About this file

This document is an Advertisement for Bids related to a Kitchen Equipment Replacement project for the Houghton-Portage Township Schools located in Houghton, Michigan. The project involves the provision of food service equipment for two school locations, with bids to be accepted until 4:00 PM EST on February 21, 2024. The equipment will be unloaded and installed by contractors on site, with the exception of the Walk-In Cooler and Freezer, which will include installation, refrigeration, condensers, line sets, startup, and shelving installation. The Owner reserves the right to accept any or all bids, in whole or in part.

The bid breakdown requires pricing by piece with accessories, including all delivery charges and applicable sales/use taxes. The equipment is to be delivered by June 14, 2024, though the Owner can take receipt prior to this date. Bidders are asked to indicate the anticipated delivery date with their itemized bid. The project specifications provide details on the Kitchen Equipment Schedule, Mechanical and Plumbing requirements, and Electrical work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Advertisement for Bids

Project: Houghton Schools Kitchen Equipment Replacement

Owner :

Houghton-Portage Township Schools

1603 Gundlach Road Houghton, Michigan 49931

Architect:

U.P. Engineers and Architects, Inc (UPEA)

100 Portage Street

Houghton, Michigan 49931

Bids will be accepted by Houghton-Portage Township Schools for the provision of food service equipment for (2) school locations by the District in the City of Houghton. Bids will be accepted until

4:00 E.S.T. on February 21st, 2024 at the office of the Superintendent. Emailed bids are acceptable provided they are received prior to the bid deadline.

Emailed bids shall be sent to:

sturnquist@hpts.us and also tsepp@up.net

Bids shall be broken down by piece with accessories, and shall include all delivery charges, and all applicable sales and use taxes. The equipment will all be unloaded and installed by contractors on site.

Note: All kitchen equipment shall be supply only, including delivery and applicable taxes, with the exception of the Walk-In Cooler and Freezer: which shall include erection and installation of the units, including line sets, condensers, compressors, startup and shelving installation. Power and condensate drains by others.

Note also: Both dishwashers being supplied shall include factory startup and commissioning, including all chemicals as necessary and owner’s training.

The Owner reserves the right to accept any or all bids, in whole or in part, and also herein reserves the right to waive any informalities or irregularities in any or all bids and to make the award as it deems, in its sole discretion, to be in the best interest of the owner.

All equipment shall be delivered to the district by June 14th, 2024 Please indicate anticipated delivery date on your itemized bid. The school can take receipt of equipment prior to this date.

Houghton-Portage Township School District

Mr. Anders Hill, Superintendent mailto:sturnquist@hpts.us mailto:tsepp@up.net

BUILDING CODE SUMMARY

USE GROUP: E

CONSTRUCTION TYPE: II-B

BUILDING AREA TO BE RENOVATED: APPROXIMATELY 1000 SF.

G5

30 65

17 139

55 52

CEDARVILLE

HESSEL

WHITEFISH

POINT

SAULT

STE

MARIE

NATIONAL PARK

ISLE ROYALE

NORWAY

MARENISCO

WHITE PINE

BERGLAND

NEWBERRY

SILVER

CITY

BESSEMER

IRONWOOD

WAKEFIELD

GREEN BAY

GWINN

HERMANSVILLE

MENOMINEE

IRON MOUNTAIN

VULCAN

CASPIAN

TROUT

WATERSMEET

CREEK

CROSSING

MASS

CITY

BRUCE

ONTONAGON

ROCKLAND BARAGA

ARNHEIM

CRYSTAL

FALLS

ISHPEMING

MICHIGAMME

L'ANSE

AURA

SKANEE

MARQUETTE

NEGAUNEE

MANISTIQUE

ESCANABA

FAYETTE

GARDEN

MUNISING

CURTIS

CITY

GOULD

HARBOR

CALUMET

RIPLEY

HOUGHTON

CHASSELL

HANCOCK

DELAWARE

LAKE

LINDEN

LAURIUM

EAGLE

HARBOR

COPPER

MACKINAC

ISLAND

IGNACE

ST

INDIAN

RIVER

CHEBOYGAN

MACKINAW CITY

PELSTON

ONAWAY

GAYLORD

PETOSKEY

CHARLEVOIX

MANCELONA

KALKASKA

TRAVERSE

CITY

EMPIRE

ELBERTA

ARCADIA

MANISTEE

SCOTTVILLE

BALDWINLUDINGTON

SHELBY

BIG RAPIDS

MOUNT

PLEASANT

CADILLAC

GRAYLING

EAST

TAWAS

ROSCOMMON

LACHINE ALPENA

WOLVERINE

ATLANTA

ROGERS CITY

ALANSON

CROSS

VILLAGE

BOYNE CITY

BELLAIRE

JORDAN

E.

EASTPORT

NORTHPORT

LELAND

BUCKLEY

FIFE

LAKE

FRANKFORT

MESICK

MANTON

BEAR

LAKE

LILLEY

HESPERIA

WHITE

CLOUD

EVART

REMUS

MIDLAND

SAGINAW

BAY

CITY

HARRISVILLE

CURRAN

MIO

OSCODA

TAWAS CITY

WEST

BRANCH

STANDISH

GLADWIN

McBAIN

LAKE CITY

CLARE

CARO

TROUT LAKE

BREVORT

IRON RIVERBRULE

WASHBURN

POPLAR

ASHLAND

PORT WING BAYFIELD

ODARRAH

MELLEN

UPSON

HURLEY

GLIDDEN

PARK FALLS

CLAM LAKE

MERCER

PRESQUE

ISLE

LAND O'LAKES

EAGLE

RIVER

PHELPS

FLORENCE

NIAGRA

CRANDON

SUPERIOR

HAYWARD

MINONG

CABLE

SHELL LAKE

GRANTSBURG

BALSAM

LAKE BARRON

MENOMONIE

DURAND

ALMA

WHITEHALL

BLACK

RIVER

FALLS

SPARTA

LA CROSSE

FRIENDSHIP

MONTELLO

WAUTOMA

GREEN

LAKE

FOND DU LAC

OSHKOSH

APPLETON

DE PERE

GREEN BAY

KEWAUNEE

STURGEON BAY

MARINETTE

OCONTO

SHAWANO

KESHENA

WAUSAU

STEVENS

POINT

WAUPACA

RHINELANDERPHILIPS

MEDFORD

MERRILL

ANTIGO

EAU CLARE

LADYSMITH

THREE

LAKES

MICHIGAN

WISCONSIN

LAKE

MICHIGAN

LAKE

SUPERIOR

HURON

LAKE

100 PORTAGE STREET

HOUGHTON, MI 49931

P (906) 482-4810 F (906) 482-9799

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

U.P. ENGINEERS &

ARCHITECTS, INC.

2906 N. STEPHENSON AVE, SUITE 2

IRON MOUNTAIN, MI 49801

P (906) 779-0937 F (906) 779-0947

424 S. PINE ST.

ISHPEMING, MI 49849

P (906) 485-1011 F (906) 485-1013

1701 DUNLAP AVE., SUITE B

MARINETTE, WI 54143

P (715) 732-4188 F (715) 732-4189

707 ASHMUN STREET

SAULT STE. MARIE, MI 49783

P (906) 635-0511 F (906) 635-0612

P R

O

JE

C T

N O w w w .u p e a .c o m

D R

A W

N B

Y

C H

E C

K E

D

A P

P R

O V

E D

D E

S

IG

N E

D B

Y

IS

S

U E

D F

O R

D

A T

E

P

H -0

H o u g h to n T w p S c h o o ls

-K it c h e n E q u ip m e n t R e p la c e m e n t\

D w g s \H

-0

H o u g h to n T w p S c h o o ls

H ig h S ch o o l_

R .r v t

/8

/2

:4 :5

A

M

KITCHEN EQUIPMENT REPLACEMENT

HOUGHTON PORTAGE TOWNSHIP SCHOOLS

G001

COVER SHEET

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

H O

U G

H T

O N

, M I 4

H -0

S P

K C

K C

S P

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

HOUGHTON, MI 49931

SHEET INDEX

NUMBER SHEET NAME

A101 AREA OF WORK PLAN - HIGH SCHOOL

A201 KITCHEN FLOOR PLAN - HIGH SCHOOL

M001 MECHANICAL AND PLUMBING ABBREVIATIONS AND SYMBOLS

M101 OVERALL EXISTING MECHANICAL PLAN - HIGH SCHOOL

M401 ENLARGED MECHANICAL/ PLUMBING PLAN - HIGH SCHOOL

M501 MECHANICAL DETAILS & SCHEDULES - HIGH SCHOOL

E001 ELECTRICAL ABBREVIATIONS

E101 AREA OF WORK PLAN - HIGH SCHOOL

ED201 ENLARGED EXISTING ELECTRICAL PLAN - HIGH SCHOOL

E201 PROPOSED ELECTRICAL PLAN - HIGH SCHOOL

E301 PROPOSED PANEL SCHEDULES - HIGH SCHOOL

A601 KITCHEN FLOOR PLAN - ELEMENTARY

PROJECT LOCATION

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L A

C E

M E

N T

P R

O J E

C T

/0 /2

A201 A2

A201 A1

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

P R

O

JE

C T

N O

D R

A W

N B

Y

C H

E C

K E

D

A P

P R

O V

E D

D E

S

IG

N E

D B

Y w w w .u p e a .c o m

IS

S

U E

D F

O R

D

A T

E

P

H -0

H o u g h to n T w p S c h o o ls

-K it c h e n E q u ip m e n t R e p la c e m e n t\

D w g s \H

-0

H o u g h to n T w p S c h o o ls

H ig h S ch o o l_

R .r v t

/7

/2

:3 :1

P

M

A101

AREA OF WORK

PLAN - HIGH

SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

H O

U G

H T

O N

, M I 4

H -0

S P

K C

K C

S P

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

1" = 30'-0"A1

AREA OF WORK PLAN

NORTH

HIGH SCHOOL

GENERAL NOTES:

1. DO NOT ROUGH-IN FROM THE DRAWINGS. REFER TO F.S.E.C. DIMENSIONED ROUGH-IN DRAWINGS FOR ACTUAL REQUIREMENTS.

2. PLUMBING CONTRACTOR (PC) AND ELECTRICAL CONTRACTOR (EC) SHALL MAKE FINAL CONNECTIONS BETWEEN EQUIPMENT AND ROUGH-IN POINT, AND PROVIDE ALL WIRING, SERVICE VALVES, PIPING, ETC AS REQUIRED.

3. TRADES SHALL INSTALL ALL ACCESSORIES (FAUCETS, DRAINS, SWITCHES, VALVES, GAS HOSES, ETC.) FURNISHED BY F.S.E.C.

4. GENERAL TRADES SHALL PROVIDE WALL, FLOOR, OR ROOF PENETRATIONS.

KITCHEN EQUIPMENT SUPPLY PACKAGE BID CLARIFICATIONS:

1. KITCHEN EQUIPMENT SHALL BE SUPPLY ONLY, INCLUDING DELIVERY AND APPLICABLE TAXES; WITH THE EXCEPTION OF THE COOLER AND FREEZER, WHICH SHALL INCLUDE INSTALLATION, REFRIGERATION, CONDENSERS, LINE SETS, STARTUP AND SHELVING INSTALLATION.

2. WALK-IN COOLER AND FREEZER SHALL HAVE STAINLESS SHROUD PANELS FROM THE TOP OF THE UNIT TO THE SUSPENDED CEILING, WHICH IS AT 12’.

3. WALK-IN COOLER AND FREEZER SHALL HAVE INTERIOR RAMPS AND INSULATED FLOORS.

4. POWER TO WALK-INS BY OTHERS, ALONG WITH CONDENSATE PIPING.

5. SUPPLY OF BOTH DISHWASHERS SHALL INCLUDE START-UP, CHEMICALS, COMMISSIONING AND TRAINING FOR STAFF. SETTING BY GENERAL CONTRACTOR.

6. HOT AND COLD FOOD SERVING CARTS SHALL INCLUDE SNEEZE GUARDS AND DROP-DOWN TUBULAR TRAY SLIDES; EXCEPT FOR (1) ITEM #1 COLD SERVING AND (1) ITEM #3 HOT SERVING WILL HAVE 1-SIDED SNEEZE

GUARDS AND DROP-DOWN TUBULAR TRAY SLIDES ON ONE SIDE ONLY. ITEM #2 AND (1) ITEM #3 SHALL HAVE SNEEZE GUARDS ON ONE SIDE ONLY, DROP-DOWN TUBULAR TRAY SLIDES ON BOTH SIDE.

7. HOT AND COLD FOOD SERVING SHALL BE INTERIOR SELF-DRAINING, AND SHALL INCLUDE A SHELF BELOW, CASTERS, AND NO SHROUDING FOR THE BASE. ALL STAINLESS STEEL CONSTRUCTION.

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L A

C E

M E

N T

P R

O J E

C T

/0 /2

/1

5' - 0"

REMOVE PORTION OF EXISTING WALL FOR PASS THROUGH

SHELF. OPENING TO BE 3'-0" TALL.

KITCHEN

LUNCH ROOM

LUNCH ROOM ALCOVE

PROPOSED

COOLER AND

FREEZER

3/16" = 1'-0"A2

KITCHEN FLOOR PLAN

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

P R

O

JE

C T

N O

D R

A W

N B

Y

C H

E C

K E

D

A P

P R

O V

E D

D E

S

IG

N E

D B

Y w w w .u p e a .c o m

IS

S

U E

D F

O R

D

A T

E

P

H -0

H o u g h to n T w p S c h o o ls

-K it c h e n E q u ip m e n t R e p la c e m e n t\

D w g s \H

-0

H o u g h to n T w p S c h o o ls

H ig h S ch o o l_

R .r v t

/7

/2

:3 :1

P

M

A201

KITCHEN FLOOR

PLAN - HIGH

SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

H O

U G

H T

O N

, M I 4

H -0

S P

T S

K C

T S

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

KITCHEN EQUIPMENT SCHEDULE

NUMBER DESCRIPTION MFR MODEL VOLTS PHASE WATTS AMPS WATER SANITARY REMARKS

1 COLD FOOD SERVING STATION VOLLRATH 37075 120 1 8.1 PROVIDE WITH BREATH GUARD WITH LIGHTS AND TUBULAR TRAY SLIDE.

2 COLD FOOD SERVING STATION VOLLRATH 37065 120 1 8.1 PROVIDE WITH BREATH GUARD WITH LIGHTS AND TUBULAR TRAY SLIDE.

3 HOT FOOD SERVING STATION VOLLRATH 37050 120/208 1 15.7 PROVIDE WITH BREATH GUARD WITH LIGHTS AND TUBULAR TRAY SLIDE.

4 3' WORK TABLE REGENCY 600TSB3036S

5 5' WORK TABLE REGENCY 600TSB3060S

6 DUAL SHELF 3' SLIDE MERCHANDISER HATCO GR2SDS-30D 120/208 1 2440 10.2 NEMA L14-20P

7 DUAL SHELF 5' SLIDE MERCHANDISER HATCO GR2SDS-54D 120/208 1 3780 15.8 NEMA L14-20P

8 OPEN DISPLAY MERCHANDISER TRUE TOAM-48-HC-TSL01 208-230 1 7.6 NEMA 6-15P

9 MILK COOLER BEVERAGE-AIR ABC7G-NATP 120 1 2.2 NEMA 5-15P

10 30"x72" WORK TABLE REGENCY 600EBT3096

11 DRYING RACK BY OWNER

12 CART EXISTING EXISTING TO REMAIN

13 DISH TABLE EXISTING EXISTING TO REMAIN

14 LOW TEMP CHEMICAL DISHWASHER AMERICAN DISH SERVICE ADC-44 208 3 8.0 KW 60 YES/EXISTING YES/EXISTING CHEMICAL SANITIZING

15 SHELVING EXISTING EXISTING TO REMAIN

16 REFRIGERATOR EXISTING EXISTING TO REMAIN

17 TYPE 1 HOOD EXISTING EXISTING TO REMAIN

18 CONVECTION OVEN EXISTING EXISTING TO REMAIN

19 HAND SINK EXISTING EXISTING TO REMAIN

20 POINT OF SALE EXISTING 120 1 RELOCATED FROM ELEMENTARY SCHOOL

21 PASS THROUGH SHELF EAGLE GROUP PTS-1836

22 VENDING MACHINE WITH MEAL MAGIC BY OWNER INSTALLED BY G.C

23 WALK-IN COOLER/FREEZER COMBO THERMALRITE 16'X12' OVERALL DIMENSIONS. 4" INSULATED FLOOR. 88" WALLS. 4" CEILING

24 WALK-IN COOLER CONDENSING UNIT RUSSELL RFO250L4SDANT 208-230 1 20.4 PROVIDE WITH LOW AMBIENT COOLING DOWN TO -40°F. LOCATED ON ROOF

25 WALK-IN COOLER EVAPORATOR RUSSELL RL6E077DDARE 208-230 1 9.8 PROVIDE WITH DEFROST MODE

26 WALK-IN FREEZER CONDENSING UNIT RUSSELL RFO060M4SDAALNT 208-230 1 15 PROVIDE WITH LOW AMBIENT COOLING DOWN TO -40°F. LOCATED ON ROOF

27 WALK-IN FREEZER EVAPORATOR RUSSELL RL6A052ADARE 115 1 0.8

3/16" = 1'-0"A1

COOLER/ FREEZER FLOOR PLAN

HIGH SCHOOL

GENERAL NOTES:

1. GENERAL CONTRACTOR SHALL RELOCATE ALL OLD EQUIPMENT TO HPTS ONSITE STORAGE AS DIRECTED BY THE

OWNER'S REP EXCEPT AS LISTED BELOW.

2. CONTRACTOR SHALL DISPOSE OF THE DISHWASHERS (BOTH BUILDINGS), STEAMER (ELEMENTARY), AND PASS

THROUGHS (ELEMENTARY).

3. GENERAL CONTRACTOR SHALL RELOCATE THE EXISTING POS STATION FROM THE ELEMENTARY SCHOOL TO THE HIGH

SCHOOL.

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L A

C E

M E

N T

P R

O J E

C T

/0 /2

STM

STM

PLUMBING PIPING MECHANICAL PIPING

DUCTWORK

CDS

CDR

CHWS

CHWR

CDS

CDR

CHWR

CHWS

AIR

ST

G

G

AIR

HWR

HWR

HWS

HWS

FP

FP

C

C

ST

V

V

SAN

HWC

SAN

EA24x14

EA24x14

EA24x14

HW

CW

HWC

OA24x14

OA24x14

OA24x14

RA24x14

SA24x14

SA24x14

S D

SA24x14

RA24x14

RA24x14

CW

HW

STM

CDR

CDS

CHWR

CHWS

HWR

HWS

G

AIR

FP

C

ST

CW

V

SAN

HWC

HW

HYDRONIC HOT WATER SUPPLY - NEW

HYDRONIC HOT WATER SUPPLY - EXISTING

HYDRONIC HOT WATER SUPPLY - DEMO

HYDRONIC HOT WATER RETURN - NEW

HYDRONIC HOT WATER RETURN - EXISTING

HYDRONIC HOT WATER RETURN - DEMO

COMPRESSED AIR - NEW

COMPRESSED AIR - EXISTING

COMPRESSED AIR - DEMO

GAS - NEW

GAS - EXISTING

GAS - DEMO

DOMESTIC COLD WATER - EXISTING

DOMESTIC COLD WATER - DEMO

DOMESTIC COLD WATER - NEW

DOMESTIC HOT WATER - EXISTING

DOMESTIC HOT WATER - DEMO

DOMESTIC HOT WATER - NEW

DOMESTIC HOT WATER RECIRC - EXISTING

DOMESTIC HOT WATER RECIRC DEMO

DOMESTIC HOT WATER RECIRC - NEW

SANITARY - EXISTING

SANITARY - DEMO

SANITARY - NEW

VENT - EXISTING

VENT - DEMO

VENT - NEW

STORM - EXISTING

STORM - DEMO

STORM - NEW

CONDENSATE - EXISTING

CONDENSATE - DEMO

CONDENSATE - NEW

FIRE PROTECTION - EXISTING

FIRE PROTECTION - DEMO

FIRE PROTECTION - NEW

ABBREVIATIONS

PIPING "T"

PIPING 90

STRAINER

SYMBOL LEGEND

CAP

NOTES

INLINE PUMP

BALANCE VALVE

PRESSURE RELIEF VALVE

3-WAY CONTROL VALVE

2-WAY CONTROL VALVE

GLOBE VALVE

GATE VALVE

CHECK VALVE

CIRCUIT SETTER

BUTTERFLY VALVE

BALL VALVE

EXHAUST AIR DUCT DOWN

EXHAUST AIR DUCT UP

RETURN AIR DUCT DOWN

RETURN AIR DUCT UP

SUPPLY AIR DUCT DOWN

SUPPLY AIR DUCT UP

AIR FLOW

HUMIDISTAT - 60" A.F.F.

THERMOSTAT - 60" A.F.F.

DUCT SMOKE DETECTOR

MOTORIZED DAMPER

FIRE / SMOKE DAMPER

(RATING DETERMINED BY WALL TYPE)

VOLUME CONTROL DAMPER

SQUARE TO ROUND TRANSITION

RETURN OR EXHAUST REGISTER

SUPPLY REGISTER

RELIEF AIR HOOD - ROOF

FRESH AIR INTAKE HOOD - ROOF

EXHAUST FAN - ROOF

RETURN OR EXHAUST AIR GRILLE

LINEAR DIFFUSER

SUPPLY AIR DIFFUSER PIPE BREAK

PIPE DOWN

PIPE UP

CLEAN OUT

GAS METER

UNION

HOSE BIBB

ELECTRIC BELL

SIAMESE CONNECTION

BARE FIN TUBE ELEMENT

FIN TUBE ELEMENT WITH COVER

EXTERNALLY INSULATED DUCTWORK

INTERNALLY LINED DUCTWORK

SUPPLY AIR DUCT - EXISTING

SUPPLY AIR DUCT - DEMO

SUPPLY AIR DUCT - NEW

RETURN AIR DUCT - EXISTING

RETURN AIR DUCT - DEMO

RETURN AIR DUCT - NEW

OUTSIDE AIR DUCT - EXISTING

OUTSIDE AIR DUCT - DEMO

OUTSIDE AIR DUCT - NEW

EXHAUST AIR DUCT - EXISTING

EXHAUST AIR DUCT - DEMO

EXHAUST AIR DUCT - NEW

CONDENSOR WATER SUPPLY

CONDENSOR WATER RETURN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CONDENSOR WATER SUPPLY - DEMO

CONDENSOR WATER SUPPLY - EXIST

CONDENSOR WATER RETURN - DEMO

CONDENSOR WATER RETURN - EXIST

CHILLED WATER SUPPLY - DEMO

CHILLED WATER SUPPLY - EXIST

CHILLED WATER RETURN - DEMO

CHILLED WATER RETURN - EXIST

METER

STEAM - NEW

STEAM - EXISTING

STEAM - DEMO

CONNECTION TO EXISTING

ACCU AIR COOLED CONDENSING UNIT

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AI ANALOG INPUT

AO ANALOG OUTPUT

APD AIR PRESSURE DROP

AS AIR SEPERATOR

B BOILER

BB BASEBOARD

BC BOOSTER COIL

BDD BACKDRAFT DAMPER

BFG BELOW FINISHED GRADE

BFP BACKFLOW PREVENTER

BHP BRAKE HORSE POWER

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BT BATH TUB

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

C CONVECTOR

CA COMPRESSED AIR

CB CATCH BASIN

CC COOLING COIL

CCF 100 CUBIC FEET

CD CEILING DIFFUSER

CF CUBIC FEET

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFP CLEAN OUT FERRULE AND PLUG

CH CHILLER

CI CAST IRON

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CO CLEAN OUT

CO CARBON MONOXIDE

COND CONDENSATE

CO2 CARBON DIOXIDE

CT COOLING TOWER

CU CONDENSING UNIT

CU FT CUBIC FOOT

CUH CABINET UNIT HEATER

CW COLD WATER

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DIFFUSER

DB DRY BULB

DEG F DEGREE FAHRENHEIT

DF DRINKING FOUNTAIN

DI DIGITAL INPUT

DIA DIAMETER

DN DOWN

DO DIGITAL OUTPUT

DWV DRAIN, WASTE AND VENT

EA EACH

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

EG EXHAUST AIR GRILLE

ELEV ELEVATION

ER EXHAUST AIR REGISTER

EUH ELECTRIC UNIT HEATER

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

EXH EXHAUST

F FURNACE

FAI FRESH AIR INTAKE

FBO FURNISHED BY OTHERS

FC FAN COIL

FD FLOOR DRAIN

FD FIRE DAMPER

FIN FIN TUBE RADIATION

FLG FLANGE

FP FIRE PROTECTION

FPM FEET PER MINUTE

FT FOOT OR FEET

F&T FLOAT AND THERMOSTATIC TRAP

G GAS (NATURAL)

GAL GALLON

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GT GREASE TRAP

H HYDROGEN

HB HOSE BIBB

HC HEATING COIL

HCO HORIZONTAL CLEANOUT

HP HORSE POWER

HTR HEATER

HVAC HEATING, VENTILATING & AIR COND

HW HOT WATER

HWC HOT WATER RECIRCULATING

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HX HEAT EXCHANGER

IE INVERT ELEVATION

IF INLINE FAN

IN INCH OR INCHES

IP IRON PIPE

INV INVERT

IWH INSTANTANEOUS WATER HEATER

JAN JANITOR

JC JANITOR'S CLOSET

JS JANITOR'S SINK

LAT LEAVING AIR TEMPERATURE

LAV LAVATORY

LBS POUNDS

LHWR LOW TEMPERATURE HOT WATER

RETURN

LHWS LOW TEMPERATURE HOT WATER

SUPPLY

LIQ LIQUID (REFRIGERATION)

LV LOUVER

LP PROPANE GAS (LIQUID)

LWT LEAVING WATER TEMPERATURE

M METER

MAU MAKE-UP AIR HANDLING UNIT

MAX MAXIMUM

MB MOP BASIN

MBH BRITISH THERMAL UNITS (1000)

MBTUH BRITISH THERMAL UNITS (1000)

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPACITY

MD MOTORIZED DAMPER

MECH MECHANICAL

MIN MINIMUM

MOCP MAXIMUM OVER CURRENT

PROTECTION

OA OUTDOOR AIR

OAI OUTDOOR AIR INTAKE

OC ON CENTER

OD OVERFLOW DRAIN

ODP OPEN DRIP PROOF

OXY OXYGEN

P PUMP

PC PLUMBING CONTRACTOR

PD PNEUMATIC OPERATED DAMPER

PIV POST INDICATING VALVE

PRV PRESSURE REDUCING VALVE

PT PRESSURE TEMPERATURE PLUG

PTAC PACKAGED TERMINAL AIR COND. UNIT

PVAC PROCESS VACUUM

S SINK

SA SUPPLY AIR

SAD SUPPLY AIR DIFFUSER

SAF SUPPLY AIR FAN

SAN SANITARY SEWER

SD SMOKE DETECTOR

SG SUPPLY AIR GRILLE

SH SHOWER HEAD

SHC STEAM HEATING COIL

SR SUPPLY REGISTER

SS STAINLESS STEEL

ST STORM

STM STEAM

SUCT SUCTION (REFRIGERATION)

TCC TEMPERATURE CONTROL CONTRACTOR

TCD TEMPERATURE CONTROL DAMPER

TCP TEMPERATURE CONTROL PANEL

TD TRANSFER DUCT

TG TRANSFER AIR GRILLE

TT THERMOSTATIC TRAP

TYP TYPICAL

UG UNDERGROUND

UH UNIT HEATER

UV UNIT VENTILATOR

V VENT

VAC VACUUM

VAV VARIABLE AIR VOLUME BOX

VD VOLUME DAMPER

VFD VARIABLE FREQUENCY DRIVE

VS VENT STACK (SANITARY)

VTR VENT THRU ROOF (SANITARY)

VUV VERTICAL UNIT VENTILATOR

W WASTE

WB WET BULB

WC WATER CLOSET

W/O WITHOUT

WH WATER HEATER

WSHP WATER SOURCE HEAT PUMP

NOTE:

NOT ALL ABBREVIATIONS AND/OR SYMBOLS ARE

USED IN THIS SET OF DOCUMENTS.

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NIC NOT INCLUDED OR NOT IN CONTRACT

NIT NITROGEN

NO NORMALLY OPEN

KW KILOWATT

R REGISTER

RA RETURN AIR

RD ROOF DRAIN

RET RETURN

RF RETURN FAN

RG RETURN AIR GRILLE

RPZ REDUCED PRESSURE ZONE BACKFLOW PREVENTER

RR RETURN REGISTER

RTU ROOF TOP UNIT

MECHANICAL/PLUMBING AND FIRE PROTECTION GENERAL NOTES

1. THESE DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND DO NOT NECESSARILY INDICATE

EVERY OFFSET, VALVE, FITTING, ETC. REQUIRED. CONTRACTOR IS RESPONSIBLE FOR FIELD ROUTING

ALL DUCTWORK AND PIPING AT NO ADDITIONAL COST.

2. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS AND OPERATIONS AND

PERFORM ALL LABOR REQUIRED FOR INSTALLATIONS AS INDICATED THE DRAWINGS, IN THE

SPECIFICATIONS AND AS REQUIRED BY LOCAL, STATE AND FEDERAL CODES, AND AS MAY BE

REASONABLY IMPLIED TO ACCOMPLISH COMPLETE MECHANICAL, PLUMBING AND FIRE PROTECTION

SYSTEMS.

3. ALL ELECTRICAL DISCONNECTS REQUIRED PER NEC CODE SHALL BE FURNISHED AND

INSTALLED BY THE ELECTRICAL CONTRACTOR UNLESS NOTED OTHERWISE.

4. CONTRACTOR SHALL PROVIDE PRODUCTS AS SPECIFIED ON THE DRAWINGS AND

SPECIFICATIONS, HOWEVER, WHERE THE WORDS "EQUAL TO" ARE USED, ADDITIONAL PRODUCTS

MAY BE SUBMITTED AS PROPOSED SUBSTITUTIONS, BUT REQUIRE APPROVAL FROM

ARCHITECT/ENGINEER.

5. DESIGN DRAWINGS SHOW GENERAL ARRANGEMENT AND EXTENT OF WORK. THE DRAWINGS

ARE DIAGRAMMATIC AND MAY NOT NECESSARILY BE DRAWN TO SCALE FOR PURPOSE OF CLARITY AND LEGIBILITY. IT IS INTENDED THAT ALL ITEMS BE LOCATED SYMMETRICALLY WITH ARCHITECTURAL

ELEMENTS WHERE FEASIBLE AND BE INSTALLED TO AVOID OBSTRUCTIONS AND PRESERVE

HEADROOM. CONTRACTOR SHALL REVIEW PLANS OF OTHER TRADES WITH HIS OWN WORK TO AVOID CONFLICTS AND INTERFERENCES. CONTRACTOR MUST MAKE USE OF ALL SOURCES OF INFORMATION

INCLUDING DRAWINGS OF EQUIPMENT FURNISHED BY OTHERS. FAILURE TO REVIEW WORKING

SPACES OR CHECK DIMENSIONS IN QUESTION SHALL NOT WARRANT CONFLICTS.

6. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE COMPLIMENTARY. WHERE DRAWINGS

AND SPECIFICATIONS CONFLICT EACH OTHER, IT IS THE CONTRACTORS RESPONSIBILITY TO GET CLARIFICATION FROM THE ARCHITECT/ENGINEER PRIOR TO BIDDING. FAILURE TO GET CLARIFICATION SHALL NOT RESULT IN ADDITIONAL COST AND THE MORE STRINGENT SHALL BE USED AS INTENDED

BASIS FOR BIDDING.

7. PLANS AND SPECIFICATIONS ARE INTENDED TO CONFORM TO GOVERNING CODES AND

STANDARDS. IF NON-CONFORMITIES ARE DISCOVERED WHILE BIDDING, OR PERFORMING THE WORK IMPLIED, BRING THE SAME TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR CLARIFICATION IN WRITING PRIOR TO SUBMITTING BID OR PROCEEDING WITH WORK. NON-CONFORMITIES OF CODE COMPLIANCE WORK INSTALLED AND CORRECTIONS REQUIRED WITHOUT CONSULTION AND WRITTEN RESPONSE OF SAME BY THE ENGINEER WILL BE THE CONTRACTORS FINANCIAL RESPONSIBILITY.

8. MOTORS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AS REQUIRED BY THE

EQUIPMENT FURNISHED BY THE MECHANICAL CONTRACTOR. MOTORS TO BE SUITABLE FOR LOAD, DUTY, VOLTAGE, FREQUENCY, HAZARD, SERVICE AND LOCATION INTENDED. SINGLE PHASE MOTORS MUST HAVE INTEGRAL THERMAL OVERLOAD PROTECTION IN ADDITION TO THAT PROVIDED IN MOTOR

CONTROLLERS. MOTORS TO CONFORM IN DESIGN AND PERFORMANCE TO THE MOTOR STANDARDS

OF NEMA. MOTORS RATED FOR CONTINUOUS DUTY UNDER FULL LOAD WITH A MAXIMUM

TEMPERATURE RISE OF 105 DEG F FOR OPEN, 125 DEG F FOR DRIP PROOF AND 130 DEG F FOR

EXPLOSION PROOF AND TOTALLY ENCLOSED TYPES. SUPPLY MOTORS WITH BELT DRIVES WITH

ADJUSTABLE BASES, REMOVABLE BELT GUARDS AND VARIABLE PITCH DRIVE PULLEY SELECTED SO THAT MIDPOINT OF VARIABLE RANGE OF PULLEY WILL DRIVE EQUIPMENT AT RATED SPEED. MOTORS

1 HP AND LARGER SHALL BE THREE PHASE (UNLESS OTHERWISE LISTED).

9. MOTOR CONTROLLERS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR FOR

MOTORS FURNISHED BY THE MECHANICAL CONTRACTOR. MOTOR CONTROLLERS SHALL BE OF SIZES AND TYPES AS NEEDED TO MEET THE OPERATIONAL CONDITIONS AS REQUIRED BY THE SEQUENCE OF OPERATION. ELECTRICAL CONTRACTOR TO FURNISH AND INSTALL THE POWER CIRCUIT, LOCAL

DISCONNECT AND CONNECTION TO MOTOR TERMINALS. MECHANICAL CONTRACTOR TO MOUNT

MOTOR CONTROLLERS AND CONTROL COMPONENTS AND WIRE AND MAKE ALL FINAL CONTROL

CONNECTIONS BETWEEN DEVICES.

10. THE DRAWINGS INDICATE KNOWN UTILITY AND DRAINAGE LINES IN ACCORDANCE WITH THE

INFORMATION FURNISHED TO THE ENGINEER. RESPONSIBILITY FOR LOCATING, UNCOVERING,

DISPOSING OR MAINTAINING ALL EXISTING UTILITY LINES TO REST SOLELY WITH THE CONTRACTOR.

VERIFY LOCATIONS AND DEPTHS OF SERVICE CONNECTION POINTS BEFORE PROCEEDING WITH

CONSTRUCTION.

11. CONTRACTOR SHALL CHECK EXISTING PREMISES BEFORE SUBMISSION OF BIDS TO CHECK

ALL CONDITIONS WHICH MAY EFFECT THE PERFORMANCE OF THE WORK INVOLVED. NO

ALLOWANCES OR EXTRA PAYMENT WILL BE MADE DUE TO CONTRACTOR'S FAILURE TO EXAMINE SITE

AND FULLY DISCERN WORKING CONDITIONS.

12. MECHANICAL CONTRACTOR SHALL RECEIVE, PROPERLY HOUSE, HANDLE, HOIST, AND

DELIVER TO PROPER LOCATION EQUIPMENT AND OTHER MATERIALS REQUIRED FOR THIS CONTRACT.

13. THE CONTRACTOR SHALL OBTAIN PERMITS, ARRANGE FOR INSPECTIONS, AND PAY FEES AND EXPENSES IN CONNECTION THEREWITH, AS A PART OF THE WORK REQUIRING SUCH PERMITS. EVERY

EFFORT IS MADE TO DESCRIBE THE WORK REQUIREMENTS IN CONFORMITY WITH APPLICABLE

CODES.

14. THE CONTRACTOR SHALL REVIEW ANY ALTERNATES OF OTHER TRADES, AND PRICE THEIR BID

TO ACCOUNT FOR ITEMS AFFECTING HIS WORK.

15. PIPING PASSING THROUGH CORRIDORS, TUNNELS, CHASES, ETC. SHALL BE CONSIDERED FOR

PROPER DRAINAGE. CONSULT WITH THE OTHER CONTRACTORS AND AVOID CONFLICT WITH

LOCATION OF PIPING. ORDER OF PRIORITY FOR ALL PIPING AND CONDUITS TO BE INSTALLED SHALL

BE AS FOLLOWS WITH THE HIGHEST PRIORITY LISTED FIRST.

A. PLUMBING DRAIN LINES

B. CONDENSATE LINES

C. DUCTWORK

D. FIRE PROTECTION

E. HOT AND COLD WATER PIPING

F. ELECTRICAL CONDUIT

16. WORK ASSIGNMENTS INFERRED BY THE DRAWINGS AND NOTES INCLUDED IN THESE PROJECT

DOCUMENTS ARE INFORMATIONAL ONLY AND ARE NOT INTENDED TO RELIEVE THE BIDDING

CONTRACTOR OF HIS OBLIGATION TO THE OWNER TO PROVIDE A COMPLETE AND COORDINATED

PROJECT. COMPREHENSIVE SUBCONTRACTOR COORDINATION AND FINAL WORK ASSIGNMENTS TO

SUBCONTRACTORS ARE THE SOLE RESPONSIBILITY OF THE BIDDING CONTRACTOR.

17. ALL DUCTS SERVING SUPPLY, RETURN AND EXHAUST TERMINALS SHALL BE PROVIDED WITH

BALANCE DAMPERS. FOR CLARITY, ALL DAMPERS MAY NOT BE SHOWN ON PLANS.

18. PROVIDE DIELECTRIC UNIONS/CONNECTIONS AT ALL JUNCTIONS OF DISSIMILAR METALS.

M

M

H

T

M

OD

OD

OD

OVERFLOW STORM - EXISTING

OVERFLOW STORM - DEMO

OVERFLOW STORM - NEW

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

P R

O

JE

C T

N O

D R

A W

N B

Y

C H

E C

K E

D

A P

P R

O V

E D

D E

S

IG

N E

D B

Y w w w .u p e a .c o m

IS

S

U E

D F

O R

D

A T

E

P

H -0

H o u g h to n T w p S ch o o ls

-K it c h e n E q u ip m e n t R e p la c e m e n t\

D w g s \M e c h a n ic a l\ H

-0

H o u g h to n T w p S c h o o ls

H ig h S ch o o l_

M e c h a n ic a l_

R .r v t

/7

/2

:5 :5

P

M

M001

MECHANICAL AND

PLUMBING

ABBREVIATIONS

AND SYMBOLS

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

H O

U G

H T

O N

, M I 4

H -0

S P

K C

K C

S P

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L A

C E

M E

N T

P R

O J E

C T

/0 /2

M401 A1

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

P R

O

JE

C T

N O

D R

A W

N B

Y

C H

E C

K E

D

A P

P R

O V

E D

D E

S

IG

N E

D B

Y w w w .u p e a .c o m

IS

S

U E

D F

O R

D

A T

E

P

H -0

H o u g h to n T w p S ch o o ls

-K it c h e n E q u ip m e n t R e p la c e m e n t\

D w g s \M e c h a n ic a l\ H

-0

H o u g h to n T w p S c h o o ls

H ig h S ch o o l_

M e c h a n ic a l_

R .r v t

/7

/2

:5 :5

P

M

M101

OVERALL EXISTING

MECHANICAL PLAN

- HIGH SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

H O

U G

H T

O N

, M I 4

H -0

S P

K C

K C

S P

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

1" = 30'-0"A2

AREA OF WORK PLAN

NORTH

HIGH SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L A

C E

M E

N T

P R

O J E

C T

/0 /2

(TYP)

EX. 2" GAS

1½" G UP

MUA-1

ACCU-1

PD-1

300 CFM

PD-1

300 CFM

PD-1

300 CFM

PD-1

300 CFM

PD-1

300 CFM

RG-1

1500 CFM

SA

RA

16"x16"

"x

10"Ø (TYP FOR PD-1)

21"x20"

12"ø

"ø

VD-1

450 CFM

VD-1

450 CFM

"x

"x

50"x18"

48"x16" 40"x16"

S A

R A

MECHANICAL ROOM ABOVE.

ROUTE EVAPORATOR CONDENSATE PIPING

TO FLOOR DRAIN LOCATED IN MECHANICAL ROOM.

1 REMOVE EXISTING DISHWASHER ROOFTOP EXHAUST FAN AND ASSOCIATED CURB, DUCTWORK, ELECTRICAL, SUPPORTS, AND APPURTENANCES.

TEMPORARILY COVER EXISTING ROOF PENETRATION WATER TIGHT. ROOF PENETRATION TO BE MODIFIED FOR MAKE UP AIR UNIT RETURN DUCT.

KEYNOTES

2 REMOVE EXISTING DIFFUSER AND ASSOCIATED DUCT AND SUPPORTS.

3 REMOVE EXISTING DUCT AND ASSOCIATED SUPPORTS AND DAMPERS. CAP UNUSED OPENINGS.

5 ROOFTOP MOUNTED MAKE UP AIR UNIT: RE-USE/MODIFY EXISTING ROOF PENETRATION FOR RETURN DUCT. PROVIDE NEW PENETRATION FOR SUPPLY DUCT AND GAS PIPING. ALL ROOF PENETRATIONS SHALL BE SEALED WATER TIGHT, BE COMPATIBLE WITH THE EXISTING ROOFING, AND INSTALLED PER MANUFACTURER'S REQUIREMENTS. PROVIDE L3x3x1/4" SUPPORT AROUND NEW SUPPLY DUCT PENETRATION. PERPENDICULAR

SUPPORTS TO THE ROOF TRUSSES SHALL SPAN FROM TRUSS TO TRUSS.

6 ROOFTOP MOUNTED REMOTE CONDENSING UNIT: MOUNT ON (2) 6X6 TREATING BLOCKING THAT SPAN AT LEAST (2) TRUSSES. PROVIDE ROOFING 6" BIGGER ON ALL SIDES UNDER 6X6'S. PROVIDE REQUIRED CLEARANCES OF ALL NEARBY UNITS.

4 DISCONNECT EXISTING PLUMBING FROM DISHWASHER. SALVAGE PLUMBING FOR RE-USE.

7 CONNECT NEW DISHWASHER TO EXISTING PLUMBING. PROVIDE WITH NEW ATMOSPHERIC VACUUM BREAKER ON WATER SUPPLY. PROVIDE AIR

GAP FROM SANITARY TO FLOOR SINK.

8 PROVIDE CONDENSATE PUMP FOR EVAPORATOR UNITS. PROVIDE CONDENSATE PIPING FROM THE PUMP TO THE FLOOR DRAIN LOCATED IN THE

MECHANICAL ROOM. COORDINATE EXACT LOCATION WITH EQUIPMENT AND LAYOUT.

9 PROVIDE STAINLESS STEEL WRAP FOR NEW PASSTHROUGH OPENING. WRAP BOTH SIDES AND TOP WITH MINIMUM 1" RETURN. OPENING IS APPROXIMATELY 3' x 3'.

SEQUENCE OF OPERATIONS

EXISTING KITCHEN EXHAUST HOOD:

THE EXISTING EXHAUST HOOD/FAN SHALL RUN CONTINUOUSLY DURING OCCUPIED HOURS. OCCUPIED HOURS ARE DETERMINED BY AN EXISTING WALL SWITCH LOCATED IN THE KITCHEN.

MAKE UP AIR UNIT:

OCCUPIED HOURS: THE MAKE UP AIR FAN SHALL START ACCORDING TO THE FACTORY SEQUENCE. OUTSIDE AIR DAMPER SHALL OPEN 100% AND THE RETURN AIR DAMPER SHALL CLOSE.

UNOCCUPIED HOURS: THE MAKE UP AIR FAN SHALL START ACCORDING TO THE FACTORY SEQUENCE WHEN A CALL FOR SPACE CONDITIONING OCCURS. THE OUTSIDE AIR DAMPER WILL CLOSE AND THE RETURN AIR DAMPER WILL OPEN TO 100%. UPON SPACE TEMPERATURE SET POINT BEING MET, THE MAKE UP AIR UNIT SHALL SHUT DOWN ACCORDING TO THE FACTORY

SEQUENCE.

HEATING CONTROL:

UPON A CALL FOR SPACE HEATING, THE MICROPROCESSOR CONTROLLER WILL MODULATE THE INDIRECT GAS FURNACE TO MAINTAIN THE SPACE TEMPERATURE SET POINT.

COOLING CONTROL:

UPON A CALL FOR COOLING, THE AIR COOLED CONDENSING UNIT SHALL ACTIVATE ITS FIRST STAGE OF COOLING. IF SPACE TEMPERATURE CAN NOT BE SATISFIED, THE SECOND STAGE

SHALL ACTIVATE.

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

P R

O

JE

C T

N O

D R

A W

N B

Y

C H

E C

K E

D

A P

P R

O V

E D

D E

S

IG

N E

D B

Y w w w .u p e a .c o m

IS

S

U E

D F

O R

D

A T

E

P

H -0

H o u g h to n T w p S ch o o ls

-K it c h e n E q u ip m e n t R e p la c e m e n t\

D w g s \M e c h a n ic a l\ H

-0

H o u g h to n T w p S c h o o ls

H ig h S ch o o l_

M e c h a n ic a l_

R .r v t

/7

/2

:5 :5

P

M

M401

ENLARGED

MECHANICAL/

PLUMBING PLAN -

HIGH SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

H O

U G

H T

O N

, M I 4

H -0

S P

K C

K C

S P

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

1/8" = 1'-0"A1

ENLARGED EXISTING MECHANICAL/ PLUMBING PLAN

1/8" = 1'-0"A3

ENLARGED PROPOSED MECHANICAL/ PLUMBING PLAN

HIGH SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L A

C E

M E

N T

P R

O J E

C T

/0 /2

INSULATION

DUCT

OUTSIDE END BEARING

DAMPER BLADE

1/8" CLEARANCE ALL AROUND

1/2" ROUND ROD PIN

INSULATION STANDOFF

HANDLE WITH

LOCKING QUADRANT

INSIDE END BEARING

INSULATION STIFFEN BLADE AS REQUIRED

DAMPER BLADE

HANDLE WITH LOCKING QUADRANT

DUCT

SECTION

SIDE ELEVATION

NOTES:

1. DELETE INSULATION STAND-OFF FOR DUCTWORK WITHOUT EXTERIOR INSULATION.

2. DETAIL SIMILAR FOR ROUND AND MULTI-BLADE DAMPERS.

FINISHED ROOF

24" FACTORY INSULATED ROOF CURB

FLASH INTO ROOF PER

MANUFACTURER

RECOMMENDATIONS

DISCONNECT

SUPPLY AIR TO KITCHEN

MAKE-UP-AIR UNIT (SEE

SCHEDULE)

OUTDOOR AIR INTAKE.

MAINTAIN MINIMUM 10'-0"

CLEARANCE TO ALL

EXHAUST OR VENT

TERMINATIONS.

GAS VALVE

GAS PIPING

POWER SUPPLY

APPROVED PENETRATION

CEILING

TREATED BLOCKING TO MATCH

INSULATION THICKNESS

DUAL WALL TURNING VANES

"D

"R

"R" = 1/2 x "D"

T H

R O

A T

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

P R

O

JE

C T

N O

D R

A W

N B

Y

C H

E C

K E

D

A P

P R

O V

E D

D E

S

IG

N E

D B

Y w w w .u p e a .c o m

IS

S

U E

D F

O R

D

A T

E

P

H -0

H o u g h to n T w p S ch o o ls

-K it c h e n E q u ip m e n t R e p la c e m e n t\

D w g s \M e c h a n ic a l\ H

-0

H o u g h to n T w p S c h o o ls

H ig h S ch o o l_

M e c h a n ic a l_

R .r v t

/7

/2

:5 :5

P

M

M501

MECHANICAL

DETAILS &

SCHEDULES - HIGH

SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

H O

U G

H T

O N

, M I 4

H -0

S P

K C

K C

S P

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

AIR-COOLED CONDENSING UNIT SCHEDULE

ID MANUFACTURER MODEL NUMBER

GROSS

CAPACITY

(MBH)

NOMINAL

CAPACITY

(TONS)

EER REFRIG. TYPE WEIGHT (LBS)

COMPRESSOR ELECTRICAL

NOTES

TYPE STAGE VOLTS PHASE MCA MOCP

ACCU-1 CARRIER 38AUD 115.7 10 11.2 R410a 516 SCROLL 3 460 3 18 25 1,2,3,4

1. INSTALL PER MANUFACTURER'S REQUIREMENTS.

2. PROVIDE WITH A COMPLETE CONTROL SYSTEM TO INTERLOCK WITH CONNECTED MAEK UP AIR UNIT. COORDINATE WITH CONTROLS CONTRACTOR.

3. COORDINATE ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR.

4. 3-STAGE COMPRESSOR

MAKE UP AIR UNIT SCHEDULE

ID MANUFACTURER MODEL NUMBER DESIGN CONDITIONS HEATING COOLING GAS CONN.

(IN.)

ELECTRICAL WEIGHT (LBS)

AIRFLOW

(CFM)

EXT. STATIC

PRESS. (IN.)

SUMMER

EADB

SUMMER

EAWB

WINTER

EADB

INPUT

CAPACITY

(MBH)

OUTPUT

CAPACITY

(MBH)

TURNDOWN LAT TYPE REFRIGERANT TOTAL

CAPACITY

(MBH)

SENSIBLE

CAPACITY

(MBH)

SUMMER

LADB

SUMMER

LAWB

VOLTS PHASE HP MCA MOCP

MUA-1 GREENHECK IGX-P109-H12-MF-G 1500 0.75 88.4 76.4 -20 200 162 4:1 79.9 DX R-410a 1115.1 55.7 54.8 54.5 3/4" 460 3 1 3.5 15 1405

PROVIDE WITH 24" HIGH INSULATED CURB.

PROVIDE WITH FACTORY CONTROL SYSTEM WITH TEMPERATURE CONTROL BASED ON ROOM TEMPERATURE.

WEATHERHOOD, ALUMINUM MESH FILTERS, LOW-LEAK OUTDOOR AIR DAMPER, ALARM MANAGEMENT, MICROPROCESSOR.

COORDINATE ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR.

DIFFUSER, GRILLE, REGISTER SCHEDULE

ID DESCRIPTION MANUFACTURER MODEL

NUMBER

MOUNTING

FRAME

NECK SIZE

(IN)

MODULE SIZE

(IN)

THROW COLOR MATERIAL Notes

PD-1 PERFORATED SUPPLY DIFFUSER NAILOR 4320S LAY-IN 10"Ø 24 x 24 4-WAY WHITE STEEL 1,2,5

RG-1 CEILING RETURN GRILLE NAILOR 51EC LAY-IN 22 x 22 24 x 24 - WHITE ALUMINUM 1,2,4

VD-1 CEILING SUPPLY DIFFUSER NAILOR 6500 LAY-IN 12"Ø 24 x 24 4-WAY WHITE STEEL 1,2,3

1. BORDER TYPE SHALL BE COMPATIBLE WITH ARCHITECTURAL CEILING TYPE IN WHICH THE DEVICE IS LOCATED.

2. SEE PLAN FOR LOCATIONS AND QUANTITIES OF AIR DEVICES.

3. 18"x18" CORE, 24"x24" FULL FACE LOUVER.

4. 1/2"x1/2"x1/2" EGGCRATE GRID.

5. 4-WAY PERFORATED SUPPLY DIFFUSER.

DUCTWORK INSULATION TYPE SCHEDULE

INSULATION

TYPE

DESCRIPTION

D-1

ASTM C1290, TYPE III, FLEXIBLE GLASS FIBER, COMMERCIAL GRADE WITH FACTORY

APPLIED REINFORCED FOIL JACKET MEETING ASTM C1136, TYPE II, MAX. OPERATING

TEMPERATURE: 250 DEG. F, DENSITY: 1.5 LBS/CU FT.

D-2

ASTM C612, TYPE IA OR IB, RIGID GLASS FIBER, WITH FACTORY APPLIED ALL SERVICE

FACING MEETING ASTM C1136, TYPE II, DENSITY: 6.0 LBS/CU FT.

D-6

ASTM C534, TYPE II, FLEXIBLE, CLOSED CELL ELASTOMERIC INSULATION, SHEET,

SERVICE TEMPERATURE RANGE: MINUS 58 TO 180 DEG F.

DUCTWORK INSULATION SCHEDULE

SYSTEM TYPE

INSULATION

TYPE

INSULATION OR

LINER

THICKNESS

SUPPLY DUCTS (EXTERNALLY INSULATED) D-1, D-2, D-6 1-1/2"

NOT TO SCALEC2

KITCHEN HOOD - MUA DETAIL

NOT TO SCALEB3

ACCEPTABLE DUCT TURNS

NOT TO SCALEC4

VOLUME DAMPER DETAIL

HIGH SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L A

C E

M E

N T

P R

O J E

C T

/0 /2

FAAP

FACP

ELECTRICAL ABBREVIATIONS, SYMBOLS AND NOTES

ABBREVIATIONS AND SYMBOLS LEGEND NOTES & DETAILS

ELR

CARBON MONOXIDE DETECTOR

1. IT SHALL BE THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO NOTIFY OTHER

CONTRACTORS TO ARRANGE CLEARANCES AND ACCESS OPENINGS FOR ALL LARGE ELECTRICAL

EQUIPMENT.

2. IT SHALL BE UNDERSTOOD THAT THE ACT OF SUBMITTING A BID BY THE CONTRACTOR

CARRIES WITH IT THE AGREEMENT TO ALL ITEMS AND CONDITIONS REFERRED OR INDICATED OR

IMPLIED ON THE DRAWINGS AND THE SPECIFICATIONS AND NO CONSIDERATION WILL BE

GRANTED FOR ANY ALLEGED MISUNDERSTANDING OF MATERIALS TO BE FURNISHED FOR WORK

TO BE DONE.

3. THE ELECTRICAL INSTALLATION SHALL COMPLY WITH RULES AND REGULATIONS OF THE

LATEST EDITION OF THE OCCUPATIONAL SAFETY AND HEALTH ACT, NATIONAL ELECTRICAL CODE, STATE ELECTRICAL CODE, LOCAL MUNICIPAL CODE AND ANY OTHER BOARD HAVING

JURISDICTION OVER THE ELECTRICAL INSTALLATION.

4. THE ELECTRICAL CONTRACTOR SHALL NOT ASSUME THAT ANY DRAWING OR

SPECIFICATION FORMING A PART OF THE CONTRACT DOCUMENTS AUTHORIZES THE VIOLATION

OF ANY CODE, REGULATION OR STANDARD. WHERE CONFLICTS ARISE, IT SHALL BE DEEMED THAT

THE CONTRACTOR HAS ESTIMATED THE COST OF ALL WORK TO BE COMPLETED IN ACCORD WITH

THE PREVAILING CODE.

5. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR ELECTRICAL WORK AND

SHALL PAY ALL REQUIRED FEES AND SALES OR USE TAX AND FINES AS APPLICABLE TO THIS

BRANCH OF WORK.

6. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL DELIVER TO THE OWNER

WITHOUT COST ALL REQUIRED CERTIFICATES OF INSPECTION AND APPROVAL.

7. THE INTENT AND OBJECT OF THESE SPECIFICATIONS AND DRAWINGS IS TO INCLUDE A

COMPLETE WIRING SYSTEM FROM SERVICE PANEL TO EACH AND EVERY OUTLET INDICATED OR

SPECIFIED, INCLUDING CONNECTING ALL ELECTRICAL DEVICES AND/OR EQUIPMENT FURNISHED

BY THE OWNER OR OTHER CONTRACTORS.

8. THE DRAWINGS, WHICH CONSTITUTE A PART OF THE CONTRACT, ARE DIAGRAMMATIC AND

INDICATE THE GENERAL ARRANGEMENT OF CIRCUITS AND OUTLETS, LOCATION OF SWITCHES,

PANELBOARD AND OTHER WORK, BUT EXTREME ACCURACY IS NOT GUARANTEED AND FIELD

VERIFICATION OF ALL LOCATIONS AND DIMENSIONS IS DIRECTED.

9. GROUND ALL EQUIPMENT INCLUDING CONDUIT, RECEPTACLES, LIGHTING, MOTORS, PIPING

AS PER ARTICLE 250 OF THE NATIONAL ELECTRICAL CODE, AND AS SHOWN ON THESE DRAWINGS.

10. PROVIDE ONLY MATERIALS THAT ARE NEW OF THE TYPE AND QUALITY SPECIFIED, WHERE

UNDERWRITERS LABORATORIES HAVE ESTABLISHED STANDARDS FOR SUCH MATERIALS,

PROVIDE ONLY MATERIALS BEARING THE U.L. LABEL.

11. ARCHITECTURAL DRAWINGS SHOWING DIMENSIONS FOR ELECTRICAL DEVICES TAKE

PRECEDENCE OVER THE ELECTRICAL DRAWINGS.

12. SYSTEMS SHALL BE FREE FROM SHORTS AND GROUNDS. TEST FOR MECHANICAL AND

ELECTRICAL DEFECTS. VERIFY CORRECT CONNECTION OF HOT, NEUTRAL AND GROUND

CONDUCTORS. ALL CONDUCTORS SHALL BE COLOR CODED AND LABELED WITH ZONE

IDENTIFICATION FOR THE CASE OF LIGHTING.

13. WHEN MATERIAL AND/OR WORKMANSHIP IS FOUND NOT TO COMPLY WITH THE SPECIFIED

REQUIREMENTS, WITHIN THREE DAYS AFTER RECEIPT OF NOTICE OF SUCH NON-COMPLIANCE,

REMOVE THE NON-COMPLYING ITEMS FROM THE JOB AND REPLACE WITH NEW ITEMS MEETING

THE REQUIREMENTS. COSTS FOR REPAIR OF NON-COMPLIANCE WORK SHALL BE BY THE

CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER.

14. UPON COMPLETION OF THE WORK, THOROUGHLY CLEAN ALL DEVICES AND EQUIPMENT.

15. ALL TELECOM, TV CABLE AND DATA CABLE SHALL BE DEDICATED RUNS FROM THE OUTLET

LOCATIONS TO THE BACKBOARD LOCATION.

16. WORK ASSIGNMENTS INFERRED BY THE DRAWINGS AND NOTES INCLUDED IN THESE

PROJECT DOCUMENTS ARE INFORMATIONAL ONLY AND ARE NOT INTENDED TO RELIEVE THE

BIDDING CONTRACTOR OF HIS OBLIGATION TO THE OWNER TO PROVIDE A COMPLETE AND

COORDINATED PROJECT. COMPREHENSIVE SUBCONTRACTOR COORDINATION AND FINAL WORK

ASSIGNMENTS TO SUBCONTRACTORS ARE THE SOLE RESPONSIBILITY OF THE BIDDING

CONTRACTOR.

LUMINARE - SURFACE MOUNT FLUORESCENT OR INCANDESCENT

LUMINARE - RECESSED FLUORESCENT OR INCANDESCENT

LUMINARE - STANDARD FLUORESCENT STRIP LIGHT

LIGHT FIXTURE - RECESSED FLUORESCENT OR LED

HEAT DETECTOR

DUAL LEVEL SWITCHING - SWITCH OUTER (2) LAMPS SEPARATE

FROM CENTER LAMP

FIRE ALARM HORN/STROBE (CEILING MOUNTED)

FIRE ALARM BOOSTER PANEL

FIRE ALARM SPEAKER

END OF LINE RESISTOR

FIRE ALARM HORN/STROBE (WALL MOUNTED)

MAGNETIC DOOR HOLD OPEN

GONG

DUCT SMOKE DETECTOR

TAMPER SWITCH

FLOW SWITCH

FIRE ALARM HORN/STROBE (WALL MOUNTED)

MANUAL PULL STATION

SMOKE DETECTOR

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

FIRE SAFETY AND ALARM SYMBOLS

GENERAL NOTES:

PHOTO CELL

OCCUPANCY SENSOR (WALL MOUNTED)

PANEL - RECESSED

PANEL - SURFACE MOUNT

AUTOMATIC TRANSFER SWITCH (ATS)

DISCONNECT

NORMALLY OPEN SWITCH

NORMALLY CLOSED SWITCH

CIRCUIT BREAKER WITH SIZE AS NOTED

NORMALLY OPEN CONTACT

NORMALLY CLOSED CONTACT

FUSED SWITCH

ELECTRIC METER

GROUND

IN-LINE FUSE

TRANSFORMER

STARTER DISCONNECT

THERMOSTAT

CONNECTION TO MOTOR

FUSED DISCONNECT

DISCONNECT

TELEPHONE/DATA OUTLET. PROVIDE 1"CONDUIT WITH PULL

STRING PER LOCATION. DATA CABLES AND TERMINATIONS BY

OTHERS.

SWITCH - PILOT

SWITCH - DIMMER

TYPICAL DEVICE MOUNTING HEIGHT

NOTE:

VERIFY HEIGHTS SHOWN COMPLY WITH LOCAL BUILDING CODE.

47"

1'-6"

6"

MAX.

SYMBOL

EXIT

BOTTOM OF

FINISHED CEILING

SYMBOL

FIRE ALARM

SYMBOL

LIGHTING SWITCH

SYMBOL

120V CONVENIENCE

RECEPTACLE

SYMBOL

TELEPHONE AND

COMPUTER

TOP OF FINISHED FLOOR

47"

6'-8"SYMBOL

FIRE ALARM

MANUAL PULL

STATION

OCCUPANCY SENSOR (CEILING MOUNTED)

ABBREVIATIONS

LIGHTING SYMBOLS

SWITCH - PUSH BUTTON

SWITCH - TIME CLOCK

SWITCH - SINGLE POLE, TIMED

SWITCH - SINGLE POLE, KEYED

SWITCH - FOUR WAY

SWITCH - THREE WAY

SWITCH - SINGLE POLE

A AMPERES

AV PANELBOARD AV

AV AUDIO/VIDEO

A/V AUDIO/VIDEO

C PANELBOARD KPP-C

C.B. CIRCUIT BREAKER

GFCI GROUND FAULT CIRCUIT INTERUPTING

GFI GROUND FAULT CIRCUIT INTERUPTING

KVA KILO-VOLT AMPS (ELECTRIC POWER)

QT QUAD TUBE (FLUORESCENT LAMP)

TT TWIN TUBE (FLUORESCENT LAMP)

TYP TYPICAL

V VOLT

4W FOUR WIRE

3ø THREE PHASE

JUNCTION BOX

JUNCTION BOX

TELEVISION CABLE OUTLET

CLOCK - WALL MOUNTED

AMPLIFIER

INTERCOM

SPEAKER - CEILING MOUNTED

SPEAKER - WALL MOUNTED

WIRELESS ACCESS POINT (WAP)

TELEPHONE/DATA OUTLET - FLOOR MOUNTED

POLE RECEPTACLE

ISOLATED GROUND RECEPTACLE

TOP SWITCHED RECEPTACLE

GROUND FAULT INTERUPTING RECEPTACLE. PROVIDE WEATHER-

PROOF WHILE IN USE COVER WHERE LOCATED OUTDOORS.

QUAD RECEPTACLE (GFI PROTECTED WHERE REQUIRED)

FLOOR RECEPTACLE (GFI PROTECTED WHERE REQUIRED)

DUPLEX RECEPTACLE

MISCELLANEOUS SYMBOLSSWITCHES AND RECEPTACLE SYMBOLS

TELEPHONE, DATA AND COMMUNICATION SYMBOLS

CO

F

S

F

F

FS

S D

S

TS

F

H

J

J

D

S

SS

S P

S

ST

S

S

S K

S

IG

G

PC

L

N E

M

T

M

C

A

IC

S

S

TV

A

LIGHT FIXTURE - EMERGENCY (WALL MOUNT)

LIGHT FIXTURE - EXIT/EMERGENCY (DIRECTIONAL ARROWS

WHERE INDICATED ON PLANS) (WALL OR CEILING MOUNT)

OSS

COUNTERTOP RECEPTACLE (GFCI WHERE REQUIRED)

CTR

LIGHT FIXTURE - SURFACE FLUORESCENT OR LED

C

B

TC

F

F

SECURITY CAMERA (OUTDOOR/INDOOR PER PLAN)

DOOR ALARM KEYPAD. PROVIDE 1"CONDUIT WITH PULL STRING PER

LOCATION. DATA CABLES AND TERMINATIONS BY OTHERS.

DL

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

P R

O

JE

C T

N O

D R

A W

N B

Y

C H

E C

K E

D

A P

P R

O V

E D

D E

S

IG

N E

D B

Y w w w .u p e a .c o m

IS

S

U E

D F

O R

D

A T

E

P

H -0

H o u g h to n T w p S c h o o ls

-K it ch e n E q u ip m e n t R e p la c e m e n t\ D w g s\

E le c tr ic a l\ H

-0

H o u g h to n T w p S c h o o ls

H ig h S c h o o l_

E le c tr ic a l_

R .r v t

/7

/2

:4 :2

P

M

E001

ELECTRICAL

ABBREVIATIONS

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

H O

U G

H T

O N

, M I 4

H -0

S P

K C

K C

S P

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L A

C E

M E

N T

P R

O J E

C T

/0 /2

WALK-INS AREA

KITCHEN AREA

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

P R

O

JE

C T

N O

D R

A W

N B

Y

C H

E C

K E

D

A P

P R

O V

E D

D E

S

IG

N E

D B

Y w w w .u p e a .c o m

IS

S

U E

D F

O R

D

A T

E

P

H -0

H o u g h to n T w p S c h o o ls

-K it ch e n E q u ip m e n t R e p la c e m e n t\ D w g s\

E le c tr ic a l\ H

-0

H o u g h to n T w p S c h o o ls

H ig h S c h o o l_

E le c tr ic a l_

R .r v t

/7

/2

:4 :2

P

M

E101

AREA OF WORK

PLAN - HIGH

SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

H O

U G

H T

O N

, M I 4

H -0

S P

K C

K C

S P

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

1" = 30'-0"A2

AREA OF WORK PLAN NORTH

HIGH SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L A

C E

M E

N T

P R

O J E

C T

/0 /2

EXISTING

PANEL K

UP TO MECHANICAL ROOM

EX. DISHWASHER

DISCONNECT TO REMAIN

1 REMOVE EXISTING RECEPTACLES AS INDICATED BY BOLD DASHED LINES AND ASSOCIATED WIRING, BOXES, AND SUPPORTS.

KEYNOTES

2 DISCONNECT EXISTING DISHWASHER AND REMOVE ASSOCIATED CONDUIT AND WIRING. SALVAGE CIRCUIT AND DISCONNECT FOR RE-USE.

3 DISCONNECT EXISTING ROOFTOP EXHAUST FAN AND REMOVE ASSOCIATED CONDUIT, WIRING, BOXES, AND SUPPORTS.

GENERAL NOTE:

RECEPTACLES SHOWN TO BE DEMOED IN THE MIDDLE OF THE ROOM ARE EACH FED UNDERGROUND WITH A 1" CONDUIT EACH. RE-USE CONDUIT FOR

NEW CIRCUITS AND COORDINATE RECEPTACLE LOCATIONS WITH NEW EQUIPMENT.

4 REMOVE EXISTING SWITCH SERVING EXISTING KITCHEN LIGHTS. SALVAGE BOX, WIRING, AND CONDUIT.

EXISTING

PANEL PH

400A 480V 3ϕ

SQUARE D I-LINE

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

P R

O

JE

C T

N O

D R

A W

N B

Y

C H

E C

K E

D

A P

P R

O V

E D

D E

S

IG

N E

D B

Y w w w .u p e a .c o m

IS

S

U E

D F

O R

D

A T

E

P

H -0

H o u g h to n T w p S c h o o ls

-K it ch e n E q u ip m e n t R e p la c e m e n t\ D w g s\

E le c tr ic a l\ H

-0

H o u g h to n T w p S c h o o ls

H ig h S c h o o l_

E le c tr ic a l_

R .r v t

/7

/2

:4 :2

P

M

ED201

ENLARGED

EXISTING

ELECTRICAL PLAN -

HIGH SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

H O

U G

H T

O N

, M I 4

H -0

S P

K C

K C

S P

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

1/4" = 1'-0"A3

EXISTING KITCHEN ELECTRICAL PLAN

Bolt, Italicized circuit is to be demoed. Contractor shall verify all circuits prior to demolition and ensure circuit continuity in all circuits not being demoed in their entirety.

Note:

Total Connected Load: 0 VA

Total Amps: 0 A 0 A 0 A

Total Load: 0 VA 0 VA 0 VA

41 0 1 20 -- Lunch Room Water Cooler 42

39 0 0 40

30A Floor Receptacle -- 30 2

0 0 2 20 -- Freezer Receptacle (Storeroom)

35 0 0 1 20 -- Kitchen Receptacles 36

Hot Food Cart -- 30 2

0 0 1 20 -- Kitchen Receptacles 34

31 Kitchen Receptacles -- 20 1 0 0 1 20 -- Kitchen Receptacles 32

29 Kitchen Receptacles -- 20 1 0 0 30

27 Kitchen Receptacles -- 20 1 0 0 2 30 -- Hot Food Cart

25 Oven Receptacle -- 20 1 0 0 1 20 -- Spare 26

23 Oven Receptacle -- 20 1 0 0 1 20 -- Spare 24

21 E Wall N corner & Lunch RM -- 20 1 0 0 1 20 -- Spare 22

19 E Wall N corner & Lunch RM -- 20 1 0 0 1 20 -- West Wall Receptacle 20

17 E Wall N corner & Lunch RM -- 20 1 0 0 1 20 -- West Wall Receptacle 18

15 Oven Receptacle -- 20 1 0 0 1 20 -- West Wall Receptacle 16

13 Oven Receptacle -- 20 1 0 0 14

11 Serving Room Outlets -- 20 1 0 0 12

9 Serving Room Outlets -- 20 1 0 0

3 70 -- Dishwasher

7 Serving Room Outlets -- 20 1 0 0 8

5 Serving Room Outlets -- 20 1 0 0 6

3 Serving Room Outlets -- 20 1 0 0

3 30 -- Disposal

1 2

CKT Circuit Description Wire Brkr Size

Brkr Poles

Phase A Load

(VA)

Phase B Load

(VA)

Phase C Load

(VA)

Brkr Poles

Brkr Size Wire Circuit Description CKT

1. Electrical Contractor shall verify all equipment requirements prior to ordering breakers.

2. Electrical Contractor is responsible to verify all circuits prior to starting work. Update/revise schedule to reflect actual work performed.

Notes:

Enclosure: Type 1 Manufacturer: Square D

Mounting: Recessed Wires: 4 Mains Rating: 150 A

Supply From: Phases: 3 Mains Type: 225

Location: Volts: 120/208 Wye A.I.C. Rating: 10kA

Branch Panel: EXISTING PANEL K

1/4" = 1'-0"A1

EXISTING MECHANICAL ROOM (FOR REFERENCE)

HIGH SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L A

C E

M E

N T

P R

O J E

C T

/0 /2

G

G

G

G

G

J J

NOTE: ALL RECEPTACLES IN THE KITCHEN SHALL BE GFCI PROTECTED. THIS INCLUDES 208V RECEPTACLES.

K-20,22

K-16,18

PH - X,X,X

PH - X,X,X

K-24,26

K-33

K-35

K-28,30

EXISTING

PANEL K

K-41

K2-17,19

K2-9,11

K2-4

K2-12,14

K2-5

K2-3

CORD DROP. COORDINATE EXACT

LOCATION AND HEIGHT WITH EQUIPMENT.

(TYP)

EXISTING

PANEL SDP-3

EXISTING

PANEL AD

EX. 150 KVA TRANSFORMER

PANEL K2

K2-1 K2-18,20

K2-13,15 K2-21,23

ON ROOF ON ROOF

K2-8,10

1 PROVIDE NEW 15A, 3-POLE, 600V BREAKER IN EXISTING PANEL PH FOR MAKE UP AIR UNIT. PROVED (4) #12 COPPER IN 3/4" CONDUIT.

KEYNOTES

2 PROVIDE NEW 25A, 3-POLE, 600V BREAKER IN EXISTING PANEL PH FOR CONDENSING UNIT. PROVED (4) #10 COPPER IN 3/4" CONDUIT.

3 EXISTING 500A, 208/120Y 3 PHASE SQUARE D I-LINE PANEL BOARD. PROVIDE NEW 100A, 3-POLE BREAKER TO FEED NEW PANEL AF.

4 NEW 225A (100A FEED), 42 SPACE, 3-PHASE, 208/120Y SQUARE D, QO PANEL BOARD. FEED FROM EXISTING PANEL SDP-3 IN 1-1/4" EMT CONDUIT WITH (4) #3 COPPER + (1) #8 COPPER GROUND. SURFACE MOUNT PANEL WITH DOOR-IN-DOOR COVER.

5 RE-USE EXISTING CIRCUIT AND DISCONNECT FOR NEW DISHWASHER. PROVIDE NEW SEALTITE AND WIRING FROM DISCONNECT TO NEW

DISHWASHER.

6 PROVIDE 3-WAY SWITCH FOR KITCHEN LIGHTS. MODIFY WIRING AS REQUIRED.

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

P R

O

JE

C T

N O

D R

A W

N B

Y

C H

E C

K E

D

A P

P R

O V

E D

D E

S

IG

N E

D B

Y w w w .u p e a .c o m

IS

S

U E

D F

O R

D

A T

E

P

H -0

H o u g h to n T w p S c h o o ls

-K it ch e n E q u ip m e n t R e p la c e m e n t\ D w g s\

E le c tr ic a l\ H

-0

H o u g h to n T w p S c h o o ls

H ig h S c h o o l_

E le c tr ic a l_

R .r v t

/7

/2

:4 :2

P

M

E201

PROPOSED

ELECTRICAL PLAN -

HIGH SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

H O

U G

H T

O N

, M I 4

H -0

S P

K C

K C

S P

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

1/4" = 1'-0"A2

PROPOSED KITCHEN ELECTRICAL PLAN

1/4" = 1'-0"A1

PROPOSED WALK-INS ELECTRICAL PLAN

HIGH SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L A

C E

M E

N T

P R

O J E

C T

/0 /2

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

P R

O

JE

C T

N O

D R

A W

N B

Y

C H

E C

K E

D

A P

P R

O V

E D

D E

S

IG

N E

D B

Y w w w .u p e a .c o m

IS

S

U E

D F

O R

D

A T

E

P

H -0

H o u g h to n T w p S c h o o ls

-K it ch e n E q u ip m e n t R e p la c e m e n t\ D w g s\

E le c tr ic a l\ H

-0

H o u g h to n T w p S c h o o ls

H ig h S c h o o l_

E le c tr ic a l_

R .r v t

/7

/2

:4 :2

P

M

E301

PROPOSED PANEL

SCHEDULES - HIGH

SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

H O

U G

H T

O N

, M I 4

H -0

S P

K C

K C

S P

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L

A C

E M

E N

T

H O

U G

H T

O N

P O

R T

A G

E T

O W

N S

H

IP

S C

H O

O L

S

Bold indicates new breaker/circuit.

Note:

Total Connected Load: 9084 VA

Total Amps: 13 A 27 A 40 A

Total Load: 1554 VA 2982 VA 4548 VA

K-41 Milk Cooler, Salad Bar #12 20 1 1236 0 1 20 -- Lunch Room Water Cooler K-42

K-39 0 0 K-40

K-37 30A Floor Receptacle -- 30 2

0 0 2 20 -- Freezer Receptacle (Storeroom)

K-38

K-35 Cold Serving Station - East #12 20 1 972 0 1 20 -- Kitchen Receptacles K-36

K-33 Cold Serving Station - West Wall #12 20 1 972 0 1 20 -- Kitchen Receptacles K-34

K-31 Kitchen Receptacles -- 20 1 0 0 1 20 -- Kitchen Receptacles K-32

K-29 Kitchen Receptacles -- 20 1 0 942 K-30

K-27 Kitchen Receptacles -- 20 1 0 942 2 20 #12 Hot Serving Station - West Wall (GFCI)

K-28

K-25 Oven Receptacle -- 20 1 0 942 K-26

K-23 Oven Receptacle -- 20 1 0 942 2 20 #12 Hot Serving Station - East (GFCI)

K-24

K-21 E Wall N corner & Lunch RM -- 20 1 0 612 K-22

K-19 E Wall N corner & Lunch RM -- 20 1 0 612 2 20 #12 3' Slant Merchandiser - East

K-20

K-17 E Wall N corner & Lunch RM -- 20 1 0 456 K-18

K-15 Oven Receptacle -- 20 1 0 456 2 20 #12 Open Display Merchandiser - East

K-16

K-13 Oven Receptacle -- 20 1 0 0 K-14

K-11 Serving Room Outlets -- 20 1 0 0 K-12

K-9 Serving Room Outlets -- 20 1 0 0

3 70 -- Dishwasher

K-10

K-7 Serving Room Outlets -- 20 1 0 0 K-8

K-5 Serving Room Outlets -- 20 1 0 0 K-6

K-3 Serving Room Outlets -- 20 1 0 0

3 30 -- Disposal

K-4

K-1 K-2

CKT Circuit Description Wire Brkr Size

Brkr Poles

Phase A Load

(VA)

Phase B Load

(VA)

Phase C Load

(VA)

Brkr Poles

Brkr Size Wire Circuit Description CKT

1. Electrical Contractor shall verify all equipment requirements prior to ordering breakers.

2. Electrical Contractor is responsible to verify all circuits prior to starting work. Update/revise schedule to reflect actual work performed.

Notes:

Enclosure: Type 1 Manufacturer: Square D

Mounting: Recessed Wires: 4 Mains Rating: 150 A

Supply From: Phases: 3 Mains Type: Main Breaker

Location: Volts: 120/208 Wye A.I.C. Rating: 10kA

Branch Panel: EXISTING PANEL K - UPDATED

Legend:

Total Connected Load: 16994 VA

Total Amps: 48 A 47 A 48 A

Total Load: 5689 VA 5616 VA 5689 VA

K2-41 K2-42

K2-39 K2-40

K2-37 K2-38

K2-35 K2-36

K2-33 K2-34

K2-31 K2-32

K2-29 0 K2-30

K2-27 Spare -- 20 A 2

0 K2-28

K2-25 Spare -- 20 A 1 0 K2-26

K2-23 1248 0 K2-24

K2-21 Cooler Condensing Unit #12 20 A 2

1248 0 2 30 A -- Spare

K2-22

K2-19 948 1123 K2-20

K2-17 5' Slant Merchandiser - West #12 20 A 2

948 1123 2 20 A #12 Freezer Evaporator

K2-18

K2-15 2080 0 1 20 A -- Spare K2-16

K2-13 Freezer Condensing Unit #8 40 A 2

2080 942 K2-14

K2-11 456 942 2 20 A #12 Hot Serving Station - Lunch Room

K2-12

K2-9 Open Display Merchandiser - West #12 20 A 2

456 500 K2-10

K2-7 Spare -- 20 A 1 0 500 2 20 A #12 Heat Trace (GFI)

K2-8

K2-5 Cold Serving Station - Lunch Room #12 20 A 1 972 0 1 20 A -- Spare K2-6

K2-3 Receptacle - Roof #12 20 A 1 180 1152 1 20 A #12 Cold Serving Station - Lunch Room K2-4

K2-1 Cooler Evaporator #12 20 A 1 96 0 1 20 A -- Spare K2-2

CKT Circuit Description Wire Brkr Size

Brkr Poles A B C

Brkr Poles

Brkr Size Wire Circuit Description CKT

Notes:

Enclosure: Type 1 Manufacturer: Square D

Mounting: Surface Wires: 4 Mains Rating: 225 A

Supply From: EXISTING PANEL SDP-3 Phases: 3 Mains Type: MLO

Location: Volts: 120/208 Wye A.I.C. Rating: 10 kA

Branch Panel: PANEL K2

HIGH SCHOOL

K

IT

C H

E N

E Q

U

IP

M E

N T

R E

P L A

C E

M E

N T

P R

O J E

C T

/0 /2

A601 A4

EX. ELECTRICAL PANELS.

SEE KEYNOTE 4.

1 REMOVE EXISTING DISHWASHER BOOSTER HEATER. RE-USE THE EXISTING ELECTRICAL FEED FOR THE NEW DISHWASHER BOOSTER HEATER. PROVIDE NEW 100A, 3-POLE, NEMA 3 DISCONNECT LOCATED UNDER THE DISHTABLE FOR THE NEW DISHWASHER. EXTEND FEED AS REQUIRED AND PROVIDE NEW SEALTITE AND WIRING FROM THE DISONNECT TO THE NEW

DISHWASHER.