This document is a Statement of Work (SOW) for the Historic Window Restoration project at the Medgar and Myrlie Evers Home National Monument in Jackson, Mississippi. The project requires a contractor to comprehensively restore the home's existing steel casement windows, including complete paint and finish removal, rust elimination, hardware repair/replacement, broken glazing replacement, and refinishing using National Park Service-approved materials. Specific requirements include retaining original hardware wherever possible, replacing 12 individual broken window panes, applying a clear protective ballistic-resistant and UV-protective glazing film, and ensuring full window functionality while preserving the historic integrity of the windows.
The project has a 45-calendar day performance period from the Notice to Proceed, with work limited to weekday hours of 7:00 am to 4:00 pm Monday through Friday. Contractors must submit a detailed Technical Proposal demonstrating at least 10 years of experience restoring historic steel casement windows, including personnel listings, construction safety procedures for hazardous materials, and proposed restoration processes. The restoration must comply with the Secretary of the Interior's Standards for the Treatment of Historic Properties, with special care taken to avoid damaging adjacent exterior or interior materials and finishes. Payment will be processed upon project completion via an electronic invoicing system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Past_Performance.pdf | ||
| Service_Contract_Act_WD___2015-5153.pdf | ||
| Sol_140P5225Q0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL PARK SERVICE
Region IR2
Medgar and Myrlie Evers Home National Monument
Project Name:
Historic Window Restoration
PMIS No. : 340947 PEPC No: 121435
National Monument Jackson, MS 39213
07550 -2
Statement of Work
TABLE OF CONTENTS
I. SCOPE / BACKGROUND
II. PROJECT REQUIREMENTS
III. SPECIFICATIONS
IV. PHOTOGRAPHS / EXISTING CONDITIONS
V. BIDDERS TO VISIT SITE
VI. RESPONSIBILITY FOR EMPLOYEES
VII. DELIVERABLE
VIII. CONTRACT PERFORMANCE PERIOD
IX. WORKING HOUR RESTRICTIONS
X. PAYMENT
ATTACHMENT A – DRAWINGS, ELEVATIONS, AND WINDOW DIMENSIONS
ATTACHMENT B – CONDITION ASSESSMENT
07550 -3
I. SCOPE:
The contractor shall furnish all labor, materials, tools, equipment, and supervision necessary for the repair, restoration and refinishing of the existing steel casement windows of the Medgar and Myrlie Evers Home located at 2332 Margaret Walker Alexander Drive, Jackson, MS 39213. This project will be completed under a single prime contract. Window restoration will be completed per the Secretary of the Interior’s Standards for the Treatment of Historic Properties and requirements listed below. Work to include the removal and stripping of all paint/finish from existing windows and hardware, removal of all rust and deterioration, repair/replacement of any damaged or inoperable features or hardware, replacement of broken glazing (3 individual panes), refinishing with NPS-approved materials and color selections (prime, body and finish coats), and site cleanup. Special care to be taken as to not damage any of the existing adjacent exterior or interior materials and finishes.
Offerors are encouraged to propose process improvements and industry best practices in their proposals.
BACKGROUND: The Medgar and Myrlie Evers Home National Monument sits at 2332 Margaret Walker Alexander Street (formerly Guynes Street) in Jackson, Mississippi. It is significant at the local, state, and national level for its association with Medgar Wiley Evers and Myrlie Beasley Evers, who made major contributions to advancing the goals of the civil rights movement. It is also significant as the site of Medgar Evers’s assassination on June 12, 1963. A white supremacist shot and killed Medgar Evers in the carport of his home. His was the first murder of a nationally significant civil rights leader. The assassination focused national attention on the necessity for civil rights legislation and forced Myrlie Evers into a more prominent, national role for the NAACP where she continued to promote issues of racial equality and social justice.
II. PROJECT REQUIREMENTS:
• Technical Proposal with project schedule to describe the plan to complete the project.
Contractors are encouraged to provide detailed and specific information on their technical proposal for the project. This document shall address the contractor’s plan to complete each and all of the five (5) bulleted tasks identified below. This document allows the review of the contractor’s plan to ensure the contractor possesses a thorough understanding of what is required to complete the work. The Technical Proposal shall address what person/group/subcontractor is doing what, and in what order with expected time durations. At a minimum, proposed persons/contractors shall be listed that will perform the following tasks:
o Listing of all personnel and subcontractors o Experience restoring historic steel casement windows (min. experience of 10 years) o Proposed construction schedule and timing of activities.
o Construction Safety and Procedures pertaining to hazardous materials / lead-based paint o Proposed window restoration processes and procedures.
Note: windows to remain in-place and not to be removed.
A Technical Proposal is required as part of the proposal package and shall also be the basis for a Technical Approach. The Technical Approach shall be submitted and approved by the CO and COR prior to starting any work.
07550 -4
Window Restoration Requirements
1. Full Window Functionality
The contractor shall inspect, assess, and restore all steel casement windows to ensure full operability, including smooth opening, secure closing, and functional locking mechanisms.
All original hardware—including but not limited to hinges, handles, latches, stays, and limiters—shall be retained, repaired, and restored wherever possible.
Replacement of hardware shall only occur if repair is not feasible. Any replacement hardware must be in-kind, matching the original in material, design, finish, dimensions, and period-appropriate character to ensure preservation of the window’s historic integrity.
2. Removal and Replacement of Glazing
The contractor shall remove all existing glazing from each steel casement window— regardless of condition—and replace it with new glazing that is in-kind and historically appropriate, matching the original in:
• Size
• Thickness
• Visual quality
• Character
A total of twelve (12) individual panes have been identified as currently broken and shall be replaced accordingly.
3. Application of Protective Glazing Film
The contractor shall apply a clear, non-tinted protective glazing film to all windowpanes (new and existing). The film must meet the following minimum specifications:
• Ballistic-resistant (bulletproof or bullet-resistant) in accordance with an industry-recognized standard (e.g., UL 752 or equivalent)
• UV-protective, blocking a minimum of 99% of ultraviolet light
• Non-reflective and distortion-free, preserving the original character and appearance of the windows
• Compatible with historic materials and finishes
Application of the film shall be in accordance with the manufacturer’s specifications and recognized best practices to ensure unobtrusive appearance, long-term durability, and no impact to operability or aesthetics of the historic windows.
07550 -5
• After project award, the contractor shall complete a site visit to field verify all conditions and requirements for all windows and related components. The total area of windows is approximately 185 square feet. Refer to Attachment A: drawings, elevations and window dimensions.
• If applicable, all permitting requirements and associated costs are the responsibility of the contractor. All requirements to follow and complete the permit through construction and permit closeout is the responsibility of the contractor.
• Prepare and submit submittals required by this SOW and individual specifications. All submittal approvals are required before commencement of work.
• A Contractor Safety Plan is required for this project. As with many old and new building materials, potential hazards exist in historic steel windows that require careful handling.
Lead-based paint is likely among the built-up paint layers found on casements. Refer to the lead sample documentation along with the recommendations for lead-based paint in the NPS-provided condition assessment (Attachment B).
• Contractor shall have limited use of site for construction operations. Do not disturb portions of project site beyond areas in which the work is indicated. Confine parking and storage of materials to locations identified by NPS.
• Removal of all demolition debris and material from site. Construction and demolition debris shall be disposed of in accordance with all environmental local, state and federal requirements.
• Site cleanup.
III. SPECIFICATIONS
PAINTING
PART 1 - GENERAL
1.1 DESCRIPTION
A. Work of this Section includes all labor, materials, equipment, and services necessary to complete the painting and finishing as shown on the construction documents and/or specified herein, including, but not limited to, the following:
1. Prime painting unprimed surfaces to be painted under this Section.
2. Painting items furnished with a prime coat of paint, including touching up of or repairing of abraded, damaged or rusted prime coats applied by others.
3. Painting ferrous metal exposed to view.
4. Painting gypsum drywall exposed to view.
5. Incidental painting and touching up as required to produce proper finish for painted
07550 -6 surfaces.
6. Painting of any surface not specifically mentioned to be painted herein or on construction documents, but for which painting is obviously necessary to complete the job, or work which comes within the intent of these specifications, is to be included as though specified.
1.2 RELATED WORK
A. Section 02 83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL: Lead Paint
Removal.
B. Division 23 HEATING; VENTILATION AND AIR-CONDITIONING: Shop prime painting of steel and ferrous metals.
C. Division 26 ELECTRICAL: Shop prime painting of steel and ferrous metals.
D. Division 27 COMMUNICATIONS: Shop prime painting of steel and ferrous metals.
E. Division 28 ELECTRONIC SAFETY AND SECURITY: Shop prime painting of steel and ferrous metals.
F. Division 32 EXTERIOR IMPROVEMENTS: Shop prime painting of steel and ferrous metals.
G. Section 32 17 23, PAVEMENT MARKINGS: Asphalt and concrete pavement marking.
1.3 SUBMITTALS
A. Painter qualifications.
B. Manufacturer's Literature and Data:
1. Before work is started, or sample panels are prepared, submit manufacturer's literature and technical data, the current Master Painters Institute (MPI) "Approved Product List" indicating brand label, product name and product code as of the date of contract award, will be used to determine compliance with the submittal requirements of this specification. The Contractor may choose to use subsequent MPI "Approved Product
List", however, only one (1) list may be used for the entire contract and each coating system is to be from a single manufacturer. All coats on a particular substrate must be from a single manufacturer. No variation from the MPI "Approved Product List" where applicable is acceptable.
C. Sample Panels:
1. After painters' materials have been approved and before work is started, submit sample
07550 -7 panels showing each type of finish and color specified.
2. Panels to Show Color: Composition board, 100 x 250 mm (4 x 10 inch).
1.4 DELIVERY AND STORAGE
A. Deliver materials to site in manufacturer's sealed container marked to show following:
1. Name of manufacturer.
2. Product type.
3. Batch number.
4. Instructions for use.
5. Safety precautions.
B. In addition to manufacturer's label, provide a label legibly printed as following:
1. Federal Specification Number, where applicable, and name of material.
2. Surface upon which material is to be applied.
3. Specify Coat Types: Prime; body; finish; etc.
C. Maintain space for storage, and handling of painting materials and equipment in a ventilated, neat and orderly condition to prevent spontaneous combustion from occurring or igniting adjacent items.
D. Store materials at site at least 24 hours before using, at a temperature between 7 and 30 degrees C (45 and 85 degrees F).
1.5 QUALITY ASSURANCE
A. Qualification of Painters: Use only qualified journeyman painters for the mixing and application of paint on exposed surfaces. Submit evidence that key personnel have successfully performed surface preparation and application of coating on a minimum of three
(3) similar projects within the past three (3) years.
B. Paint Coordination: Provide finish coats which are compatible with the prime paints used.
Review other Sections of these specifications in which prime paints are to be provided to ensure compatibility of the total coatings system for the various substrates. Upon request from other subcontractors, furnish information on the characteristics of the finish materials proposed to be used, to ensure that compatible prime coats are used. Provide barrier coats over incompatible primers or remove and re-prime as required. Notify the Contracting
Officer Representative (COR) in writing of any anticipated problems using the coating systems as specified with substrates primed by others.
1.6 REGULATORY REQUIREMENTS
A. Paint materials are to conform to the restrictions of the local Environmental and Toxic
Control jurisdiction.
1. Volatile Organic Compounds (VOC) Emissions Requirements: Field-applied paints and coatings that are inside the waterproofing system to not exceed limits of authorities having jurisdiction.
2. Lead-Base Paint:
a. Comply with Section 410 of the Lead-Based Paint Poisoning Prevention Act, as amended, and with implementing regulations promulgated by Secretary of Housing and Urban Development.
b. Regulations concerning prohibition against use of lead-based paint in federal and federally assisted construction, or rehabilitation of residential structures are set forth in Subpart F, Title 24, Code of Federal Regulations, Department of Housing and
Urban Development.
c. Do not use coatings having a lead content over 0.06 percent by weight of non-volatile content.
d. For lead-paint removal, see Section 02 83 33.13, LEAD-BASED PAINT REMOVAL
AND DISPOSAL.
PART 2 - PRODUCTS
2.1 MATERIALS:
A. Conform to the coating specifications and standards referenced in PART 3. Submit manufacturer’s technical data sheets for specified coatings and solvents.
2.2 PAINT PROPERTIES:
A. Use ready-mixed paint.
B. Where no requirements are given in the referenced specifications for primers, use primers with pigment and vehicle, compatible with substrate and finish coats specified.
C. Provide undercoat paint produced by the same manufacturer as the finish coats. Use only thinners approved by the paint manufacturer and use only to recommended limits.
D. //VOC Content: For field applications that are inside the weatherproofing system, paints and coating to comply with VOC content limits of authorities having jurisdiction and the following VOC content limits:
1. Flat Paints and Coatings: 50 gram/liter.
2. Non-flat Paints and Coatings: 150 gram/liter.
3. Dry-Fog Coatings: 400 gram/liter. 07550 -7
07550 -8
4. Primers, Sealers, and Undercoaters: 200 gram/liter.
5. Anticorrosive and Antirust Paints applied to Ferrous Metals: 250 gram/liter.
6. Zinc-Rich Industrial Maintenance Primers: 340 gram/liter.
7. Pretreatment Wash Primers: 420 gram/liter.
8. Shellacs, Clear: 730 gram/liter.
9. Shellacs, Pigmented: 550 gram/liter. //
E. VOC test method for paints and coatings is to be in accordance with 40 CFR 59 (EPA
Method 24). Part 60, Appendix A with the exempt compounds’ content determined by
Method 303 (Determination of Exempt Compounds) in the South Coast Air Quality
Management District’s (SCAQMD) “Laboratory Methods of Analysis for Enforcement
Samples” manual.
PART 3 - EXECUTION
3.1 JOB CONDITIONS:
A. Safety: Observe required safety regulations and manufacturer's warning and instructions for storage, handling and application of painting materials.
1. Take necessary precautions to protect personnel and property from hazards due to falls, injuries, toxic fumes, fire, explosion, or other harm.
2. Deposit soiled cleaning rags and waste materials in metal containers approved for that purpose. Dispose of such items off the site at end of each day’s work.
B. Atmospheric and Surface Conditions:
1. Do not apply coating when air or substrate conditions are:
a. Less than 3 degrees C (5 degrees F) above dew point.
b. Below 10 degrees C (50 degrees F) or over 35 degrees C (95 degrees F), unless specifically pre-approved by the COR and the product manufacturer. Under no circumstances are application conditions to exceed manufacturer recommendations.
c. When the relative humidity exceeds 85 percent; or to damp or wet surfaces; unless otherwise permitted by the paint manufacturer’s printed instructions.
2. Maintain interior temperatures until paint dries hard.
3. Do no exterior painting when it is windy and dusty.
4. Do not paint in direct sunlight or on surfaces that the sun will warm.
5. Apply only on clean, dry and frost-free surfaces.
07550 -9
3.2 INSPECTION:
A. Examine the areas and conditions where painting and finishing are to be applied and correct any conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions are corrected to permit proper installation of the work.
3.3 GENERAL WORKMANSHIP REQUIREMENTS:
A. Application may be by brush or roller. Spray application only upon acceptance from the
COR in writing.
B. Furnish to the COR a painting schedule indicating when the respective coats of paint for the various areas and surfaces will be completed. This schedule is to be kept current as the job progresses.
C. Protect work at all times. Protect all adjacent work and materials by suitable covering or other method during progress of work. Upon completion of the work, remove all paint spots from floors, glass and other surfaces. Remove from the premises all rubbish and accumulated materials of whatever nature not caused by others and leave work in a clean condition.
D. Remove and protect hardware, accessories, and similar items, or provide in place protection.
Upon completion of each space, carefully replace all removed items by workmen skilled in the trades involved.
E. Materials are to be applied under adequate illumination, evenly spread and flowed on smoothly to avoid runs, sags, holidays, brush marks, air bubbles and excessive roller stipple.
F. Apply materials with a coverage to hide substrate completely. When color, stain, dirt or undercoats show through final coat of paint, the surface is to be covered by additional coats until the paint film is of uniform finish, color, appearance and coverage, at no additional cost to the Government.
G. All coats are to be dry to manufacturer’s recommendations before applying succeeding coats.
3.4 SURFACE PREPARATION:
A. General:
1. The Contractor shall be held wholly responsible for the finished appearance and satisfactory completion of painting work. Properly prepare all surfaces to receive paint, which includes cleaning, sanding, and touching-up of all prime coats applied under other
Sections of the work. Broom clean all spaces before painting is started. All surfaces to be painted or finished are to be completely dry, clean and smooth.
07550 -10
2. Perform preparation and cleaning procedures in strict accordance with the paint manufacturer’s instructions and as herein specified, for each particular substrate condition.
3. Clean surfaces before applying paint or surface treatments with materials and methods compatible with substrate and specified finish. Remove any residue remaining from cleaning agents used. Do not use solvents, acid, or steam on concrete and masonry.
Schedule the cleaning and painting so that dust and other contaminants from the cleaning process will not fall in wet, newly painted surfaces.
B. Ferrous Metals:
1. Remove oil, grease, soil, drawing and cutting compounds, flux and other detrimental foreign matter in accordance with SSPC-SP 1 (Solvent Cleaning).
2. Remove loose mill scale, rust, and paint, by hand or power tool cleaning, as defined in
SSPC-SP 2 (Hand Tool Cleaning) and SSPC-SP 3 (Power Tool Cleaning).
3. Spot prime abraded and damaged areas which expose bare metal of factory finished items with paint as recommended by manufacturer of item.
3.5 PAINT PREPARATION:
A. Thoroughly mix painting materials to ensure uniformity of color, complete dispersion of pigment and uniform composition.
B. Do not thin unless necessary for application and when finish paint is used for body and prime coats. Use materials and quantities for thinning as specified in manufacturer's printed instructions.
C. Remove paint skins, then strain paint through commercial paint strainer to remove lumps and other particles.
D. Mix two (2) component and two (2) part paint and those requiring additives in such a manner as to uniformly blend as specified in manufacturer's printed instructions unless specified otherwise.
E. For tinting required to produce exact shades specified, use color pigment recommended by the paint manufacturer.
3.6 APPLICATION:
A. Start of surface preparation or painting will be construed as acceptance of the surface as satisfactory for the application of materials.
07550 -11
B. Unless otherwise specified, apply paint in three (3) coats; prime, body, and finish. When two
(2) coats applied to prime coat are the same, first coat applied over primer is body coat and second coat is finish coat.
C. Apply each coat evenly and cover substrate completely.
D. Allow not less than 48 hours between application of succeeding coats, except as allowed by manufacturer's printed instructions, and approved by COR.
E. Apply by brush or roller. Spray application for new or existing occupied spaces only upon approval by acceptance from COR in writing.
F. Do not paint in closed position operable items such as window sashes and similar items.
3.7 PRIME PAINTING:
A. After surface preparation, prime surfaces before application of body and finish coats.
B. Spot prime and apply body coat to damaged and abraded painted surfaces before applying succeeding coats.
C. Metals:
1. Steel and iron: MPI 95 (Fast Drying Metal Primer).
3.8 EXTERIOR FINISHES:
A. Apply following finish coats. .
B. Steel and Ferrous Metal //, Including Tern //:
1. Two (2) coats of // MPI 8 (Exterior Alkyd, Flat) // // MPI 9 (Exterior Alkyd Enamel) // //
MPI 94 (Exterior Alkyd, Semi-Gloss) // on exposed surfaces, except on surfaces over 94 degrees C (201 degrees F).
3.9 INTERIOR FINISHES:
A. Apply following finish coats over prime coats in spaces or on surfaces specified.
B. Metal Work:
1. Apply to exposed surfaces.
2. Ferrous Metal, Galvanized Metal, and Other Metals Scheduled:
a. Apply two (2) coats of MPI 47 (Interior Alkyd, Semi-Gloss) unless specified otherwise.
b. Two (2) coats of // MPI 48 (Interior Alkyd Gloss) // // MPI 51 (Interior Alkyd, Eggshell) //.
07550 -12
c. One (1) coat of MPI 46 (Interior Enamel Undercoat) plus one coat of MPI 47 (Interior
Alkyd, Semi-Gloss) on exposed interior surfaces of alkyd-amine enamel prime finished windows.
C. Gypsum Board:
1. One (1) coat of // MPI 45 (Interior Primer Sealer) // // MPI 46 (Interior Enamel
Undercoat) // plus one (1) coat of MPI 139 (Interior High Performance Latex, MPI Gloss level 3).
2. Two (2) coats of MPI 138 (Interior High Performance Latex, MPI Gloss Level 2).
3. One (1) coat of // MPI 45 (Interior Primer Sealer) // // MPI 46 (Interior Enamel
Undercoat) // plus one (1) coat of MPI 54 (Interior Latex, Semi-Gloss, MPI Gloss Level
5) or MPI 114 (Interior Latex, Gloss).
4. One (1) coat of // MPI 45 (Interior Primer Sealer) // MPI 46 (Interior Enamel Undercoat)
// plus one (1) coat of MPI 48 (Interior Alkyd Gloss).
D. Plaster:
1. One (1) coat of // MPI 45 (Interior Primer Sealer) // MPI 46 (Interior Enamel Undercoat)
// MPI 50 (Interior Latex Primer Sealer) // plus one (1) coat of MPI 139 (Interior High
Performance Latex, MPI Gloss level 3).
2. Two (2) coats of MPI 51 (Interior Alkyd, Eggshell).
3. One (1) coat of // MPI 45 (Interior Primer Sealer) // // MPI 46 (Interior Enamel
Undercoat) // or MPI 50 (Interior Latex Primer Sealer) plus one (1) coat of 139 (Interior
High Performance Latex, MPI Gloss level 3).
4. One (1) coat MPI 101 (Cold Curing Epoxy Prime).
E. Masonry and Concrete Walls:
1. Over MPI 4 (Interior/Exterior Latex Block Filler) on CMU surfaces.
2. Two (2) coats of // MPI 53 (Interior Latex, Flat, MPI Gloss Level 1) // // MPI 52 (Interior
Latex, MPI Gloss Level 3) // // MPI 54 (Interior Latex, Semi-Gloss, MPI Gloss Level 5)
// // MPI 114 (Interior Latex, Gloss) //.
3. Two (2) coats of // MPI 138 (Interior High Performance Latex, MPI Gloss Level 2) // //
MPI 139 (Interior High Performance Latex, MPI Gloss Level 3) // // MPI 140 (Interior
High Performance Latex MPI Gloss Level 4) // // MPI 141 (Interior High Performance
Latex MPI Gloss Level 5) // // MPI 114 (Interior Latex, Gloss) //.
F. Wood:
1. Sanding:
07550 -13
a. Use 220-grit sandpaper.
b. Sand sealers and varnish between coats.
c. Sand enough to scarify surface to assure good adhesion of subsequent coats, to level roughly applied sealer and varnish, and to knock off "whiskers" of any raised grain as well as dust particles.
2. Sealers:
a. MPI 31 (gloss) or MPI 71 (flat) thinned as recommended by manufacturer at rate of one (1) part of thinner to four (4) parts of varnish.
b. Apply sealers specified except sealer may be omitted where pigmented, penetrating, or wiping stains containing resins are used.
c. Allow manufacturer's recommended drying time before sanding, but not less than 24 hours or 36 hours in damp or muggy weather.
d. Sand as specified.
3. Paint Finish:
a. One (1) coat of // MPI 45 (Interior Primer Sealer) // // MPI 46 (Interior Enamel
Undercoat) // plus one (1) coat of MPI 47 (Interior Alkyd, Semi-Gloss.
b. One (1) coat // MPI 66 (Interior Alkyd Fire retardant, Clear Top-Coat (UL Approved)
// // MPI 67 (Interior Latex Fire Retardant, Top-Coat (UL Approved), intumescent type, on exposed wood // in attics with floors used for mechanical equipment // // and above ceilings where shown //.
c. One (1) coat of // MPI 45 Interior Primer Sealer) // // MPI 46 (Interior Enamel
Undercoat) // plus one (1) coat of MPI 48 (Interior Alkyd Gloss).
d. Two (2) coats of MPI 51 (Interior Alkyd, Eggshell).
3.10 REFINISHING EXISTING PAINTED SURFACES:
A. Clean, patch and repair existing surfaces as specified under “Surface Preparation”. No
“telegraphing” of lines, ridges, flakes, etc., through new surfacing is permitted. Where this occurs, sand smooth and re-finish until surface meets with COR’s approval.
B. Remove existing finishes or apply separation coats to prevent non compatible coatings from having contact.
C. Patched or Replaced Areas in Surfaces and Components: Apply spot prime and body coats as specified for new work to repaired areas or replaced components.
D. Except where scheduled for complete painting apply finish coat over plane surface to nearest break in plane, such as corner, reveal, or frame.
E. In existing rooms and areas where alterations occur, clean existing stained and natural finished wood retouch abraded surfaces and then give entire surface one (1) coat of // MPI 31
(Polyurethane, Moisture Cured, Clear Gloss) // // MPI 71 (Polyurethane, Moisture Cured, Clear Flat) //.
F. Refinish areas as specified for new work to match adjoining work unless specified or scheduled otherwise.
G. Coat knots and pitch streaks showing through old finish with MPI 36 (Knot Sealer) before refinishing.
H. Sand or dull glossy surfaces prior to painting.
I. Sand existing coatings to a feather edge so that transition between new and existing finish will not show in finished work.
3.11 PAINT COLOR:
A. Color and gloss of finish coats to by provided by NPS.
B. Coat Colors:
1. Color of priming coat: Lighter than body coat.
2. Color of body coat: Lighter than finish coat.
3. Color prime and body coats to not show through the finish coat and to mask surface imperfections or contrasts.
3.12 PROTECTION CLEAN UP, AND TOUCH-UP:
A. Protect work from paint droppings and spattering by use of masking, drop cloths, removal of items or by other approved methods.
B. Upon completion, clean paint from hardware, glass and other surfaces and items not required to be painted of paint drops or smears.
C. Before final inspection, touch-up or refinished in a manner to produce solid even color and finish texture, free from defects in work which was damaged or discolored.
- - - E N D - - -
IV. PHOTOGRAPHS / EXISTING CONDITIONS:
Front of home Rear of home
West (carport) window East side of home
V. BIDDERS TO VISIT SITE: All bidders are expected to visit the site of the work and to inform themselves as to all existing conditions. Failure to do so in no way relieves the successful bidder from the necessity of furnishing all equipment and materials and performing all work required for the completion of the contract in conformity with all specifications.
No allowance will be made for the failure of the bidder correctly to estimate the difficulties attending the execution of the work.
VI. RESPONSIBILITY FOR EMPLOYEES: The contractor shall be responsible for the safety of his employees and for any injury or damage done to or by them from any source or cause. He shall save and hold the United States free from all claims for damages to all persons and (or) property arising from the execution of the work covered by these specifications.
The contractor shall make good at his own expense all damage to any property of the United States, arising from his operations under these specifications, or from the fault or neglect of any of his employees.
VII. DELIVERABLE: The deliverable for this project is the satisfactorily completion for all required work under this contract. All equipment, tools, surplus materials, and rubbish shall be removed upon completion of work.
VIII. CONTRACT PERFORMANCE PERIOD: 45 calendar days from Notice to Proceed.
IX. WORKING HOUR RESTRICTIONS: Contractor shall conduct his operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent. All work and deliveries shall be limited to the weekday hours of 7:00 am to 4:00 pm Monday through Friday, unless otherwise approved by the Contracting Officer or COR. No work shall occur on National Park Service holidays or weekends without prior approval.
No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
X. PAYMENT: Payments will be processed upon completion of project and need to be submitted to and processed via the electronic invoicing system. Information can be found at www.ipp.gov.
http://www.ipp.gov/
| II. PROJECT REQUIREMENTS: |
| III. SPECIFICATIONS |
| 1.1 DESCRIPTION |
| 1.2 RELATED WORK |
| 1.3 SUBMITTALS |
| 1.4 DELIVERY AND STORAGE |
| 1.5 QUALITY ASSURANCE |
| 1.6 REGULATORY REQUIREMENTS |
| 2.1 MATERIALS: |
| 2.2 PAINT PROPERTIES: |
| 3.1 JOB CONDITIONS: |
| 3.2 INSPECTION: |
| 3.3 GENERAL WORKMANSHIP REQUIREMENTS: |
| 3.4 SURFACE PREPARATION: |
| 3.5 PAINT PREPARATION: |
| 3.6 APPLICATION: |
| 3.7 PRIME PAINTING: |
| 3.8 EXTERIOR FINISHES: |
| 3.9 INTERIOR FINISHES: |
| 3.10 REFINISHING EXISTING PAINTED SURFACES: |
| 3.11 PAINT COLOR: |
| 3.12 PROTECTION CLEAN UP, AND TOUCH-UP: |
| IV. PHOTOGRAPHS / EXISTING CONDITIONS: |