J-C1 Preventive Maintenance List.xlsx

XLSX spreadsheet 52 KB Posted

Attached to
Pentagon Fire Protection Systems Maintenance
Solicitation number
HQ0034-11-R-0056
Issued by

About this file

HQ0034-11-R-0056 Pentagon Fire Protection Systems Maintenance - J-C1 Preventive Maintenance List

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

02 Pentagon Fire Alarm

J-C1 Pentagon Fire Protection Systems
HQ0034-11-R-0056
ItemActivityTask FrequencyReferenceQty
Fire Alarm Panels
Simplex 4100UAnnuallyNFPA 72§10.4.2.251
Lamps, LEDs testtest
Secondary power supply battery teststest
Local mode audiotest
Simplex 4100+AnnuallyNFPA 72§10.4.2.20
Lamps, LEDs testtest
Secondary power supply battery teststest
Local mode audiotest
Simplex 4020AnnuallyNFPA 72§10.4.2.23
Lamps, LEDs testtest
Secondary power supply battery teststest
Local mode audiotest
Simplex 4009 NAC PanelAnnuallyNFPA 72§10.4.2.221
Secondary power supply battery teststest
Integrated Management SystemAnnuallyNFPA 72§10.4.2.215
Secondary UPS power supply testtest
EdwardsAnnuallyNFPA 72§10.4.2.22
Secondary power supply battery teststest
Fire Alarm Inititating Devices
Duct detectorstestAnnuallyNFPA 72§10.4.2.2462
Kitchen extinguishing system switchestestAnnuallyNFPA 72§10.4.2.232
Gas detectorstestAnnuallyNFPA 72§10.4.2.24
Heat detectorstestAnnuallyNFPA 72§10.4.2.2327
Manual pull stationstestAnnuallyNFPA 72§10.4.2.21395
Smoke detectorstestAnnuallyNFPA 72§10.4.2.26193
Aspirating smoke detectorstestAnnuallyNFPA 72§10.4.2.21
Supervisory Tamper switchestestSemi-AnnuallyNFPA 72§10.4.2.21214
Waterflow devicestestSemi-AnnuallyNFPA 72§10.4.2.2655
High/low pressure switchestestSemi-AnnuallyNFPA 72§10.4.2.275
Alarm Notification Appliances
Speaker circuit decibel audibility teststestAnnuallyNFPA 72§10.4.2.21009
Speaker circuit isolation module teststestAnnuallyNFPA 72§10.4.2.2425
Strobe circuit visibitity teststestAnnuallyNFPA 72§10.4.2.21319
Fire Alarm Controls
Magnetic door holderstestAnnuallyNFPA 72§10.4.2.2201
WON doorstestAnnuallyNFPA 72§10.4.2.2109
Elevator recall functionstestAnnuallyNFPA 72§10.4.2.2102
Elevator shunt-trip functionstestAnnuallyNFPA 72§10.4.2.228
Fire alarm door release interlockstestAnnuallyNFPA 72§10.4.2.248
AHU shutdowntestAnnuallyNFPA 72§10.4.2.2395
Motorized damperstestAnnuallyNFPA 72§10.4.2.256
Smoke curtainstestSemi-AnnualNFPA 72§10.4.2.33
Firefigher phones
Firefighter phone transmission testtestAnnuallyNFPA 72§10.4.2.2273

03 Pentagon Water Based Item Activity Task Frequency Reference Qty

Electrical system conditionsInspectionCTR AnnuallyNFPA 25, §8.2.2(3)4
Flow testTestAnnuallyNFPA 25, §8.3.3.14

Hose connections and piping and cabinets Inspection Annually NFPA 25, §6.2.1 360

Flow and Hydrostatic Tests5 yearsNFPA 25, §6.3.12
Flow testTest
Alarm Devices400
Waterflow and supervisory devicesTestQuaterly
Waterflow Vane typeTestSemi-annually
inspection and testTestAnnually
Control ValvesCTR Annually*NFPA 25, §12.3.3.1974
Position and operationTest
Preaction and Deluge ValvesCTR Annually*NFPA 25, §12.4.3.17
Valve enclosureInspection
Dry Pipe Valves/Quick Opening DevicesCTR Annually*NFPA 25, §12.4.4.1.19
Valve enclosureInspection
Hose ValvesAnnuallyNFPA 25, §12.5.5.2.1360
Class I and III standpipe hose valvesTest
Fire department connectionsInspectionQuarterlyNFPA 25, §12.7.19
CTR Annually* = GOV to perform the service except for the annual checkup

02 PHRP Fire Alarm

PHRP Plant Fire Alarm System's
ItemActivityTask FrequencyReferenceQty
Fire Alarm Panels
EST FAST Panel'sAnnuallyNFPA 72§10.4.2.21
Secondary power supply battery teststest
Fire Alarm Inititating Devices
Duct detectorstestAnnuallyNFPA 72§10.4.2.215
Heat detectorstestAnnuallyNFPA 72§10.4.2.216
Manual pull stationstestAnnuallyNFPA 72§10.4.2.219
Smoke detectorstestAnnuallyNFPA 72§10.4.2.226
Supervisory Tamper switchestestSemi-AnnuallyNFPA 72§10.4.2.221
Waterflow devicestestSemi-AnnuallyNFPA 72§10.4.2.27
High/low pressure switchestestSemi-AnnuallyNFPA 72§10.4.2.22
Alarm Notification Appliances
Speaker circuit decibel audibility teststestAnnuallyNFPA 72§10.4.2.248
Fire Alarm Controls
Elevator recall functionstestAnnuallyNFPA 72§10.4.2.21
Elevator shunt-trip functionstestAnnuallyNFPA 72§10.4.2.21
AHU shutdowntestAnnuallyNFPA 72§10.4.2.215

03 PHRP Water Based

PHRP PLANT Water Base System's
ItemActivityTask FrequencyReferenceQty
Diesel system conditionsInspectionCTR Annually*NFPA 25, §8.2.2(4)1
Flow testTestAnnuallyNFPA 25, §8.3.3.11

Hose connections and piping Inspection Annually NFPA 25, §6.2.1 10

Preaction and Deluge ValvesCTR Annually*NFPA 25, §12.4.3.12
Valve enclosureInspection
Dry Pipe Valves/Quick Opening DevicesCTR Annually*NFPA 25, §12.4.4.1.11
Valve enclosureInspection
Fire department connectionsInspectionQuarterlyNFPA 25, §12.7.11
CTR Annually* = GOV to perform the service except for the annual checkup

02 PHRP Screen Fire Alarm

PHRP SCREEN Fire Alarm System's
ItemActivityTask FrequencyReferenceQty
Fire Alarm Panels
Notifier AFP-200 Panel'sAnnuallyNFPA 72§10.4.2.21
Secondary power supply battery teststest
Fire Alarm Inititating Devices
Manual pull stationstestAnnuallyNFPA 72§10.4.2.22
Smoke detectorstestAnnuallyNFPA 72§10.4.2.21
Supervisory Tamper switchestestSemi-AnnuallyNFPA 72§10.4.2.22
Waterflow devicestestSemi-AnnuallyNFPA 72§10.4.2.21
Alarm Notification Appliances
Speaker circuit decibel audibility teststestAnnuallyNFPA 72§10.4.2.24
Firefigher phones
Firefighter phone transmission testtestAnnuallyNFPA 72§10.4.2.20

02 I Moc Fire Alarm

I MOC Fire Alarm System's
ItemActivityTask FrequencyReferenceQty
Fire Alarm Panels
Fire Lite MS-5024AnnuallyNFPA 72§10.4.2.21
Secondary power supply battery teststest
Fire Alarm Inititating Devices
Manual pull stationstestAnnuallyNFPA 72§10.4.2.25
Supervisory Tamper switchestestSemi-AnnuallyNFPA 72§10.4.2.22
Waterflow devicestestSemi-AnnuallyNFPA 72§10.4.2.21
Alarm Notification Appliances
Speaker circuit decibel audibility teststestAnnuallyNFPA 72§10.4.2.28

03 I Moc Water Based

I-MOC Water Base System's
ItemActivityTask FrequencyReferenceQty
Fire department connectionsInspectionQuarterlyNFPA 25, §12.7.11
CTR Annually* = GOV to perform the service except for the annual checkup

02 T Moc Fire Alarm

T-MOC Fire Alarm System's
ItemActivityTask FrequencyReferenceQty
Fire Alarm Panels
Fire Lite MS-50241
Secondary power supply battery teststestAnnuallyNFPA 72§10.4.2.2
Fire Alarm Inititating Devices
Heat detectorstestAnnuallyNFPA 72§10.4.2.217
Manual pull stationstestAnnuallyNFPA 72§10.4.2.22
Smoke detectorstestAnnuallyNFPA 72§10.4.2.21
Supervisory Tamper switchestestSemi-AnnuallyNFPA 72§10.4.2.22
Waterflow devicestestSemi-AnnuallyNFPA 72§10.4.2.21
Alarm Notification Appliances
Speaker circuit decibel audibility teststestAnnuallyNFPA 72§10.4.2.26

03 Incinerator Water Based

Incinerator Plant Water Base System's
ItemActivityTask FrequencyReferenceQty
Dry Pipe Valves/Quick Opening DevicesCTR Annually*NFPA 25, §12.4.4.1.11
Valve enclosureInspection
Valve enclosure, with low temperature alarmsInspection

Fire department connections Inspection Quarterly NFPA 25, §12.7.1 1

CTR Annually* = GOV to perform the service except for the annual checkup

02 Incinerator Fire Alarm

Incinerator Plant Fire Alarm System's
ItemActivityTask FrequencyReferenceQty
Fire Alarm Panels
Faraday MPC-2000AnnuallyNFPA 72§10.4.2.21
Secondary power supply battery teststest
Fire Alarm Inititating Devices
Manual pull stationstestAnnuallyNFPA 72§10.4.2.27
Smoke detectorstestAnnuallyNFPA 72§10.4.2.21
Waterflow devicestestSemi-AnnuallyNFPA 72§10.4.2.20
High/low pressure switchestestSemi-AnnuallyNFPA 72§10.4.2.20
Alarm Notification Appliances
Speaker circuit decibel audibility teststestAnnuallyNFPA 72§10.4.2.24

Moc BLGD 100 Water Base

Moc BLGD 100 Water Base System's
ItemActivityTask FrequencyReferenceQty
Alarm Devices
Water-flow devicesTestQuarterlyNFPA 25, §5.3.3.11
Vane-type waterflow devicesTestSemi-annuallyNFPA 25, §5.3.3.21

CTR Annually* = GOV to perform the service except for the annual checkup

Moc BLGD 104 Water Base

Moc BLGD 104 Water Base System's
ItemActivityTask FrequencyReferenceQty
Alarm Devices
Water-flow devicesTestQuarterlyNFPA 25, §5.3.3.11
Vane-type waterflow devicesTestSemi-annuallyNFPA 25, §5.3.3.21
CTR Annually* = GOV to perform the service except for the annual checkup

C Moc Fire Alarm

C Moc Fire Alarm System's
ItemActivityTask FrequencyReferenceQty
Fire Alarm Panels
Fire Lite MS-5024AnnuallyNFPA 72§10.4.2.21
Secondary power supply battery teststest
Fire Alarm Inititating Devices
Manual pull stationstestAnnuallyNFPA 72§10.4.2.25
Smoke detectorstestAnnuallyNFPA 72§10.4.2.216
Alarm Notification Appliances
Speaker circuit decibel audibility teststestAnnuallyNFPA 72§10.4.2.28

C Moc Water Base

C Moc Water Base System's
ItemActivityTask FrequencyReferenceQty
Alarm Devices
Water-flow devicesTestQuarterlyNFPA 25, §5.3.3.11
Vane-type waterflow devicesTestSemi-annuallyNFPA 25, §5.3.3.21

CTR Annually* = GOV to perform the service except for the annual checkup

Haz Mat Facility Fire Alarm

Hazardous Material Facility
ItemActivityTask FrequencyReferenceQty
Fire Alarm Panels
Simplex 4100UAnnuallyNFPA 72§10.4.2.21
Lamps, LEDs testtest
Secondary power supply battery teststest
Local mode audiotest
Fire Alarm Inititating Devices
Duct detectorstestAnnuallyNFPA 72§10.4.2.22
Heat detectorstestAnnuallyNFPA 72§10.4.2.25
Manual pull stationstestAnnuallyNFPA 72§10.4.2.29
Smoke detectorstestAnnuallyNFPA 72§10.4.2.25
Supervisory Tamper switchestestSemi-AnnuallyNFPA 72§10.4.2.210
Waterflow devicestestSemi-AnnuallyNFPA 72§10.4.2.25
High/low pressure switchestestSemi-AnnuallyNFPA 72§10.4.2.21
Alarm Notification Appliances
Speaker circuit decibel audibility teststestAnnuallyNFPA 72§10.4.2.28
Strobe circuit visibitity teststestAnnuallyNFPA 72§10.4.2.215
Fire Alarm Controls
Elevator recall functionstestAnnuallyNFPA 72§10.4.2.21
Elevator shunt-trip functionstestAnnuallyNFPA 72§10.4.2.21
AHU shutdowntestAnnuallyNFPA 72§10.4.2.22

Haz Mat Facility Water Base

Hazardous Material Facility
ItemActivityTask FrequencyReferenceQty
Electrical system conditionsInspectionCTR Annually*NFPA 25, §8.2.2(4)1
Flow testTestAnnuallyNFPA 25, §8.3.3.11

Hose connections and piping Inspection Annually NFPA 25, §6.2.1 4

Preaction and Deluge ValvesCTR Annually*NFPA 25, §12.4.3.10
Valve enclosureInspection
Dry Pipe Valves/Quick Opening DevicesCTR Annually*NFPA 25, §12.4.4.1.11
Valve enclosureInspection
Fire department connectionsInspectionQuarterlyNFPA 25, §12.7.11
CTR Annually* = GOV to perform the service except for the annual checkup

File details come from the government source that posted it. Updated .