About this file

This document is a Request for Pre-Qualification Submittal (PQS) from Horizon Opportunities, Inc. (the "Owner") to solicit qualified Virginia Class A contractors to provide construction services, materials, and equipment for the renovation of a facility located at 1204 Fenwick Drive, Lynchburg, VA. The project involves substantial renovation of the existing 2-story building, including replacing the building cladding, reducing the length of the pre-engineered metal building section, addressing moisture intrusion issues, and accommodating a change of use to a 23-hour crisis receiving center and longer-term residential crisis stabilization unit with 16 individual sleeping rooms. Contractors interested in bidding must submit a sealed PQS by February 16, 2024, and those deemed acceptable will be invited to submit bids. The project is planned to commence in April 2024 and be substantially complete by June 2025.

The PQS outlines minimum requirements for contractors, including the ability to provide payment and performance bonds, required insurance coverage, successful completion of at least three similar projects in the last 10 years, and disclosure of any litigation, liquidated damages, terminations, safety violations, or bond claims in the past 5-10 years. The Owner will objectively evaluate the PQS submissions to confirm the contractors meet the minimum requirements and do not have a history of difficulties in completing projects safely, timely, and without meritless claims.

View the file

Other files

File Type Posted
RFQ - Attachment A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Qualification Submittal Page 1 of 13

HORIZON OPPORTUNITIES, INC’S,

REQUEST FOR PRE-QUALIFICATION SUBMITTALS FROM

QUALIFIED VIRGINIA CLASS A CONTRACTORS

FOR THE RENOVATION OF

FACILITY LOCATED AT

1204 FENWICK DRIVE, LYNCHBURG VA

Horizon Opportunities, Inc. (the “Owner”) intends to contract with a qualified Virginia

Class A contractor to provide construction services, materials and equipment (the “Work”) to comply with professionally prepared Plans and Specifications for the rehabilitation of a building located at 1204 Fenwick Drive, Lynchburg, Virginia 24502 (the “Project”). The completed facility will be used as a crisis receiving center under the Owner’s lease with Horizon Behavior

Health.

The Owner requests any qualified Virginia Class A contractor (“Contractor”) interested in submitting a competitive, sealed bid (“Bid”) for the Project to submit for the Owner’s prior review and approval a Pre-Qualification Submittal (“PQS”) consistent with the terms set forth herein.

1. PROJECT SCOPE

The Project for which a PQS is required involves a substantial renovation of the existing facility situated at 1204 Fenwick Dr in Lynchburg, VA. Originally used as a racquetball and tennis facility, the building currently serves as office space. Despite the office space transformation, the 2-story racquetball court volumes remain within the building's structure, concealed by renovated surfaces defining the office space.

The existing facility features a 2-story rectangular form, with the western 2/3 characterized by CMU bearing walls, interior steel columns, steel bar joists, plywood floor decking, and a low-slope EPDM roof over steel deck. The eastern 1/3 comprises an open Pre-Engineered Metal Building (PEMB) with a high bay gable roof line, formerly housing indoor tennis courts.

The existing facility is clad with a single skin metal building panel, insulated with PEMB insulation liner system for the PEMB and minimal rigid insulation on the interior face of the CMU portion of the building. The renovation consists of replacing the entire building cladding with insulated metal panels to meet current energy code requirements. The

PEMB will be reduced in length by 2 bays, approximately 45’ to provide a courtyard defined on two sides by existing retaining walls, and new construction on the other two sides.

The existing building is integrated into the site's slope, descending from the north side just below the 2nd floor elevation to the south side, where the grade aligns with the 1st floor elevation. The project includes excavating down to the footing along portions of the

1st-floor retaining wall, addressing moisture intrusion issues, re-waterproofing the retaining/foundation wall, and replacing foundation drains.

Pre-Qualification Submittal Page 2 of 13

To accommodate the new building program, a change of use is necessary. The existing use is assumed to be Business, while the proposed Occupancy and Use Group is a non-separated mixed-use of Business and Residential R-4. The new program for Horizon

Behavioral Health will include a 23hr crisis receiving center as well as longer term residential crisis stabilization unit with 16 individual sleeping rooms.

Demolition notes, floor plans, reflected ceiling plans, and exterior elevations for the

Project are included in Attachment A.

2. Any Contractor interested in submitting a Bid for the Project shall first submit a sealed pre-qualification submittal (“PQS”) by February 16, 2024 (“Due Date”). An original and two copies of the PQS shall be delivered to the following address by the Due Date.

Horizon Behavioral Health

Procurement Department

2241 Langhorne Rd

Lynchburg, VA 24501

3. PQSs deemed acceptable will be accepted by announcement to the Contractors on or before February 29, 2024 .

4. An Invitation to Bid shall be issued to the Contractors seeking a Bid for the Project.

5. The Project is planned to begin in April 2024 and be substantially complete by June

2025.

6. Contractors must meet the following minimum requirements:

a. The ability to provide payment and performance bonds for the Project equal to the submitted Bid amount.

b. The ability to provide the insurance set forth in Exhibit 1 to be evidenced by a letter from an insurance company licensed to do business in the Commonwealth of Virginia confirming the Contractor’s ability to provide the required coverage.

c. Successful completion in the last ten (10) years of at least three (3) similar projects to be described in Exhibit 3.

d. No officer, director, or owner has been convicted of a felony or a crime involving moral turpitude.

e. The Contractor has not been debarred by any federal state, or local public body.

7. The Contractor shall disclose in Exhibit 2

a. The name of the court or arbitration venue, the name of the opposing parties, thenature of the disputes involved, and the ultimate outcome of all litigation or

Pre-Qualification Submittal Page 3 of 13 arbitration proceedings that the Contractor, or any of its officers, directors, or owners, has been a named party in over the last five (5) years.

b. The name of the owner of all projects on which Contractor paid liquidated damages over the last five (5) years.

c. The name of the owner of all projects on which the Owner terminated the

Contractor for cause or convenience in the last ten (10) years.

d. Any findings in the last ten (10) years that the Contractor (i) violated the regulations of the Department of Professional and Occupational Regulation, or (ii) engaged in a serious, willful or repeated violation of the safety regulations of the

Virginia Department of Labor and Industry.

e. Any instance in the last ten (10) years where Contractor’s surety had to pay any performance or payment bond claims asserted on a Contractor project.

8. The Contractor shall confirm in Exhibit 2 that it satisfies the minimum standards set forth in Paragraph 6.

9. The Contractor shall attach to its PQS resumes for the employees it intends to act as the project manager, superintendent, and safety officer for the Project with the understanding and agreement that they will not be replaced during the Project except for causes preventing their continued performance beyond the Contractor’s reasonable control.

10. The Owner shall objectively evaluate the PQS to confirm (a) that the Contractor satisfies the minimum requirements set forth in Paragraph 6, (b) that the disclosures do not demonstrate prior difficulties in advancing construction projects safely to completion in a timely manner, consistent with law, and without the assertion of claims found to be meritless; and (c) that the project manager, superintendent, and safety officer have sufficient experience to manage the Project.

Pre-Qualification Submittal Page 4 of 13

EXHIBIT 1

INSURANCE REQUIREMENTS

The following minimum limits are required of Contractor:

1. Workers’ Compensation:

a. State: Statutory Amount

b. Employer’s Liability

i. $5,000,000 Each accident

ii. $5,000,000 Disease, Policy limit

iii. $5,000,000 Disease, Each Employee

c. Benefits required by union labor contracts: As applicable

2. Commercial General Liability insurance for all major divisions of coverage including

Premises, Property and Operations; Independent Contractors’ Protective; Products and

Completed Operations; Broad Form Bodily Injury and Property Damage; Personal Injury with employee exclusion deleted; Contractual liability obligations (hold harmless coverage):

a. Bodily Injury and Property Damage: $5,000,000 Combined Single Limit.

b. Products and Completed Operations Insurance shall be maintained for a minimum period of five (5) year(s) after final payment and the Contractor shall continue to provide evidence of such coverage to the owner on an annual basis during the aforementioned period.

c. Property Damage Liability Insurance shall include coverage for the following hazards:

i. X (Explosion)

ii. C (Collapse)

iii. U (Underground)

d. Personal Injury (with Employment Exclusion deleted, if applicable): $5,000,000

Combined Single Limit.

e. Contractual Liability Obligations (Hold Harmless Coverage): $5,000,000

Combined Single Limit.

f. If the Commercial General Liability policy includes a General Aggregate, such

General Aggregate shall be not less than $10,000,000. Policy shall be endorsed to have General Aggregate apply to this Project only.

3. Umbrella Excess Liability: $10,000,000 over primary insurance. Excess Liability applies to General Liability, Automobile and Employer’s Liability.

4. Automobile Liability (owned, non-owned, hired): Bodily Injury/Property Damage:

$2,000,000 Combined Single Limit

5. Builder’s Risk: Builder’s Risk Insurance shall be in an amount equal to 100% of the completed value of the project value less any non-recurring expenses such as A&E fees, Site work, etc. The policy shall provide Broad Form Causes of Loss (extended, if necessary, to include the perils of wind, flood, earthquake, collapse, vandalism/malicious

Pre-Qualification Submittal Page 5 of 13 mischief, and theft, including theft of materials) for anything that will be a part of the completed project whether or not attached to any structure at the time of the loss. The policy must include any architects’ and engineers’ fees necessary to provide copies of plans, specifications, and supervision of work for the repair and/or replacement of property damage caused by a covered peril. The policy must include the Owner as a Named Insured with the Contractor as an additional insured.

6. The insurance policies shall include or be endorsed to include the following provisions:

a. HBH, its officers/officials, employees, agents and volunteers shall be endorsed as

“insureds” under the terms and conditions of the policies for liabilities which may arise out of the contractor/vendor’s operations or activities in these projects.

b. The contractor/vendor shall send an actual copy of the policy endorsement document from the insurance carrier that provides this coverage (ISO Form

CG20100704 or similar); OR, send an actual copy of the policy endorsement that provides blanket additional insured coverage when required by a written agreement

(ISO Form CG20331001 or similar), to: Horizon Procurement, 2241 Langhorne

Road, Lynchburg, VA 24501.

c. In addition to #6.b above, the contractor/vendor shall provide HBH with a certificate of insurance with applicable endorsements affecting coverages, signed by a person authorized by the insurance company to bind coverage on its behalf.

Certificates of insurance shall be received by HBH within 5 days of notice of intent to award. Please state ability to comply _____________.

d. Any deductibles or self-insured retentions applicable to required coverages shall be paid by the contractor/vendor, and HBH shall not be required to participate therewith.

e. The contractor/vendor shall agree to provide HBH with 30 days’ written notice of any cancellation of or reduction in the required coverages.

f. The insurance required hereunder shall be primary and any insurance or self-insurance maintained by HBH shall be excess of the contractors/vendors insurance and shall not contribute therewith.

g. Failure of the contractor/vendor to comply with any reporting provisions of the insurance policies required hereunder shall not affect coverage provided to HBH.

h. All rights of subrogation against HBH shall be waived.

i. All coverages for subcontractors of the contractors/vendors, if any, shall be subject to all of the requirements stated herein.

Pre-Qualification Submittal Page 6 of 13

EXHIBIT 2

PRE-QUALIFICATION SUBMITTAL

1. Provided below is/are the name(s) of the court or arbitration venue, the name(s) of the opposing parties, the nature of the disputes involved, and the ultimate outcome of all litigation or arbitration proceedings that the Contractor, or any of its officers, directors, or owners, has been a named party in over the last five (5) years.

2. Provided below is/are the name(s) of the owner of all projects on which

Contractor paid liquidated damages over the last five (5) years.

3. The name of the owner of all projects on which the Owner terminated the

Contractor for cause or convenience in the last ten (10) years.

Pre-Qualification Submittal Page 7 of 13

4. Provided below is a disclosure of any findings in the last ten (10) years that the

Contractor (i) violated the regulations of the Department of Professional and Occupational

Regulation, or (ii) engaged in a serious, willful, or repeated violation of the safety regulations of the Virginia Department of Labor and Industry.

5. Provided below are any instance(s) in the last ten (10) years where Contractor’s surety had to pay any performance or payment bond claims asserted on a Contractor project.

On behalf of _______________________________________, I certify, as an officer of the company, that _____________________________ satisfies the minimum requirements set forth in Paragraph 6 of the Requests for Pre-Qualification Submittal and that the disclosures set forth in this Exhibit 2 are complete and true.

By ___________________________

Its ____________________________

Pre-Qualification Submittal Page 8 of 13

EXHIBIT 3

Complete a separate form for each project.

To demonstrate the Project experience requirements, furnish the information requested below for at least three (3) similar projects completed in the last ten (10) years as required by Paragraph 6 section c. of the Requests for Pre-Qualification Submittal. It is the responsibility of the Contractor to confirm all contact information requested below and to notify references that they may be contacted by the Owner:

Project Overview and Description

A. Name of the project_______________________________________________________

Year completed __________________________________________________________

B. Project Owner and Client Name ____________________________________________

C. Project Location:

Identify owner jurisdiction and describe key features of project location (e.g. established development vs. greenfield area, downtown urban-core, crossing of or proximity to natural features and/or large infrastructure/utilities, property impacts).

D. Contract Amount and Project Schedule

a. Contract Amount

Initial Contract Value: ________________________________________________

Final Contract Value: _________________________________________________

b. Project Schedule

Start date: ___________________________________________________________

Original contract substantial completion date: ___________ ___________

Extended contract substantial completion date: ___________ _________ _____

Actual substantial completion date of the Project: _________________ ____________

If project is not completed, what is percent completion to date? ______ _____

Pre-Qualification Submittal Page 9 of 13

E. Description of project and specific relevance to this project. At minimum, include:

a. Project Type: Type of project and functional purpose:

b. Project Technical Details:

F. Firm’s Role/ Contract Scope of Work:

a. Responding firm’s role and contract Scope of Work (incl. percent of work performed):

b. Did you have any Joint Venture partners for your contract scope?

If so, name firm(s) and indicate percent of work performed by each:

Pre-Qualification Submittal Page 10 of 13

c. List other subcontractors utilized and for what construction activities:

d. Describe project risk management strategies and tools employed in the contract

(e.g. GDR/GBR, Differing Site Conditions, Value Engineering Change Proposal, Escrow Bid Documents, Partnering, Disputes Review Board (DRB), etc.):

e. Were Escrow Bid Documents used? If so, were they ever opened during the construction period? If so, explain why they were opened and the result of the same relative to claim compensation:

G. Client Reference and Contact Information:

a. Name, address, e-mail address, and phone number of the Owner, including contact name, title, and role on the project:

Pre-Qualification Submittal Page 11 of 13

b. Name, address, e-mail address, and phone number of the Design Engineer, including contact name, title, and role on the project:

c. Name, address, e-mail address, and phone number of the Construction

Manager, including contact name, title, and role on the project:

H. Supplementary Project Experience Requirements

a. Provide a brief description on how Health and Safety was structured and managed on the project and comment on your safety record during the course of the project (provide metrics such as number of recordable incidents and types of incidents, days lost time and lost time incident rate):

Pre-Qualification Submittal Page 12 of 13

b. Provide a brief description and discussion on how schedule and cost were controlled on the project and, if applicable, explain any differences in the initial and final contract values as well as the reasons for project extension beyond original contract substantial performance date (if applicable):

c. Provide a brief description of your approach to Risk Management on the project (elaborate on your role and that of sub-contractors, key risks and issues as well as how they were managed and resolved):

d. Provide a brief description of your approach to Quality and Site Management on the project (elaborate on your role and that of sub-contractors, adherence to defined standards, contract provisions and restrictions, quality assurance on workmanship of sub-contractors):

e. Provide a brief description of your approach to Community Relations

Management on the project (elaborate on your approach to communications, key challenges and issues as well as how they were mitigated and resolved):

Pre-Qualification Submittal Page 13 of 13