About this file
This document is a Cost Estimate for Bidding prepared by Calvin, Giordano & Associates, Inc. for the City Holiday Lighting Project (Holiday Lights in Median) Phase 3B in Dania Beach, Florida, dated 6/30/2025. The estimate covers the installation of underground electrical utility infrastructure through directional boring for holiday lighting displays in two medians on Dania Beach Boulevard, specifically the 7th and 8th medians starting from US-1 and moving east.
The cost estimate breaks down the project expenses into three main categories: Exhibit M construction at $111,953.73, a permitting allowance of $10,000.00, and an undefined contingency allowance of $50,000.00, resulting in a total construction cost of $171,953.73. The document includes a disclaimer noting that the estimate represents a "snapshot in time" and is subject to potential changes due to market volatility, labor costs, material prices, and other uncontrollable factors. The project is for the City of Dania Beach, with the engineering firm emphasizing the inherent uncertainties in long-term cost projections.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Estimate for Bidding
DATE
6/30/2025
PROJECT TITLE CGA PROJECT NO.
19-2777
LOCATION
OWNER
ESTIMATED BY HBH CHECKED BY JDM APPROVED BY HBH
I. EXHIBIT CONSTRUCTION COST
1.01 Exhibit M 1 LS $111,953.73 $111,953.73
1.02 Permitting Allowance 1 LS $10,000.00 $10,000.00
1.03 Undefined Contigency Allowance 1 LS $50,000.00 $50,000.00
EXHIBIT CONSTRUCTION COST SUBTOTAL $171,953.73
TOTAL CONSTRUCTION COST $171,953.73
Notes:
1. CGA has no control over costs of labor, materials, competitive bidding environments and procedures, unidentified field conditions, financial or market conditions, or other factors likely to affect these estimated costs, all of which are and will unavoidably remain in a state of change, especially considering the high volatility of the market attributable to Acts of God and other market events beyond the control of all parties. This estimate represents a "snapshot in time" that will inherently degrade over time.
ENGINEER'S OPINION OF
PROBABLE COST
City Holiday Lighting Project (Holiday Lights in Median) Phase 3B, City of Dania Beach
Dania Beach, FL
City of Dania Beach
ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT
File details come from the government source that posted it. Updated .