Rehabilitation of the Oxygenation Train #3 (Project #24-9422)
This is a project specification and scope of work document for the City of Hollywood, Florida's South Regional Wastewater Treatment Plant (SRWWTP). The project involves comprehensive rehabilitation of Oxygenation Train No. 3, one of five parallel activated sludge treatment units that have been in continuous operation since 1997. The scope encompasses structural, mechanical, and electrical upgrades including concrete spall repairs at varying depths, crack injection, lining system replacement, construction joint and expansion joint repairs, column and aerator floor repairs, replacement of surface aerators and mixers, installation of a new purge blower, and replacement of butterfly, check, and pneumatic control valves. Electrical work includes disconnect switch replacement, new instrumentation wiring for flow and pressure monitoring, sampling panel improvements, and control panel installations. The four baffled cells in the train are arranged in series to maintain plug-flow characteristics that optimize the conversion of biologically oxidizable organic pollutants into stable biomass through the pure oxygen-based aeration system.
The document does not specify response deadlines, bid due dates, site visit schedules, bidders' conferences, award dates, contract term, pricing parameters, set-asides, incumbent information, or funding sources within the provided excerpt. The rehabilitation project addresses the aging components of infrastructure critical to the wastewater treatment facility's biological oxidation process and operational reliability.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
IFB-425-26-JM
REHABILITATION OF THE OXYGENATION TRAIN #3
(PROJECT # 24-9422)
FOR THE
CITY OF HOLLYWOOD, FLORIDA (CITY)
IFB Issue Date: July 29, 2026
Questions Due Date: August 17, 2026
Submittal Due Date: September 2, 2026, 2:00 pm
City of Hollywood
IFB-425-26-JM
Rehabilitation of the Oxygenation Train #3 (Project # 24-9422)
TABLE OF CONTENTS
1. SUMMARY
2. INTRODUCTION
3. SPECIAL TERMS AND CONDITIONS
4. SCOPE OF WORK/SERVICES
5. BID SUBMISSIONS
6. PRICING (BID FORM)
7. GENERAL TERMS AND CONDITIONS
Attachments:
A - 24-9422_O2 TRAIN 3 REHABILITATION_DRAWINGS_BID SET_JULY 2026
B - 24-9422_O2 TRAIN 3 REHABILITATION_SPECS DIV 00_BID SET_JULY 2026
C - 24-9422_O2 TRAIN 3 REHABILITATION_SPECS DIV 01-46_BID SET_JULY 2026
1. SUMMARY
1.1. Summary
The project consists of the Rehabilitation of Oxygenation Train No. 3 at the City of Hollywood
South Regional Wastewater Treatment Plant (SRWWTP). The rehabilitation includes comprehensive structural, mechanical, and electrical upgrades designed to restore aging infrastructure and enhance operational reliability.
1.2. Background
The South Regional Wastewater Treatment Plant (SRWWTP) operates five oxygenation trains in parallel: Trains 1 and 2 were constructed in 1975, Trains 3 and 4 were commissioned in 1997, and Train 5 was added in 2005.
Trains 1 and 2 underwent rehabilitation in 2006 and 2007, respectively. Like the other trains, Oxygenation Train No. 3 is fully enclosed and receives oxygen feed gas under pressure. Each train contains four baffled cells arranged in series, creating a plug-flow environment that enhances biological reaction rates and improves the removal efficiency of carbonaceous biochemical oxygen demand (CBOD5). Surface aerators recirculate mixed liquor, enhance oxygen transfer, and support bulk mixing.
1.3. Contact Information
Project Contact:
Giselle Hipolito Senior Project Manager 2600 Hollywood Hollywood, FL 33313 Email: ghipolito@hollywoodfl.org Phone: (954) 805-3748
Procurement Contact:
Julissa Marcano Senior Purchasing Agent 1621 N 14th Ave Building A Hollywood, FL 33020 Email: jmarcano@hollywoodfl.org Phone: (954) 710-9956
Department:
Public Utilities
1.4. Timeline
Release Project Date July 29, 2026
Pre-Bid Meeting (Non-Mandatory) August 10, 2026, 11:00am
Southern Regional Wastewater Treatment
Plant (SRWWTP) Second Floor Conference 1621 N 14th Ave Bldg A Hollywood, FL 33020
Question Submission Deadline August 17, 2026, 12:00pm
Bid Submission Deadline September 2, 2026, 2:00pm
2. INTRODUCTION
2.1. Purpose
The City of Hollywood, Florida (City) is seeking bids from qualified and experienced contractors, hereinafter referred to as the Contractor or Bidder, to Rehabilitation of Oxygenation Train No. 3 at the City of Hollywood South Regional Wastewater Treatment Plant (SRWWTP) for the City, in accordance with the terms, conditions, and specifications contained in this solicitation. Responses to this solicitation are due by Wednesday, September 2, 2026, by 2:00 pm, and will be opened in a virtual public setting on September 2, 2026, at 2:00 PM.
Submittals shall be received electronically through OpenGov, the City's eProcurement Portal
("Portal").
Submittals shall be considered a bid on the part of the bidder, which bid shall be deemed accepted upon approval of the City, and in case of default, the City reserves the right to accept or reject any or all bids, to waive irregularities and technicalities, and request new bids The City also reserves the right to award any resulting agreement as it deems will best serve the interests of the city.
Submission of a bid shall serve as prima facie evidence that the Bidder has examined this solicitation and is fully aware of all conditions affecting the provision of services and the evaluation criteria and scoring methodology as set forth in this solicitation document.
2.2. Pre-bid Conference and/or Site Visit (Non-Mandatory)
There will be a non-mandatory pre-bid conference and/or site visit scheduled for this solicitation.
It is strongly suggested that all Contractors attend the non-mandatory pre-bid conference and/or site visit to receive information that may be critical to their understanding of this solicitation.
Please keep in mind that site visits at other times might not be available. It is the sole responsibility of the Contractor to become familiar with the scope of the City’s requirements prior to submitting a bid. No variation in price or conditions shall be permitted based upon a claim of ignorance.
Submission of a bid will be considered evidence that the Bidder has familiarized themselves with the nature and extent of the work, equipment, materials, and labor required.
2.3. OpenGov ("Portal")
The City of Hollywood uses OpenGov, the e-Procurement Portal (“Portal”)
(https://procurement.opengov.com/portal/hollywoodfl) to administer the competitive solicitation process, including but not limited to soliciting proposals, issuing addenda, posting results and issuing notification of an intended decision.
The City shall not be responsible for a Proposer’s inability to submit a proposal by the proposal end date and time for any reason, including issues arising from the use of the Portal.
2.4. Point of Contact
For information concerning procedures for responding to this solicitation, contact the Point of
Contact within the Office of Procurement Services, Julissa Marcano, Senior Purchasing Agent atjmarcano@hollywoodfl.org or by phone at (954) 710-9956, or Jean Joinville, Procurement
Manager, at jjoinville@hollywoodfl.org or by phone at 954-921-3290. Such contact is to be for clarification purposes only. All questions must be submitted in writing via the Portal by Monday, August 17, 2026, by 12:00 pm, in order to receive a timely response.
Project Manager: Giselle Hipolito, Senior Project Manager, Public Utilities, email:
ghipolito@hollywoodfl.org, or by phone: (954) 805-3748.
For information concerning technical specifications, please utilize the question / answer feature provided by OpenGov at https://procurement.opengov.com/portal/hollywoodfl. Questions of a material nature must be received prior to the cut-off date specified in the solicitation schedule.
Material changes, if any, to the scope of services or bidding procedures will only be transmitted by written addendum. (See addendum section of the OpenGov site). Bidders please note: No part of your bid can be submitted via FAX. No variation in price or conditions shall be permitted based upon a claim of ignorance. Submission of a bid will be considered evidence that the Bidder has familiarized themselves with the nature and extent of the work, and the equipment, materials, and labor required. The entire bid response must be submitted in accordance with all specifications contained in this solicitation. The questions and answers submitted in OpenGov shall become part of any contract that is created from this solicitation.
It is the sole responsibility of the Bidder to ensure that their bid is submitted electronically through the Portal at https://procurement.opengov.com/portal/hollywoodfl
2.5. Cone of Silence
The City of Hollywood City Commission adopted Ordinance No. O-2007-05, which created
Section 30.15(F) imposing a Cone of Silence for certain City purchases of goods and Services.
The Cone of Silence refers to limits on communications held between vendors and vendor’s representatives and City elected officials, management and staff during the period in which a
Formal Solicitation is open.
The Ordinance does allow potential vendors or vendor’s representatives to communicate with designated employees for the limited purpose of seeking clarification or additional information.
The names and contact information of those employees that may be contacted for clarification or additional information are included in the solicitation.
The Cone of Silence does not prohibit a vendor or vendor’s representative from communicating verbally, or in writing with the City Manager, the City Manager’s designee, the City Attorney or the
City Attorney’s designee on those procurement items to be considered by the City Commission.
The Cone of Silence does not prohibit a vendor or vendor’s representative from making public presentations at a duly noticed pre-bid conference or duly noticed evaluation committee meeting or from communicating with the City Commission during a duly noticed public meeting.
The Cone of Silence shall be imposed when a formal competitive solicitation has been issued and shall remain in effect until an award is made, a contract is approved, or the City Commission takes any other action which ends the solicitation.
To view the Cone of Silence, go to the City of Hollywood Code of Ordinance online, and view
Section 30.15F
All communications regarding this bid should be sent in writing to the Procurement Services
Division as identified in this bid.
3. SPECIAL TERMS AND CONDITIONS
3.1. Addenda, Changes, and Interpretations
It is the sole responsibility of each contractor to notify the Point of Contact utilizing the question / answer feature provided by OpenGov and request modification or clarification of any ambiguity, conflict, discrepancy, omission or other error discovered in this competitive solicitation. Requests for clarification, modification, interpretation, or changes must be received prior to the Question and Answer (Q & A) Deadline. Requests received after this date may not be addressed. Questions and requests for information that would not materially affect the scope of services to be performed, or the solicitation process will be answered within the question / answer feature provided by
OpenGov and shall be for clarification purposes only. Material changes, if any, to the scope of services or the solicitation process will only be transmitted by official written addendum issued by the City and uploaded to OpenGov as a separate addendum to the solicitation. Under no circumstances shall an oral explanation given by any City official, officer, staff, or agent be binding upon the City and should be disregarded. All addenda are a part of the competitive solicitation documents and each firm will be bound by such addenda. It is the responsibility of each to read and comprehend all addenda issued.
3.2. Dimensions, Quantities and Subsurface Information
Dimensions, quantities, and subsurface information supplied by the City are in no way warranted to indicate true amounts or conditions. Bidders/Contractors shall neither plead misunderstanding or deception nor make claims against the City if the actual amounts, conditions, or dimensions do not conform to those stated. Any "Outside" reports made available by the Engineer are neither guaranteed as to accuracy or completeness, nor a part of the Contract Documents.
3.3. Trench Safety Form
The Trench Safety Form included in the Bid Documents must be completed and signed.
Noncompliance with this requirement may invalidate the bid.
3.4. Changes and Alterations
Bidder may change or withdraw a Bid at any time prior to Bid submission deadline; however, no oral modifications will be allowed. Modifications shall not be allowed following the Bid deadline.
3.5. Bidder’s Costs
The City shall not be liable for any costs incurred by Bidders in responding to this solicitation.
3.6. Pricing/Delivery
All pricing must include delivery and installation and be quoted FOB: Destination, unless specified otherwise in the #SCOPE OF WORK/SERVICES section.
3.7. Price Validity
Prices provided in this solicitation shall be valid for at least One-Hundred and Twenty (120) days from time of solicitation opening unless otherwise extended and agreed upon by the City and
Bidder.
3.8. No Exclusive Contract
Bidder agrees and understands that the contract shall not be construed as an exclusive arrangement and further agrees that the City may, at any time, secure similar or identical services from another vendor at the City’s sole option.
3.9. Responsive
In order to be considered responsive to the solicitation, the contractor’s bid shall fully conform in all material respects to the solicitation and all of its requirements, including all form and substance.
3.10. Responsible
In order to be considered as a responsible bidder, bidder shall be fully capable to meet all of the requirements of the solicitation and subsequent contract, must possess the full capability, including financial and technical, to perform as contractually required, and must be able to fully document the ability to provide good faith performance.
3.11. Minimum Qualifications
To be eligible for award of a contract in response to this solicitation, the Bidder must demonstrate that they have successfully completed services, as specified in the #SCOPE OF
WORK/SERVICES section of this solicitation, are normally and routinely engaged in performing such services, and are properly and legally licensed (if required) to perform such work. Bidder must possess and be able to provide the City with any and all required Federal, State, County and/or municipal licenses, and occupational licenses. Bidder must be able to provide proof of valid licensing for all subcontractors and/or material suppliers hired by the contractor, if requested. In addition, the Bidder must have no conflict of interest with regard to any other work performed by the Bidder for the City.
3.12. Award of Contract
Award may be in the aggregate, or by line Item, or by group, whichever is determined to be in the best interest of the City. Award will be made to the responsive and responsible bidder, quoting the lowest price, for that product/service that will best serve the needs of the City.
The Contract will be awarded only to a Bidder, who in the opinion of the Engineer, is fully qualified to undertake the work, quoting the lowest price, for that product/service that will best serve the needs of the City. The City reserves the right before awarding the Contract to require a Bidder to submit such evidence of his qualifications as it may deem necessary and may consider any available evidence of his financial status, technical qualifications, and other qualifications and abilities.
The City also reserves the right to accept or reject any or all bids, part of bids, and to waive minor irregularities or variations to specifications contained in bids, and minor irregularities in the bidding process. The City also reserves the right to award the contract on a split order basis, lump sum basis, individual item basis, or such combination as shall best serve the interest of the City.
As applicable, the City shall comply with Section 287.05701, Florida Statutes, in not considering or giving preference for an award based on a vendor’s social, political, or ideological interest.
The City, in all solicitations or advertisements for purchasing of goods, supplies, materials, equipment and services, will receive consideration from qualified businesses without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.
3.13. Execution Of Contract
The Bidder awarded the Contract shall, within ten days from the date of award, execute all required documents and submit them electronically, complete with valid signatures and seals.
A. The Contract B. Performance and Payment Bond C. Evidence of required Insurance D. Proof of authority to execute the Contract E. Proof of authority to execute the Bond on behalf of the Awardee F. List of Subcontractors, estimated Contract Value for each and proof that such subcontractors possess all required Federal, State, County and/or municipality licenses, including but not limited to certified of competency and occupational license
The above documents must be furnished, executed and delivered before the Contract will be executed by the City. The Contract shall not be binding upon the City until it has been executed by the City and a copy of such fully executed Contract is delivered to the Contractor.
3.14. Failure To Execute Contract, Bid Guaranty Forfeited
Should the Bidder to whom the Contract has been awarded refuse or fail to complete the requirements of Section 2.13 above within ten (10) days after Notice of Award, the additional time in days (including weekends) required to CORRECTLY complete the documents will be deducted, in equal amount, from the Contract Time, or the City may elect to revoke the Award. The Bid
Guaranty of any Bidder failing to execute the awarded Contract shall be retained by the City and the Contract awarded as the Commission desires.
3.15. Manufacturer/Brand/Model Specific Request
In the event of a manufacturer/brand/model specification. No substitutions will be allowed unless specified in Section: SCOPE OF WORK/SERVICES.
3.16. Permits and Fees
The Contractor and Subcontractors must obtain Building Permits required for all work covered under this contract as well as any other permit required by any other regulatory agency. The
Master Building Permit required by the City shall be obtained by the Contractor but paid for by the
City. Any and all other permits required by the City, County, State of Florida, or other regulatory agency shall be obtained and paid for by the Contractor.
The Contractor or Subcontractors shall also be responsible to call for all inspections as required in Section 110 (Inspections) of the latest edition of the Florida Building Code.
Refer to theTechnical Specifications (Section 01025 Basis of Payment)
3.17. Contract Security
When the awarded bidder delivers the executed contract to the City, it must be accompanied by the required bonds.
3.18. Contract Period
The initial contract term shall commence upon date of award by the City for a duration of 796
Calendar days. The City reserves the right to extend the contract providing all terms, conditions and specifications remain the same, both parties agree to the extension, and such extension is approved by the City. Refer to Attachment A - 24-9422_O2 TRAIN 3 REHABILITATION_SPECS
DIV 00_BID SET_JULY 2026
In the event services are scheduled to end because of the expiration of this contract, the
Contractor shall continue the service upon the request of the City as authorized by the awarding authority. The extension period shall not extend for more than 120 days beyond the expiration date of the existing contract. The Contractor shall be compensated for the service at the rate in effect when this extension clause is invoked by the City.
3.19. Bid Guaranty
A Bid Guaranty in the form of a Cashier's Check, Certified Check or Bid Bond executed by the
Bidder and a qualified Surety in the amount of 5% of the Bid is required for this project.
3.20. Warranties of Usage
Any estimated quantities listed are for information and tabulation purposes only. No warranty or guarantee of quantities needed is given or implied. It is understood that the Contractor will furnish the City's needs as they arise.
3.21. Rules and Submittals of Bids
The signer of the bid must declare that the only person(s), company or parties interested in the proposal as principals are named therein; that the bid is made without collusion with any other person(s), company or parties submitting a bid; that it is in all respects fair and in good faith, without collusion or fraud; and that the signer of the bid has full authority to bind the principal bidder.
3.22. Tie Breaker
In cases where there is a tie for the bid award, the award shall be made by giving preference to the low bidder(s) with the following items (in this order): (1) maintenance of a drug-free workplace in accordance with the requirements of Florida Statutes Section 287.087, (2) local Hollywood vendor preference, (3) closest proximity/location to project site or City Hall, and/or (4) minority-owned or disadvantaged business status. If a tie still exists after the aforementioned tiebreakers are utilized, the Chief Procurement Officer will make a recommendation for award among the tied bidders.
3.23. Local Preference
When the lowest responsive responsible bidder is a non-Hollywood business and a responsive responsible local Hollywood vendor’s Bid is within 5% of the Bid submitted by the lowest responsive responsible bidder, the local vendor is allowed to submit a second Bid. The second bid from the local Hollywood bidder must be lower than the bid submitted by the lowest responsive and responsible non-Hollywood bidder by at least 1% in order for the bid to be awarded to the local Hollywood bidder. If more than one responsive and responsible local Hollywood vendor is within 5%, each would be permitted to submit a best and final offer and the local Hollywood vendor submitting the lowest bid will be awarded the contract; provided, however, if none of the local
Hollywood vendors bids are lower than the lowest responsive and responsible non-Hollywood bidder by at least 1%, the non- Hollywood bidder will be awarded the contract.
3.24. Contracting with Entities of Foreign Countries
By responding to this solicitation, your entity certifies and attests under penalty of perjury to not being a “foreign country of concern" as defined under Sections 287.138 and 692.202, Florida
Statutes, and compliance with all regulations within the statutes.
3.25. Federal Procurement Standards
This solicitation shall be subject to Federal procurement standards as defined under Sections
200.317 through 200.327 of the Code of Federal Regulations (CFR) if funded by a Federal award, including all contract provisions/clauses under Section 200.327 of the CFR.
3.26. Conflict of Interests Prohibited
Any respondent submitting a response to this solicitation is responsible for being aware of, and complying with Section 34.02 of the City Code of Ordinances. If you have questions concerning whether you may or may not need to comply with the ordinance, please contact the City of
Hollywood, City Clerk's Office at 954-921-3299.
3.27. Protest Procedure
Any respondent who is not recommended for award of a contract and who alleges a failure by the
City to follow the City’s Procurement Code or any applicable law may protest to the CPO, by delivering a letter of protest to the CPO in accordance with Section 38.52 of the City’s
Procurement Code within five days after a notice of intent to award is posted on the City’s web site, OpenGov, City Clerk’s Office, Open Government, and/or City’s Sunshine Board
(https://www.hollywoodfl.org/Archive.aspx?AMID=140).
3.28. Insurance Requirements
Contractor shall maintain, at its sole expense, during the term of this agreement the following insurances:
All insurance policies shall be issued by companies authorized to do business under the laws of the State of Florida and satisfactory to the Owner. All companies be rated a minimum A-VII, as per A.M. Best Company’s Key Rating Guide, latest edition.
Any sub-contractor shall supply such similar insurance required of the Contractor. Such certificates shall name the City as additional insured on the general liability and auto liability policies.
The Contractor shall furnish certificates of insurance to Risk Management for review and approval prior to the execution of this agreement. No failure to renew, material change or cancellation of, the insurance shall be effective without a 30-day prior written notice to and approval by the Owner.
A. Commercial General Liability Prior to the commencement of work governed by this contract, the Contractor shall obtain General
Liability Insurance. Coverage shall be maintained throughout the life of the contract and include, as a minimum:
a. Premises Operations
b. Products and Completed Operations
c. Personal & Advertising Injury
d. Damages to rented premises
The minimum limits acceptable shall be:
$2,000,000 Each Occurrence / $4,000,000 General Aggregate
The City of Hollywood shall be named as an Additional Insured in the Description of Operations
Box.
The City of Hollywood must be the certificate holder per the following format:
City of Hollywood (Nothing else on this line) Public Utilities, Engineering Support Services Division 1621 N 14th Avenue Hollywood, FL 33020
B. Commercial Automobile Liability Insurance
Recognizing that the work governed by this contract requires the use of vehicles, the Contractor, prior to the commencement of work, shall obtain Vehicle Liability Insurance. Coverage shall be maintained throughout the life of the contract and include, as a minimum, liability coverage for:
Owned, Non-Owned, and Hired Vehicles
The minimum limits acceptable shall be:
$1,000,000 Combined Single Limit
The City of Hollywood shall be named as Additional Insured in the Description of Operations Box.
The City of Hollywood must be the certificate holder per the following format:
City of Hollywood (Nothing else on this line) Public Utilities, Engineering Support Services Division
1621 N 14th Avenue Hollywood, FL 33020
C. Worker’s Compensation / Employers Liability Insurance
Prior to the commencement of work governed by this contract, the contractor shall obtain Workers'
Compensation Insurance with limits sufficient to respond to the applicable State statues.
In addition, the Contractor shall obtain Employers' Liability Insurance with limits of not less than:
$1,000,000 bodily injury by accident $1,000,000 bodily injury by disease, each employee $1,000,000 bodily injury by disease, policy limit
D. Contractors Pollution Liability Coverage
For sudden and gradual occurrences and in an amount not less than $1,000,000 per claim arising out of this Agreement, including but not limited to, all hazardous materials identified under the
Agreement.
E. Builder’s Risk / Property Coverage, if applicable:
For buildings/structures under construction, coverage must be afforded in an amount not less than 100% of the total project cost, including soft costs, with an All Other Peril (AOP) deductible of no more than $25,000 each claim. Coverage form shall include, but not be limited to:
• All Risk Coverage including Flood and Windstorm with no coinsurance clause
• Any separate Flood and/or Windstorm deductibles are subject to approval by the City
• Waiver of Occupancy Clause Endorsement, which will enable the City to occupy the facility under construction/renovation during the activity
• Storage and transport of materials, equipment, supplies of any kind whatsoever to be used on or incidental to the project
• Equipment Breakdown for cold testing of all mechanized, pressurized, or electrical equipment
This policy shall insure the interests of the owner, contractor, and subcontractors in the property against all risk of physical loss and damage and name the City as a loss payee. This insurance shall remain in effect until the work is completed and the property has been accepted by the City.
Please Note: The Certificate shall contain a provision that coverage afforded under the policy will not be cancelled until at least thirty (30) days prior written notice has been given to the City.
Certificates of insurance, reflecting evidence of the required insurance, shall be provided to the
City. In the event the Certificate of Insurance provided indicates that the insurance shall terminate and lapse during the period of this Agreement, the vendor shall furnish, at least thirty (30) days prior to the expiration of the date of such insurance, a renewed Certificate of Insurance as proof that equal and like coverage for the balance of the period of the Agreement or extension thereunder is in effect.
The insurance policy shall not contain any exceptions that would exclude coverage for risks that can be directly or reasonably related to the scope of goods or services in this bid/proposal. A violation of this requirement at any time during the term, or any extension thereof shall be grounds for the immediate termination of any contract entered into pursuant to this bid/proposal. In order to show that this requirement has been met, along with an insurance declaration sheet demonstrating the existence of a valid policy of insurance meeting the requirements of this bid/proposal, the successful proposer must submit a signed statement from insurance agency of record that the full policy contains no such exception.
The City reserves the right to require additional insurance in order to meet the full value of the contract.
Contractor waives, and Contractor shall ensure that Contractor’s insurance carrier waives, all subrogation rights against the City, its officials, employees, and volunteers for all losses or damages. The City requires the policy to be endorsed with WC 00 03 13 Waiver of our Right to
Recover from Others or equivalent.
Contractor shall ensure that Contractor’s insurance policy is primary and non-contributary.
The City reserves the right to require any other insurance coverage it deems necessary depending upon the exposures.
I understand and am responsible for the insurance requirements and corresponding due date as documented in this Bid.
3.29. Uncontrollable Circumstances (Force Majeure)
The City and Contractor will be excused from the performance of their respective obligations under this agreement when and to the extent that their performance is delayed or prevented by any circumstances beyond their control including, fire, flood, explosion, strikes or other labor disputes, acts of God or public emergency, war, riot, civil commotion, malicious damage, act or omission of any governmental authority, delay or failure or shortage of any type of transportation, equipment, or service from a public utility needed for their performance, provided that:
A. The non performing party gives the other party prompt written notice describing the particulars of the Force Majeure including, but not limited to, the nature of the occurrence and its expected duration, and continues to furnish timely reports with respect thereto during the period of the Force Majeure;
B. The excuse of performance is of no greater scope and of no longer duration than is required by the Force Majeure; and
C. No obligations of either party that arose before the Force Majeure causing the excuse of performance are excused as a result of the Force Majeure; and
D. The non-performing party uses its best efforts to remedy its inability to perform.
Notwithstanding the above, performance shall not be excused under this Section for a period in excess of two (2) months, provided that in extenuating circumstances, the City may excuse performance for a longer term. Economic hardship of the Contractor will not constitute Force Majeure. The term of the agreement shall be extended by a period equal to that during which either party's performance is suspended under this Section.
3.30. Supplier Portal (Oracle) Payment Method
The City has implemented software that contains a supplier portal allowing suppliers to submit and update their information via the supplier portal. New suppliers will be required to register; and current suppliers will need to confirm and update their information.
Contractors are responsible for ensuring that all contact, payment, and general information is updated at all times, and will not hold the City liable for any inaccurate information.
3.31. Debarred or Suspended Bidders or Proposers
Contractor(s) certifies/certify, by submission of a response to this solicitation, that neither it nor its principals and subcontractors are presently debarred or suspended by any federal, state, county or municipal department or agency.
3.32. Payment and Performance Bond
A Performance Bond and a Payment Bond each equal to 100 percent of the total Bid will be required of the Awardee. The Bond must be written through a company licensed to do business in the State of Florida and be rated at least "A", Class X, in the latest edition of "Best's Key Rating
Guide", published by A.M. Best Company. As per Florida Statute Section 255.05, the Contractor shall be required to record the payment and performance bonds in the public records of Broward
County.
3.33. Public Records
A. Public Records/Trade Secrets/Copyright:
All responses will become the property of the City. The Contractor’s response to the solicitation is a public record pursuant to Florida law and is subject to disclosure by the City pursuant to Chapter 119.07, Florida Statutes (“Public
Records law”). The City shall permit public access to all documents, papers, letters or other material submitted in connection with this solicitation and the
Contract to be executed for this solicitation, subject to the provisions of Chapter
119, Florida Statutes.
Any language contained in the Consultant’s response to the solicitation purporting to require confidentiality of any portion of the Consultant’s response to the solicitation, except to the extent that certain information is in the City’s opinion a Trade Secret pursuant to Florida law, shall be void. If a Consultant submits any documents or other information to the City that the Consultant claims is Trade Secret information and exempt from Florida Statutes Chapter 119.07 (“Public Records Laws”), the Consultant shall clearly designate that it is a Trade Secret and that it is asserting that the document or information is exempt. The Consultant must specifically identify the exemption being claimed under Florida Statutes 119.07. The City shall be the final arbiter of whether any information contained in the Consultant’s response to the solicitation constitutes a Trade
Secret. The City’s determination of whether an exemption applies shall be final, and the
Consultant agrees to defend, indemnify, and hold harmless the City and the City’s officers, employees, and agent, against any loss or damages incurred by any person or entity as a result of the City’s treatment of records as public records. In the event of
Contract award, all documentation produced as part of the Contract shall become the exclusive property of the City. Proposals purporting to be subject to copyright protection in full or in part will be rejected.
EXCEPT FOR CLEARLY MARKED PORTIONS THAT ARE BONA FIDE TRADE
SECRETS PURSUANT TO FLORIDA LAW, DO NOT MARK YOUR RESPONSE TO
THE SOLICITATION AS PROPRIETARY OR CONFIDENTIAL. DO NOT MARK YOUR
RESPONSE TO THE SOLICITATION OR ANY PART THEREOF AS COPYRIGHTED.
B. PUBLIC RECORDS GENERAL
IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF
CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR’S DUTY TO PROVIDE
PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF
PUBLIC RECORDS AT CITY CLERK’S OFFICE, 2600 HOLLYWOOD BOULEVARD,
HOLLYWOOD, FLORIDA 33020 OR AT (954) 921-3211,
PCERNY@HOLLYWOODFL.ORG.
• Consultant shall:
o Keep and maintain public records that ordinarily and necessarily would be required by the City in order to perform the service.
o Upon request from the City’s custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119, Florida Statutes.
o Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of this contract if the Consultant does not transfer the records to the City.
o Upon completion of the Contract, transfer, at no cost, to the City all public records in possession of the Consultant or keep and maintain public records required by the
City to perform the service. If the Consultant transfers all public records to the City upon completion of this Contract, the Consultant shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Consultant keeps and maintains public records upon completion of this Contract, the Consultant shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, upon request from the City’s custodian of public records, in a format that is compatible with the information technology systems of the City. It is solely and exclusively the
Contractor’s responsibility to familiarize itself with Chapter 119, Florida Statutes, and to ensure compliance with its requirements.
4. SCOPE OF WORK/SERVICES
4.1. Project Description
The Oxygenation Train No. 3 Rehabilitation project at the South Regional Wastewater Treatment
Plant (SRWWTP) focuses on restoring one of the facility’s key activated sludge treatment units.
Oxygenation Train No. 3 is part of a system of five parallel trains that utilize pure oxygen generated on-site to support biological oxidation within the activated sludge process. Each train contains four baffled cells arranged in series to promote plug-flow characteristics, enabling efficient conversion of biologically oxidizable organic pollutants into stable biomass. Surface aerators and mixers maintain circulation and mixing of the mixed liquor, ensuring optimal contact between microorganisms and wastewater.
This rehabilitation effort addresses the aging structural, mechanical, and electrical components of Train No. 3, which has been in continuous operation since its commissioning in 1997. The project includes concrete repair, lining restoration, replacement of aerators and mixers, installation of new valves and a purge blower, and upgrades to electrical disconnects, wiring, and control equipment.
The project scope includes:
• Concrete rehabilitation—spall repairs at varying depths, crack injection, lining system replacement, construction joint repair, expansion joint repair, and column and aerator-floor repairs.
• Mechanical improvements include new aerator mixers, installation of a purge blower, butterfly and check valves, pneumatic control valves, and 12-inch plug valve replacements.
• Electrical upgrades address disconnect switch replacement, new wiring for flow and pressure instrumentation, sampling panel improvements, and control panel installations.
4.2. Technical Specifications
Refer to Attachment B - 24-9422_O2 TRAIN 3 REHABILITATION_SPECS DIV 01-46_BID
SET_JULY 2026
4.3. Contractor Qualifications
The Contract will be awarded only to the responsive and responsible bidder, who in the opinion of the Engineer and Procurement Division, is fully qualified to undertake the work and is in compliance with the City’s Local Preference Criteria (when applicable). The City reserves the right before awarding the Contract to require a bidder to submit such evidence of his qualifications as it may deem necessary and may consider any available evidence of his financial status, technical qualifications and other qualifications and abilities.
Bidders shall submit proof, along with their bid, that their firm has successfully completed comparable projects meeting the following criteria:
A. The Bidder shall have successfully completed a minimum of one (1) project demonstrating experience installing mechanical aerators for high-purity oxygen (HPO) applications greater than or equal to 40 HP. This project shall have been performed within the past ten (10) years from the date of the Invitation to Bid.
B. Structural Rehabilitation of Oxygenation Train 3: The Bidder shall have successfully completed a minimum of one (1) project demonstrating experience with structural rehabilitation of interior of oxygenation trains projects having a total construction value of greater than $5 million and three
(3) projects demonstrating experience structural rehabilitation of inner O2 trains projects having a total construction (for each project) of greater than $3 million. These projects shall have been performed within the past ten (10) years from the date of the Invitation to Bid.
C. The Bidder’s proposed project manager shall have successfully completed a minimum of two
(2) projects demonstrating project management experience with oxygenation train upgrade projects having a total construction value (for each project) of greater than $5 million. These projects shall have been performed within the past ten (10) years from the date of the Invitation to Bid.
D. The Bidder or Bidder’s Electrical Subcontractor shall have successfully completed a minimum of five (5) projects demonstrating experience with medium and low voltage industrial power systems, including motor control centers (MCC), motors, transformers and switchgear. These projects shall have been performed within the past ten (10) years from the date of the Invitation to Bid.
Any one of the following causes, among others, may be considered as sufficient justification to disqualify a bidder and reject his or her bid:
A. Submission of more than one bid for the same work by an individual, firm, partnership or corporation under the same or different names.
B. Evidence of collusion.
C. Previous participation in collusive bidding on work for the City of Hollywood, Florida.
D. Submission of an unbalanced bid in which the prices bid for some items are out of proportion to the prices bid for other items.
E. Lack of competency. The Bidder shall provide proof that their past experience can demonstrate similar complexity and size compared to this contract. The Engineer may declare any bidder ineligible, at any time during the process or receiving bids or awarding the contract, if developments arise which, in his opinion, adversely affects the bidder's responsibility. The Bidder will be given an opportunity, by the engineer, to present additional evidence before final action is taken.
F. Lack of responsibility as shown by past work judged by the Engineer from the standpoint of workmanship and progress.
G. Non-compliance with the City’s Local Preference (when applicable).
H. Uncompleted work for which the Bidder is committed by Contract, which is in the judgment of the Engineer, might hinder or prevent the prompt completion of work under this Contract.
I. Being in arrears on any existing Contracts with the City, or any taxes, licenses or other monies due the City; in litigation with the City or having defaulted on a previous contract with the City.
4.4. Subcontractors
For the City to be assured that only competent and qualified subcontractors will be employed on this project, each Bidder shall submit in the bid a list of the subcontractors performing work on this project. This subcontractors list shall include each firm's name, address, telephone number, contact person and work to be performed. Subcontractors shall be properly registered or licensed with the State of Florida, Broward County and the City of Hollywood. Subcontractors shall, in the
City's opinion, be qualified both technically and financially to perform the work.
The City reserves the right to reject any subcontractor who is deemed by the City to be unacceptable technically or financially, or has previously performed work which the City believes to be unsatisfactory. No change may be made to this list of subcontractors by the Contractor, before or after contract award, without the express written consent of the City.
If, prior to award, the City rejects any subcontractor, the Contractor shall be afforded the opportunity to submit qualifications for an alternate subcontractor with no attendant increase in the base lump sum bid amount, adjustment of contract time or alteration of the bid documents. Such qualifications will be due within ten (10) days of receipt of notification of subcontractor rejection. Failure to submit an acceptable alternate subcontractor may result in rejection of the bid. In this event, the bid bond shall be returned to Contractor without claim by the City and with forfeiture of all claim rights by the Contractor.
4.5. Deliverable and Objectives
Refer to the following attachments:
A - 24-9422_O2 TRAIN 3 REHABILITATION_SPECS DIV 00_BID SET_JULY 2026
B - 24-9422_O2 TRAIN 3 REHABILITATION_SPECS DIV 01-46_BID SET_JULY 2026
C - 24-9422_O2 TRAIN 3 REHABILITATION_DRAWINGS_BID SET_JULY 2026
4.6. Project Schedule / Timeline
Refer to Attachment A - 24-9422_O2 TRAIN 3 REHABILITATION_SPECS DIV 00_BID
SET_JULY 2026
4.7. Substantial Completion
Refer to Attachment A - 24-9422_O2 TRAIN 3 REHABILITATION_SPECS DIV 00_BID
SET_JULY 2026
5. BID SUBMISSIONS
The responsibility for submitting a bid/proposal on or before the time and date is solely and strictly the responsibility of the bidder/proposer, the City will in no way be responsible for delays caused by technical difficulty or caused by any other occurrence. No part of a bid/proposal can be submitted via FAX or via direct Email to the City. No variation in price or conditions shall be permitted based upon a claim of ignorance.
5.1. VENDOR REFERENCE FORM*
Please download the below documents, complete, and upload.
• Vendor_Reference_Form_(Fill...
*Response required
5.2. HOLD HARMLESS AND INDEMNITY CLAUSE*
I, an authorized representative, the contractor, shall indemnify, defend and hold harmless the City of Hollywood, its elected and appointed officials, employees and agents for any and all suits, actions, legal or administrative proceedings, claims, damage, liabilities, interest, attorney’ s fees, costs of any kind whether arising prior to the start of activities or following the completion or acceptance and in any manner directly or indirectly caused, occasioned or contributed to in whole or in part by reason of any act, error or omission, fault or negligence whether active or passive by the contractor, or anyone acting under its direction, control, or on its behalf in connection with or incident to its performance of the contract.
☐ Please confirm
*Response required
5.3. NON-COLLUSION STATEMENT*
I , being first duly sworn, depose that:
A. He/she is an authorized representative of the Company, the Bidder/Offeror that has submitted the attached Bid/Proposal.
B. He/she has been fully informed regarding the preparation and contents of the attached
Bid/Proposal and of all pertinent circumstances regarding such Bid/Proposal;
C. Such Bid/Proposal is genuine and is not a collusion or sham Bid/Proposal;
D. Neither the said Bidder/Offeror nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant has in any way colluded, conspired, connived or agreed, directly or indirectly with any other
Bidder/Offeror, firm or person to submit a collusive or sham Bid/Proposal in connection with the contractor for which the attached Bid/Proposal has been submitted or to refrain from bidding/proposing in connection with such contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder/Offeror, firm or person to fix the price or prices, profit or cost element of the
Bid/Proposed price or the Bid/Proposed price of any other Bidder/Offeror, or to secure an advantage against the City of Hollywood or any person interested in the Contract; and
E. The price or prices quoted in the attached Bid/Proposal are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the
Bid/Proposal or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.
☐ Please confirm
*Response required
5.4. CERTIFICATIONS REGARDING DEBARMENT, SUSPENSION AND
OTHER RESPONSIBILITY MATTERS*
The applicant certifies that it and its principals:
A. Are not presently debarred, suspended, proposed for debarment, declared ineligible, sentenced to a denial of Federal benefits by a State or Federal court, or voluntarily excluded from covered transactions by any Federal department or agency;
B. Have not within a three-year period preceding this application been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction, violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property;
C. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, or local) with commission of any of the offenses enumerated in paragraph (b) of this certification; and
D. Have not within a three-year period preceding this application had one or more public transactions (Federal, State, or local) terminated for cause or default.
☐ Please confirm
*Response required
5.5. DRUG-FREE WORKPLACE PROGRAM*
A. IDENTICAL TIE BID/PROPOSALS - Preference shall be given to businesses with drug-free workplace programs. Whenever two or more bids/proposals which are equal with respect to price, quality, and service are received by the State or by any political subdivision for the procurement of commodities or contractual services, a bid/proposal received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie bids/proposals will be followed if none of the tied vendors have a drug-free workplace program. In order to have a drug-free workplace program, a business shall:
1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.
2. Inform employees about the dangers of drug abuse in the workplace, the business’s policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.
3. Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection (1).
4. In the statement specified in subsection (1), notify the employee that, as a condition of working on the commodities or contractual services that are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of chapter 893 or of any controlled substance law of the…