This document is an Advertisement for Bids related to a Kitchen Equipment Replacement project for the Houghton-Portage Township Schools located in Houghton, Michigan. The project involves the provision of food service equipment for two school locations, with bids to be accepted until 4:00 PM EST on February 21, 2024. The equipment will be unloaded and installed by contractors on site, with the exception of the Walk-In Cooler and Freezer, which will include installation, refrigeration, condensers, line sets, startup, and shelving installation. The Owner reserves the right to accept any or all bids, in whole or in part.
The bid breakdown requires pricing by piece with accessories, including all delivery charges and applicable sales/use taxes. The equipment is to be delivered by June 14, 2024, though the Owner can take receipt prior to this date. Bidders are asked to indicate the anticipated delivery date with their itemized bid. The project specifications provide details on the Kitchen Equipment Schedule, Mechanical and Plumbing requirements, and Electrical work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Houghton Portage Township Schools Addendum Kitchen Equipment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advertisement for Bids
Project: Houghton Schools Kitchen Equipment Replacement
Owner :
Houghton-Portage Township Schools
1603 Gundlach Road Houghton, Michigan 49931
Architect:
U.P. Engineers and Architects, Inc (UPEA)
100 Portage Street
Houghton, Michigan 49931
Bids will be accepted by Houghton-Portage Township Schools for the provision of food service equipment for (2) school locations by the District in the City of Houghton. Bids will be accepted until
4:00 E.S.T. on February 21st, 2024 at the office of the Superintendent. Emailed bids are acceptable provided they are received prior to the bid deadline.
Emailed bids shall be sent to:
sturnquist@hpts.us and also tsepp@up.net
Bids shall be broken down by piece with accessories, and shall include all delivery charges, and all applicable sales and use taxes. The equipment will all be unloaded and installed by contractors on site.
Note: All kitchen equipment shall be supply only, including delivery and applicable taxes, with the exception of the Walk-In Cooler and Freezer: which shall include erection and installation of the units, including line sets, condensers, compressors, startup and shelving installation. Power and condensate drains by others.
Note also: Both dishwashers being supplied shall include factory startup and commissioning, including all chemicals as necessary and owner’s training.
The Owner reserves the right to accept any or all bids, in whole or in part, and also herein reserves the right to waive any informalities or irregularities in any or all bids and to make the award as it deems, in its sole discretion, to be in the best interest of the owner.
All equipment shall be delivered to the district by June 14th, 2024 Please indicate anticipated delivery date on your itemized bid. The school can take receipt of equipment prior to this date.
Houghton-Portage Township School District
Mr. Anders Hill, Superintendent mailto:sturnquist@hpts.us mailto:tsepp@up.net
BUILDING CODE SUMMARY
USE GROUP: E
CONSTRUCTION TYPE: II-B
BUILDING AREA TO BE RENOVATED: APPROXIMATELY 1000 SF.
G5
30 65
17 139
55 52
CEDARVILLE
HESSEL
WHITEFISH
POINT
SAULT
STE
MARIE
NATIONAL PARK
ISLE ROYALE
NORWAY
MARENISCO
WHITE PINE
BERGLAND
NEWBERRY
SILVER
CITY
BESSEMER
IRONWOOD
WAKEFIELD
GREEN BAY
GWINN
HERMANSVILLE
MENOMINEE
IRON MOUNTAIN
VULCAN
CASPIAN
TROUT
WATERSMEET
CREEK
CROSSING
MASS
CITY
BRUCE
ONTONAGON
ROCKLAND BARAGA
ARNHEIM
CRYSTAL
FALLS
ISHPEMING
MICHIGAMME
L'ANSE
AURA
SKANEE
MARQUETTE
NEGAUNEE
MANISTIQUE
ESCANABA
FAYETTE
GARDEN
MUNISING
CURTIS
CITY
GOULD
HARBOR
CALUMET
RIPLEY
HOUGHTON
CHASSELL
HANCOCK
DELAWARE
LAKE
LINDEN
LAURIUM
EAGLE
HARBOR
COPPER
MACKINAC
ISLAND
IGNACE
ST
INDIAN
RIVER
CHEBOYGAN
MACKINAW CITY
PELSTON
ONAWAY
GAYLORD
PETOSKEY
CHARLEVOIX
MANCELONA
KALKASKA
TRAVERSE
CITY
EMPIRE
ELBERTA
ARCADIA
MANISTEE
SCOTTVILLE
BALDWINLUDINGTON
SHELBY
BIG RAPIDS
MOUNT
PLEASANT
CADILLAC
GRAYLING
EAST
TAWAS
ROSCOMMON
LACHINE ALPENA
WOLVERINE
ATLANTA
ROGERS CITY
ALANSON
CROSS
VILLAGE
BOYNE CITY
BELLAIRE
JORDAN
E.
EASTPORT
NORTHPORT
LELAND
BUCKLEY
FIFE
LAKE
FRANKFORT
MESICK
MANTON
BEAR
LAKE
LILLEY
HESPERIA
WHITE
CLOUD
EVART
REMUS
MIDLAND
SAGINAW
BAY
CITY
HARRISVILLE
CURRAN
MIO
OSCODA
TAWAS CITY
WEST
BRANCH
STANDISH
GLADWIN
McBAIN
LAKE CITY
CLARE
CARO
TROUT LAKE
BREVORT
IRON RIVERBRULE
WASHBURN
POPLAR
ASHLAND
PORT WING BAYFIELD
ODARRAH
MELLEN
UPSON
HURLEY
GLIDDEN
PARK FALLS
CLAM LAKE
MERCER
PRESQUE
ISLE
LAND O'LAKES
EAGLE
RIVER
PHELPS
FLORENCE
NIAGRA
CRANDON
SUPERIOR
HAYWARD
MINONG
CABLE
SHELL LAKE
GRANTSBURG
BALSAM
LAKE BARRON
MENOMONIE
DURAND
ALMA
WHITEHALL
BLACK
RIVER
FALLS
SPARTA
LA CROSSE
FRIENDSHIP
MONTELLO
WAUTOMA
GREEN
LAKE
FOND DU LAC
OSHKOSH
APPLETON
DE PERE
GREEN BAY
KEWAUNEE
STURGEON BAY
MARINETTE
OCONTO
SHAWANO
KESHENA
WAUSAU
STEVENS
POINT
WAUPACA
RHINELANDERPHILIPS
MEDFORD
MERRILL
ANTIGO
EAU CLARE
LADYSMITH
THREE
LAKES
MICHIGAN
WISCONSIN
LAKE
MICHIGAN
LAKE
SUPERIOR
HURON
LAKE
100 PORTAGE STREET
HOUGHTON, MI 49931
P (906) 482-4810 F (906) 482-9799
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
U.P. ENGINEERS &
ARCHITECTS, INC.
2906 N. STEPHENSON AVE, SUITE 2
IRON MOUNTAIN, MI 49801
P (906) 779-0937 F (906) 779-0947
424 S. PINE ST.
ISHPEMING, MI 49849
P (906) 485-1011 F (906) 485-1013
1701 DUNLAP AVE., SUITE B
MARINETTE, WI 54143
P (715) 732-4188 F (715) 732-4189
707 ASHMUN STREET
SAULT STE. MARIE, MI 49783
P (906) 635-0511 F (906) 635-0612
P R
O
JE
C T
N O w w w .u p e a .c o m
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n T w p S c h o o ls
-K it c h e n E q u ip m e n t R e p la c e m e n t\
D w g s \H
-0
H o u g h to n T w p S c h o o ls
H ig h S ch o o l_
R .r v t
/8
/2
:4 :5
A
M
KITCHEN EQUIPMENT REPLACEMENT
HOUGHTON PORTAGE TOWNSHIP SCHOOLS
G001
COVER SHEET
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
HOUGHTON, MI 49931
SHEET INDEX
NUMBER SHEET NAME
A101 AREA OF WORK PLAN - HIGH SCHOOL
A201 KITCHEN FLOOR PLAN - HIGH SCHOOL
M001 MECHANICAL AND PLUMBING ABBREVIATIONS AND SYMBOLS
M101 OVERALL EXISTING MECHANICAL PLAN - HIGH SCHOOL
M401 ENLARGED MECHANICAL/ PLUMBING PLAN - HIGH SCHOOL
M501 MECHANICAL DETAILS & SCHEDULES - HIGH SCHOOL
E001 ELECTRICAL ABBREVIATIONS
E101 AREA OF WORK PLAN - HIGH SCHOOL
ED201 ENLARGED EXISTING ELECTRICAL PLAN - HIGH SCHOOL
E201 PROPOSED ELECTRICAL PLAN - HIGH SCHOOL
E301 PROPOSED PANEL SCHEDULES - HIGH SCHOOL
A601 KITCHEN FLOOR PLAN - ELEMENTARY
PROJECT LOCATION
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L A
C E
M E
N T
P R
O J E
C T
/0 /2
A201 A2
A201 A1
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n T w p S c h o o ls
-K it c h e n E q u ip m e n t R e p la c e m e n t\
D w g s \H
-0
H o u g h to n T w p S c h o o ls
H ig h S ch o o l_
R .r v t
/7
/2
:3 :1
P
M
A101
AREA OF WORK
PLAN - HIGH
SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
1" = 30'-0"A1
AREA OF WORK PLAN
NORTH
HIGH SCHOOL
GENERAL NOTES:
1. DO NOT ROUGH-IN FROM THE DRAWINGS. REFER TO F.S.E.C. DIMENSIONED ROUGH-IN DRAWINGS FOR ACTUAL REQUIREMENTS.
2. PLUMBING CONTRACTOR (PC) AND ELECTRICAL CONTRACTOR (EC) SHALL MAKE FINAL CONNECTIONS BETWEEN EQUIPMENT AND ROUGH-IN POINT, AND PROVIDE ALL WIRING, SERVICE VALVES, PIPING, ETC AS REQUIRED.
3. TRADES SHALL INSTALL ALL ACCESSORIES (FAUCETS, DRAINS, SWITCHES, VALVES, GAS HOSES, ETC.) FURNISHED BY F.S.E.C.
4. GENERAL TRADES SHALL PROVIDE WALL, FLOOR, OR ROOF PENETRATIONS.
KITCHEN EQUIPMENT SUPPLY PACKAGE BID CLARIFICATIONS:
1. KITCHEN EQUIPMENT SHALL BE SUPPLY ONLY, INCLUDING DELIVERY AND APPLICABLE TAXES; WITH THE EXCEPTION OF THE COOLER AND FREEZER, WHICH SHALL INCLUDE INSTALLATION, REFRIGERATION, CONDENSERS, LINE SETS, STARTUP AND SHELVING INSTALLATION.
2. WALK-IN COOLER AND FREEZER SHALL HAVE STAINLESS SHROUD PANELS FROM THE TOP OF THE UNIT TO THE SUSPENDED CEILING, WHICH IS AT 12’.
3. WALK-IN COOLER AND FREEZER SHALL HAVE INTERIOR RAMPS AND INSULATED FLOORS.
4. POWER TO WALK-INS BY OTHERS, ALONG WITH CONDENSATE PIPING.
5. SUPPLY OF BOTH DISHWASHERS SHALL INCLUDE START-UP, CHEMICALS, COMMISSIONING AND TRAINING FOR STAFF. SETTING BY GENERAL CONTRACTOR.
6. HOT AND COLD FOOD SERVING CARTS SHALL INCLUDE SNEEZE GUARDS AND DROP-DOWN TUBULAR TRAY SLIDES; EXCEPT FOR (1) ITEM #1 COLD SERVING AND (1) ITEM #3 HOT SERVING WILL HAVE 1-SIDED SNEEZE
GUARDS AND DROP-DOWN TUBULAR TRAY SLIDES ON ONE SIDE ONLY. ITEM #2 AND (1) ITEM #3 SHALL HAVE SNEEZE GUARDS ON ONE SIDE ONLY, DROP-DOWN TUBULAR TRAY SLIDES ON BOTH SIDE.
7. HOT AND COLD FOOD SERVING SHALL BE INTERIOR SELF-DRAINING, AND SHALL INCLUDE A SHELF BELOW, CASTERS, AND NO SHROUDING FOR THE BASE. ALL STAINLESS STEEL CONSTRUCTION.
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L A
C E
M E
N T
P R
O J E
C T
/0 /2
/1
5' - 0"
REMOVE PORTION OF EXISTING WALL FOR PASS THROUGH
SHELF. OPENING TO BE 3'-0" TALL.
KITCHEN
LUNCH ROOM
LUNCH ROOM ALCOVE
PROPOSED
COOLER AND
FREEZER
3/16" = 1'-0"A2
KITCHEN FLOOR PLAN
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n T w p S c h o o ls
-K it c h e n E q u ip m e n t R e p la c e m e n t\
D w g s \H
-0
H o u g h to n T w p S c h o o ls
H ig h S ch o o l_
R .r v t
/7
/2
:3 :1
P
M
A201
KITCHEN FLOOR
PLAN - HIGH
SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
T S
K C
T S
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
KITCHEN EQUIPMENT SCHEDULE
NUMBER DESCRIPTION MFR MODEL VOLTS PHASE WATTS AMPS WATER SANITARY REMARKS
1 COLD FOOD SERVING STATION VOLLRATH 37075 120 1 8.1 PROVIDE WITH BREATH GUARD WITH LIGHTS AND TUBULAR TRAY SLIDE.
2 COLD FOOD SERVING STATION VOLLRATH 37065 120 1 8.1 PROVIDE WITH BREATH GUARD WITH LIGHTS AND TUBULAR TRAY SLIDE.
3 HOT FOOD SERVING STATION VOLLRATH 37050 120/208 1 15.7 PROVIDE WITH BREATH GUARD WITH LIGHTS AND TUBULAR TRAY SLIDE.
4 3' WORK TABLE REGENCY 600TSB3036S
5 5' WORK TABLE REGENCY 600TSB3060S
6 DUAL SHELF 3' SLIDE MERCHANDISER HATCO GR2SDS-30D 120/208 1 2440 10.2 NEMA L14-20P
7 DUAL SHELF 5' SLIDE MERCHANDISER HATCO GR2SDS-54D 120/208 1 3780 15.8 NEMA L14-20P
8 OPEN DISPLAY MERCHANDISER TRUE TOAM-48-HC-TSL01 208-230 1 7.6 NEMA 6-15P
9 MILK COOLER BEVERAGE-AIR ABC7G-NATP 120 1 2.2 NEMA 5-15P
10 30"x72" WORK TABLE REGENCY 600EBT3096
11 DRYING RACK BY OWNER
12 CART EXISTING EXISTING TO REMAIN
13 DISH TABLE EXISTING EXISTING TO REMAIN
14 LOW TEMP CHEMICAL DISHWASHER AMERICAN DISH SERVICE ADC-44 208 3 8.0 KW 60 YES/EXISTING YES/EXISTING CHEMICAL SANITIZING
15 SHELVING EXISTING EXISTING TO REMAIN
16 REFRIGERATOR EXISTING EXISTING TO REMAIN
17 TYPE 1 HOOD EXISTING EXISTING TO REMAIN
18 CONVECTION OVEN EXISTING EXISTING TO REMAIN
19 HAND SINK EXISTING EXISTING TO REMAIN
20 POINT OF SALE EXISTING 120 1 RELOCATED FROM ELEMENTARY SCHOOL
21 PASS THROUGH SHELF EAGLE GROUP PTS-1836
22 VENDING MACHINE WITH MEAL MAGIC BY OWNER INSTALLED BY G.C
23 WALK-IN COOLER/FREEZER COMBO THERMALRITE 16'X12' OVERALL DIMENSIONS. 4" INSULATED FLOOR. 88" WALLS. 4" CEILING
24 WALK-IN COOLER CONDENSING UNIT RUSSELL RFO250L4SDANT 208-230 1 20.4 PROVIDE WITH LOW AMBIENT COOLING DOWN TO -40°F. LOCATED ON ROOF
25 WALK-IN COOLER EVAPORATOR RUSSELL RL6E077DDARE 208-230 1 9.8 PROVIDE WITH DEFROST MODE
26 WALK-IN FREEZER CONDENSING UNIT RUSSELL RFO060M4SDAALNT 208-230 1 15 PROVIDE WITH LOW AMBIENT COOLING DOWN TO -40°F. LOCATED ON ROOF
27 WALK-IN FREEZER EVAPORATOR RUSSELL RL6A052ADARE 115 1 0.8
3/16" = 1'-0"A1
COOLER/ FREEZER FLOOR PLAN
HIGH SCHOOL
GENERAL NOTES:
1. GENERAL CONTRACTOR SHALL RELOCATE ALL OLD EQUIPMENT TO HPTS ONSITE STORAGE AS DIRECTED BY THE
OWNER'S REP EXCEPT AS LISTED BELOW.
2. CONTRACTOR SHALL DISPOSE OF THE DISHWASHERS (BOTH BUILDINGS), STEAMER (ELEMENTARY), AND PASS
THROUGHS (ELEMENTARY).
3. GENERAL CONTRACTOR SHALL RELOCATE THE EXISTING POS STATION FROM THE ELEMENTARY SCHOOL TO THE HIGH
SCHOOL.
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L A
C E
M E
N T
P R
O J E
C T
/0 /2
STM
STM
PLUMBING PIPING MECHANICAL PIPING
DUCTWORK
CDS
CDR
CHWS
CHWR
CDS
CDR
CHWR
CHWS
AIR
ST
G
G
AIR
HWR
HWR
HWS
HWS
FP
FP
C
C
ST
V
V
SAN
HWC
SAN
EA24x14
EA24x14
EA24x14
HW
CW
HWC
OA24x14
OA24x14
OA24x14
RA24x14
SA24x14
SA24x14
S D
SA24x14
RA24x14
RA24x14
CW
HW
STM
CDR
CDS
CHWR
CHWS
HWR
HWS
G
AIR
FP
C
ST
CW
V
SAN
HWC
HW
HYDRONIC HOT WATER SUPPLY - NEW
HYDRONIC HOT WATER SUPPLY - EXISTING
HYDRONIC HOT WATER SUPPLY - DEMO
HYDRONIC HOT WATER RETURN - NEW
HYDRONIC HOT WATER RETURN - EXISTING
HYDRONIC HOT WATER RETURN - DEMO
COMPRESSED AIR - NEW
COMPRESSED AIR - EXISTING
COMPRESSED AIR - DEMO
GAS - NEW
GAS - EXISTING
GAS - DEMO
DOMESTIC COLD WATER - EXISTING
DOMESTIC COLD WATER - DEMO
DOMESTIC COLD WATER - NEW
DOMESTIC HOT WATER - EXISTING
DOMESTIC HOT WATER - DEMO
DOMESTIC HOT WATER - NEW
DOMESTIC HOT WATER RECIRC - EXISTING
DOMESTIC HOT WATER RECIRC DEMO
DOMESTIC HOT WATER RECIRC - NEW
SANITARY - EXISTING
SANITARY - DEMO
SANITARY - NEW
VENT - EXISTING
VENT - DEMO
VENT - NEW
STORM - EXISTING
STORM - DEMO
STORM - NEW
CONDENSATE - EXISTING
CONDENSATE - DEMO
CONDENSATE - NEW
FIRE PROTECTION - EXISTING
FIRE PROTECTION - DEMO
FIRE PROTECTION - NEW
ABBREVIATIONS
PIPING "T"
PIPING 90
STRAINER
SYMBOL LEGEND
CAP
NOTES
INLINE PUMP
BALANCE VALVE
PRESSURE RELIEF VALVE
3-WAY CONTROL VALVE
2-WAY CONTROL VALVE
GLOBE VALVE
GATE VALVE
CHECK VALVE
CIRCUIT SETTER
BUTTERFLY VALVE
BALL VALVE
EXHAUST AIR DUCT DOWN
EXHAUST AIR DUCT UP
RETURN AIR DUCT DOWN
RETURN AIR DUCT UP
SUPPLY AIR DUCT DOWN
SUPPLY AIR DUCT UP
AIR FLOW
HUMIDISTAT - 60" A.F.F.
THERMOSTAT - 60" A.F.F.
DUCT SMOKE DETECTOR
MOTORIZED DAMPER
FIRE / SMOKE DAMPER
(RATING DETERMINED BY WALL TYPE)
VOLUME CONTROL DAMPER
SQUARE TO ROUND TRANSITION
RETURN OR EXHAUST REGISTER
SUPPLY REGISTER
RELIEF AIR HOOD - ROOF
FRESH AIR INTAKE HOOD - ROOF
EXHAUST FAN - ROOF
RETURN OR EXHAUST AIR GRILLE
LINEAR DIFFUSER
SUPPLY AIR DIFFUSER PIPE BREAK
PIPE DOWN
PIPE UP
CLEAN OUT
GAS METER
UNION
HOSE BIBB
ELECTRIC BELL
SIAMESE CONNECTION
BARE FIN TUBE ELEMENT
FIN TUBE ELEMENT WITH COVER
EXTERNALLY INSULATED DUCTWORK
INTERNALLY LINED DUCTWORK
SUPPLY AIR DUCT - EXISTING
SUPPLY AIR DUCT - DEMO
SUPPLY AIR DUCT - NEW
RETURN AIR DUCT - EXISTING
RETURN AIR DUCT - DEMO
RETURN AIR DUCT - NEW
OUTSIDE AIR DUCT - EXISTING
OUTSIDE AIR DUCT - DEMO
OUTSIDE AIR DUCT - NEW
EXHAUST AIR DUCT - EXISTING
EXHAUST AIR DUCT - DEMO
EXHAUST AIR DUCT - NEW
CONDENSOR WATER SUPPLY
CONDENSOR WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSOR WATER SUPPLY - DEMO
CONDENSOR WATER SUPPLY - EXIST
CONDENSOR WATER RETURN - DEMO
CONDENSOR WATER RETURN - EXIST
CHILLED WATER SUPPLY - DEMO
CHILLED WATER SUPPLY - EXIST
CHILLED WATER RETURN - DEMO
CHILLED WATER RETURN - EXIST
METER
STEAM - NEW
STEAM - EXISTING
STEAM - DEMO
CONNECTION TO EXISTING
ACCU AIR COOLED CONDENSING UNIT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
AS AIR SEPERATOR
B BOILER
BB BASEBOARD
BC BOOSTER COIL
BDD BACKDRAFT DAMPER
BFG BELOW FINISHED GRADE
BFP BACKFLOW PREVENTER
BHP BRAKE HORSE POWER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BT BATH TUB
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
C CONVECTOR
CA COMPRESSED AIR
CB CATCH BASIN
CC COOLING COIL
CCF 100 CUBIC FEET
CD CEILING DIFFUSER
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFP CLEAN OUT FERRULE AND PLUG
CH CHILLER
CI CAST IRON
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CO CLEAN OUT
CO CARBON MONOXIDE
COND CONDENSATE
CO2 CARBON DIOXIDE
CT COOLING TOWER
CU CONDENSING UNIT
CU FT CUBIC FOOT
CUH CABINET UNIT HEATER
CW COLD WATER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DIFFUSER
DB DRY BULB
DEG F DEGREE FAHRENHEIT
DF DRINKING FOUNTAIN
DI DIGITAL INPUT
DIA DIAMETER
DN DOWN
DO DIGITAL OUTPUT
DWV DRAIN, WASTE AND VENT
EA EACH
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EG EXHAUST AIR GRILLE
ELEV ELEVATION
ER EXHAUST AIR REGISTER
EUH ELECTRIC UNIT HEATER
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
EXH EXHAUST
F FURNACE
FAI FRESH AIR INTAKE
FBO FURNISHED BY OTHERS
FC FAN COIL
FD FLOOR DRAIN
FD FIRE DAMPER
FIN FIN TUBE RADIATION
FLG FLANGE
FP FIRE PROTECTION
FPM FEET PER MINUTE
FT FOOT OR FEET
F&T FLOAT AND THERMOSTATIC TRAP
G GAS (NATURAL)
GAL GALLON
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GT GREASE TRAP
H HYDROGEN
HB HOSE BIBB
HC HEATING COIL
HCO HORIZONTAL CLEANOUT
HP HORSE POWER
HTR HEATER
HVAC HEATING, VENTILATING & AIR COND
HW HOT WATER
HWC HOT WATER RECIRCULATING
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
IE INVERT ELEVATION
IF INLINE FAN
IN INCH OR INCHES
IP IRON PIPE
INV INVERT
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
JC JANITOR'S CLOSET
JS JANITOR'S SINK
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LBS POUNDS
LHWR LOW TEMPERATURE HOT WATER
RETURN
LHWS LOW TEMPERATURE HOT WATER
SUPPLY
LIQ LIQUID (REFRIGERATION)
LV LOUVER
LP PROPANE GAS (LIQUID)
LWT LEAVING WATER TEMPERATURE
M METER
MAU MAKE-UP AIR HANDLING UNIT
MAX MAXIMUM
MB MOP BASIN
MBH BRITISH THERMAL UNITS (1000)
MBTUH BRITISH THERMAL UNITS (1000)
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
MD MOTORIZED DAMPER
MECH MECHANICAL
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT
PROTECTION
OA OUTDOOR AIR
OAI OUTDOOR AIR INTAKE
OC ON CENTER
OD OVERFLOW DRAIN
ODP OPEN DRIP PROOF
OXY OXYGEN
P PUMP
PC PLUMBING CONTRACTOR
PD PNEUMATIC OPERATED DAMPER
PIV POST INDICATING VALVE
PRV PRESSURE REDUCING VALVE
PT PRESSURE TEMPERATURE PLUG
PTAC PACKAGED TERMINAL AIR COND. UNIT
PVAC PROCESS VACUUM
S SINK
SA SUPPLY AIR
SAD SUPPLY AIR DIFFUSER
SAF SUPPLY AIR FAN
SAN SANITARY SEWER
SD SMOKE DETECTOR
SG SUPPLY AIR GRILLE
SH SHOWER HEAD
SHC STEAM HEATING COIL
SR SUPPLY REGISTER
SS STAINLESS STEEL
ST STORM
STM STEAM
SUCT SUCTION (REFRIGERATION)
TCC TEMPERATURE CONTROL CONTRACTOR
TCD TEMPERATURE CONTROL DAMPER
TCP TEMPERATURE CONTROL PANEL
TD TRANSFER DUCT
TG TRANSFER AIR GRILLE
TT THERMOSTATIC TRAP
TYP TYPICAL
UG UNDERGROUND
UH UNIT HEATER
UV UNIT VENTILATOR
V VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME BOX
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VS VENT STACK (SANITARY)
VTR VENT THRU ROOF (SANITARY)
VUV VERTICAL UNIT VENTILATOR
W WASTE
WB WET BULB
WC WATER CLOSET
W/O WITHOUT
WH WATER HEATER
WSHP WATER SOURCE HEAT PUMP
NOTE:
NOT ALL ABBREVIATIONS AND/OR SYMBOLS ARE
USED IN THIS SET OF DOCUMENTS.
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NIC NOT INCLUDED OR NOT IN CONTRACT
NIT NITROGEN
NO NORMALLY OPEN
KW KILOWATT
R REGISTER
RA RETURN AIR
RD ROOF DRAIN
RET RETURN
RF RETURN FAN
RG RETURN AIR GRILLE
RPZ REDUCED PRESSURE ZONE BACKFLOW PREVENTER
RR RETURN REGISTER
RTU ROOF TOP UNIT
MECHANICAL/PLUMBING AND FIRE PROTECTION GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND DO NOT NECESSARILY INDICATE
EVERY OFFSET, VALVE, FITTING, ETC. REQUIRED. CONTRACTOR IS RESPONSIBLE FOR FIELD ROUTING
ALL DUCTWORK AND PIPING AT NO ADDITIONAL COST.
2. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS AND OPERATIONS AND
PERFORM ALL LABOR REQUIRED FOR INSTALLATIONS AS INDICATED THE DRAWINGS, IN THE
SPECIFICATIONS AND AS REQUIRED BY LOCAL, STATE AND FEDERAL CODES, AND AS MAY BE
REASONABLY IMPLIED TO ACCOMPLISH COMPLETE MECHANICAL, PLUMBING AND FIRE PROTECTION
SYSTEMS.
3. ALL ELECTRICAL DISCONNECTS REQUIRED PER NEC CODE SHALL BE FURNISHED AND
INSTALLED BY THE ELECTRICAL CONTRACTOR UNLESS NOTED OTHERWISE.
4. CONTRACTOR SHALL PROVIDE PRODUCTS AS SPECIFIED ON THE DRAWINGS AND
SPECIFICATIONS, HOWEVER, WHERE THE WORDS "EQUAL TO" ARE USED, ADDITIONAL PRODUCTS
MAY BE SUBMITTED AS PROPOSED SUBSTITUTIONS, BUT REQUIRE APPROVAL FROM
ARCHITECT/ENGINEER.
5. DESIGN DRAWINGS SHOW GENERAL ARRANGEMENT AND EXTENT OF WORK. THE DRAWINGS
ARE DIAGRAMMATIC AND MAY NOT NECESSARILY BE DRAWN TO SCALE FOR PURPOSE OF CLARITY AND LEGIBILITY. IT IS INTENDED THAT ALL ITEMS BE LOCATED SYMMETRICALLY WITH ARCHITECTURAL
ELEMENTS WHERE FEASIBLE AND BE INSTALLED TO AVOID OBSTRUCTIONS AND PRESERVE
HEADROOM. CONTRACTOR SHALL REVIEW PLANS OF OTHER TRADES WITH HIS OWN WORK TO AVOID CONFLICTS AND INTERFERENCES. CONTRACTOR MUST MAKE USE OF ALL SOURCES OF INFORMATION
INCLUDING DRAWINGS OF EQUIPMENT FURNISHED BY OTHERS. FAILURE TO REVIEW WORKING
SPACES OR CHECK DIMENSIONS IN QUESTION SHALL NOT WARRANT CONFLICTS.
6. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE COMPLIMENTARY. WHERE DRAWINGS
AND SPECIFICATIONS CONFLICT EACH OTHER, IT IS THE CONTRACTORS RESPONSIBILITY TO GET CLARIFICATION FROM THE ARCHITECT/ENGINEER PRIOR TO BIDDING. FAILURE TO GET CLARIFICATION SHALL NOT RESULT IN ADDITIONAL COST AND THE MORE STRINGENT SHALL BE USED AS INTENDED
BASIS FOR BIDDING.
7. PLANS AND SPECIFICATIONS ARE INTENDED TO CONFORM TO GOVERNING CODES AND
STANDARDS. IF NON-CONFORMITIES ARE DISCOVERED WHILE BIDDING, OR PERFORMING THE WORK IMPLIED, BRING THE SAME TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR CLARIFICATION IN WRITING PRIOR TO SUBMITTING BID OR PROCEEDING WITH WORK. NON-CONFORMITIES OF CODE COMPLIANCE WORK INSTALLED AND CORRECTIONS REQUIRED WITHOUT CONSULTION AND WRITTEN RESPONSE OF SAME BY THE ENGINEER WILL BE THE CONTRACTORS FINANCIAL RESPONSIBILITY.
8. MOTORS SHALL BE PROVIDED BY MECHANICAL CONTRACTOR AS REQUIRED BY THE
EQUIPMENT FURNISHED BY THE MECHANICAL CONTRACTOR. MOTORS TO BE SUITABLE FOR LOAD, DUTY, VOLTAGE, FREQUENCY, HAZARD, SERVICE AND LOCATION INTENDED. SINGLE PHASE MOTORS MUST HAVE INTEGRAL THERMAL OVERLOAD PROTECTION IN ADDITION TO THAT PROVIDED IN MOTOR
CONTROLLERS. MOTORS TO CONFORM IN DESIGN AND PERFORMANCE TO THE MOTOR STANDARDS
OF NEMA. MOTORS RATED FOR CONTINUOUS DUTY UNDER FULL LOAD WITH A MAXIMUM
TEMPERATURE RISE OF 105 DEG F FOR OPEN, 125 DEG F FOR DRIP PROOF AND 130 DEG F FOR
EXPLOSION PROOF AND TOTALLY ENCLOSED TYPES. SUPPLY MOTORS WITH BELT DRIVES WITH
ADJUSTABLE BASES, REMOVABLE BELT GUARDS AND VARIABLE PITCH DRIVE PULLEY SELECTED SO THAT MIDPOINT OF VARIABLE RANGE OF PULLEY WILL DRIVE EQUIPMENT AT RATED SPEED. MOTORS
1 HP AND LARGER SHALL BE THREE PHASE (UNLESS OTHERWISE LISTED).
9. MOTOR CONTROLLERS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR FOR
MOTORS FURNISHED BY THE MECHANICAL CONTRACTOR. MOTOR CONTROLLERS SHALL BE OF SIZES AND TYPES AS NEEDED TO MEET THE OPERATIONAL CONDITIONS AS REQUIRED BY THE SEQUENCE OF OPERATION. ELECTRICAL CONTRACTOR TO FURNISH AND INSTALL THE POWER CIRCUIT, LOCAL
DISCONNECT AND CONNECTION TO MOTOR TERMINALS. MECHANICAL CONTRACTOR TO MOUNT
MOTOR CONTROLLERS AND CONTROL COMPONENTS AND WIRE AND MAKE ALL FINAL CONTROL
CONNECTIONS BETWEEN DEVICES.
10. THE DRAWINGS INDICATE KNOWN UTILITY AND DRAINAGE LINES IN ACCORDANCE WITH THE
INFORMATION FURNISHED TO THE ENGINEER. RESPONSIBILITY FOR LOCATING, UNCOVERING,
DISPOSING OR MAINTAINING ALL EXISTING UTILITY LINES TO REST SOLELY WITH THE CONTRACTOR.
VERIFY LOCATIONS AND DEPTHS OF SERVICE CONNECTION POINTS BEFORE PROCEEDING WITH
CONSTRUCTION.
11. CONTRACTOR SHALL CHECK EXISTING PREMISES BEFORE SUBMISSION OF BIDS TO CHECK
ALL CONDITIONS WHICH MAY EFFECT THE PERFORMANCE OF THE WORK INVOLVED. NO
ALLOWANCES OR EXTRA PAYMENT WILL BE MADE DUE TO CONTRACTOR'S FAILURE TO EXAMINE SITE
AND FULLY DISCERN WORKING CONDITIONS.
12. MECHANICAL CONTRACTOR SHALL RECEIVE, PROPERLY HOUSE, HANDLE, HOIST, AND
DELIVER TO PROPER LOCATION EQUIPMENT AND OTHER MATERIALS REQUIRED FOR THIS CONTRACT.
13. THE CONTRACTOR SHALL OBTAIN PERMITS, ARRANGE FOR INSPECTIONS, AND PAY FEES AND EXPENSES IN CONNECTION THEREWITH, AS A PART OF THE WORK REQUIRING SUCH PERMITS. EVERY
EFFORT IS MADE TO DESCRIBE THE WORK REQUIREMENTS IN CONFORMITY WITH APPLICABLE
CODES.
14. THE CONTRACTOR SHALL REVIEW ANY ALTERNATES OF OTHER TRADES, AND PRICE THEIR BID
TO ACCOUNT FOR ITEMS AFFECTING HIS WORK.
15. PIPING PASSING THROUGH CORRIDORS, TUNNELS, CHASES, ETC. SHALL BE CONSIDERED FOR
PROPER DRAINAGE. CONSULT WITH THE OTHER CONTRACTORS AND AVOID CONFLICT WITH
LOCATION OF PIPING. ORDER OF PRIORITY FOR ALL PIPING AND CONDUITS TO BE INSTALLED SHALL
BE AS FOLLOWS WITH THE HIGHEST PRIORITY LISTED FIRST.
A. PLUMBING DRAIN LINES
B. CONDENSATE LINES
C. DUCTWORK
D. FIRE PROTECTION
E. HOT AND COLD WATER PIPING
F. ELECTRICAL CONDUIT
16. WORK ASSIGNMENTS INFERRED BY THE DRAWINGS AND NOTES INCLUDED IN THESE PROJECT
DOCUMENTS ARE INFORMATIONAL ONLY AND ARE NOT INTENDED TO RELIEVE THE BIDDING
CONTRACTOR OF HIS OBLIGATION TO THE OWNER TO PROVIDE A COMPLETE AND COORDINATED
PROJECT. COMPREHENSIVE SUBCONTRACTOR COORDINATION AND FINAL WORK ASSIGNMENTS TO
SUBCONTRACTORS ARE THE SOLE RESPONSIBILITY OF THE BIDDING CONTRACTOR.
17. ALL DUCTS SERVING SUPPLY, RETURN AND EXHAUST TERMINALS SHALL BE PROVIDED WITH
BALANCE DAMPERS. FOR CLARITY, ALL DAMPERS MAY NOT BE SHOWN ON PLANS.
18. PROVIDE DIELECTRIC UNIONS/CONNECTIONS AT ALL JUNCTIONS OF DISSIMILAR METALS.
M
M
H
T
M
OD
OD
OD
OVERFLOW STORM - EXISTING
OVERFLOW STORM - DEMO
OVERFLOW STORM - NEW
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n T w p S ch o o ls
-K it c h e n E q u ip m e n t R e p la c e m e n t\
D w g s \M e c h a n ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S ch o o l_
M e c h a n ic a l_
R .r v t
/7
/2
:5 :5
P
M
M001
MECHANICAL AND
PLUMBING
ABBREVIATIONS
AND SYMBOLS
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L A
C E
M E
N T
P R
O J E
C T
/0 /2
M401 A1
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n T w p S ch o o ls
-K it c h e n E q u ip m e n t R e p la c e m e n t\
D w g s \M e c h a n ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S ch o o l_
M e c h a n ic a l_
R .r v t
/7
/2
:5 :5
P
M
M101
OVERALL EXISTING
MECHANICAL PLAN
- HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
1" = 30'-0"A2
AREA OF WORK PLAN
NORTH
HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L A
C E
M E
N T
P R
O J E
C T
/0 /2
(TYP)
EX. 2" GAS
1½" G UP
MUA-1
ACCU-1
PD-1
300 CFM
PD-1
300 CFM
PD-1
300 CFM
PD-1
300 CFM
PD-1
300 CFM
RG-1
1500 CFM
SA
RA
16"x16"
"x
10"Ø (TYP FOR PD-1)
21"x20"
12"ø
"ø
VD-1
450 CFM
VD-1
450 CFM
"x
"x
50"x18"
48"x16" 40"x16"
S A
R A
MECHANICAL ROOM ABOVE.
ROUTE EVAPORATOR CONDENSATE PIPING
TO FLOOR DRAIN LOCATED IN MECHANICAL ROOM.
1 REMOVE EXISTING DISHWASHER ROOFTOP EXHAUST FAN AND ASSOCIATED CURB, DUCTWORK, ELECTRICAL, SUPPORTS, AND APPURTENANCES.
TEMPORARILY COVER EXISTING ROOF PENETRATION WATER TIGHT. ROOF PENETRATION TO BE MODIFIED FOR MAKE UP AIR UNIT RETURN DUCT.
KEYNOTES
2 REMOVE EXISTING DIFFUSER AND ASSOCIATED DUCT AND SUPPORTS.
3 REMOVE EXISTING DUCT AND ASSOCIATED SUPPORTS AND DAMPERS. CAP UNUSED OPENINGS.
5 ROOFTOP MOUNTED MAKE UP AIR UNIT: RE-USE/MODIFY EXISTING ROOF PENETRATION FOR RETURN DUCT. PROVIDE NEW PENETRATION FOR SUPPLY DUCT AND GAS PIPING. ALL ROOF PENETRATIONS SHALL BE SEALED WATER TIGHT, BE COMPATIBLE WITH THE EXISTING ROOFING, AND INSTALLED PER MANUFACTURER'S REQUIREMENTS. PROVIDE L3x3x1/4" SUPPORT AROUND NEW SUPPLY DUCT PENETRATION. PERPENDICULAR
SUPPORTS TO THE ROOF TRUSSES SHALL SPAN FROM TRUSS TO TRUSS.
6 ROOFTOP MOUNTED REMOTE CONDENSING UNIT: MOUNT ON (2) 6X6 TREATING BLOCKING THAT SPAN AT LEAST (2) TRUSSES. PROVIDE ROOFING 6" BIGGER ON ALL SIDES UNDER 6X6'S. PROVIDE REQUIRED CLEARANCES OF ALL NEARBY UNITS.
4 DISCONNECT EXISTING PLUMBING FROM DISHWASHER. SALVAGE PLUMBING FOR RE-USE.
7 CONNECT NEW DISHWASHER TO EXISTING PLUMBING. PROVIDE WITH NEW ATMOSPHERIC VACUUM BREAKER ON WATER SUPPLY. PROVIDE AIR
GAP FROM SANITARY TO FLOOR SINK.
8 PROVIDE CONDENSATE PUMP FOR EVAPORATOR UNITS. PROVIDE CONDENSATE PIPING FROM THE PUMP TO THE FLOOR DRAIN LOCATED IN THE
MECHANICAL ROOM. COORDINATE EXACT LOCATION WITH EQUIPMENT AND LAYOUT.
9 PROVIDE STAINLESS STEEL WRAP FOR NEW PASSTHROUGH OPENING. WRAP BOTH SIDES AND TOP WITH MINIMUM 1" RETURN. OPENING IS APPROXIMATELY 3' x 3'.
SEQUENCE OF OPERATIONS
EXISTING KITCHEN EXHAUST HOOD:
THE EXISTING EXHAUST HOOD/FAN SHALL RUN CONTINUOUSLY DURING OCCUPIED HOURS. OCCUPIED HOURS ARE DETERMINED BY AN EXISTING WALL SWITCH LOCATED IN THE KITCHEN.
MAKE UP AIR UNIT:
OCCUPIED HOURS: THE MAKE UP AIR FAN SHALL START ACCORDING TO THE FACTORY SEQUENCE. OUTSIDE AIR DAMPER SHALL OPEN 100% AND THE RETURN AIR DAMPER SHALL CLOSE.
UNOCCUPIED HOURS: THE MAKE UP AIR FAN SHALL START ACCORDING TO THE FACTORY SEQUENCE WHEN A CALL FOR SPACE CONDITIONING OCCURS. THE OUTSIDE AIR DAMPER WILL CLOSE AND THE RETURN AIR DAMPER WILL OPEN TO 100%. UPON SPACE TEMPERATURE SET POINT BEING MET, THE MAKE UP AIR UNIT SHALL SHUT DOWN ACCORDING TO THE FACTORY
SEQUENCE.
HEATING CONTROL:
UPON A CALL FOR SPACE HEATING, THE MICROPROCESSOR CONTROLLER WILL MODULATE THE INDIRECT GAS FURNACE TO MAINTAIN THE SPACE TEMPERATURE SET POINT.
COOLING CONTROL:
UPON A CALL FOR COOLING, THE AIR COOLED CONDENSING UNIT SHALL ACTIVATE ITS FIRST STAGE OF COOLING. IF SPACE TEMPERATURE CAN NOT BE SATISFIED, THE SECOND STAGE
SHALL ACTIVATE.
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n T w p S ch o o ls
-K it c h e n E q u ip m e n t R e p la c e m e n t\
D w g s \M e c h a n ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S ch o o l_
M e c h a n ic a l_
R .r v t
/7
/2
:5 :5
P
M
M401
ENLARGED
MECHANICAL/
PLUMBING PLAN -
HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
1/8" = 1'-0"A1
ENLARGED EXISTING MECHANICAL/ PLUMBING PLAN
1/8" = 1'-0"A3
ENLARGED PROPOSED MECHANICAL/ PLUMBING PLAN
HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L A
C E
M E
N T
P R
O J E
C T
/0 /2
INSULATION
DUCT
OUTSIDE END BEARING
DAMPER BLADE
1/8" CLEARANCE ALL AROUND
1/2" ROUND ROD PIN
INSULATION STANDOFF
HANDLE WITH
LOCKING QUADRANT
INSIDE END BEARING
INSULATION STIFFEN BLADE AS REQUIRED
DAMPER BLADE
HANDLE WITH LOCKING QUADRANT
DUCT
SECTION
SIDE ELEVATION
NOTES:
1. DELETE INSULATION STAND-OFF FOR DUCTWORK WITHOUT EXTERIOR INSULATION.
2. DETAIL SIMILAR FOR ROUND AND MULTI-BLADE DAMPERS.
FINISHED ROOF
24" FACTORY INSULATED ROOF CURB
FLASH INTO ROOF PER
MANUFACTURER
RECOMMENDATIONS
DISCONNECT
SUPPLY AIR TO KITCHEN
MAKE-UP-AIR UNIT (SEE
SCHEDULE)
OUTDOOR AIR INTAKE.
MAINTAIN MINIMUM 10'-0"
CLEARANCE TO ALL
EXHAUST OR VENT
TERMINATIONS.
GAS VALVE
GAS PIPING
POWER SUPPLY
APPROVED PENETRATION
CEILING
TREATED BLOCKING TO MATCH
INSULATION THICKNESS
DUAL WALL TURNING VANES
"D
"R
"R" = 1/2 x "D"
T H
R O
A T
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n T w p S ch o o ls
-K it c h e n E q u ip m e n t R e p la c e m e n t\
D w g s \M e c h a n ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S ch o o l_
M e c h a n ic a l_
R .r v t
/7
/2
:5 :5
P
M
M501
MECHANICAL
DETAILS &
SCHEDULES - HIGH
SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
AIR-COOLED CONDENSING UNIT SCHEDULE
ID MANUFACTURER MODEL NUMBER
GROSS
CAPACITY
(MBH)
NOMINAL
CAPACITY
(TONS)
EER REFRIG. TYPE WEIGHT (LBS)
COMPRESSOR ELECTRICAL
NOTES
TYPE STAGE VOLTS PHASE MCA MOCP
ACCU-1 CARRIER 38AUD 115.7 10 11.2 R410a 516 SCROLL 3 460 3 18 25 1,2,3,4
1. INSTALL PER MANUFACTURER'S REQUIREMENTS.
2. PROVIDE WITH A COMPLETE CONTROL SYSTEM TO INTERLOCK WITH CONNECTED MAEK UP AIR UNIT. COORDINATE WITH CONTROLS CONTRACTOR.
3. COORDINATE ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR.
4. 3-STAGE COMPRESSOR
MAKE UP AIR UNIT SCHEDULE
ID MANUFACTURER MODEL NUMBER DESIGN CONDITIONS HEATING COOLING GAS CONN.
(IN.)
ELECTRICAL WEIGHT (LBS)
AIRFLOW
(CFM)
EXT. STATIC
PRESS. (IN.)
SUMMER
EADB
SUMMER
EAWB
WINTER
EADB
INPUT
CAPACITY
(MBH)
OUTPUT
CAPACITY
(MBH)
TURNDOWN LAT TYPE REFRIGERANT TOTAL
CAPACITY
(MBH)
SENSIBLE
CAPACITY
(MBH)
SUMMER
LADB
SUMMER
LAWB
VOLTS PHASE HP MCA MOCP
MUA-1 GREENHECK IGX-P109-H12-MF-G 1500 0.75 88.4 76.4 -20 200 162 4:1 79.9 DX R-410a 1115.1 55.7 54.8 54.5 3/4" 460 3 1 3.5 15 1405
PROVIDE WITH 24" HIGH INSULATED CURB.
PROVIDE WITH FACTORY CONTROL SYSTEM WITH TEMPERATURE CONTROL BASED ON ROOM TEMPERATURE.
WEATHERHOOD, ALUMINUM MESH FILTERS, LOW-LEAK OUTDOOR AIR DAMPER, ALARM MANAGEMENT, MICROPROCESSOR.
COORDINATE ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR.
DIFFUSER, GRILLE, REGISTER SCHEDULE
ID DESCRIPTION MANUFACTURER MODEL
NUMBER
MOUNTING
FRAME
NECK SIZE
(IN)
MODULE SIZE
(IN)
THROW COLOR MATERIAL Notes
PD-1 PERFORATED SUPPLY DIFFUSER NAILOR 4320S LAY-IN 10"Ø 24 x 24 4-WAY WHITE STEEL 1,2,5
RG-1 CEILING RETURN GRILLE NAILOR 51EC LAY-IN 22 x 22 24 x 24 - WHITE ALUMINUM 1,2,4
VD-1 CEILING SUPPLY DIFFUSER NAILOR 6500 LAY-IN 12"Ø 24 x 24 4-WAY WHITE STEEL 1,2,3
1. BORDER TYPE SHALL BE COMPATIBLE WITH ARCHITECTURAL CEILING TYPE IN WHICH THE DEVICE IS LOCATED.
2. SEE PLAN FOR LOCATIONS AND QUANTITIES OF AIR DEVICES.
3. 18"x18" CORE, 24"x24" FULL FACE LOUVER.
4. 1/2"x1/2"x1/2" EGGCRATE GRID.
5. 4-WAY PERFORATED SUPPLY DIFFUSER.
DUCTWORK INSULATION TYPE SCHEDULE
INSULATION
TYPE
DESCRIPTION
D-1
ASTM C1290, TYPE III, FLEXIBLE GLASS FIBER, COMMERCIAL GRADE WITH FACTORY
APPLIED REINFORCED FOIL JACKET MEETING ASTM C1136, TYPE II, MAX. OPERATING
TEMPERATURE: 250 DEG. F, DENSITY: 1.5 LBS/CU FT.
D-2
ASTM C612, TYPE IA OR IB, RIGID GLASS FIBER, WITH FACTORY APPLIED ALL SERVICE
FACING MEETING ASTM C1136, TYPE II, DENSITY: 6.0 LBS/CU FT.
D-6
ASTM C534, TYPE II, FLEXIBLE, CLOSED CELL ELASTOMERIC INSULATION, SHEET,
SERVICE TEMPERATURE RANGE: MINUS 58 TO 180 DEG F.
DUCTWORK INSULATION SCHEDULE
SYSTEM TYPE
INSULATION
TYPE
INSULATION OR
LINER
THICKNESS
SUPPLY DUCTS (EXTERNALLY INSULATED) D-1, D-2, D-6 1-1/2"
NOT TO SCALEC2
KITCHEN HOOD - MUA DETAIL
NOT TO SCALEB3
ACCEPTABLE DUCT TURNS
NOT TO SCALEC4
VOLUME DAMPER DETAIL
HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L A
C E
M E
N T
P R
O J E
C T
/0 /2
FAAP
FACP
ELECTRICAL ABBREVIATIONS, SYMBOLS AND NOTES
ABBREVIATIONS AND SYMBOLS LEGEND NOTES & DETAILS
ELR
CARBON MONOXIDE DETECTOR
1. IT SHALL BE THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO NOTIFY OTHER
CONTRACTORS TO ARRANGE CLEARANCES AND ACCESS OPENINGS FOR ALL LARGE ELECTRICAL
EQUIPMENT.
2. IT SHALL BE UNDERSTOOD THAT THE ACT OF SUBMITTING A BID BY THE CONTRACTOR
CARRIES WITH IT THE AGREEMENT TO ALL ITEMS AND CONDITIONS REFERRED OR INDICATED OR
IMPLIED ON THE DRAWINGS AND THE SPECIFICATIONS AND NO CONSIDERATION WILL BE
GRANTED FOR ANY ALLEGED MISUNDERSTANDING OF MATERIALS TO BE FURNISHED FOR WORK
TO BE DONE.
3. THE ELECTRICAL INSTALLATION SHALL COMPLY WITH RULES AND REGULATIONS OF THE
LATEST EDITION OF THE OCCUPATIONAL SAFETY AND HEALTH ACT, NATIONAL ELECTRICAL CODE, STATE ELECTRICAL CODE, LOCAL MUNICIPAL CODE AND ANY OTHER BOARD HAVING
JURISDICTION OVER THE ELECTRICAL INSTALLATION.
4. THE ELECTRICAL CONTRACTOR SHALL NOT ASSUME THAT ANY DRAWING OR
SPECIFICATION FORMING A PART OF THE CONTRACT DOCUMENTS AUTHORIZES THE VIOLATION
OF ANY CODE, REGULATION OR STANDARD. WHERE CONFLICTS ARISE, IT SHALL BE DEEMED THAT
THE CONTRACTOR HAS ESTIMATED THE COST OF ALL WORK TO BE COMPLETED IN ACCORD WITH
THE PREVAILING CODE.
5. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR ELECTRICAL WORK AND
SHALL PAY ALL REQUIRED FEES AND SALES OR USE TAX AND FINES AS APPLICABLE TO THIS
BRANCH OF WORK.
6. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL DELIVER TO THE OWNER
WITHOUT COST ALL REQUIRED CERTIFICATES OF INSPECTION AND APPROVAL.
7. THE INTENT AND OBJECT OF THESE SPECIFICATIONS AND DRAWINGS IS TO INCLUDE A
COMPLETE WIRING SYSTEM FROM SERVICE PANEL TO EACH AND EVERY OUTLET INDICATED OR
SPECIFIED, INCLUDING CONNECTING ALL ELECTRICAL DEVICES AND/OR EQUIPMENT FURNISHED
BY THE OWNER OR OTHER CONTRACTORS.
8. THE DRAWINGS, WHICH CONSTITUTE A PART OF THE CONTRACT, ARE DIAGRAMMATIC AND
INDICATE THE GENERAL ARRANGEMENT OF CIRCUITS AND OUTLETS, LOCATION OF SWITCHES,
PANELBOARD AND OTHER WORK, BUT EXTREME ACCURACY IS NOT GUARANTEED AND FIELD
VERIFICATION OF ALL LOCATIONS AND DIMENSIONS IS DIRECTED.
9. GROUND ALL EQUIPMENT INCLUDING CONDUIT, RECEPTACLES, LIGHTING, MOTORS, PIPING
AS PER ARTICLE 250 OF THE NATIONAL ELECTRICAL CODE, AND AS SHOWN ON THESE DRAWINGS.
10. PROVIDE ONLY MATERIALS THAT ARE NEW OF THE TYPE AND QUALITY SPECIFIED, WHERE
UNDERWRITERS LABORATORIES HAVE ESTABLISHED STANDARDS FOR SUCH MATERIALS,
PROVIDE ONLY MATERIALS BEARING THE U.L. LABEL.
11. ARCHITECTURAL DRAWINGS SHOWING DIMENSIONS FOR ELECTRICAL DEVICES TAKE
PRECEDENCE OVER THE ELECTRICAL DRAWINGS.
12. SYSTEMS SHALL BE FREE FROM SHORTS AND GROUNDS. TEST FOR MECHANICAL AND
ELECTRICAL DEFECTS. VERIFY CORRECT CONNECTION OF HOT, NEUTRAL AND GROUND
CONDUCTORS. ALL CONDUCTORS SHALL BE COLOR CODED AND LABELED WITH ZONE
IDENTIFICATION FOR THE CASE OF LIGHTING.
13. WHEN MATERIAL AND/OR WORKMANSHIP IS FOUND NOT TO COMPLY WITH THE SPECIFIED
REQUIREMENTS, WITHIN THREE DAYS AFTER RECEIPT OF NOTICE OF SUCH NON-COMPLIANCE,
REMOVE THE NON-COMPLYING ITEMS FROM THE JOB AND REPLACE WITH NEW ITEMS MEETING
THE REQUIREMENTS. COSTS FOR REPAIR OF NON-COMPLIANCE WORK SHALL BE BY THE
CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER.
14. UPON COMPLETION OF THE WORK, THOROUGHLY CLEAN ALL DEVICES AND EQUIPMENT.
15. ALL TELECOM, TV CABLE AND DATA CABLE SHALL BE DEDICATED RUNS FROM THE OUTLET
LOCATIONS TO THE BACKBOARD LOCATION.
16. WORK ASSIGNMENTS INFERRED BY THE DRAWINGS AND NOTES INCLUDED IN THESE
PROJECT DOCUMENTS ARE INFORMATIONAL ONLY AND ARE NOT INTENDED TO RELIEVE THE
BIDDING CONTRACTOR OF HIS OBLIGATION TO THE OWNER TO PROVIDE A COMPLETE AND
COORDINATED PROJECT. COMPREHENSIVE SUBCONTRACTOR COORDINATION AND FINAL WORK
ASSIGNMENTS TO SUBCONTRACTORS ARE THE SOLE RESPONSIBILITY OF THE BIDDING
CONTRACTOR.
LUMINARE - SURFACE MOUNT FLUORESCENT OR INCANDESCENT
LUMINARE - RECESSED FLUORESCENT OR INCANDESCENT
LUMINARE - STANDARD FLUORESCENT STRIP LIGHT
LIGHT FIXTURE - RECESSED FLUORESCENT OR LED
HEAT DETECTOR
DUAL LEVEL SWITCHING - SWITCH OUTER (2) LAMPS SEPARATE
FROM CENTER LAMP
FIRE ALARM HORN/STROBE (CEILING MOUNTED)
FIRE ALARM BOOSTER PANEL
FIRE ALARM SPEAKER
END OF LINE RESISTOR
FIRE ALARM HORN/STROBE (WALL MOUNTED)
MAGNETIC DOOR HOLD OPEN
GONG
DUCT SMOKE DETECTOR
TAMPER SWITCH
FLOW SWITCH
FIRE ALARM HORN/STROBE (WALL MOUNTED)
MANUAL PULL STATION
SMOKE DETECTOR
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
FIRE SAFETY AND ALARM SYMBOLS
GENERAL NOTES:
PHOTO CELL
OCCUPANCY SENSOR (WALL MOUNTED)
PANEL - RECESSED
PANEL - SURFACE MOUNT
AUTOMATIC TRANSFER SWITCH (ATS)
DISCONNECT
NORMALLY OPEN SWITCH
NORMALLY CLOSED SWITCH
CIRCUIT BREAKER WITH SIZE AS NOTED
NORMALLY OPEN CONTACT
NORMALLY CLOSED CONTACT
FUSED SWITCH
ELECTRIC METER
GROUND
IN-LINE FUSE
TRANSFORMER
STARTER DISCONNECT
THERMOSTAT
CONNECTION TO MOTOR
FUSED DISCONNECT
DISCONNECT
TELEPHONE/DATA OUTLET. PROVIDE 1"CONDUIT WITH PULL
STRING PER LOCATION. DATA CABLES AND TERMINATIONS BY
OTHERS.
SWITCH - PILOT
SWITCH - DIMMER
TYPICAL DEVICE MOUNTING HEIGHT
NOTE:
VERIFY HEIGHTS SHOWN COMPLY WITH LOCAL BUILDING CODE.
47"
1'-6"
6"
MAX.
SYMBOL
EXIT
BOTTOM OF
FINISHED CEILING
SYMBOL
FIRE ALARM
SYMBOL
LIGHTING SWITCH
SYMBOL
120V CONVENIENCE
RECEPTACLE
SYMBOL
TELEPHONE AND
COMPUTER
TOP OF FINISHED FLOOR
47"
6'-8"SYMBOL
FIRE ALARM
MANUAL PULL
STATION
OCCUPANCY SENSOR (CEILING MOUNTED)
ABBREVIATIONS
LIGHTING SYMBOLS
SWITCH - PUSH BUTTON
SWITCH - TIME CLOCK
SWITCH - SINGLE POLE, TIMED
SWITCH - SINGLE POLE, KEYED
SWITCH - FOUR WAY
SWITCH - THREE WAY
SWITCH - SINGLE POLE
A AMPERES
AV PANELBOARD AV
AV AUDIO/VIDEO
A/V AUDIO/VIDEO
C PANELBOARD KPP-C
C.B. CIRCUIT BREAKER
GFCI GROUND FAULT CIRCUIT INTERUPTING
GFI GROUND FAULT CIRCUIT INTERUPTING
KVA KILO-VOLT AMPS (ELECTRIC POWER)
QT QUAD TUBE (FLUORESCENT LAMP)
TT TWIN TUBE (FLUORESCENT LAMP)
TYP TYPICAL
V VOLT
4W FOUR WIRE
3ø THREE PHASE
JUNCTION BOX
JUNCTION BOX
TELEVISION CABLE OUTLET
CLOCK - WALL MOUNTED
AMPLIFIER
INTERCOM
SPEAKER - CEILING MOUNTED
SPEAKER - WALL MOUNTED
WIRELESS ACCESS POINT (WAP)
TELEPHONE/DATA OUTLET - FLOOR MOUNTED
POLE RECEPTACLE
ISOLATED GROUND RECEPTACLE
TOP SWITCHED RECEPTACLE
GROUND FAULT INTERUPTING RECEPTACLE. PROVIDE WEATHER-
PROOF WHILE IN USE COVER WHERE LOCATED OUTDOORS.
QUAD RECEPTACLE (GFI PROTECTED WHERE REQUIRED)
FLOOR RECEPTACLE (GFI PROTECTED WHERE REQUIRED)
DUPLEX RECEPTACLE
MISCELLANEOUS SYMBOLSSWITCHES AND RECEPTACLE SYMBOLS
TELEPHONE, DATA AND COMMUNICATION SYMBOLS
CO
F
S
F
F
FS
S D
S
TS
F
H
J
J
D
S
SS
S P
S
ST
S
S
S K
S
IG
G
PC
L
N E
M
T
M
C
A
IC
S
S
TV
A
LIGHT FIXTURE - EMERGENCY (WALL MOUNT)
LIGHT FIXTURE - EXIT/EMERGENCY (DIRECTIONAL ARROWS
WHERE INDICATED ON PLANS) (WALL OR CEILING MOUNT)
OSS
COUNTERTOP RECEPTACLE (GFCI WHERE REQUIRED)
CTR
LIGHT FIXTURE - SURFACE FLUORESCENT OR LED
C
B
TC
F
F
SECURITY CAMERA (OUTDOOR/INDOOR PER PLAN)
DOOR ALARM KEYPAD. PROVIDE 1"CONDUIT WITH PULL STRING PER
LOCATION. DATA CABLES AND TERMINATIONS BY OTHERS.
DL
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n T w p S c h o o ls
-K it ch e n E q u ip m e n t R e p la c e m e n t\ D w g s\
E le c tr ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S c h o o l_
E le c tr ic a l_
R .r v t
/7
/2
:4 :2
P
M
E001
ELECTRICAL
ABBREVIATIONS
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L A
C E
M E
N T
P R
O J E
C T
/0 /2
WALK-INS AREA
KITCHEN AREA
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n T w p S c h o o ls
-K it ch e n E q u ip m e n t R e p la c e m e n t\ D w g s\
E le c tr ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S c h o o l_
E le c tr ic a l_
R .r v t
/7
/2
:4 :2
P
M
E101
AREA OF WORK
PLAN - HIGH
SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
1" = 30'-0"A2
AREA OF WORK PLAN NORTH
HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L A
C E
M E
N T
P R
O J E
C T
/0 /2
EXISTING
PANEL K
UP TO MECHANICAL ROOM
EX. DISHWASHER
DISCONNECT TO REMAIN
1 REMOVE EXISTING RECEPTACLES AS INDICATED BY BOLD DASHED LINES AND ASSOCIATED WIRING, BOXES, AND SUPPORTS.
KEYNOTES
2 DISCONNECT EXISTING DISHWASHER AND REMOVE ASSOCIATED CONDUIT AND WIRING. SALVAGE CIRCUIT AND DISCONNECT FOR RE-USE.
3 DISCONNECT EXISTING ROOFTOP EXHAUST FAN AND REMOVE ASSOCIATED CONDUIT, WIRING, BOXES, AND SUPPORTS.
GENERAL NOTE:
RECEPTACLES SHOWN TO BE DEMOED IN THE MIDDLE OF THE ROOM ARE EACH FED UNDERGROUND WITH A 1" CONDUIT EACH. RE-USE CONDUIT FOR
NEW CIRCUITS AND COORDINATE RECEPTACLE LOCATIONS WITH NEW EQUIPMENT.
4 REMOVE EXISTING SWITCH SERVING EXISTING KITCHEN LIGHTS. SALVAGE BOX, WIRING, AND CONDUIT.
EXISTING
PANEL PH
400A 480V 3ϕ
SQUARE D I-LINE
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n T w p S c h o o ls
-K it ch e n E q u ip m e n t R e p la c e m e n t\ D w g s\
E le c tr ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S c h o o l_
E le c tr ic a l_
R .r v t
/7
/2
:4 :2
P
M
ED201
ENLARGED
EXISTING
ELECTRICAL PLAN -
HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
1/4" = 1'-0"A3
EXISTING KITCHEN ELECTRICAL PLAN
Bolt, Italicized circuit is to be demoed. Contractor shall verify all circuits prior to demolition and ensure circuit continuity in all circuits not being demoed in their entirety.
Note:
Total Connected Load: 0 VA
Total Amps: 0 A 0 A 0 A
Total Load: 0 VA 0 VA 0 VA
41 0 1 20 -- Lunch Room Water Cooler 42
39 0 0 40
30A Floor Receptacle -- 30 2
0 0 2 20 -- Freezer Receptacle (Storeroom)
35 0 0 1 20 -- Kitchen Receptacles 36
Hot Food Cart -- 30 2
0 0 1 20 -- Kitchen Receptacles 34
31 Kitchen Receptacles -- 20 1 0 0 1 20 -- Kitchen Receptacles 32
29 Kitchen Receptacles -- 20 1 0 0 30
27 Kitchen Receptacles -- 20 1 0 0 2 30 -- Hot Food Cart
25 Oven Receptacle -- 20 1 0 0 1 20 -- Spare 26
23 Oven Receptacle -- 20 1 0 0 1 20 -- Spare 24
21 E Wall N corner & Lunch RM -- 20 1 0 0 1 20 -- Spare 22
19 E Wall N corner & Lunch RM -- 20 1 0 0 1 20 -- West Wall Receptacle 20
17 E Wall N corner & Lunch RM -- 20 1 0 0 1 20 -- West Wall Receptacle 18
15 Oven Receptacle -- 20 1 0 0 1 20 -- West Wall Receptacle 16
13 Oven Receptacle -- 20 1 0 0 14
11 Serving Room Outlets -- 20 1 0 0 12
9 Serving Room Outlets -- 20 1 0 0
3 70 -- Dishwasher
7 Serving Room Outlets -- 20 1 0 0 8
5 Serving Room Outlets -- 20 1 0 0 6
3 Serving Room Outlets -- 20 1 0 0
3 30 -- Disposal
1 2
CKT Circuit Description Wire Brkr Size
Brkr Poles
Phase A Load
(VA)
Phase B Load
(VA)
Phase C Load
(VA)
Brkr Poles
Brkr Size Wire Circuit Description CKT
1. Electrical Contractor shall verify all equipment requirements prior to ordering breakers.
2. Electrical Contractor is responsible to verify all circuits prior to starting work. Update/revise schedule to reflect actual work performed.
Notes:
Enclosure: Type 1 Manufacturer: Square D
Mounting: Recessed Wires: 4 Mains Rating: 150 A
Supply From: Phases: 3 Mains Type: 225
Location: Volts: 120/208 Wye A.I.C. Rating: 10kA
Branch Panel: EXISTING PANEL K
1/4" = 1'-0"A1
EXISTING MECHANICAL ROOM (FOR REFERENCE)
HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L A
C E
M E
N T
P R
O J E
C T
/0 /2
G
G
G
G
G
J J
NOTE: ALL RECEPTACLES IN THE KITCHEN SHALL BE GFCI PROTECTED. THIS INCLUDES 208V RECEPTACLES.
K-20,22
K-16,18
PH - X,X,X
PH - X,X,X
K-24,26
K-33
K-35
K-28,30
EXISTING
PANEL K
K-41
K2-17,19
K2-9,11
K2-4
K2-12,14
K2-5
K2-3
CORD DROP. COORDINATE EXACT
LOCATION AND HEIGHT WITH EQUIPMENT.
(TYP)
EXISTING
PANEL SDP-3
EXISTING
PANEL AD
EX. 150 KVA TRANSFORMER
PANEL K2
K2-1 K2-18,20
K2-13,15 K2-21,23
ON ROOF ON ROOF
K2-8,10
1 PROVIDE NEW 15A, 3-POLE, 600V BREAKER IN EXISTING PANEL PH FOR MAKE UP AIR UNIT. PROVED (4) #12 COPPER IN 3/4" CONDUIT.
KEYNOTES
2 PROVIDE NEW 25A, 3-POLE, 600V BREAKER IN EXISTING PANEL PH FOR CONDENSING UNIT. PROVED (4) #10 COPPER IN 3/4" CONDUIT.
3 EXISTING 500A, 208/120Y 3 PHASE SQUARE D I-LINE PANEL BOARD. PROVIDE NEW 100A, 3-POLE BREAKER TO FEED NEW PANEL AF.
4 NEW 225A (100A FEED), 42 SPACE, 3-PHASE, 208/120Y SQUARE D, QO PANEL BOARD. FEED FROM EXISTING PANEL SDP-3 IN 1-1/4" EMT CONDUIT WITH (4) #3 COPPER + (1) #8 COPPER GROUND. SURFACE MOUNT PANEL WITH DOOR-IN-DOOR COVER.
5 RE-USE EXISTING CIRCUIT AND DISCONNECT FOR NEW DISHWASHER. PROVIDE NEW SEALTITE AND WIRING FROM DISCONNECT TO NEW
DISHWASHER.
6 PROVIDE 3-WAY SWITCH FOR KITCHEN LIGHTS. MODIFY WIRING AS REQUIRED.
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n T w p S c h o o ls
-K it ch e n E q u ip m e n t R e p la c e m e n t\ D w g s\
E le c tr ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S c h o o l_
E le c tr ic a l_
R .r v t
/7
/2
:4 :2
P
M
E201
PROPOSED
ELECTRICAL PLAN -
HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
1/4" = 1'-0"A2
PROPOSED KITCHEN ELECTRICAL PLAN
1/4" = 1'-0"A1
PROPOSED WALK-INS ELECTRICAL PLAN
HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L A
C E
M E
N T
P R
O J E
C T
/0 /2
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
P R
O
JE
C T
N O
D R
A W
N B
Y
C H
E C
K E
D
A P
P R
O V
E D
D E
S
IG
N E
D B
Y w w w .u p e a .c o m
IS
S
U E
D F
O R
D
A T
E
P
H -0
H o u g h to n T w p S c h o o ls
-K it ch e n E q u ip m e n t R e p la c e m e n t\ D w g s\
E le c tr ic a l\ H
-0
H o u g h to n T w p S c h o o ls
H ig h S c h o o l_
E le c tr ic a l_
R .r v t
/7
/2
:4 :2
P
M
E301
PROPOSED PANEL
SCHEDULES - HIGH
SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
H O
U G
H T
O N
, M I 4
H -0
S P
K C
K C
S P
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L
A C
E M
E N
T
H O
U G
H T
O N
P O
R T
A G
E T
O W
N S
H
IP
S C
H O
O L
S
Bold indicates new breaker/circuit.
Note:
Total Connected Load: 9084 VA
Total Amps: 13 A 27 A 40 A
Total Load: 1554 VA 2982 VA 4548 VA
K-41 Milk Cooler, Salad Bar #12 20 1 1236 0 1 20 -- Lunch Room Water Cooler K-42
K-39 0 0 K-40
K-37 30A Floor Receptacle -- 30 2
0 0 2 20 -- Freezer Receptacle (Storeroom)
K-38
K-35 Cold Serving Station - East #12 20 1 972 0 1 20 -- Kitchen Receptacles K-36
K-33 Cold Serving Station - West Wall #12 20 1 972 0 1 20 -- Kitchen Receptacles K-34
K-31 Kitchen Receptacles -- 20 1 0 0 1 20 -- Kitchen Receptacles K-32
K-29 Kitchen Receptacles -- 20 1 0 942 K-30
K-27 Kitchen Receptacles -- 20 1 0 942 2 20 #12 Hot Serving Station - West Wall (GFCI)
K-28
K-25 Oven Receptacle -- 20 1 0 942 K-26
K-23 Oven Receptacle -- 20 1 0 942 2 20 #12 Hot Serving Station - East (GFCI)
K-24
K-21 E Wall N corner & Lunch RM -- 20 1 0 612 K-22
K-19 E Wall N corner & Lunch RM -- 20 1 0 612 2 20 #12 3' Slant Merchandiser - East
K-20
K-17 E Wall N corner & Lunch RM -- 20 1 0 456 K-18
K-15 Oven Receptacle -- 20 1 0 456 2 20 #12 Open Display Merchandiser - East
K-16
K-13 Oven Receptacle -- 20 1 0 0 K-14
K-11 Serving Room Outlets -- 20 1 0 0 K-12
K-9 Serving Room Outlets -- 20 1 0 0
3 70 -- Dishwasher
K-10
K-7 Serving Room Outlets -- 20 1 0 0 K-8
K-5 Serving Room Outlets -- 20 1 0 0 K-6
K-3 Serving Room Outlets -- 20 1 0 0
3 30 -- Disposal
K-4
K-1 K-2
CKT Circuit Description Wire Brkr Size
Brkr Poles
Phase A Load
(VA)
Phase B Load
(VA)
Phase C Load
(VA)
Brkr Poles
Brkr Size Wire Circuit Description CKT
1. Electrical Contractor shall verify all equipment requirements prior to ordering breakers.
2. Electrical Contractor is responsible to verify all circuits prior to starting work. Update/revise schedule to reflect actual work performed.
Notes:
Enclosure: Type 1 Manufacturer: Square D
Mounting: Recessed Wires: 4 Mains Rating: 150 A
Supply From: Phases: 3 Mains Type: Main Breaker
Location: Volts: 120/208 Wye A.I.C. Rating: 10kA
Branch Panel: EXISTING PANEL K - UPDATED
Legend:
Total Connected Load: 16994 VA
Total Amps: 48 A 47 A 48 A
Total Load: 5689 VA 5616 VA 5689 VA
K2-41 K2-42
K2-39 K2-40
K2-37 K2-38
K2-35 K2-36
K2-33 K2-34
K2-31 K2-32
K2-29 0 K2-30
K2-27 Spare -- 20 A 2
0 K2-28
K2-25 Spare -- 20 A 1 0 K2-26
K2-23 1248 0 K2-24
K2-21 Cooler Condensing Unit #12 20 A 2
1248 0 2 30 A -- Spare
K2-22
K2-19 948 1123 K2-20
K2-17 5' Slant Merchandiser - West #12 20 A 2
948 1123 2 20 A #12 Freezer Evaporator
K2-18
K2-15 2080 0 1 20 A -- Spare K2-16
K2-13 Freezer Condensing Unit #8 40 A 2
2080 942 K2-14
K2-11 456 942 2 20 A #12 Hot Serving Station - Lunch Room
K2-12
K2-9 Open Display Merchandiser - West #12 20 A 2
456 500 K2-10
K2-7 Spare -- 20 A 1 0 500 2 20 A #12 Heat Trace (GFI)
K2-8
K2-5 Cold Serving Station - Lunch Room #12 20 A 1 972 0 1 20 A -- Spare K2-6
K2-3 Receptacle - Roof #12 20 A 1 180 1152 1 20 A #12 Cold Serving Station - Lunch Room K2-4
K2-1 Cooler Evaporator #12 20 A 1 96 0 1 20 A -- Spare K2-2
CKT Circuit Description Wire Brkr Size
Brkr Poles A B C
Brkr Poles
Brkr Size Wire Circuit Description CKT
Notes:
Enclosure: Type 1 Manufacturer: Square D
Mounting: Surface Wires: 4 Mains Rating: 225 A
Supply From: EXISTING PANEL SDP-3 Phases: 3 Mains Type: MLO
Location: Volts: 120/208 Wye A.I.C. Rating: 10 kA
Branch Panel: PANEL K2
HIGH SCHOOL
K
IT
C H
E N
E Q
U
IP
M E
N T
R E
P L A
C E
M E
N T
P R
O J E
C T
/0 /2
A601 A4
EX. ELECTRICAL PANELS.
SEE KEYNOTE 4.
1 REMOVE EXISTING DISHWASHER BOOSTER HEATER. RE-USE THE EXISTING ELECTRICAL FEED FOR THE NEW DISHWASHER BOOSTER HEATER. PROVIDE NEW 100A, 3-POLE, NEMA 3 DISCONNECT LOCATED UNDER THE DISHTABLE FOR THE NEW DISHWASHER. EXTEND FEED AS REQUIRED AND PROVIDE NEW SEALTITE AND WIRING FROM THE DISONNECT TO THE NEW
DISHWASHER.
KEYNO…