Requirement_3.docx

DOCX document 15 KB Posted

Attached to
General maintenance storage cages Federal contract opportunity
Solicitation number
HOODW1JYAE0006
Issued by
Department of the Army

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S2P2 REQUIREMENTS SETS

1. General maintenance storage cages

a. 6 each closed storage cages Each parts cage shall:

· be 6’ long x 3’ wide x 7’ high

· have 3 shelves

· have translucent polycarbonate locking doors with a twist handle lock with a key

· be hermetically sealed in order to prevent fluid or damp intrusion

b. 3 each semi-open storage cages Each parts cage shall:

· be 8’ long x 4’ wide x 7’ high

· have 3 shelves

· have removable doors with a twist handle lock with a key

c. All general maintenance storage cages shall comply with the following:

· All cages shall comply with OSHA (CFR 1910) regulations. The equipment needs to be manufactured out of aluminum in order to make it easy moveable inside the hangar. To ensure long life time, make it recognizable as 302nd Squadron equipment and easy visible the racks shall be powder coated in “Carmel Orange”. On at least two sides all equipment shall be marked “302 SQN” in black paint.

· All cages shall have fork lift pockets in order to be transportable by a fork lift.

· All cages shall have a protective layer (e.g. industrial carpeting) to protect the parts to be stored.

· All cages shall have an identification plate which shows at least Manufacturer, part number and manufacturing date.

· All cages shall have directional and locking casters.

· To ensure future support and commonality all cages shall be provided by the same vendor. The vendor shall keep a customer file for future support such as repairs, replacement and any additional requirements.

· Vendor needs to install all provided equipment and provide handling instructions at 302nd Squadron facilities, Fort Hood, TX within 5 days of equipment arrival at 302nd SQDN.

· Vendor is responsible for handling and crating of equipment.

· All cages shall be ready for pick-up by government arranged transportation at vendor facility no later than 60 days after order confirmation.

File details come from the government source that posted it.