberly.h.darby.civ@mail.mil

File details come from the government source that posted it. Updated .