View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

JUSTIFICATION AND APPROVAL

FOR OTHER THAN FULL AND OPEN COMPETITION

1. Contracting Activity: Army Contracting Command-Detroit Arsenal (ACC-DTA), is the responsible contracting activity for this action.

2. Description of Action: ACC-DTA proposes to award a new three-year Firm Fixed Price (FFP), Indefinite Delivery Indefinite Quantity (IDIQ) contract for the procurement of Anti-Lock Brake/Electronic Stability Control (ABS/ESC) Retrofit Kits to Ricardo Defense Incorporated (Ricardo Defense). The guaranteed minimum quantity is

This contract will support the Program Executive Office Combat Support and Combat Service Support (PEO CS&CSS) Product Director Light Tactical Vehicles (PD LTV) requirement to retrofit non ABS/ESC equipped High Mobility Multi-Purposed Wheeled Vehicles (HMMWVs) in the current fleet. Funding will be available prior to the placement of each order and is anticipated to be Fiscal Years (FY) 2021-2023 Other Procurement Army (OPA) funding.

3. Description of Supplies: The proposed action will allow for the procurement of up to ABS/ESC Retrofit Kits for the HMMWV Family of Vehicles (FoV). The Ricardo Defense ABS/ESC Retrofit Kits is the system currently being installed in HMMWVs during new production and Recapitalization programs. The HMMWV is a highly mobile, diesel-powered, four-wheel-drive vehicle that performs various special and multipurpose missions in combat, combat support, and combat service support roles. The required supplies address critical safety issues identified with the current HMMWV braking system. The safety certified HMMWV ABS/ESC Retrofit Kit is a replacement brake system that

Controlled by: PD LTV CUI Categories: BUDGET, OPSEC Distribution/Dissemination Control: N/A POC: T. Kowalski, 586-381-6624

OPSEC

Quantities

OPSEC: Capabilities

FOIA

Financial Information

OPSEC: Capabilities

OPSEC: Capabilities, limitations, or vulnerabilities

FOIA #5: Deliberative process of Government personnel

FOIA: #5: Deliberative process of Government personnel

FOIA #5 Deliberative process of Government personnel

FOIA #5 Deliberative process of Government personnel

FOIA #5 Deliberative process of Government personnel

FOIA: #5

Deliberative process

FOIA #5

Deliberative process

FOIA: #5

Deliberative process of Governmebt personnel

FOIA #5: Deliberative process

FOIA #5: Deliberative process of Government personnel

OPSEC: Equipment capabilities, limitations and vulnerabilities

FOIA #4 Proprietary, commercial, or financial information.

OPSEC: Capabilities, limitations, or vulnerabilities.

FOIA #4 Proprietary

FOIA #4 Proprietary

FOIA #4 Proprietary, commercial, or financial information

OPSEC: Capabilities, limitations, or vulnerabilities

OPSEC:

//MDS// 14FEB2020

Signature Date

12. Requirements Certification: "I certify that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief".

Typed Name: MICHAEL D. SPRANG Title: Project Manager, Joint Program Office Joint Light Tactical Vehicles

//MDS// 14FEB2020

Signature Date

13. Fair and Reasonable Cost Determination: "I hereby determine that the anticipated cost for this contract action will be fair and reasonable". The determination will be made through a combination of Cost and Price analyses. Army Contracting Command -Warren (ACC-WRN) has a dedicated Cost and Pricing Division with trained Cost/Price Analysts and Industrial Specialists who will assist the PCO by performing the Cost and Price analyses. The Contracting Officer will request that engineers or similar personnel familiar with the end item review labor types and quantities as well as material kinds and quantities to ensure that what is proposed is fair and reasonable.

Defense Contract Audit Agency (DCAA) and Defense Contract Management Agency (DCMA) expertise and audit support will be requested for input. The recommendation as contained in the DCAA audit, DCMA technical report, and /or Program Offices technical report will be used by the Cost/price Analysts to develop a recommended negotiating position. This detailed Government Position will be approved in a comprehensive Business Clearance Review consisting of review by senior ACC-WRN contracting officials. Certified Cost or Pricing Data will be required and will form the basis for this analysis. The results of negotiations and the detailed Price Fair and Reasonable Determination from the Contracting officer will be documented in a Post Negotiation memorandum that will be reviewed and concurred upon by senior Contracting personnel with the Pricing Division.

Typed Name: REYMUNDO MONCAYO Title: Procuring Contracting Officer Army Contracting Command - Warren

//RM// 14FEB2020

Signature Date

14. Procuring Contracting Officer Certification: "I certify that this justification is accurate and complete to the best of my knowledge and belief".

OPSEC

Typed Name: REYMUNDO MONCAYO Title: Contracting Officer Army Contracting Command - Warren

//RM// 14FEB2020

Signature Date

Budget data

File details come from the government source that posted it. Updated .