High Street Drainage Improvements_Construction Plans.pdf
PDF 23 MB Posted
- Attached to
- High Street Drainage Improvements Project
- Solicitation number
- BD-25-1249-BDPW4-400-118040
- Issued by
- Bristol County, Boston City, Massachusetts
View the file
Other files
| File | Type | Posted |
|---|---|---|
| High Street Drainage Improvements_Bid Documents.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MH#14
MH
#16
HIGH STREET
TO
W
N
RIVER
TOW
N RIVER HIGH STREET
WALL STREET
PROJECT SITE VICINITY MAP:
PREPARED BY:
LOCATION MAP:
HIGH STREET
BRIDGEWATER, MASSACHUSETTS
CONSTRUCTION PLANS
JUNE 6, 2025
PREPARED FOR:
TOWN OF BRIDGEWATER
66 CENTRAL SQUARE
BRIDGEWATER, MA 02324
0' 50' 100'
SCALE 1" = 100'
0 1/2" 1"
0' 1500' 3000'
SCALE 1" = 1500'
0 1/2" 1"
Know what's below.
before you dig.Call
R www.digsafe.com
99 REALTY DRIVE
CHESHIRE, CT 06410
203.271.1773
SLRCONSULTING.COM
HIGH STREET DRAINAGE
IMPROVEMENTS
PROJECT SITE
LIST OF DRAWINGS
NO. NAME TITLE
01 -- TITLE
02 IN-1 INDEX
03 EX-1 EXISTING CONDITIONS
04 EX-2 EXISTING CONDITIONS
05 UT-1 UTILITY PLAN
06 UT-2 UTILITY PLAN
07 LA-1 LAYOUT & RESTORATION PLAN
08 LA-2 LAYOUT & RESTORATION PLAN
09 CP-1 CONSTRUCTION PLAN
10 MPT-1 MAINTENANCE & PROTECTION OF TRAFFIC PLAN
11 SE-1 SEDIMENTATION & EROSION CONTROL DETAILS
12 DE-1 DETAILS
17+00
0+00 1+00
2+00 3+00
4+00 5+00
6+00 7+00
8+00 9+00
10+00 11+00 12+00
13+00
14+00
15+00
16+00
L38 L39 L40 L41 L42 L43 L1 L2 L3 L4
L5 L6
L7 L8
L9 L10
L11 L12
L13 L14 L15 L16 L17 L18 L19 L20
L21 L22 L23 L24 L25 L26 L27 L28
L29
L30
L31
L32
L33
L34
L35
C1
BASELINE GEOMETRY TABLE:
HIGH STREET
SEGMENT
NUMBER
L38
L39
L40
L41
L42
L43
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19
L20
L21
L22
L23
L24
L25
L26
L27
L28
L29
L30
L31
C1
L32
L33
L34
L35
SEGMENT
LENGTH
29.4'
31.1'
25.3'
30.2'
25.3'
28.4'
30.6'
36.5'
64.1'
41.0'
56.6'
57.1'
52.3'
56.8'
53.3'
63.3'
25.6'
56.2'
40.4'
29.6'
48.7'
42.3'
35.8'
41.4'
37.9'
30.2'
14.9'
21.3'
9.2'
19.5'
29.8'
17.4'
10.9'
33.2'
55.4'
46.8'
43.7'
59.3'
30.9'
45.0'
114.2'
41.5'
CURVE
RADIUS
188.4'
LINE DIRECTION
N34.9E
N35.1E
N34.9E
N35.3E
N34.9E
N35.2E
N35.1E
N35.0E
N35.0E
N34.9E
N34.0E
N32.9E
N32.7E
N32.7E
N32.8E
N33.0E
N33.0E
N32.9E
N33.4E
N33.2E
N33.8E
N35.4E
N38.0E
N42.2E
N44.1E
N46.6E
N48.0E
N47.6E
N49.3E
N47.3E
N48.2E
N49.3E
N51.8E
N53.1E
N56.9E
N59.4E
N60.5E
N69° 41' 31.14"E
N78.2E
N78.3E
N79.3E
N79.3E
CURVE
CHORD
DIRECTION
N69.7E
CURVE
CHORD
LENGTH
59.0'
SHEET NAME
DATE
IN-1
PROJECT NO.
DESIGNED
TMD
SCALE
DRAWN
GAB
CHECKED
WAG
S
W
N
E
JUNE 6, 2025
21408.00002
1"=60'
IN
D
EX
B R
ID
G
EW
A
TE
R
, M A
SS
A
C H
U
SE
TT
S
H
IG
H S
TR
EE
T D
R A
IN
A
G E
IM
PR
O
VE
M
EN
TS
H
IG
H S
TR
EE
T
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
C O
N
ST
R U
C
TI
O N
P
LA
N S
0' 30' 60'
0 1/2" 1"
Copyright SLR International Corporation - 2021
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
SEE SHEET EX-1, UT-1 & LA-1
SEE SHEET EX-2, UT-2 & LA-2
1. SURVEY INFORMATION IS BASED ON A FIELD SURVEY BY SHERMAN & FRYDRYK, LLC. DATED BETWEEN OCTOBER 4, 2018 AND OCTOBER 25, 2018.
2. HORIZONTAL DATUM IS NAD83 AND WAS ESTABLISHED AT THIS SITE BY GPS METHODS.
3. VERTICAL DATUM IS NAVD88. A BENCHMARK ON NG 16, AS SHOWN ON THIS PLAN, WAS PROVIDED BY MILONE & MACBROOM AND USED FOR THIS SURVEY.
THE BENCHMARK IS A SPIKE FOUND ELEV. = 51.60.
4. LOCATIONS OF UTILITIES SHOWN HEREON ARE THE RESULTS OF SURFACE EVIDENCE AS LOCATED BY FIELD SURVEY, PLANS OF RECORD, AND OTHER AVAILABLE SOURCES. THIS PLAN DOES NOT NECESSARILY DEPICT THE EXACT LOCATIONS OF ALL UTILITIES WHICH MAY EXIST AT THIS TIME WITHIN THE
PREMISES SURVEYED.
5. THE CONTRACTOR SHOULD VERIFY THE EXISTING CONDITIONS TO HIS SATISFACTION PRIOR TO BEGINNING ANY EXCAVATION. "DIG SAFE" SHALL BE
NOTIFIED AT LEAST 72 HOURS PRIOR TO BEGINNING ANY WORK.
SHERMAN & FRYDRYK MAPPING AND SURVEY NOTES:
1. THE ELEVATIONS SHOWN ON THIS SURVEY ARE BASED ON THE FOLLOWING BENCHMARK: "BENCH TIE IN POLE NG 16", ELEVATION=51.60 (DATUM: NAVD 88). SAID BENCHMARK IS SHOWN ON PLAN ENTITLED: "EXISTING CONDITIONS, TOWN RIVER RESTORATION PROJECT, HIGH STREET, BRIDGEWATER, MASSACHUSETTS", DATED MARCH 15, 2019, PREPARED BY MILONE & MACBROOM.
2. THE COORDINATES SHOWN ON THIS SURVEY ARE BASED ON THE NORTH AMERICAN DATUM OF 1983 (NAD83) IN THE MASSACHUSETTS MAINLAND ZONE.
THE COORDINATES ARE BASED ON CONTROL POINTS PROVIDED (WITH COORDINATES) ON PLAN ENTITLED: "TOPOGRAPHIC SURVEY WORKSHEET, HIGH STREET DAM, FISH PASSAGE AND REMOVAL FEASIBILITY STUDY, HIGH STREET, BRIDGEWATER, MASSACHUSETTS", DATED MAY 04, 2017, PREPARED AND
PROVIDED BY MILONE & MACBROOM.
3. INVERTS, PIPE SIZES, AND PIPE CLASSIFICATIONS FOR SANITARY SEWER AND STORM DRAIN SYSTEMS, AS SHOWN HEREON, WERE DETERMINED BY INSPECTION AND MEASUREMENTS PERFORMED AT GROUND SURFACE LEVEL (STRUCTURES WERE NOT PHYSICALLY ENTERED). THE RESULTS OF THE INSPECTIONS AND MEASUREMENTS MAY VARY FROM ACTUAL CONDITIONS AS COULD BE DETERMINED BY EXCAVATION OR USE OF CONFINED SPACE ENTRY PERSONNEL AND/OR EQUIPMENT. UNDERGROUND UTILITY LOCATIONS AS SHOWN HEREON ARE TAKEN FROM AVAILABLE RECORD AND FIELD INFORMATION
AND ARE APPROXIMATE ONLY. CONTACT DIG-SAFE BEFORE PLANNING ANY CONSTRUCTION.
4. PROJECT BENCHMARK "A" RAILROAD SPIKE SET IN EAST FACE OF UTILITY POLE #8 ON EAST SIDE OF HIGH STREET OPPOSITE HOUSE #82 ELEV=69.38 (DATUM NAVD 88.) PROJECT BENCHMARK "B" XCUT SET ON HYDRANT BONNET BOLT ADJACENT TO LETTER "R" IN "MUELLER" ELEV=91.28 (DATUM NAVD 88.)
PROJECT BENCHMARK "C" RAILROAD SPIKE SET IN EAST FACE OF NET&T UTILITY POLE #2-1 AT NORTHEAST CORNER OF HIGH STREET & MAIN STREET
INTERSECTION ELEV=101.98 (DATUM NAVD 88.)
WELCH ASSOCIATES LAND SURVEYORS SURVEY NOTES:
MAPPING AND SURVEY NOTES:
1. TOPOGRAPHIC INFORMATION IS BASED UPON GROUND SURVEY PERFORMED BY SLR INTERNATIONAL CORPORATION (SLR) ON JULY 11, 2024.
2. SURVEY OF DRAINAGE STRUCTURES IS BASED UPON GROUND SURVEY PERFORMED BY THE TOWN OF BRIDGEWATER ON MARCH 2, 2025.
3. HORIZONTAL MAPPING IS REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (NAD83), IN THE MASSACHUSETTS MAINLAND ZONE. ELEVATION DATA IS REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88). ALL CONTOURS ARE PRESENTED IN FEET.
4. SLR ACCEPTS NO RESPONSIBILITY FOR THE ACCURACY OF MAPS AND DATA WHICH HAVE BEEN SUPPLIED BY OTHERS.
5. LIDAR TOPOGRAPHY OUTSIDE THE LIMITS OF GROUND SURVEY PROVIDED BY MASS GIS 2013-2014 SANDY DATA SET AT 1' CONTOUR INTERVALS.
6. PROPERTY BOUNDARY INFORMATION WAS PROVIDED IN GIS FORMAT, AND IS FOR INFORMATIONAL PURPOSES ONLY. ASSESSORS INFORMATION IS APPROXIMATE, AND SHOULD NOT BE CONSIDERED COMPLETE OR CURRENT FOR PURPOSES OF CONSTRUCTION AND/OR EASEMENT NEGOTIATION.
7. INFORMATION REGARDING THE LOCATION OF EXISTING UTILITIES HAS BEEN BASED UPON AVAILABLE INFORMATION AND MAY BE INCOMPLETE, AND WHERE SHOWN SHOULD BE CONSIDERED APPROXIMATE. THE LOCATION OF ALL EXISTING UTILITIES SHOULD BE CONFIRMED PRIOR TO BEGINNING CONSTRUCTION. CONTACT "DIG SAFE MASSACHUSETTS" BY CALLING 811. ALL UTILITY LOCATIONS THAT DO NOT MATCH THE VERTICAL OR HORIZONTAL CONTROL SHOWN ON THE PLANS SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION.
8. ALL DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER FOR DETERMINATION.
SLR INTERNATIONAL CORPORATION & TOWN OF BRIDGEWATER MAPPING AND SURVEY NOTES:
HIGH STREET
HIGH STREET
HIGH STREET
WALL STREET
TO
W
N
RIVER
M
AI
N
ST
RE
ET
N/F
STOLL REALTY TRUST
BK. 41627 PG. 66
ID: 10-61-0
N/F
BRIAN J. & KELLY A. COFFEY
BK. 49972 PG. 163
ID: 10-31-0
N/F
FRANCISCO M. &
M. YVONNE VICENTE
BK. 8049 PG. 185
ID: 10-32-0
N/F
IAN J. DOBBS
BK. 35978 PG. 136
ID: 10-60-0
N/F
JASON P. BROGAN
BK. 50290 PG. 219
ID: 10-59-0
N/F
SARAH PAULINE & JOHN
EDWARD NORRIS
BK. 38473 PG. 108
ID: 10-33-0
N/F
36 HIGH STREET
IRREVOCABLE TRUST
BK. 44051 PG. 58
ID: 10-58-0
N/F
STEVEN & ANTOINETTE
C. DURRANE
BK. 47811 PG. 133
ID: 10-57-0
N/F
RONALD E. AMBER
BK. 20810 PG. 348
ID: 10-34-0
N/F
MARY A. LEONARD
BK. 33720 PG. 349
ID: 10-35-0
N/F
STEVEN & LISA WELBY
BK. 23862 PG. 230
ID: 10-37-0
N/F
GCP CORPORATION
BK. 17608 PG. 272
ID: 10-29-0
N/F
GHELFI FAMILY REALTY TRUST
BK. 46786 PG. 81
ID: 10-38-0
N/F
LEANNE DELANEY
L.CT. CERT #116067
ID: 10-160-0
N/F
ANGELO L. D'EMILIA, RALPH F. D'EMILIA,
& STEFANO M. D'EMILIA
BK. 13922 PG. 234
ID: 10-55-0
N/F
MARY GOODHUE LYNCH
L.CT. CERT #120814
ID: 10-39-0
N/F
GINA D'EMILIA
BK. 44218 PG. 206
ID: 10-54-0
N/F
91-93 HIGH STREET REALTY TRUST
L.CT. CERT #111577
ID: 10-169-0
N/F
MICHAEL J. EVANS
BK. 36497 PG. 321
ID: 10-53-0
N/F
KEITH J. NELSON & LISA J. DENNEN
BK. 34730 PG. 191
ID: 10-51-0
N/F
TOWN OF BRIDGEWATER
BK. 14784 PG. 87
ID: 10-40-0
M.E.M. REALTY TRUST
BK. 11179 PG. 259 PARCEL A
ID: 10-47-0
120 HIGH ST.
N/F
TOWN OF BRIDGEWATER
BK. 14784 PG. 87 PARCEL A
N/F
LINCOLN ATHLETIC
ASSOCIATION
BK. 1766 PG. 144
ID: 10-46-0
150 HIGH ST.
N/F
M.E.M. REALTY TRUST
BK. 11179 PG. 259
PARCEL B
ID: 10-41-0
N/F
M.E.M. REALTY TRUST
BK. 11179 PG. 259 PARCEL A
ID: 10-47-0
120 HIGH ST.
N/F FRANCIS M. FERIOLI et.al.
BK. 40972 PG. 163
ID: 10-45-0
18 WALL ST.
THOMAS R. & LISA A. BRENNAN
BK. 15982 PG. 17
ID: 10-44-0
23 WALL ST.
LISA MARIE REALTY TRUST
BK. 13684 PG. 173
ID: 10-43-0
171 HIGH ST.
TOWN OF BRIDGEWATER
BK. 14784 PG. 87 PARCEL B
SURVEY INFORMATION IS BASED ON A COMPILATION OF SURVEYS PERFORMED BY SLR INTERNATIONAL CORPORATION, THE TOWN OF BRIDGEWATER, SHERMAN & FRYDRYK, AND WELCH ASSOCIATES LAND SURVEYORS. REFER TO PLAN FOR SURVEY EXTENTS.
LEGEND
SURVEY LIMITS, SEE NOTES
PROPERTY BOUNDARIES
EDGE OF ROAD/SIDEWALK
BUILDINGS
WELCH SURVEY AREA
SLR & TOWN SURVEY AREA
SHERMAN FRYDRYK SURVEY AREA
N/F
TEIXEIRA ERLON G
BK. 50084 PG. 334
ID: 10-56-0 SEE SHEET EX-1, UT-1 & LA-1
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, MAINTAINING,
AND/OR TRANSFERRING ALL BENCHMARKS AS NEEDED TO COMPLETE THE
WORK. BENCHMARKS WITHIN THE WORK LIMITS THAT NEED TO BE
TRANSFERRED OR RESET SHALL BE DONE SO PRIOR TO THE START OF
EXCAVATION OR CONSTRUCTION WORK.
2. THE BENCHMARKS AND SURVEY CONTROL POINTS (CP) PROVIDED HEREIN ARE
BASED ON INFORMATION DERIVED FROM THE ORIGINAL SURVEY(S) AND HAVE
NOT BEEN VERIFIED BY SLR INTERNATIONAL CORPORATION (SLR) SINCE.
THESE POINTS ARE BEING FURNISHED FOR INFORMATIONAL PURPOSES ONLY
AND THE USER OF THIS INFORMATION IS CAUTIONED TO VERIFY THE
EXISTENCE OF, AND FIELD CHECK THE ACCURACY OF THESE POINTS PRIOR TO
USE. THE USER IS CAUTIONED NOT TO RELY ON ITS ACCURACY. SLR
DISCLAIMS ANY LIABILITY WHATSOEVER TO USER OF THIS DOCUMENT DUE TO
LOST, DAMAGED AND/OR DISTURBED BENCHMARKS AND/OR CP'S. THERE ARE
NO WARRANTIES, REPRESENTATIONS, EXPRESSED OR IMPLIED AND SLR
CANNOT BE HELD RESPONSIBLE FOR ANY DISCREPANCIES THAT MAY ARISE.
SURVEY STAKEOUT NOTES:
BEGIN STATION = 0+00
NORTHING = 2825451.3440
EASTING = 796052.5384
END STATION = 17+00
NORTHING = 2826597.6700
EASTING = 797213.7094
UP #6
W/ TRANSUP #5
W/ LIGHT
UP #3
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W
W
W W
W
W W
W W
W W
W W
W W
W W
W W
W
W W
W W
W W
W W W
W
D
D
D D D D D D D D D D D D D D D D D D D D D
D
D
D D D D D D D D D D D D D D D D D
D D
S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S
S S
S
S
S S
S
S
8" SEWER (R)8" SEWER (R)
8" SEWER (R)
CB#3
Rim = 87.31'
Inv. 12" CMP = 83.6'
CB#4
Rim = 87.35' Inv. 12" CMP = 84.2'
CB#1
Rim = 90.81' Inv. 12" CMP = 87.0'
CB#2
Rim = 90.84' Inv. 12" CMP = 86.9'
2 STORY VINYL
#65
2 STORY WOOD
#54
2 12 STORY VINYL
#55
2 STORY WOOD
#45
2 STORY WOOD
#36
3 STORY WOOD
#31
3 STORY WOOD
#30
3 STORY
WOOD/VINYL
#29
3 STORY WOOD
#28
PBM "B":
TOP OF FIRE HYDRANT
LAT: N042°00'01.45",
LONG: W070°59'05.65"
ELEV.: 92.05±
92 90
86 84 82 80
WELCH SURVEY LIMITS
LIDAR SURVEY LIMITS
S S
S
S S
S
S
S
SMH#1
MH#2
CB#2
CB#1
CB#3
CB#4
MH#1
Rim = 90.92' Inv. 12" CMP = 86.6' (In CB#1) Inv. 12" CMP = 86.6' (In CB#2) Inv. 12" CMP = 86.5' (Out)
MH#2
Rim = 87.58'
Inv. 12" CMP = 83.5' (In CB#3) Inv. 12" CMP = 83.0' (In CB#4) Inv. 12" CMP = 83.0' (In MH#1)
Inv. 16" CMP = 82.9' (Out)
W
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
G G
G G
G G
G
G G
G
G G
G G
G G
G
G
G
G G
G G G
G G
G G
G G
G G
GG
G
G G
G
91 89
85 83
81 79
82 8086
88 86
12" CMP D
12" CMP D
" C
MP
D
16" CMP D
" C
MP
D
12" CMP D0+00 1+00 2+00 3+00 4+00 5+00
UP #4
W/ LIGHT
Granite CurbGranite Curb Granite Curb
Granite Curb Granite Curb
Granite Curb Granite Curb Granite Curb Granite Curb Granite Curb
Bit Sidewalk Bit SidewalkBit Sidewalk
Bit Sidewalk Bit Sidewalk GrassGrassGrassGrass
Grass
Grass Grass Grass Grass
Bit.
Drive
Bit.
Drive
Bit.
Drive
Bit.
Drive
Bit.
Drive
Bit.
Drive
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
Grass Grass
Gravel Drive
Bit.
Drive
Bit.
Drive Bit.
Drive Bit.
Drive
DYL
DYL
SWL
SWL
SWL
SWLSWL
Bit.
Drive
Gravel
Fence
WELCH SURVEY LIMITS
L38 L39 L40 L41 L42 L43 L1 L2 L3 L4 L5 L6
Bit Sidewalk
UP #11 W/
LIGHT
UP #10UP #9
W/ LIGHT
UP #8
W/ TRANS
UP #7
W/ LIGHT
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W
W W
W W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W
W W
D
D D D
D
D D D D D D D D D D D D D D D
D
D
D D D D D D D D D D D D D D D D D
D
D D D D D
D
S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S
S S
S S
S S
S
S
S
S
S
S S
S
S
S
S
S S
S
S
S
S S
S S
S S
SS
8" SEWER (R)
8" SEWER (R)
8" SEWER (R)
APPR
OXIMATE
UNDERGROUND
CULVERT
CB#9
Rim = 49.57'
Inv. 12" CMP = 46.99' Sump El. = 45.47'
CB#10
Rim = 49.54'
Inv. 12" CMP = 46.96' Sump El. = 45.92'
CB#7
Rim = 65.67' Inv 12" CMP = 61.9'
CB#8
Rim = 65.49' Inv. 12" CMP = 61.6'
CB#5
Rim =76.45' Inv. 12" CMP = 72.6'
CB#6
Rim = 76.47' Inv. 12" CMP = 73.0'
Gravel
Stanley Iron Works Park Sign
2 1/2
STORY WOOD #85
1 STORY WOOD
#83
2.5 STORY
WOOD
#75
PBM "A":
UTILITY POLE #8
LAT: N042°00'05.78",
LONG: W070°59'01.75"
ELEV.: 68.1±
74 72
68 66
62 60
54 52 50 48
WELCH SURVEY LIMITS
LIDAR SURVEY LIMITS
S
D
D
D D
S S S
S
MH#4
MH#5
MH#8
MH#6
MH#7
CB#7
CB#8
CB#9
CB#10
MH#3
CB#5
CB#6
MH#3
Rim = 76.39' Inv. 12" CMP = 72.1' (In CB#5) Inv. 12" CMP = 71.8' (In CB#6) Inv. 16" CMP = 71.6' (In MH#2) Inv. 18" CMP = 71.6' (Out)
MH#4
Rim = 65.02' Inv. 12" CMP = 60.9' (In CB#7) Inv. 12" CMP = 60.3' (In CB#8) (Full of Sediment) Inv. 18" CMP = 59.9' (In MH#3) Inv. 18" CMP = 60.1' (Out)
MH#5 (6' Dia.)
Rim = 49.30'
Inv. 12" CMP = 44.09' (In CB#9) Inv. 12" CMP = 44.23' (In CB#10) Inv. 18" CMP = 43.99' (In MH#4)
INV. 24" CMP = 44.30' (Out MH#8) Inv. 12" RCP = 42.68' (Out MH#6)
Sump El. = 41.74'
MH#8
Rim = 47.00'
Inv. 12" RCP = 41.76 (In MH#7) Inv. 24" CMP = 42.16 (In MH#5)
Inv. 24" CMP = 41.08' (Out) Sump El. = 40.91'
MH#7 (Cover Bolted Down) Rim = 48.76'
Inv. = Unk.MH#6 (Stormcepter) Rim = 49.24'
Inv. 12" RCP = 42.71' (In MH#5) Inv. 12" RCP = 42.42' (Out)
W
W
W W
G G G
G G
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
G G
G G
G
G
G G
G
G
G
G G
G G
G
G
G G
G G
G G
G G
G
73 71
67 65
61 59 57 55
53 51
46 44
62 60 58
56 54
40 42 44
12" CMP D
18" CMP D
" C
M P
D
18" CMP D
12" CMP D
" C
MP
D
24" CMP D
12" RCP D
12" CMP D
" C
MP D
12" RCP D 12" RCP D
24" CM
P D
6+00 7+00 8+00 9+00 10+00
11+00
3 STORY
MULTI-UNITS
#91-93
G G
Granite Curb
Granite Curb Granite Curb
Granite Curb
Granite Curb Granite Curb
Granite Curb Granite Curb
Bit Sidewalk Bit Sidewalk
Bit Sidewalk Grass
Grass Grass
Grass Grass
Grass
Bit.
Drive
Bit.
Drive
Conc.
DriveBit.
Drive
C on c.
W al k
Grass Grass
GrassBit.
Drive
Bit.
Drive
Bit.
DYL
DYL
DYL
DYL
SWL
SWL
SWL
SWL
SWL
Fence
FenceFe nc e
G G
G
Chain Link Fence
WELCH SURVEY LIMITS
Bit. Driveway
L7 L8
L9 L10 L11 L12 L13 L14 L15 L16 L17
L18
L19
L20
SHEET NAME
DATE
EX-1
PROJECT NO.
DESIGNED
TMD
SCALE
DRAWN
GAB
CHECKED
WAG
S
W
N
E
JUNE 6, 2025
21408.00002
1"=20'
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
B R
ID
G
EW
A
TE
R
, M A
SS
A
C H
U
SE
TT
S
H
IG
H S
TR
EE
T D
R A
IN
A
G E
IM
PR
O
VE
M
EN
TS
H
IG
H S
TR
EE
T
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
C O
N
ST
R U
C
TI
O N
P
LA
N S
0' 10' 20'
0 1/2" 1"
Copyright SLR International Corporation - 2021
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
M A
TC
H
LI
N E
A
TH
IS
S H
EE
T
M A
TC
H
LI
N E
B
S
EE
S H
EE
T
EX
-2
M A
TC
H
LI
N E
A
TH
IS
S H
EE
T
HIGH STREET
HIGH STREET
LEGEND
SURVEY LIMITS, SEE NOTES
PROPERTY BOUNDARIES
EDGE OF ROAD/SIDEWALK
BUILDINGS
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
SSS SANITARY SEWER
OVERHEAD WIRE
D D D DRAINAGE
W W W WATER
GAS
TREELINE
WALL
FENCE
WATER VALVE
HYDRANT
UTILITY POLE
SANITARY SEWER MANHOLE
DRAINAGE MANHOLE
CATCH BASIN
CONTROL POINT
GAS GATE
SIGN
GG
LIGHT POLE
TREE
TOP OF CURB ELEVATION
BOTTOM OF CURB ELEVATIONDOUBLE YELLOW LINE (DYL)
SINGLE WHITE LINE (SWL)
NET&T
10' BOX CULVERT
INV.=37.40
Path
D
D
D
S
S
S
S
S
S
S
S
S
S
12" CMP D
12" CMP D
12" C M
P D
10" PVC S
12" CMP D
10" PVC S
24" BOX
" C
MP D
12" CMP D
8" PVC S
24" CULVERT BOX
12" CMP D
12" CMP D
(r)
GG
L.P.
U.P.
INV.=42.11
STANLEY IRON
WORKS PARK
W
W
W
W
S
S
S
10" SEWER INSU (R)
CB#11
Rim = 45.85' Inv. 12" CMP = 42.78' Sump El. = 40.79'
CB#12
Rim = 45.68' Inv. 12" CMP = 42.89' Sump El. = 40.89'
W
W
W
W
S
S
S
S
W W
W
SSSSSS
SSSS
8" PVC (INSULATED)
8" PVC (INSULATED)
SAN MH
T.F.=48.65±
INV.=45.9±
SAN
MH
T.F.=50.0±
INV.=46.7±
Conc Wall
Gravel
Pavers W alk
Grass
Grass
Bi t
P ar ki ng
Bocc e B all Court
(Sand)
Conc. C urb
Conc. C urb
Bit.
Conc. Curb
Bit. Parking
Building Foundation
Conc.
C onc. D rivew ay
W
EL
CH
S
UR
VE
Y
LI
M
IT
S
SH
ER
M
AN
F
RY
DR
YK
SU
RV
EY
L
IM
IT
S
LIDAR SURVEY LIMITS
SHERMAN FRYDRYK SURVEY LIMITS
SHERMAN FRYDRYK
SURVEY LIMITS
S
S
S
S
TO
W
N
RI
VE
R
TO
W
N R
IVER
Conc. Sidewalk
Conc. Sidewalk
Conc. S idewalk
Iron Railing
Iron Railing
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
Wood Guardrail
Post (typ.)
Edge of Arm or
Ed ge o f A rm or
Pl an tin g
Benchmark Benchtie In NET&T 12 Elev.=47.08
Benchmark Benchtie In NG 16 Elev.=51.65
Ex. Headwall Inv. 15" RCP = 36.88'
Wall Remains
Portion of Dam Abutment Remaining (Refer to SP-2)
Dam Abutment Remains
NET&T
U.P.
14-89
Conc.
Wingwall
Conc.
Wingwall
Conc.
Wingwall
Conc. Ret. Wall
NG2
15T
NG
Stone Stairs
SAN. MH
T.F.=47.47
SAN. MH
T.F.=46.94
Stone Dust Sidewalk
Rip Rap Swale
Guy Pole 14-89
Detectable Warning Strip (Typ.)
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
CB#19
Rim = 52.21' Inv. 12" PVC = 48.29' Hood Sump El. = 44.31'
CB
Rim = 47.68
CB#15
Rim = 45.28' Inv. 12" RCP = 41.67' Sump El. = 38.00'
CB#14
Rim = 45.14'
Inv. 12" RCP = 41.81' (Out) Sump El. = 37.87'
CB#13
Rim = 45.17 Inv 12" RCP = 41.72' (Out) Sump El. = =30.59'
D
D
D
D
D
D
D
D
D
D
D
D D
D
DD
D S
S
S
S
S
S
S
S
S
S
W
W
W
W
W
W
W
W
W
W
D
12" CMP D
12" PVC D
S
S
S
S
S
S
S
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
S
S
S
S
S
S
S S
S S
S
CB#21
Rim = 64.51' Inv. 12" CMP = 60.61' Sump El. = 58.41'
CB#20
Rim = 63.52'
Inv. 12" CMP = 59.77' Sump El. = 57.56'
Ex. 4' Dia. Block MH#16 Rim = 63.65'
Inv. 12" CMP = 59.35' (In CB#21) Inv. 12" CMP = 58.89' (Out)
Ex. 6' Dia. MH#15 Rim = 62.46' Inv. 12" CMP = 57.80' (In MH#16) Inv. 12" CMP = 57.73' (In CB#20) Inv. 12" CMP = 56.87' (Out) Sump El. = 56.85'
Ex. 4' Dia. Block MH#14 (Paved Over) Rim = 51.76'
Inv. 12" PVC = Unk. (In CB#19) Inv. 12" CMP = Unk. (In MH#15)
Inv. 12" CMP = Unk. (Out) Sump El. = Unk.
MH#13
Rim = 51.02' Inv. 12" CMP = 46.40' (In MH#14) Inv. 12" RCP = 46.40' (In CB#18) Inv. 12" CMP = 46.30' (In Unknown) Inv. 15" RCP = 46.44' (Out) Sump El. = 42.72'
CB#18
Rim = 50.54'
Inv. 12" RCP = 47.45' (Out) Hood
Sump El. = 43.49'
Ex. Headwall Inv. 15" RCP = 41.06'
CB#17
Rim = 46.65' Inv. 12" RCP = 42.14' (Out) Sump El. = 37.78'
CB#16
Rim = 46.88'
Inv. 12" RCP = 43.77' Hood Sump El. = 39.74'
W
W
6" W
AT
ER
M
AI
N
SL
R
TO
W N
SU
RV
EY
L
IM
IT
S
SHERMAN FRYDRYK SURVEY LIMITS
SLR & TOWN SURVEY LIMITS
SLR & TOWN
SURVEY LIMITS
SLR & TOWN SURVEY LIMITS
SL
R
TO
W N S
UR
VE
Y
LI
M
IT
S
MH#9
MH#10
MH
#11
MH#12
MH#13
MH#14
MH
#15
MH
#16
CB#11
CB#12 CB#13
CB#14
CB#15
CB#16
CB#17
CB#18
CB#19
CB
#20
CB
#21
MH#12
Rim = 47.36'
Inv. 12" RCP = Unk. (In CB#16) Inv. 12" RCP = 44.03' (In CB#17) Inv. 15" RCP = 44.62' (In MH#13) Inv. 15" RCP = 40.97' (Out) Hood
Sump El. = 36.81'
MH#10
Rim = 45.62' Inv. 12" CMP = Unk. (In MH#9) Inv. 12" RCP = 42.17' (In CB#13) Inv. 12" RCP = Unk. (In CB#14) Inv. 12" RCP = Unk. (In CB#15) Inv. 15" RCP = 42.14' (Out MH#11) Sump El. = 37.95'
MH#11 (With 'Sewer' Cover) Rim = 45.65'
Inv. 15" RCP = 41.58' (In MH#10) Inv. 15" RCP = 41.46' (Out)
Sump El. = 37.51'
MH#9 (Paved Over) Rim = 45.64' Inv. 12" CMP = Unk. (In CB#11) Inv. 12" CMP = Unk. (In CB#12) Inv. 12" CMP = Unk. (Out) Sump El. = Unk.
G
G
G
G
G
G
G
G
G
G
G G
G G
G G
G
G
G
G G
G G
GGGGGGGGGGGG
G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
36 38
44 46
15" RCP D
RC
P
D
15" RCP D
12" RCP D
12" R
CP D
12" RCP D
12" CMP D
12" RCP D
12" RCP D
15" RCP D
15" R C P D
17+00
11+00
12+00
13+00
14+00
15+00
16+00
Bit. Driveway
Granite Curb
Granite Curb
Granite Curb
Granite Curb
Granite Curb
Granite Curb
Bit. Sidewalk
Bit. Drive
U.P.
U.P.
Bit. Drive
Conc. Sidewalk
Grass
Grass
Grass
Grass
G
G
G
G
G
G
Bi t
Dr iv ew ay
De pa rt m en t o f P ub lic
W or ks (D
PW
DYL
DYL
DYL
Ex ist in g
St ac ke d
St on e Ba tte re d W al l
L21
L22
L23
L24
L25
L26 L27
L28
L29
L30
L31
L32
L33
L34
L35
C1
Existing Pavement Seam
Existing Pavement Seam
Existing Pavement
Seam
SHEET NAME
DATE
PROJECT NO.
DESIGNED
TMD
SCALE
DRAWN
GAB
CHECKED
WAG
S
W
N
E
21408.00002
1"=20'
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
B R
ID
G
EW
A
TE
R
, M A
SS
A
C H
U
SE
TT
S
H
IG
H S
TR
EE
T D
R A
IN
A
G E
IM
PR
O
VE
M
EN
TS
H
IG
H S
TR
EE
T
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
C O
N
ST
R U
C
TI
O N
P
LA
N S
0' 10' 20'
0 1/2" 1"
Copyright SLR International Corporation - 2021
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
M A
TC
H
LI
N E
B
S
EE
S H
EE
T
EX
-1
JUNE 6, 2025
EX-2
LEGEND
SURVEY LIMITS, SEE NOTES
PROPERTY BOUNDARIES
EDGE OF ROAD/SIDEWALK
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
SSS SANITARY SEWER
OVERHEAD WIRE
D D D DRAINAGE
W W W WATER
GAS
TREELINE
WALL
FENCE
WATER VALVE
HYDRANT
UTILITY POLE
SANITARY SEWER MANHOLE
DRAINAGE MANHOLE
CATCH BASIN
CONTROL POINT
GAS GATE
SIGN
GG
LIGHT POLE
TREE
HIGH STREET
HIGH STREET
W
AL
L S
TR
EE
T
TOP OF CURB ELEVATION
BUILDINGS
BOTTOM OF CURB ELEVATIONDOUBLE YELLOW LINE (DYL)
SINGLE WHITE LINE (SWL)
EXISTING PAVEMENT SEAM
W/ LIGHT
UP #3
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W
W
W W
W
W W
W W
W W
W W
W W
W W
W W
W
W W
W W
W W
W W W
W
D
D D
S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S
S S
S
S
S S
S
S
8" SEWER (R)8" SEWER (R)
8" SEWER (R)
CB#3
Rim = 87.31'
Inv. 12" CMP = 83.6'
CB#4
Rim = 87.35' Inv. 12" CMP = 84.2'
CB#1
Rim = 90.81' Inv. 12" CMP = 87.0'
CB#2
Rim = 90.84' Inv. 12" CMP = 86.9'
2 STORY VINYL
#65
2 STORY WOOD
#54
2 12 STORY VINYL
#55
2 STORY WOOD
#45
2 STORY WOOD
#36
3 STORY WOOD
#31
3 STORY WOOD
#30
3 STORY
WOOD/VINYL
#29
3 STORY WOOD
#28
PBM "B":
TOP OF FIRE HYDRANT
LAT: N042°00'01.45",
LONG: W070°59'05.65"
ELEV.: 92.05±
92 90
86 84 82 80
S S
S
S S
S
S
S
SMH#1
MH#2
CB#2
CB#1
CB#3
CB#4
MH#1
Rim = 90.92' Inv. 12" CMP = 86.6' (In CB#1) Inv. 12" CMP = 86.6' (In CB#2) Inv. 12" CMP = 86.5' (Out)
MH#2
Rim = 87.58'
Inv. 12" CMP = 83.5' (In CB#3) Inv. 12" CMP = 83.0' (In CB#4) Inv. 12" CMP = 83.0' (In MH#1)
Inv. 16" CMP = 82.9' (Out)
W
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
G G
G G
G G
G
G G
G
G G
G G
G G
G
G
G
G G
G G G
G G
G G
G G
G G
GG
G
G G
G
91 89
85 83
81 79
82 8086
88 86
0+00 1+00 2+00 3+00 4+00 5+00
UP #4
W/ LIGHT
Granite CurbGranite Curb Granite Curb
Granite Curb Granite Curb
Granite Curb Granite Curb Granite Curb Granite Curb Granite Curb
Bit Sidewalk Bit SidewalkBit Sidewalk
Bit Sidewalk Bit Sidewalk GrassGrassGrassGrass
Grass
Grass Grass Grass Grass
Bit.
Drive
Bit.
Drive
Bit.
Drive
Bit.
Drive
Bit.
Drive
Bit.
Drive
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
Grass Grass
Gravel Drive
Bit.
Drive
Bit.
Drive Bit.
Drive Bit.
Drive
DYL
DYL
SWL
SWL
SWL
SWLSWL
Bit.
Drive
Gravel
Fence
L38 L39 L40 L41 L42 L43 L1 L2 L3 L4 L5 L6
HIGH STREET
Bit Sidewalk
UP #11 W/
LIGHT
UP #10UP #9
W/ LIGHT
UP #8
W/ TRANS
UP #7
W/ LIGHT
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W
W W
W W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W
W W
S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S
S S
S S
S S
S
S
S
S
S
S S
S
S
S
S
S S
S
S
S
S S
S S
S S
SS
8" SEWER (R)
8" SEWER (R)
8" SEWER (R)
APPR
OXIMATE
UNDERGROUND
CULVERT
CB#9
Rim = 49.57'
Inv. 12" CMP = 46.99' Sump El. = 45.47'
CB#10
Rim = 49.54'
Inv. 12" CMP = 46.96' Sump El. = 45.92'
CB#7
Rim = 65.67' Inv 12" CMP = 61.9'
CB#8
Rim = 65.49' Inv. 12" CMP = 61.6'
CB#5
Rim =76.45' Inv. 12" CMP = 72.6'
CB#6
Rim = 76.47' Inv. 12" CMP = 73.0'
Gravel
Stanley Iron Works Park Sign
2 1/2
STORY WOOD #85
1 STORY WOOD
#83
2.5 STORY
WOOD
#75
PBM "A":
UTILITY POLE #8
LAT: N042°00'05.78",
LONG: W070°59'01.75"
ELEV.: 68.1±
74 72
68 66
62 60
54 52 50 48
S
D
D
D D
S S S
S
MH#4
MH#5
MH#8
MH#6
MH#7
CB#7
CB#8
CB#9
CB#10
MH#3
CB#5
CB#6
MH#3
Rim = 76.39' Inv. 12" CMP = 72.1' (In CB#5) Inv. 12" CMP = 71.8' (In CB#6) Inv. 16" CMP = 71.6' (In MH#2) Inv. 18" CMP = 71.6' (Out)
MH#4
Rim = 65.02' Inv. 12" CMP = 60.9' (In CB#7) Inv. 12" CMP = 60.3' (In CB#8) (Full of Sediment) Inv. 18" CMP = 59.9' (In MH#3) Inv. 18" CMP = 60.1' (Out)
MH#5 (6' Dia.)
Rim = 49.30'
Inv. 12" CMP = 44.09' (In CB#9) Inv. 12" CMP = 44.23' (In CB#10) Inv. 18" CMP = 43.99' (In MH#4)
INV. 24" CMP = 44.30' (Out MH#8) Inv. 12" RCP = 42.68' (Out MH#6)
Sump El. = 41.74'
MH#8
Rim = 47.00'
Inv. 12" RCP = 41.76 (In MH#7) Inv. 24" CMP = 42.16 (In MH#5)
Inv. 24" CMP = 41.08' (Out) Sump El. = 40.91'
MH#7 (Cover Bolted Down) Rim = 48.76'
Inv. = Unk.MH#6 (Stormcepter) Rim = 49.24'
Inv. 12" RCP = 42.71' (In MH#5) Inv. 12" RCP = 42.42' (Out)
W
W
W W
G G G
G G
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
G G
G G
G
G
G G
G
G
G
G G
G G
G
G
G G
G G
G G
G G
G
73 71
67 65
61 59 57 55
53 51
46 44
62 60 58
56 54
40 42 44
12" RCP D 12" RCP D 12" RCP D
6+00 7+00 8+00 9+00 10+00
11+00
3 STORY
MULTI-UNITS
#91-93
G G
Granite Curb
Granite Curb Granite Curb
Granite Curb
Granite Curb Granite Curb
Granite Curb Granite Curb
Bit Sidewalk Bit Sidewalk
Bit Sidewalk Grass
Grass Grass
Grass Grass
Grass
Bit.
Drive
Bit.
Drive
Conc.
DriveBit.
Drive
C on c.
W al k
Grass Grass
GrassBit.
Drive
Bit.
Drive
Bit.
DYL
DYL
DYL
DYL
SWL
SWL
SWL
SWL
SWL
Fence
FenceFe nc e
G G
G
Chain Link Fence
Bit. Driveway
L7 L8
L9 L10 L11 L12 L13 L14 L15 L16 L17
L18
L19
L20
HIGH STREET
SHEET NAME
DATE
UT-1
PROJECT NO.
DESIGNED
TMD
SCALE
DRAWN
GAB
CHECKED
WAG
S
W
N
E
JUNE 6, 2025
21408.00002
1"=20'
U
TI
LI
TY
P
LA
N
B R
ID
G
EW
A
TE
R
, M A
SS
A
C H
U
SE
TT
S
H
IG
H S
TR
EE
T D
R A
IN
A
G E
IM
PR
O
VE
M
EN
TS
H
IG
H S
TR
EE
T
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
C O
N
ST
R U
C
TI
O N
P
LA
N S
0' 10' 20'
0 1/2" 1"
Copyright SLR International Corporation - 2021
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
M A
TC
H
LI
N E
A
TH
IS
S H
EE
T
M A
TC
H
LI
N E
B
S
EE
S H
EE
T
U T-
M A
TC
H
LI
N E
A
TH
IS
S H
EE
T
CONNECT PIPE TO
EXISTING CULVERT.
SUBMIT SHOP
DRAWINGS FOR
APPROVAL.
R&D EXIST. 24" CMP
(SLEEVE) W/ 18" CPP
INSTALL NEW 24" RCP
(APPROX. 66 LF)
R&D EXIST. 18" CMP
INSTALL NEW 18" RCP
(APPROX. 216 LF)
PROVIDE TEST PIT(S) TO
DETERMINE SLOPE, CONDITION,
AND LOCATION OF PIPE.
R&D EXISTING MANHOLE
INSTALL 5' DIA. MANHOLE
R&D EXIST. 24" CMP (SLEEVE) W/ 18" CPP
INSTALL 24" RCP (APPROX. 22 LF)
SUPPORT AND PROTECT EXISTING
SANITARY MANHOLE AND MAIN
R&D EXIST. 18" CMP
INSTALL NEW 18" RCP
(APPROX. 196 LF)
R&D EXIST. 16" CMP
INSTALL NEW 15" RCP
(APPROX. 254 LF)
R&D EXIST. 12" CMP
INSTALL NEW 12" RCP
(APPROX. 266 LF)
R&D EXIST. 12" CMP
INSTALL 12" RCP
(APPROX. 13 LF)
PROVIDE TEST PIT PRIOR TO
WORK (TYP.) SEE NOTES.
R&D EXISTING MANHOLE
INSTALL 4' DIA. MANHOLE
GENERAL NOTES:
1. CONTRACTOR SHALL PROVIDE ADDITIONAL SURVEY AND STAKING AS REQUIRED TO COMPLETE THE PROPOSED WORK. THIS INCLUDES SURVEY OF
EXISTING STRUCTURES WITH MISSING INVERT INFORMATION, SURVEY TO CONFIRM ELEVATIONS PRIOR TO SUBMITTING SHOP DRAWINGS, AND ADDITIONAL SURVEY AS NEEDED TO CONFIRM POSITIVE ROADWAY DRAINAGE. THERE SHALL BE NO EXTRA PAYMENT FOR SURVEY AND STAKEOUT
SERVICES.
2. DUE TO CHANGE IN STRUCTURE TYPE, SIZE, AND DEPTH FOR CATCH BASINS AND MANHOLES, THE CONTRACTOR IS REQUIRED TO PERFORM TEST PITS AT EACH STRUCTURE LOCATION (NOT SHOWN) TO ENSURE THAT THE PROPOSED STRUCTURES, INCLUDING SUMPS, CAN BE INSTALLED WITHOUT IMPACT TO EXISTING UTILITIES. TEST PITS SHALL BE DUG PRIOR TO BEGINNING THE DRAINAGE WORK AT LOCATIONS WHERE THERE MAY BE A QUESTION OF DEPTH OR LOCATION OF AN EXISTING UTILITY, AND AS NOTED ON THE PLANS. TEST PITS AT STRUCTURES AND SURVEY VERIFICATION
SHALL BE INCLUDED IN THE PRICE FOR EACH STRUCTURE.
3. CONTRACTOR IS RESPONSIBLE FOR CONTACTING CALL BEFORE YOU DIG AND PERFORMING TEST PITS TO LOCATE ALL UTILITIES PRIOR TO WORK. AT
A MINIMUM, CONTRACTOR MUST PERFORM TEST PITS AT LOCATIONS SHOWN ON THIS PLAN.
4. CONTRACTOR TO PROTECT ALL EXISTING SERVICES AND LATERAL CROSSINGS. CONTRACTOR SHALL BRING ANY CONFLICTS TO THE ATTENTION OF THE TOWN AND REPLACE ANY SANITARY LATERALS OR WATER SERVICES AS DIRECTED. IT IS ANTICIPATED THAT CONFLICTS WITH LATERALS WILL BE
MINIMIZED DUE TO IN PLACE REPLACEMENT.
5. CONTRACTOR SHALL NOTIFY THE TOWN OF ANY UNFORESEEN CONDITIONS AND CHANGES IN THE PROPOSED WORK.
DRAINAGE REPAIR NOTES:
1. ALL PROPOSED DRAINAGE PIPE SHALL BE REINFORCED CONCRETE PIPE CLASS IV IN ACCORDANCE WITH MASSDOT STANDARD SPECIFICATIONS.
2. ALL PROPOSED DRAINAGE PIPE SHALL MATCH THE INVERTS, SLOPE, AND SIZE OF THE EXISTING CMP PIPE TO BE REPLACED, UNLESS OTHERWISE NOTED.
3. STRUCTURE RIMS TO MATCH EXISTING UNLESS NOTED OTHERWISE (MH#9)
4. CONTRACTOR SHALL SALVAGE AND REUSE ALL EXISTING CATCH BASIN FRAME AND GRATES AND MANHOLE FRAME AND COVERS. CONTRACTOR SHALL REPLACE ANY
DAMAGED FRAMES AND GRATES/COVERS, AT THE DIRECTION OF THE TOWN.
5. ALL PROPOSED CATCH BASINS AND MANHOLES SHALL BE IN ACCORDANCE WITH MASSDOT STANDARD DETAILS AND SPECIFICATIONS AND THE PROVIDED DETAILS, UNLESS OTHERWISE NOTED. PRICE FOR STRUCTURES SHALL INCLUDE THE STRUCTURE, EXCAVATION, BACKFILL, AND ALL APPURTENANT FEATURES. THERE WILL BE NO SEPARATE
PAYMENT FOR STRUCTURES GREATER THAN 9 FEET IN DEPTH.
6. ALL TRENCHING AND BACKFILL SHALL BE IN ACCORDANCE WITH MASSDOT STANDARD DETAILS AND SPECIFICATIONS. TRENCHING, BACKFILL, COMPACTION, TEMPORARY SUPPORT, TESTING, AND OTHER REQUIRED WORK AS SHOWN IN THE DETAIL AND NOTED IN THE SPECIFICATIONS SHALL BE INCLUDED THE PRICE PER LINEAR FOOT OF
PIPE.
7. THE COST FOR REMOVAL AND DISPOSAL OF ALL PIPE AND STRUCTURES SHALL BE INCLUDED AS PART OF THE DESIGNATED BID ITEMS.
8. CONTRACTOR SHALL VERIFY INVERTS OF EXISTING CATCH BASINS, MANHOLES, AND PIPES IN THE FIELD PRIOR TO REPLACEMENT AND SHALL NOT RELY ON ELEVATIONS AND SIZES SHOWN ON THE PLANS PRIOR TO ORDERING MATERIALS - REFER TO MAPPING AND SURVEY NOTES. NOTIFY THE TOWN OF ANY DEVIATIONS FROM THE PLANS
PRIOR TO SHOP DRAWING SUBMITTALS.
9. CONTRACTOR IS RESPONSIBLE FOR PROVIDING CONNECTIONS TO ALL EXISTING AND PROPOSED STRUCTURES IN ACCORDANCE WITH MASSDOT STANDARDS AND AS APPROVED BY THE TOWN. THERE SHALL BE NO EXTRA PAYMENT FOR CONNECTIONS TO EXISTING STRUCTURES, UNLESS NOTED OTHERWISE.
R&D EXIST. 12" CMP
INSTALL 12" RCP
(APPROX. 21 LF)
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASIN
RIM AND INVERT ELEVATIONS AT PROPOSED
STRUCTURES SHALL MATCH EXISTING UNLESS
NOTED OTHERWISE. ALL PROPOSED CATCH
BASINS SHALL HAVE 4 FT SUMP.
R&D EXISTING MANHOLE
INSTALL 5' DIA. MANHOLE
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASIN
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASIN
R&D EXIST. 12" CMP
INSTALL 12" RCP
(APPROX. 13 LF)
R&D EXIST. 12" CMP
INSTALL 12" RCP
(APPROX. 19 LF)
R&D EXISTING MANHOLE
INSTALL 5' DIA. MANHOLE
R&D EXIST. 12" CMP
INSTALL 12" RCP
(APPROX. 21 LF)
R&D EXIST. 12" CMP
INSTALL 12" RCP (APPROX. 11 LF)
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASIN
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASIN
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASIN
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASIN
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASIN
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASINR&D EXIST. 12" CMP
INSTALL 12" RCP
(APPROX. 13 LF)
R&D EXIST. 12" CMP
INSTALL 12" RCP
(APPROX. 21 LF)
R&D EXIST. 12" CMP
INSTALL 12" RCP
(APPROX. 16 LF)
R&D EXIST. 12" CMP
INSTALL 12" RCP
(APPROX. 20 LF)
R&D EXISTING MANHOLE
INSTALL 4' DIA. MANHOLE
LEGEND
D REMOVE EXISTING DRAINAGE PIPE (NO REPLACEMENT)
PROPOSED CATCH BASIN (REMOVE EXISTING AS NOTED)
PROPOSED MANHOLE (REMOVE EXISTING AS NOTED)
PROPOSED DRAINAGE PIPE (REMOVE EXISTING AS NOTED)
REMOVE EXISTING MANHOLE (NO REPLACEMENT)
SUPPORT AND PROTECT
EXISTING UTILITIES (TYP.)
SUPPORT AND PROTECT
EXISTING UTILITIES (TYP.)
TP
TP TP
TP
TP
TP
TP
TEST PITTP
SALVAGE CATCH BASIN FRAME
AND GRATES AND MANHOLE
FRAME AND COVERS FOR REUSE.
R&D REMOVE AND DISPOSE
NET&T
10' BOX CULVERT
INV.=37.40
Path
S
S
S
S
S
S
S
S
S
S
10" PVC S
10" PVC S
24" BOX
8" PVC S
24" CULVERT BOX
(r)
GG
L.P.
U.P.
INV.=42.11
STANLEY IRON
WORKS PARK
W
W
W
W
S
S
S
10" SEWER INSU (R)
CB#11
Rim = 45.85' Inv. 12" CMP = 42.78' Sump El. = 40.79'
CB#12
Rim = 45.68' Inv. 12" CMP = 42.89' Sump El. = 40.89'
W
W
W
W
S
S
S
S
W W
W
SSSSSS
SSSS
8" PVC (INSULATED)
8" PVC (INSULATED)
SAN MH
T.F.=48.65±
INV.=45.9±
SAN
MH
T.F.=50.0±
INV.=46.7±
Conc Wall
Gravel
Pavers W alk
Grass
Grass
Bi t
P ar ki ng
Bocc e B all Court
(Sand)
Conc. C urb
Conc. C urb
Bit.
Conc. Curb
Bit. Parking
Building Foundation
Conc.
C onc. D rivew ay
S
S
S
S
TO
W
N
RI
VE
R
TO
W
N R
IVER
Conc. Sidewalk
Conc. Sidewalk
Conc. S idewalk
Iron Railing
Iron Railing
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
Wood Guardrail
Post (typ.)
Edge of Arm or
Ed ge o f A rm or
Pl an tin g
Benchmark Benchtie In NET&T 12 Elev.=47.08
Benchmark Benchtie In NG 16 Elev.=51.65
Ex. Headwall Inv. 15" RCP = 36.88'
Wall Remains
Portion of Dam Abutment Remaining (Refer to SP-2)
Dam Abutment Remains
NET&T
U.P.
14-89
Conc.
Wingwall
Conc.
Wingwall
Conc.
Wingwall
Conc. Ret. Wall
NG2
15T
NG
Stone Stairs
SAN. MH
T.F.=47.47
SAN. MH
T.F.=46.94
Stone Dust Sidewalk
Rip Rap Swale
Guy Pole 14-89
Detectable Warning Strip (Typ.)
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
CB#19
Rim = 52.21' Inv. 12" PVC = 48.29' Hood Sump El. = 44.31'
CB
Rim = 47.68
CB#15
Rim = 45.28' Inv. 12" RCP = 41.67' Sump El. = 38.00'
CB#14
Rim = 45.14'
Inv. 12" RCP = 41.81' (Out) Sump El. = 37.87'
CB#13
Rim = 45.17 Inv 12" RCP = 41.72' (Out) Sump El. = =30.59'
D
D
D
D
D
D
D
D
D
D
D
D D
D
DD
D S
S
S
S
S
S
S
S
S
S
W
W
W
W
W
W
W
W
W
W
D
12" CMP D
S
S
S
S
S
S
S
D
D
D
D
D
D
D
D
D
D
D
D
S
S
S
S
S
S
S S
S S
S
CB#21
Rim = 64.51' Inv. 12" CMP = 60.61' Sump El. = 58.41'
CB#20
Rim = 63.52'
Inv. 12" CMP = 59.77' Sump El. = 57.56'
Ex. 4' Dia. Block MH#16 Rim = 63.65'
Inv. 12" CMP = 59.35' (In CB#21) Inv. 12" CMP = 58.89' (Out)
Ex. 6' Dia. MH#15 Rim = 62.46' Inv. 12" CMP = 57.80' (In MH#16) Inv. 12" CMP = 57.73' (In CB#20) Inv. 12" CMP = 56.87' (Out) Sump El. = 56.85'
Ex. 4' Dia. Block MH#14 (Paved Over) Rim = 51.76'
Inv. 12" PVC = Unk. (In CB#19) Inv. 12" CMP = Unk. (In MH#15)
Inv. 12" CMP = Unk. (Out) Sump El. = Unk.
MH#13
Rim = 51.02' Inv. 12" CMP = 46.40' (In MH#14) Inv. 12" RCP = 46.40' (In CB#18) Inv. 12" CMP = 46.30' (In Unknown) Inv. 15" RCP = 46.44' (Out) Sump El. = 42.72'
CB#18
Rim = 50.54'
Inv. 12" RCP = 47.45' (Out) Hood
Sump El. = 43.49'
Ex. Headwall Inv. 15" RCP = 41.06'
CB#17
Rim = 46.65' Inv. 12" RCP = 42.14' (Out) Sump El. = 37.78'
CB#16
Rim = 46.88'
Inv. 12" RCP = 43.77' Hood Sump El. = 39.74'
W
W
6" W
AT
ER
M
AI
N
MH#9
MH#10
MH
#11
MH#12
MH#13
MH
#15
CB#11
CB#12 CB#13
CB#14
CB#15
CB#16
CB#17
CB#18
CB#19
CB
#20
CB
#21
MH#12
Rim = 47.36'
Inv. 12" RCP = Unk. (In CB#16) Inv. 12" RCP = 44.03' (In CB#17) Inv. 15" RCP = 44.62' (In MH#13) Inv. 15" RCP = 40.97' (Out) Hood
Sump El. = 36.81'
MH#10
Rim = 45.62' Inv. 12" CMP = Unk. (In MH#9) Inv. 12" RCP = 42.17' (In CB#13) Inv. 12" RCP = Unk. (In CB#14) Inv. 12" RCP = Unk. (In CB#15) Inv. 15" RCP = 42.14' (Out MH#11) Sump El. = 37.95'
MH#11 (With 'Sewer' Cover) Rim = 45.65'
Inv. 15" RCP = 41.58' (In MH#10) Inv. 15" RCP = 41.46' (Out)
Sump El. = 37.51'
MH#9 (Paved Over) Rim = 45.64' Inv. 12" CMP = Unk. (In CB#11) Inv. 12" CMP = Unk. (In CB#12) Inv. 12" CMP = Unk. (Out) Sump El. = Unk.
G
G
G
G
G
G
G
G
G
G
G G
G G
G G
G
G
G
G G
G G
GGGGGGGGGGGG
G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
36 38
44 46
15" RCP D
RC
P
D
15" RCP D
12" RCP D
12" R
CP D
12" RCP D
12" CMP D
12" RCP D
12" RCP D
15" RCP D
15" R C P D
17+00
11+00
12+00
13+00
14+00
15+00
16+00
Bit. Driveway
Granite Curb
Granite Curb
Granite Curb
Granite Curb
Granite Curb
Granite Curb
Bit. Sidewalk
Bit. Drive
U.P.
U.P.
Bit. Drive
Conc. Sidewalk
Grass
Grass
Grass
Grass
G
G
G
G
G
G
Bi t
Dr iv ew ay
De pa rt m en t o f P ub lic
W or ks (D
PW
DYL
DYL
DYL
Ex ist in g
St ac ke d
St on e Ba tte re d W al l
L21
L22
L23
L24
L25
L26 L27
L28
L29
L30
L31
L32
L33
L34
L35
C1
Existing Pavement Seam
Existing Pavement Seam
Existing Pavement
Seam
HIGH STREET
HIGH STREET
WALL
STR
EE
T
STANLEY IRON WORKS PARK
Grass
Conc Retaining
Wall C onc. D rivew ay
D
SHEET NAME
DATE
PROJECT NO.
DESIGNED
TMD
SCALE
DRAWN
GAB
CHECKED
WAG
S
W
N
E
B R
ID
G
EW
A
TE
R
, M A
SS
A
C H
U
SE
TT
S
H
IG
H S
TR
EE
T D
R A
IN
A
G E
IM
PR
O
VE
M
EN
TS
H
IG
H S
TR
EE
T
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
C O
N
ST
R U
C
TI
O N
P
LA
N S
0' 10' 20'
0 1/2" 1"
Copyright SLR International Corporation - 2021
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
R&D EX. 12" CMP
(APPROX. 20 LF)
R&D EX. 12" CMP
(APPROX.16 LF)
R&D EX. 4' DIA. MANHOLE
(PAVED OVER)
R&D EXISTING MANHOLE
UT-2
JUNE 6, 2025
21408.00002
1"=20'
U
TI
LI
TY
P
LA
N
M A
TC
H
LI
N E
B
S
EE
S H
EE
T
U T-
LEGEND
R&D EXISTING MANHOLE
(PAVED OVER)
INSTALL 4' DIA. MANHOLE.
ADJUST RIM ELEVATION TO
GRADE.
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASIN
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASIN
R&D EXIST. 12" CMP
INSTALL 12" RCP
(APPROX. 14 LF)
R&D EXIST. 12" CMP
INSTALL 12" RCP
(APPROX. 24 LF)
INSTALL 12" RCP
(APPROX. 19 LF)
R&D EXIST. 12" CMP
INSTALL 12" RCP
(APPROX. 138 LF)
INSTALL 12" RCP
(APPROX. 23 LF)
INSTALL 12" RCP
(APPROX. 21 LF)
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASIN
R&D EXISTING CATCH BASIN
INSTALL 4' DIA. CATCH BASIN
PERFORM TEST PIT(S) TO DETERMINE IF
12" CMP TO MH 13 IS ACTIVE. IF ACTIVE,
REPLACE WITH 12" RCP. IF INACTIVE, CUT
AND REMOVE IN ROADWAY AND ABANDON
REMAINING SECTION.
D REMOVE EXISTING DRAINAGE PIPE (NO REPLACEMENT)
PROPOSED CATCH BASIN (REMOVE EXISTING AS NOTED)
PROPOSED MANHOLE (REMOVE EXISTING AS NOTED)
PROPOSED DRAINAGE PIPE (REMOVE EXISTING AS NOTED)
REMOVE EXISTING MANHOLE (NO REPLACEMENT)
R&D EXISTING MANHOLE
INSTALL 4' DIA. MANHOLE
SUPPORT AND PROTECT
EXISTING UTILITIES (TYP.)
TP
TP
TP
TP
TP
PROVIDE TEST PIT PRIOR TO
WORK (TYP.) SEE NOTES.
TEST PITTP
RIM AND INVERT ELEVATIONS AT PROPOSED
STRUCTURES SHALL MATCH EXISTING UNLESS
NOTED OTHERWISE. ALL PROPOSED CATCH
BASINS SHALL HAVE 4 FT SUMP.
SALVAGE CATCH BASIN FRAME
AND GRATES AND MANHOLE
FRAME AND COVERS FOR REUSE.
W/ LIGHT
UP #3
WG
WG
WG
D
D D
2 STORY VINYL
#65
2 STORY WOOD
#54
2 12 STORY VINYL
#55
2 STORY WOOD
#45
2 STORY WOOD
#36
3 STORY WOOD
#31
3 STORY WOOD
#30
3 STORY
WOOD/VINYL
#29
3 STORY WOOD
#28
PBM "B":
TOP OF FIRE HYDRANT
LAT: N042°00'01.45",
LONG: W070°59'05.65"
ELEV.: 92.05±
92 90
86 84 82 80
N/FGCP CORPORATIONBK. 17608 PG. 272ID: 10-29-0
91 89
85 83
81 79
82 8086
88 86
0+00 1+00 2+00 3+00 4+00 5+00
UP #4
W/ LIGHT
Granite CurbGranite Curb Granite Curb
Granite Curb Granite Curb
Granite Curb Granite Curb Granite Curb Granite Curb Granite Curb
Bit Sidewalk Bit SidewalkBit Sidewalk
Bit Sidewalk Bit Sidewalk GrassGrassGrassGrass
Grass
Grass Grass Grass Grass
Bit.
Drive
Bit.
Drive
Bit.
Drive
Bit.
Drive
Bit.
Drive
Bit.
Drive
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
C on c.
W al k
Grass Grass
Gravel Drive
Bit.
Drive
Bit.
Drive Bit.
Drive Bit.
Drive
DYL
DYL
SWL
SWL
SWL
SWLSWL
Bit.
Drive
Gravel
Fence
L38 L39 L40 L41 L42 L43 L1 L2 L3 L4 L5 L6
Bit Sidewalk
WG
UP #11 W/
LIGHT
UP #10UP #9
W/ LIGHT
UP #8
W/ TRANS
UP #7
W/ LIGHT
WG
WG
WG
WGWG
WG
APPR
OXIMATE
UNDERGROUND
CULVERT
Gravel
Stanley Iron Works Park Sign
2 1/2
STORY WOOD #85
1 STORY WOOD
#83
2.5 STORY
WOOD
#75
PBM "A":
UTILITY POLE #8
LAT: N042°00'05.78",
LONG: W070°59'01.75"
ELEV.: 68.1±
74 72
68 66
62 60
54 52 50 4877
73 71
67 65
61 59 57 55
53 51
48 46 44
62 60 58
56 54
6+00 7+00 8+00 9+00 10+00
11+00
3 STORY
MULTI-UNITS
#91-93
Granite Curb
Granite Curb Granite Curb
Granite Curb
Granite Curb Granite Curb
Granite Curb Granite Curb
Bit Sidewalk Bit Sidewalk
Bit Sidewalk Grass
Grass Grass
Grass Grass
Grass
Bit.
Drive
Bit.
Drive
Conc.
DriveBit.
Drive
C on c.
W al k
Grass Grass
GrassBit.
Drive
Bit.
Drive
Bit.
DYL
DYL
DYL
DYL
SWL
SWL
SWL
SWL
SWL
Fence
FenceFe nc e
Chain Link Fence
Bit. Driveway
L7 L8
L9 L10 L11 L12 L13 L14 L15 L16 L17
L18
L19
L20
SHEET NAME
DATE
LA-1
PROJECT NO.
DESIGNED
TMD
SCALE
DRAWN
GAB
CHECKED
WAG
S
W
N
E
JUNE 6, 2025
21408.00002
1"=20'
LA
YO
U T
R
ES
TO
R A
TI
O
N P
LA
N
B R
ID
G
EW
A
TE
R
, M A
SS
A
C H
U
SE
TT
S
H
IG
H S
TR
EE
T D
R A
IN
A
G E
IM
PR
O
VE
M
EN
TS
H
IG
H S
TR
EE
T
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
C O
N
ST
R U
C
TI
O N
P
LA
N S
0' 10' 20'
0 1/2" 1"
Copyright SLR International Corporation - 2021
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
LEGEND
SAWCUT LINE
GRANITE CURB REMOVAL & REPLACEMENT
ASPHALT REMOVAL & REPLACEMENT
LAWN REMOVAL & RESTORATION
M A
TC
H
LI
N E
A
TH
IS
S H
EE
T
M A
TC
H
LI
N E
B
S
EE
S H
EE
T
LA
-2
M A
TC
H
LI
N E
A
TH
IS
S H
EE
T
PAVING AND RESTORATION NOTES:
1. CONTRACTOR SHALL REPAIR TRENCHES IN ACCORDANCE WITH THE APPLICABLE DETAILS AND MASSDOT STANDARD
SPECIFICATIONS.
2. WITHIN THE CONTRACT PAVING LIMITS, THE CONTRACTOR SHALL MILL A MINIMUM OF 2" AND PROVIDE A MIN OF 2" OF HMA SURFACE COURSE (CURB TO CURB) SUCH THAT ALL AREAS OF WORK WITHIN THE PAVING LIMITS HAVE A NEW SURFACE COURSE, TO BE INSTALLED CONTINUOUSLY THROUGH THE WORK AREA WITHIN THE LIMITS SHOWN.
3. SECTIONS OF GRANITE CURB SHALL BE REMOVED TO THE NEAREST JOINT. REUSE SECTIONS OF GRANITE CURB AS ABLE. IMPORT NEW CURB IF EXISTING CURB IS DAMAGED, AT THE DIRECTION OF THE TOWN. PROVIDE SHOP DRAWINGS PRIOR TO ORDERING NEW CURB. LINEAR COST OF CURB SHALL INCLUDE BOTH STRAIGHT AND CURVED
SECTIONS.
4. ALL CURBS, STRUCTURES, UTILITIES, AND ADJACENT PROPERTIES SHALL BE PROTECTED DURING THE WORK.
CONTRACTOR TO REPAIR OR REPLACE ANYTHING DAMAGED DURING THE WORK.
5. CONTRACTOR SHALL RESTORE ALL AREAS THAT ARE DISTURBED DURING CONSTRUCTION. AREAS SHOWN TO RECEIVE TOPSOIL AND SEED ARE A MINIMUM, AND ALL DISTURBED AREAS SHALL BE RESTORED TO THE ACCEPTANCE OF THE
TOWN.
6. CONTRACTOR SHALL PROVIDE NEW PAVEMENT MARKINGS IN ALL AREAS WITHIN THE PAVEMENT LIMITS, AND OTHER LOCATIONS AS SHOWN ON THIS PLAN. PAVEMENT MARKINGS SHALL BE REPLACED IN KIND TO MATCH EXISTING.
PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH MASSDOT STANDARD SPECIFICATIONS.
PAVING LIMITS (MILL AND OVERLAY)
DOUBLE YELLOW LINE PAVEMENT MARKING
SINGLE WHITE LINE PAVEMENT MARKING
S A W
C U
T (T
YP
SAWCUT (V.I.F.)
LAWN RESTORATION (TYP.)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 18 LF)
ASPHALT RESTORATION (TYP.)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 22 LF)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 12 LF)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 15 LF)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 20 LF)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 16 LF)
LAWN RESTORATION (TYP.) GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 20 LF)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 15 LF)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 20 LF)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 16 LF)
ASPHALT RESTORATION (TYP.)
SAWCUT (V.I.F.)
PAVING LIMITS (MILL & OVERLAY)
PAVING LIMITS (MILL & OVERLAY)
PROPOSED PAVEMENT MARKINGS (TYP.)
PROPOSED PAVEMENT MARKINGS (TYP.)
SAWCUT (V.I.F.)
SAWCUT (V.I.F.)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 8 LF)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 16 LF)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 6 LF)
SAWCUT (TYP)
BEGIN MILL AND OVERLAY
APPROX. STA. 0+07
MATCH EXISTING
39.18
TOP2
44.32
TOP2
44.15 top12 c
41.59 top13
42.11 cl11/spillway
43.06 top14
NET&T
GG
L.P.
U.P.
INV.=42.11
DH FD
IP FD
SB FD
CB FD
DH FD
30" HW
30" HW
20" HW
30" HW
6" HW
6" HW
10" HW
14" HW
SAN MH
T.F.=48.65±
INV.=45.9±
SAN
MH
T.F.=50.0±
INV.=46.7±
Gravel
24" 16"
6" 18"
24"
Grass
Bi t
P ar ki ng
Bit.
Bit. Parking
Conc.
C onc. D rivew ay
31.73 inv /overflow box 3.5w5.5h
41.59 top13
44.04 top14
31.73 inv /overflow box 3.5w5.5h
WG
TO
W
N
RI
VE
R
TO
W
N R
IVER
Conc. Sidewalk
Conc. Sidewalk
Conc. S idewalk
Iron Railing
Iron Railing
Wood Guardrail
Post (typ.)
Ed ge o f A rm or
Pl an tin g
Benchmark Benchtie In NET&T 12 Elev.=47.08
Benchmark Benchtie In NG 16 Elev.=51.65
NET&T
U.P.
14-89
NG2
15T
NG
SAN. MH
T.F.=47.47
SAN. MH
T.F.=46.94
Guy Pole 14-89
Detectable Warning Strip (Typ.)
D
6" W
AT
ER
M
AI
N
36 38
44 46
17+00
11+00
12+00
13+00
14+00
15+00
16+00
Bit. Driveway
Granite Curb
Granite Curb
Granite Curb
Granite Curb
Granite Curb
Granite Curb
Bit. Sidewalk
Bit. Drive
U.P.
U.P.
Bit. Drive
Conc. Sidewalk
Grass
Grass
Grass
Grass
Bi t
Dr iv ew ay
De pa rt m en t o f P ub lic
W or ks (D
PW
DYL
DYL
DYL
L21
L22
L23
L24
L25
L26 L27
L28
L29
L30
L31
L32
L33
L34
L35
C1
Existing Pavement Seam
Existing Pavement Seam
Existing Pavement
Seam
SHEET NAME
DATE
PROJECT NO.
DESIGNED
TMD
SCALE
DRAWN
GAB
CHECKED
WAG
S
W
N
E
B R
ID
G
EW
A
TE
R
, M A
SS
A
C H
U
SE
TT
S
H
IG
H S
TR
EE
T D
R A
IN
A
G E
IM
PR
O
VE
M
EN
TS
H
IG
H S
TR
EE
T
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
C O
N
ST
R U
C
TI
O N
P
LA
N S
0' 10' 20'
0 1/2" 1"
Copyright SLR International Corporation - 2021
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
LA-2
JUNE 6, 2025
21408.00002
1"=20'
LA
YO
U T
R
ES
TO
R A
TI
O
N P
LA
N
M A
TC
H
LI
N E
B
S
EE
S H
EE
T
LA
-1
SA
W
CU
T
(T
YP
SAWCUT (
TYP
SAWCUT (
TY
P)
LEGEND
SAWCUT (V.I.F.)
LAWN RESTORATION (TYP.)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 12 LF)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 16 LF)
ASPHALT RESTORATION
GRANITE CURB REMOVAL
AND REPLACEMENT
(APPROX. 16 LF)
GRANITE CURB REMOVAL AND
REPLACEMENT (APPROX. 24 LF)
PAVING LIMITS (MILL & OVERLAY)
(TYP.)
PROPOSED PAVEMENT MARKINGS (TYP.)
FOG LINE TO EXTEND OUTSIDE
LIMITS OF PAVING TO EXTENTS
SHOWN. TIE IN WITH EXISTING
PAVEMENT MARKINGS.
SAWCUT LINE
GRANITE CURB REMOVAL & REPLACEMENT
ASPHALT REMOVAL & REPLACEMENT
LAWN REMOVAL & RESTORATION
PAVING LIMITS (MILL AND OVERLAY)
DOUBLE YELLOW LINE PAVEMENT MARKING
SINGLE WHITE LINE PAVEMENT MARKING
SAWCUT (TYP)
END MILL AND OVERLAY
APPROX. STA. 11+56
MATCH EXISTING
BEGIN MILL AND OVERLAY
APPROX. STA. 14+80
MATCH EXISTING
END MILL AND OVERLAY
APPROX. STA. 16+64
MATCH EXISTING
D D
D D
D D
D D
D D
D D
D
D D
D D
D D
D D
D D
D
2 1/2
STORY WOOD #85
1 STORY WOOD
#83
2.5 STORY
WOOD
#75
2 STORY VINYL
#65
2 STORY WOOD
#54
2 12 STORY VINYL
#55
2 STORY WOOD
#45
2 STORY WOOD
#36
3 STORY WOOD
#31
3 STORY WOOD
#30
3 STORY
WOOD/VINYL
#29
3 STORY WOOD
#28
#7 HIGH ST
#457 MAIN ST
D D
D
D
D
D
D
D
D
D
MH#14
MH
#16
3 STORY
MULTI-UNITS
#91-93
SHEET NAME
DATE
PROJECT NO.
DESIGNED
TMD
SCALE
DRAWN
GAB
CHECKED
WAG
S
W
N
E
B R
ID
G
EW
A
TE
R
, M A
SS
A
C H
U
SE
TT
S
H
IG
H S
TR
EE
T D
R A
IN
A
G E
IM
PR
O
VE
M
EN
TS
H
IG
H S
TR
EE
T
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
C O
N
ST
R U
C
TI
O N
P
LA
N S
0' 30' 60'
0 1/2" 1"
Copyright SLR International Corporation - 2021
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
CP-1
JUNE 6, 2025
21408.00002
1"=60'
C O
N
ST
R U
C
TI
O N
P
LA
N
HIGH STREET
HIGH STREET
HIGH STREET
WALL STREET
TO
W
N
RIVER
M
AI
N
ST
RE
ET
LEGEND
COMPOST FILTER TUBE
CHAIN LINK FENCE/CONSTRUCTION FENCE
INLET PROTECTION (SILT SACK)
CONSTRUCTION ENTRANCE
LIMIT OF WORK
DP
W
D
RI
VE
W
AY
HIGH STREET
DPW YARD
TEMPORARY STOCKPILE AREA
1. THE CONTRACTOR IS ADVISED THAT THE PROJECT HAS A STRICT CONSTRUCTION
SCHEDULE TO COMPLY WITH GRANT RESTRICTIONS. THE CONTRACTOR IS ADVISED THAT
ALL WORK FOR THE PROJECT MUST BE COMPLETED BY NOVEMBER 2025. THE
CONTRACTOR SHALL PAY LIQUIDATED DAMAGES FOR ANY WORK NOT COMPLETED BY THE
CONTRACT DEADLINES, AS STATED IN THE SPECIFICATIONS.
2. THE CONTRACTOR IS RESPONSIBLE FOR ACKNOWLEDGING THE CONTRACT DEADLINE AND
SUBMITTING A SCHEDULE THAT SEQUENCES THE WORK TO MEET THE PROJECT
COMPLETION DATE. THE CONTRACTOR IS RESPONSIBLE FOR STAFFING A CONSTRUCTION
CREW, INCLUDING PROJECT MANAGERS, LABORERS, SUBCONTRACTORS, ETC., LARGE
ENOUGH TO MEET THE PROJECT DEADLINE.
3. PRIOR TO THE COMMENCEMENT OF WORK A PRE-CONSTRUCTION MEETING SHALL BE HELD
WITH REPRESENTATIVES FROM THE TOWN OF BRIDGEWATER AND THE CONTRACTOR.
WEEKLY OR BIWEEKLY CONSTRUCTION MEETINGS WILL BE SCHEDULED, AT THE REQUEST
OF THE TOWN.
4. THE PROPOSED CONSTRUCTION SEQUENCE IS PROVIDED AS A RECOMMENDED APPROACH
AND IS NOT COMPREHENSIVE OR UNIQUE. THE CONTRACTOR IS RESPONSIBLE FOR
SUBMITTING A PROPOSED CONSTRUCTION SEQUENCE AND SCHEDULE TO THE TOWN FOR
APPROVAL PRIOR TO THE START OF CONSTRUCTION.
5. ALL CONSTRUCTION MATERIALS AND METHODS SHALL CONFORM TO THE TOWN OF
BRIDGEWATER REQUIREMENTS AND TO THE APPLICABLE SECTIONS OF THE
MASSACHUSETTS DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS.
6. THE PLANS REQUIRE A CONTRACTOR'S WORKING KNOWLEDGE OF LOCAL, MUNICIPAL,
WATER COMPANY, AND STATE CODES FOR UTILITY SYSTEMS. ANY CONFLICTS BETWEEN
MATERIALS AND LOCATIONS SHOWN, AND LOCAL REQUIREMENTS SHALL BE BROUGHT TO
THE ATTENTION OF THE TOWN PRIOR TO THE EXECUTION OF WORK. THE TOWN WILL NOT
BE HELD LIABLE FOR COSTS INCURRED TO IMPLEMENT OR CORRECT WORK WHICH DOES
NOT CONFORM TO LOCAL CODE.
7. THE CONTRACTOR SHALL DESIGNATE A SUPERINTENDENT AT THE START OF
CONSTRUCTION AND THE CONTRACTOR'S SUPERINTENDENT SHALL BE ON-SITE AT ALL
TIMES DURING CONSTRUCTION. THE CONTRACTOR AND HIS/HER JOB SUPERINTENDENT
SHALL BE RESPONSIBLE FOR COMPLYING WITH THE JOB SPECIFICATIONS.
8. THE CONTRACTOR MUST COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL
PERMITS AND REGULATIONS THROUGHOUT THE DURATION OF THE PROJECT. COMPLIANCE
WITH ALL CONDITIONS OF APPLICABLE PERMITS IS THE RESPONSIBILITY OF THE
CONTRACTOR. COPIES OF ALL PERMITS AND AUTHORIZATIONS SHALL BE MAINTAINED ON
THE PROJECT SITE BY THE CONTRACTOR THROUGHOUT CONSTRUCTION.
9. THE CONTRACTOR SHALL MAINTAIN A COMPLETE SET OF PLANS ON SITE AT ALL TIMES
AND FOLLOW THE SPECIFICATIONS, DETAILS, AND NOTES FOR ALL ASPECTS OF THE
PROJECT. ANY CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE TOWN
IMMEDIATELY.
10. ANY MATERIAL EXPORTED OFF-SITE SHALL BE LEGALLY DISPOSED OF IN AN UPLAND
LOCATION. THE CONTRACTOR IS RESPONSIBLE FOR FINDING A SUITABLE RECIPIENT OF
THE MATERIAL, GAINING REGULATORY APPROVAL FOR EXPORTED MATERIAL PLACEMENT
IF NEEDED, AND HAULING.
11. FOLLOWING COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL PARTICIPATE IN A
SEMI-FINAL AND FINAL SITE INSPECTION WITH THE TOWN FOR THE PURPOSE OF
VERIFYING THAT THE PROJECT HAS BEEN COMPLETED ACCORDING TO THE
CONSTRUCTION PLANS, SPECIFICATIONS AND THE TERMS AND CONDITIONS OF THE
CONTRACT.
12. THE SITE SHOULD BE KEPT CLEAN OF LOOSE DEBRIS, LITTER, AND OTHER MATERIAL
SUCH THAT NONE OF THESE MATERIAL ENTER WATERS OR WETLANDS.
13. ALL EXISTING PROPERTY MONUMENTATION MUST BE PROTECTED DURING THE WORK.
MONUMENTATION THAT IS DISTURBED MUST BE RESET BY A MASSACHUSETTS LICENSED
LAND SURVEYOR AT NO COST TO THE TOWN OR THE ABUTTING PROPERTY OWNER.
14. ALL CONTRACTOR EQUIPMENT, INCLUDING CRANES AND RIGGING, MUST MAINTAIN A
MINIMUM OF 10-FOOT OFFSET FROM ACTIVE POWER LINES AT ALL TIMES.
GENERAL CONSTRUCTION NOTES:
1. THE TOWN HAS PERMITTED THE CONTRACTOR TO USE THE TOWN OF BRIDGEWATER DEPARTMENT OF PUBLIC WORKS (DPW) YARD FOR TEMPORARY ACCESS, STAGING, AND STOCKPILING OF MATERIALS. THE LOCATION OF THE STAGING AND STOCKPILE AREAS ARE SHOWN SCHEMATICALLY, AND THE CONTRACTOR MUST COORDINATE THE EXACT LOCATIONS PRIOR TO BEGINNING
WORK. AREAS NOT APPROVED BY THE TOWN SHALL NOT BE UTILIZED BY THE CONTRACTOR.
2. THE CONTRACTOR SHALL KEEP ALL TEMPORARY SOIL AND MATERIAL STOCKPILES COVERED AND SURROUNDED WITH SEDIMENTATION AND EROSION CONTROLS. THE CONTRACTOR IS REQUIRED TO PROMPTLY REMOVE ALL MATERIALS AND EQUIPMENT ONCE WORK IS COMPLETE. UNDER NO CIRCUMSTANCES CAN MATERIAL OR EQUIPMENT BE LEFT ON SITE AFTER THE
PROJECT IS COMPLETE.
3. CONSTRUCTION ACCESS ROUTES SHOWN ARE SCHEMATIC IN NATURE - FINAL ROUTES TO BE NEGOTIATED WITH THE TOWN AND
PROPERTY OWNERS PRIOR TO START OF CONSTRUCTION.
4. ACCESS ROADS AND STAGING AND STOCKPILE AREAS ARE TO BE RESTORED UPON PROJECT COMPLETION TO THE ACCEPTANCE
OF THE TOWN.
5. ALL PRIVATELY OWNED LAWN, GARDEN, SHRUBS, TREES, FENCING, AND OTHER YARD FEATURES SHALL BE RESTORED OR
REPAIRED AT PROJECT COMPLETION AT THE APPROVAL OF THE PROPERTY OWNER.
6. CLEARING OF NATIVE VEGETATION FOR CONSTRUCTION ACCESS SHOULD BE MINIMIZED UNLESS SHOWN ON THE PLANS OR APPROVED BY THE ENGINEER. THERE SHALL BE NO CLEARING OF TREES WITH GREATER THAN 3" DBH WITHOUT TOWN
APPROVAL.
7. EXTRA CARE SHALL BE TAKEN BY THE CONTRACTOR TO ENSURE NO DAMAGE IS DONE TO THE ASPHALT ROADWAY, ASPHALT PARKING LOT, CONCRETE SIDEWALKS, GRANITE CURB, OR PAVEMENT MARKINGS TO REMAIN. ANY AND ALL DAMAGE CAUSED BY THE CONTRACTOR SHALL BE REPAIRED TO EXISTING OR BETTER CONDITIONS AT THE CONTRACTOR'S EXPENSE. THE TOWN MUST
APPROVE ALL REPAIRS PRIOR TO THE COMPLETION OF THE PROJECT.
8. UNDERGROUND UTILITIES SHALL BE LOCATED AND AVOIDED WHEN PLANNING THE CONSTRUCTION ACCESS ROUTES. ANY
DISRUPTION OR DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED BY THE CONTRACTOR.
9. CONSTRUCTION ENTRANCES MUST BE MAINTAINED AT EACH UN-PAVED ACCESS POINT, AS REQUESTED BY THE TOWN.
10. ALL EQUIPMENT AND FUEL STORAGE AREAS SHALL BE LOCATED OUTSIDE OF 100-YEAR FLOODPLAIN.
11. NO CONSTRUCTION VEHICLES SHALL BE STORED, SERVICED, WASHED OR FLUSHED IN A LOCATION WHERE LEAKS, SPILLAGE, WASTE MATERIALS, CLEANERS, OR WATERS WILL BE INTRODUCED OR FLOW INTO WETLANDS OR WATERCOURSES. AN EMERGENCY MANAGEMENT PLAN AND SPILL KIT MUST BE MAINTAINED ON SITE AT ALL TIMES. IN THE EVENT OF AN ACCIDENTAL RELEASE, IMMEDIATELY STOP CONSTRUCTION WORK, CONTAIN THE SPILL, AND NOTIFY THE TOWN AND APPROPRIATE
AUTHORITIES.
12. ALL WETLANDS AND WATERCOURSES SHALL BE AVOIDED AND PROTECTED FROM CONSTRUCTION…