RED_LINED_J.1(a)_QIN-QIO_Schedule_of_Deliverables.docx
DOCX document 176 KB Posted
- Solicitation number
- HHSM-500-2014-RFP-QIN-QIO
About this file
RED LINED J.1(a)_QIN-QIO_Schedule_of_Deliverables
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The period of performance for the QIN-QIO SOW IDIQ contract is August 1, 2014 through July 31, 2019.
All work and deliverables required under this contract shall be completed by the expiration date of the period of performance.
Attachment J.1(a) – Schedule of Deliverables, unless otherwise specified all deliverable due dates required monthly, every six months, quarterly, annually or bi-annually are defined as due 10 “calendar” days after the given time period. If a due date falls on a weekend or holiday, the due date shall be the very next business day.
For example: If the contract period of performance begins on August 1, then a deliverable due date of “quarterly” would be due on the 10th day following the end of each quarter (i.e., November 10 for the period of August 1 – October 31).
| No. |
| Item |
| Recipient |
| Due Date(s) |
| Reporting Mechanism |
| Notes |
| Evaluation |
of Deliverable
Task A– Excellence in Operations
| QIN.A.1#1 |
| Task A.1.1-A.1.4 QIN-QIO Comprehensive Strategic Plan |
Plan Key Components
· A.1.1 Implementation Strategy
· A.1.2 Management Plan
· A.1.3 Integrated Communications Plan
· A.1.4 Information Systems and Emergency Preparedness Plans
| COR/GTL |
| RFP Draft Update: Draft due within 21 days and Final due Wwithin 45 90 calendar days of Task order award or within 5 days of any other change event |
| Electronically, via CMS designated system (e.g., DDST). |
| MS Word or Excel Format |
| QIN.A.1#2 |
| Task A.1.3.1 Social Media Business Case |
| COR/GTL |
| At least 30 days prior to an expected launch of a new or modified social media presence |
| Electronically, via CMS designated system (e.g., DDST) |
| MS Word or Excel Format |
| QIOs will use a CMS-furnished template to complete the business case, which must include, among other things, a corporate social media policy that addresses all required elements of the business case. |
| QIN.A.1#3 |
| Task A.1.3.1 Pre-purchase Proposal for Outreach Items |
Proposal is required for any purchase of:
· Outreach item with a per-cost state of at least $1,000; or
· Any paid media item, regardless of cost.
(See Glossary for definition of terms “outreach item” and “paid media.”)
| COR/GTL |
| At least 30 days prior to the QIO’s planned purchase date |
| Electronically, via CMS designated system (e.g., DDST) |
| MS Word or Excel Format |
| QIOs will use a CMS-furnished template for the proposal, which will be evaluated to determine that the cost is not considered “promotional” in nature, and therefore, an unallowable cost under the FAR. |
| QIN.A.1#4 |
| Task A.1.3.1 New or Adapted Communications Materials |
| COR/GTL |
| Within 5 business days of the request from the COR or GTL |
| Per the discretion of the COR |
| Format per the discretion of the COR |
| In the event the COR or a GTL would like to review a QIO’s communication material, individual communications items shall be furnished to CMS as part of this deliverable. The QIO shall not send unsolicited communications materials to CMS on a regular basis. |
| QIN.A.1#52 |
| Task A.1.5 Task Order Work Plan Compendium |
a. Develop
b. Maintain on Real-time Basis
c. Updates
| COR/GTL |
| a. Due within 90 calendar days and Qquarterly after with a start date of 10/31/2014 until the end of the Task Order |
b. Add new Task Order Work Plans upon new Task Order awards
c. Updates: When modifications are executed and changes made to approved Task Order Work Plans
| Electronically, via CMS designated system (e.g., DDST). |
| MS Word or Excel Format |
MS Word Format
| QIN.A.1#36 |
| Task A.1.6. Continuous Internal Quality Improvement Program Plan |
COR/GTL
| RFP Draft Update: Draft due within 21 days and final due within 90 Within 45 calendar days of Task order award or within 5 days of any other change event |
| Electronically, via CMS designated system (e.g., DDST). |
| MS Word or Excel Format |
| QIN.A.1#74 |
| Task A.1.7.a Reporting Requirements |
Monthly Documentation of QIO activities by Task
| COR |
| At least 3 business days prior to the monthly COR monitoring call |
| Electronically, via CMS designated system (e.g., DDST).with email to COR |
| COR will provide direction as to content and format. |
| QIN.A.1#58 |
| Task A.1.7.b Reporting Requirements |
Draft Final QIO Report for All Tasks
| COR/GTL |
| December 158, 2018 |
| Electronically, via CMS designated system (e.g., DDST). |
| QIN.A.1#69 |
| Final QIO Report for All Tasks |
Task A.1.7.c Reporting Requirements
| COR/GTL |
| February 1, 2019 |
| Electronically, via CMS designated system (e.g., DDST). |
| QIN.A.1#107 |
| Task A.1.8. General Contract Management |
a. Orientation Meeting
b. Contract Kick-Off/Planning Meeting
c. Comprehensive Strategic Plan
d. Standing Conference Calls
e. Transition Process Conference Attendance Requests (CAR)
f. SOW Transition Process
g. Collaboration
h. Conference Attendance Requests
| COR/GTL and may include Contracting Officer and/or Contract Specialist |
| a. Orientation - Within 5 calendar days of Task order award |
b. Contract Kick-Off/Planning Meeting – Within 21 calendar days of Task order award
c. See above Task A.1
d. Standing Conference Calls – Monthly with COR and Quarterly with COR and GTL
e. No more than 120 days before the end of the contract
f. Ongoing
g. CAR – 4 months prior to the planned meeting
| Electronically, via CMS designated system (e.g., DDST). |
| MS Word or Excel Format |
| QIN.A.1S#118 |
| Section A.1.8, General Contract Management, h, |
Base Section C.3.3.1 Certification by Security Point of Contact (SPOC) for Compliance with CMS Systems Security Requirements h.1. Appointment of QIN Security POC (SPOC)
| QIN COR, CMS QNET ISSO |
| Within 14 90 days of Task Order award, and within 15 days of changes made |
| Electronically as directed by the CMS QNET ISSO |
| Template will be provided by CMS QNET ISSO |
| QIN.A.1S#129 |
| Section A.1.8, General Contract Management, h, |
Base Section C.3.3.1 Certification by Security Point of Contact (SPOC) for Compliance with CMS Systems Security Requirements h.2. List of assigned QIN Information Technology staff with required information
| QIN COR, CMS QNET ISSO |
| Within 14 90 days of Task Order award, and within 15 days of changes made |
| Electronically as directed by the CMS QNET ISSO |
| Template will be provided by CMS QNET ISSO |
| QIN.A.1S#1310 |
| Section A.1.8, General Contract Management, h, |
Base Section C.3.3.1 Certification by Security Point of Contact (SPOC) for Compliance with CMS Systems Security Requirements h.3. QNET Security Awareness Training (SAT) and Certification Letter
| CMS QNET ISSO |
| Initial within 14 90 days after Task Order award and annually thereafter. Also, within 30 days after any major changes |
| Electronically as directed by the CMS QNET ISSO |
| Template will be provided by CMS QNET ISSO; Submit additional artifacts upon request |
| QIN.A.1S#114 |
| Section A.1.8, General Contract Management, h, |
Base Section C.3.3.1 Certification by Security Point of Contact (SPOC) for Compliance with CMS Systems Security Requirements h.4. Review the CMS security website and check for updates
| QIN COR, CMS QNET ISSO |
| Initial within 14 90 days after Task Order award and and every 30 calendar days thereafter |
| Monthly Report |
| Include in Monthly Report |
| QIN.A.1S#125 |
| Section A.1.8, General Contract Management, h, Base Section C.3.3.1 Certification by Security Point of Contact (SPOC) for Compliance with CMS Systems Security Requirements |
h.5. Submit a Business Continuity and Contingency Plan (BCCP)
| QIN COR, CMS QNET ISSO |
| Initial within 14 90 days after Task Order award and annually thereafter and annually thereafter. Also, 30 days after completion of any serious structural changes |
| Electronically as directed by the CMS QNET ISSO |
| Template will be provided by CMS QNET ISSO. Serious structural changes consist of building relocations or major structural changes to the current infrastructure. |
| QIN.A.1S#163 |
| Section A.1.8, General Contract Management, h, Base Section C.3.3.1 Certification by Security Point of Contact (SPOC) for Compliance with CMS Systems Security Requirements |
h.6. Artifacts resulting from compliance with CMS, FISMA, OIG, and other relevant audits, reviews, evaluations, tests, and assessments of QIN systems, processes, and facilities as it relates to program security and compliance
| CMS QNET ISSO |
| Initial within 14 90days after Task Order award and annually thereafter. Also, within 30 days after any major changes |
| As Directed by CMS |
| QIN.A.1S#174 |
| Section A.1.8, General Contract Management, h, Base Section C.3.3.1 Certification by Security Point of Contact (SPOC) for Compliance with CMS Systems Security Requirements |
h.7. QIN System Security Plan and Information Security Risk Assessment
| CMS QNET ISSO |
| Initial within 14 90 days after Task Order award and annually thereafter. Also, within 30 days after any major changes |
| Electronically as directed by the CMS QNET ISSO |
| Template will be provided by CMS QNET ISSO |
| QIN.A.1S#185 |
| Section A.1.8, General Contract Management, h, |
Base Section C.3.3.1 Certification by Security Point of Contact (SPOC) for Compliance with CMS Systems Security Requirements h.8. Corrective Action Plans (CAPs)
| CMS QNET ISSO |
| Within 30 days after audit or finding |
| Electronically as directed by the CMS QNET ISSO |
| Template will be provided by CMS QNET ISSO |
| QIN.A.1#196 |
| Section A.1.8, General Contract Management, h, |
Base Section C.3.3.1 Certification by Security Point of Contact (SPOC) for Compliance with CMS Systems Security Requirements h.9. Plan of Action and Milestones (POA&M)
CMS QNET ISSO
| Within 15 days of approval of CAP; monthly thereafter until CAP is closed |
| Electronically as directed by the CMS QNET ISSO |
| Template will be provided by CMS QNET ISSO; |
Monthly due date will be as determined by CMS QNET ISSO
| QIN.A.1#2017 |
| Section A.1.8, General Contract Management, i, |
Base Section C.4 General Requirements i.1. Adherence to Privacy, Confidentiality, and Disclosure Requirements - Provide documentation of adherence
| COR/GTL |
| Initial within 90 days after Task Order award and annually thereafter. Also, within 30 days after any major changes |
| DDST |
| QIN.A.1#2118 |
| Section A.1.8, General Contract Management, i, |
Base Section C.4 General Requirements i.2. Provide a copy of Training Materials Developed or Used to Meet Confidentiality Training Requirements
| COR/GTL |
| Initial within 90 days after Task Order award and annually thereafter. Also, within 30 days after any major changes |
| DDST |
| QIN.A.1#2219 |
| Section A.1.8, General Contract Management, i, |
Base Section C.4 General Requirements i.4. and i.5.
a. Execute CDAC Subcontract
b. Copy the COR on all communications with CDAC subcontractor
| COR/GTL |
| a. As Directed by CMS |
b. Immediately- all instances
DDST
| QIN.A.1#2320 |
| Section A.1.8, General Contract Management, i, |
Base Section C.4 General Requirements i.6. Participate in Collaborative Activities Sponsored by CMS
| COR/GTL |
| Initial within 90 days after Task Order award and annually thereafter. Also, within 30 days after any major changes |
| DDST |
| QIN.A.1#241 |
| Section A.1.8, General Contract Management, i, |
Base Section C.4 General Requirements i.7. Review CMS Contractor Website Guidelines
| COR/GTL |
| Initial within 90 days after Task Order award and annually thereafter. Also, within 30 days after any major changes |
| Monthly Report |
| QIN.A.1#252 |
| Section A.1.8, General Contract Management, i, |
Base Section C.4 General Requirements i.8. Assist CMS’ Public Health Efforts by Disseminating Information
| COR/GTL/CO |
| Initial within 90 days after Task Order award and annually thereafter. Also, within 30 days after any major changes |
| Monthly Report |
| Include in Monthly Report |
| QIN.A.1#263 |
| Section A.1.8, General Contract Management, i, |
Solicitation Section H.3, H.15 and H.21 Conflict of Interest Certification
| COR/GTL/CO |
| Initial within 90 days after Task Order award and annually thereafter. Also, within 30 days after any major changes |
| QIN.A.1#274 |
| Section A.1.8, General Contract Management, i, |
Base Section C.4 General Requirements i.9. and i.10. Continuity of Operations Plan (COOP) and Contingency Plan (CP)
a. Develop COOP and CP
b. Table Top Test
| COR/GTL |
| Initial within 90 days after Task Order award and annually thereafter. Also, within 30 days after any major changes |
| DDST |
| The CP includes a Disaster Recovery Plan |
| QIN.A.1#285 |
| Section A.1.8, General Contract Management, i, |
Base Section C.4 General Requirements i.11. Compliance and Cooperation with Data Requests Subject to QIO Confidentiality Provisions
| COR/GTL |
| Initial within 90 days after Task Order award and Submitted annually on date of award and as directed by CMS |
| DDST |
QIN-QIO IDIQ
| HHSM-500-2014-RFP-QIN-QIO | Excellence in Operations and Quality Improvement | ||
| Task Order No. 001 | Attachment J.1(a) – Schedule of Deliverables | ||
| rev 1/93/14 |
For the QIN-QIO Schedule of Deliverables, unless otherwise specified all deliverable due dates required monthly, quarterly, or annually are defined as due 10 “calendar” days after the given time period. If a due date falls on a weekend or holiday, the due date shall be the very next business day.
| No. |
| Item |
| Recipient |
| Due Date(s) |
| Reporting Mechanism |
| Notes |
| Evaluation |
of Deliverable
Task B.1 – Cardiac Health
| QIN.B.1#1 |
| Task Work Plan |
Task B.1.1
COR/GTL
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| QIN.B.1#2 |
| Provider Recruitment. |
Task B.1.2, Task B.1.2.1., and B.1.2.2
(Include in Quarterly Report Task B.1.7)
COR/GTL
Quarterly with a start date of report submission by 10/31/2014 until the end of the Task Order. Recruitment ends 10/31/14.
| Electronically, via CMS designated system (e.g., DDST). |
| This report shall include the type and number of providers utilizing certified EHRs to report on PQRS ABCS measures specified in B.1.2.2. |
| Quarterly and after review and approval of the recruitment proposal, the QIOs will be evaluated on whether the proposed and approved recruitment is number and type of participating providers are actually maintained based on a review of the documents submitted via DDST |
| QIN.B.1#3 |
| Recruitment Proposal |
Task B.1.2
(Include in Task Work Plan)
| COR/GTL |
| 10/31/2014 |
| Task Work Plan, Electronically, via CMS designated system (e.g., DDST). |
| QIN.B.1#4 |
| Beneficiary and Family Engagement |
Task B.1.3
(Include in Quarterly Report Task B.1.7)
COR/GTL
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| QIN.B.1#5 |
| Partner and/or Stakeholder Recruitment |
Task B.1.4
(Include in Quarterly Report Task B.1.7)
COR/GTL/
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| The QIO may use the same partners and stakeholders for Task B.4. |
| QIOs will be evaluated on whether the proposed number of partners and/or stakeholders are actually recruited and maintained based on a review of the documents submitted via DDST. |
| QIN.B.1#6 |
| Report on Technical Assistance Activities |
Task B.1.5
(Include in Quarterly Report Task B.1.7)
COR/GTL
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| Include at a minimum the requirements set forth in each task area. |
| QIOs will be evaluated on compliance with the technical assistance requirements set forth in B.1.5, B.1.6, and B.1.7 based on review of the documents submitted. |
| QIN.B.1#7 |
| LAN Quarterly Report |
Task B.1.6
(Include in Quarterly Report Task B.1.7)
| COR/GTL |
| Quarterly with a start date of 101/31/20154 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| Include in the report documentation about convening the first meeting by the 01/31/2015due date. |
| QIN.B.1#8 | |
| Aspirin, Blood Pressure (BP) Control, Cholesterol Management, Smoking – Screening and Cessation – Data from the PQRS Aligned CEHRT Users | Comment by Author: Changes made based on a question received. Aspirin and Cholesterol should have been included in the original table. While the QIOs are only evaluated on BP and Smoking, they should submit quarterly data on all 4 measures. This can all be in one deliverable and not separated out. The date changed to align with what is in the measures table. No one will have baseline information by 10/31/2014. …Cynthia P. |
Task B.1.2.2
(Include in Quarterly Report Task B.1.7)
| COR/GTL |
| Quarterly with a start date of 102/1031/20145 for baseline data submission with subsequent data submitted until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
QIOs will be evaluated on timely submission of BP data obtained from all CEHRT users.
| 9 |
| Smoking – Screening and Cessation – Data Report from CEHRT Users |
Task B.1.2.2
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
QIOs will be evaluated on timely submission of smoking data obtained from all CEHRT users.
| QIN.B.1#910 |
| Monitoring and Reporting Requirements |
Quarterly Reports
Task B.1.7
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| QIN.B.1#101 |
| Sustainability Plan |
Task B.1.8
(Include in Task Work Plan)
10/31/2014 2015 and annually until the end of the Task Order Task Work Plan, Electronically, via CMS designated system (e.g., DDST).
| No. |
| Item |
| Recipient |
| Due Date(s) |
| Reporting Mechanism |
| Notes |
| Evaluation |
of Deliverable
Task B.2 - Everyone with Diabetes Counts (EDC)
| QIN.B.2#1 |
| Task Work Plan |
Task B.2.1
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
Electronically, via CMS designated system (e.g., DDST).
| Plan should include resource planning activities, key milestones including due dates, risk mitigation, task descriptions, including a detailed description of activities necessary to complete each task, activity planning through personnel. |
| Determined by GTL based on feasibility of plan |
| QIN.B.2#2 |
| Quarterly Report Task B.2.6 |
Should include Task B.2.2, Task B.2.3, Task B.2.4, Task B.2.5.2, Task B.2.5.3, Task B.2.5.6, Task B.2.8.5
COR/GTL
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| Quarterly Reports should include at a minimum: participating practices/provider recruitment targets, beneficiary recruitment targets (see Quarterly Targets in Table 1 in SOW), report on amount of clinical measures obtained, numbers of completed beneficiary surveys (PAS) obtained, lower extremity amputation rates, any barriers encountered and mitigation strategies implemented, successes, including beneficiary success stories, any partner/stakeholder recruitment updates. Initial quarterly report should include marketing strategy/plan, train-the-trainer strategy/ plan and sustainability strategy/plan. Quarterly report updates should also include progress reports on sustainability plan and trainer-the-trainer plan. |
| QIOs will be evaluated based on meeting targets in Quarterly Targets Table 1 in SOW, on clinical data for a minimum of 10% of beneficiaries who complete DSME classes, and on feasibility of train-the-trainer and sustainability plans. |
QIN.B.2#3
Environmental Scan of Medicare Beneficiaries
Task B.2.5.4
COR/GTL
Quarterly with a start date of 10/31/2014 until the end of the Task Order 30 days from Task Order award Electronically, via CMS designated system (e.g., DDST).
| The QIO shall submit an environmental scan to CMS detailing the number of Medicare beneficiaries with diabetes by county and zip code in the targeted population. |
| Based on thoroughness and completeness of scan. |
| QIN.B.2#4 |
| Environmental Scan of certified diabetes educators and community health workers (CDEs/CHWs) |
Task B.2.5.5
COR/GTL
Quarterly with a start date of 10/31/2014 until the end of the Task Order 30 days from Task Order award Electronically, via CMS designated system (e.g., DDST).
The QIO shall submit an environmental scan to CMS detailing the number of CDEs and CHWs in its state/jurisdiction by county and zip code. Scan should also include current diabetes education initiatives in the QIO’s state/jurisdiction to avoid duplication of services.
Based on thoroughness and completeness of scan.
| 5 |
| Monitoring and Reporting Requirements |
Quarterly Reports
Task B.2.6
COR/GTL
Quarterly with a start date of 10/31/2014 until the end of the Task Order
Electronically, via CMS designated system (e.g., DDST).
| QIN.B.2#6 |
| Sustainability Plan |
Task B.2.7 and Task B.2.8.6
(Include in Task Work Plan)
| COR/GTL |
| 10/31/2014 2015 and annually until the end of the Task Order. |
| Task Work Plan Electronically, via CMS designated system (e.g., DDST). |
CMS designated template The QIO shall develop and implement a sustainability plan that will promote, facilitate, and ensure continued training of diabetes educators as well as continuation of DSME training classes after the QIO has completed its SOW.
| No. |
| Item |
| Recipient |
| Due Date(s) |
| Reporting Mechanism |
| Notes |
| Evaluation |
of Deliverable
Task B.3- Using IIS to Improve Prevention Coordination - RESERVED
| 1 |
| Task Work Plan |
Task B.3.1
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| Include recruitment goal |
| 2 |
| Beneficiary and Family Engagement |
Task B. 3.3
COR/GTL
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| 3 |
| Recruitment Plan |
Task B. 3.2
(Include in Task Work Plan)
Identify and recruit participating practices and other healthcare providers (includes signed consent form).
The QIO must recruit at least 50% of the target number within 12 months of the effective date, and 95% within 24 months of the effective date. At least 40% of the recruited practices/providers must provide care to a predominately minority/underserved population.
| COR/GTL |
| Within 90 days of Task Order award |
| Task Work Plan Electronically, via CMS designated system (e.g., DDST). |
| 4 |
| Task B.3.5.1. - Meet with CDC grantee to discuss logistics |
| Within 20 days of Task Order award |
| Electronically, via CMS designated system (e.g., DDST) quarterly report |
| 5 |
| Task B.3.5.2. - Begin training on IIS |
| Within 30 days of Task Order award |
| Electronically, via CMS designated system (e.g., DDST) quarterly report |
| 6 |
| TaskB.3.5.4. - Provide technical assistance in reporting to the participating practices, i.e., education in using IIS |
Ongoing Electronically, via CMS designated system (e.g., DDST). quarterly report
| 7 |
| TaskB.3.5.5. - Work with vendors to identify barriers and solutions to reporting issues |
As needed Electronically, via CMS designated system (e.g., DDST).
quarterly Report
| 8 |
| Quarterly Reports to CMA |
Task B.3.5.6
Submit quarterly reports, including progress on recruitment, technical assistance & education provided to practices, practices’ progress in reporting, timeliness and completeness of practices’ reporting to IIS, etc. The quarterly reports must include documentation from the IIS (or EHRs) to support that practices’ reporting to IIS has been successful.
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
Electronically, via CMS designated system (e.g., DDST).
| 9 |
| Task B.3.5.7. - Review IIS reports to monitor progress of practices |
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| 10 |
| Sustainability Plan |
Task B.3.7
(Include in Task Work Plan)
| COR/GTL |
| 10/31/2014 and annually until the end of the Task Order. |
| Task Work Plan Electronically, via CMS designated system (e.g., DDST). |
| No. |
| Item |
| Recipient |
| Due Date(s) |
| Reporting Mechanism |
| Notes |
| Evaluation |
of Deliverable
Task B.4 - REC Collaboration
| QIN.B.4#1 |
| Task Work Plan |
Task B. 4.1
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
Electronically, via CMS designated system (e.g., DDST).
| QIN.B.4#2 |
| Recruitment Plan |
Tasks B.4.2 and B.4.4
(Include in Task Work Plan)
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Task Work Plan Electronically, via CMS designated system (e.g., DDST). |
| QIO must identify a target number of EPs, EHs and CAHs communities and providers to recruit per quarter through quarter 10. The recruitment plan must identify number of EPs, EHs and CAHs communities in need of assistance. |
| QIN.B.4#3 |
| Provider and Practitioner Recruitment |
Task B.4.2
(Include in Quarterly Report Task B.4.7)
| COR/GTL |
| Quarterly with a start date of 10/31/20154 until the end of the Task Order |
Electronically, via CMS designated system (e.g., DDST).
| QIN.B.4#4 |
| Partner and Stakeholder Recruitment |
Task B. 4.4
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| QIN.B.4#5 |
| Beneficiary and Family Engagement |
Task B. 4.3 (Include in Quarterly Report Task B.4.7)
COR/GTL
Quarterly with a start date of 10/31/2014 until the end of the Task Order
Electronically, via CMS designated system (e.g., DDST).
| QIN.B.4#6 |
| Educational Materials & Strategy |
Task B.4.6
(Include in Quarterly Report Task B.4.7) (Include in Task Work Plan)
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Task Work Plan Electronically, via CMS designated system (e.g., DDST). |
| QIO must provide list of educational materials, invitations, webinar information and others |
| QIN.B.4#7 |
| Communication and Collaboration Strategy |
Task B.4.6
(Include in Quarterly Report Task B.4.7) (Include in Task Work Plan)
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Task Work Plan Electronically, via CMS designated system (e.g., DDST). |
| QIO must provide a communication and collaboration plan with multiple stakeholders including plans for joint presentations, co-branding and educational sessions |
| QIN.B.4#8 |
| Learning Community Strategy |
Task B.4.6
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Task Work Plan Electronically, via CMS designated system (e.g., DDST). |
| The QIO will facilitate discussions and meetings participating provider, partner, meetings, and stakeholder collaboration and discussions, through the Learning and Action Network (LAN). |
| QIN.B.4#9 |
| Provider Technical Assistance |
Task B.4.5
(Include in Quarterly Report Task B.4.7)
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| QIN.B.4#10 |
| LANs |
Task B.4.6
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| QIN.B.4#11 |
| Monitoring and Reporting Requirements |
Task B.4.7 Quarterly Reports
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| QIO must provide updates on recruitment, progress, engagement activities, measure rates, opportunities and barriers. |
| QIN.B.4#12 |
| Community/Sustainability Plan |
Task B.4.8
(Include in Task Work Plan)
| COR/GTL |
| 10/31/2014 and Annually until the end of the Task Order. |
| Task Work Plan Electronically, via CMS designated system (e.g., DDST). |
| Provide recommendations for community sustainability and consider local, state and federal resources |
No.
| Item |
| Recipient |
| Due Date(s) |
| Reporting Mechanism |
| Notes |
| Evaluation |
of Deliverable
Task C.1 – HAI
| QIN.C.1#1 |
| Task Work Plan |
Task C.1.1
COR/GTL
Quarterly with a start date of 10/31/2014 until the end of the Task Order
| Electronically, via CMS designated system (e.g., DDST). |
| Plan must include: resource planning activities, key milestones including due dates, risk mitigation, task descriptions including a detailed description of activities necessary to complete each task, activity planning through personnel, and a recruitment strategy. |
| COR/GTL/ |
Task Lead
| QIN.C.1#2 |
| Provider Hospital Recruitment |
Task C.1.2
a. Recruitment Plan (Include in Task Work Plan)
b. Recruit Hospitals (ICU and Non-ICU) with signed commitment letters to actively participate in the HAI initiative and Learning and Action Networks.
Hospitals that previously worked with a QIO and wish to continue HAI work for CLABSI, CAUTI, and CDI, will update their commitment letters for this Task Order to actively participate in the HAI initiative and Learning and Action Networks.
Including their status (CLABSI, CAUTI, and CDI) and completion of specified tasks within Task C.1.1.
(Include in Quarterly Report Task C.1.8.)
COR/GTL
a.10/31/2014 b.Quarterly with a start date of 10/31/2014 until the end of the Task Order
| Electronically, via CMS designated system (e.g., DDST). |
| CMS will provide reporting template and technical assistance to QIOs on template use as required |
| QIO must provide all relevant identifiers for each facility, completing all relevant fields in the supplied template. This deliverable applies to all HAI projects. |
| QIN.C.1#3 |
| Beneficiary and Family Engagement |
Task C.1.3
(Include in Quarterly Report Task C.1.8.)
COR/GTL
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| QIN.C.1#4 |
| Partner and Stakeholder Recruitment and Collaboration |
Task C.1.4
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| QIN.C.1#5 |
| Partnership/Collaboration Plan |
Task C.1.4
(Include in Task Work Plan)
| COR/GTL |
| A start date of 10/31/2014 and annually thereafter |
| Task Work Plan Electronically, via CMS designated system (e.g., DDST). |
| QIN.C.1#6 |
| Request for Partnership/Collaboration |
Task C.1.4
COR/GTL
| Ongoing |
| Electronically, via CMS designated system (e.g., DDST). |
| QIO to craft request letter |
| Request Letter - the QIO shall identify the partnering entity, purpose of partnership and shall also include an attestation of non-duplicative State and Federally-sponsored efforts. |
| QIN.C.1#7 |
| Report of Partnership/Collaboration |
Task C.1.4
(Include in Quarterly Report Task C.1.8.)
| COR/GTL |
| On the last day of the sixth month of the Task Order and every six months thereafter. |
Electronically, via CMS designated system (e.g., DDST).
Report shall provide committed partnerships and collaborations along with activities undertaken as they contribute to national HAI reduction and prevention goals.
QIO shall demonstrate and document in the above mentioned report, the activities, partnerships, and collaborations they have with local agencies to develop and implement HAI prevention and reduction interventions as well as the data that was used to document progress of said interventions.
QIN.C.1#8
Reporting on QIO Tool Development and Distribution Task C.1.8
| COR/GTL |
| On the last day of the sixth month of the Task Order and every six months thereafter. |
| Electronically, via CMS designated system (e.g., DDST). |
| Table format preferred |
| Report must identify tools developed and/or distributed through action networks, purpose of tool, distribution date, and technical assistance provided by the QIO. |
| QIN.C.1#9 |
| C.1.6.1 Central Line-Associated Bloodstream Infection (CLABSI) – section a.1. |
Statewide Environmental Scan of CLABSI SIRs
(Include in Quarterly Report Task C.1.8.)
| NCC/ COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
At Task Order award and quarterly thereafter Electronically, via CMS designated system (e.g., DDST).
Will be based in SOW requirements in C.1.6.1
| QIN.C.1#10 |
| C.1.6.1 Central Line-Associated Bloodstream Infection (CLABSI) section a.4. |
Provide CLABSI outcome data quarterly until national benchmark SIR has been reached.
| NCC/ COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
At Task Order award then quarterly thereafter Electronically, via CMS designated system (e.g., DDST).
Will be based in SOW requirements in C.1.6.1
| QIN.C.1#11 |
| C.1.6.2.a. Catheter-Associated Urinary Tract Infections (CAUTI): |
Statewide Scan of CAUTI SIRs
(Include in Quarterly Report Task C.1.8.)
| NCC/ COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
Electronically, via CMS designated system (e.g., DDST).
Will be based in SOW requirements in C.1.6.2
| QIN.C.1#12 |
| C.1.6.3. Clostridium Difficile Infection (CDI): g. Statewide Environmental Scan of CDI SIRs |
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
NHSN
Will be based in SOW requirements in C.1.6.3
| QIN.C.1#13 |
| C.1.6.4 Ventilator-Associated Events (VAE) |
a. Conduct at least one educational LAN even regarding VAE by 7/31/15
b. Document the number of QIOs hospitals that have attended the LAN and been trained on the elements of VAE reduction and reporting in hospitals to the NHSN by 7/31/16
c. Report the number of QIO recruited hospitals trained by QIOs with or without conjunction from their regional partner on VAE by 7/31/17
d. Establish a baseline for VAE by 7/31/17
e. Report baseline data from by 7/31/18 and continue to work and monitor VAE
COR/GTL
Electronically via CMS designated system (e.g., DDST)
Will be based in SOW requirements in C.1.6.4
| QIN.C.1#14 |
| Task C.1.7. Learning and Action Networks (LANs): |
Section a.3, Strategies Develop strategies for identifying current and potential duplication of HAI work and mitigating such duplication when and if it occurs.
Sections a.4, Duplicative Activities and a.5, Partnerships Partnerships and duplicative activities and their resolution should be reported to CMS at least quarterly.
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
Electronically, via CMS designated system (e.g., DDST).
Based on SOW requirements in C.1.7
| QIN.C.1#15 |
| Task C.1.8. Monitoring and Reporting Requirements: |
a. HAI Map
b. Documentation of HAI Work, Recruitment Reports, Tool Development and Distribution Reports
c. Hospital patient and family engagement activities (C.1.8.f)
| COR/GTL |
| a. and b. By the end of the month to coincide with the environmental scan. |
c. Quarterly Electronically, via CMS designated system (e.g., DDST).
Based on SOW requirements in C.1.8
| QIN.C.1#16 |
| Task C.1.9 Sustainability Plan |
(Include in Task Work Plan)
| COR/GTL |
| Within 45 days of Task Order Award and Annually until the end of the Task Order. |
| Electronically, via CMS designated system (e.g., DDST). |
QIN-QIO SoW IDIQ HHSM-500-2014-RFP-QIN-QIO Quality Improvement Task Order No. 001 Attachment J.1(a) – Schedule of Deliverables
No.
| Item |
| Recipient |
| Due Date(s) |
| Reporting Mechanism |
| Notes |
| Evaluation |
of Deliverable
Task C.2 – Nursing Homes
| QIN.C.2#1 |
| Task Work Plan |
Task C.2.1
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| See Part 4 of this TO, Core Requirements Applicable to All Task Orders for Task Work Plan specifications |
| QIO will be evaluated for compliance with Part 4 of this TO, Core Requirements Applicable to All Task Orders and Task C.2- Nursing Home (NH), and any elements identified in teleconference with COR/GTL. |
| QIN.C.2#2 |
| Collaborative Structure |
Section B.2.dC. General Desired Outcomes Task C.2.1 Task C.2.6.1.b
| COR/GTL/NCC |
| September 30, 2014 9/30/2014 |
| Electronically, via CMS designated system (e.g., DDST). |
| QIN-QIO, consulting with the NCC, shall create an operational infrastructure for every state Collaborative I and II |
| QIO will be evaluated based upon infrastructure detail, inclusion of needs of QION service area, including geography, population dispersal, etc., issues, and feasibility of structure. |
| QIN.C.2#3 |
| Provider Recruitment |
Task C.2.2
a. Recruitment Plan (Include in Task Work Plan)
b. Collaborative I: Recruitment Target Number (RTN) and 1-Star Category Target Count (SCTC) and required documentation of participation: Participation Agreements and Decisions Not to Participate
C.2.2 and C.2, Section G - Appendix 2
| COR/GTL |
| 10/Oct. 31,/ 2014 |
| Electronically, via CMS designated system (e.g., DDST). |
Template: Participant Agreement or Decisions Not to Participate
| QIO must meet RTN and 1-Star SCTC counts as calculated for each individual participating state and territory |
| QIO must recruit >6% of RTN, inclusive of >6% SCTC. QIO must have a fully executed Participation Agreement for each QIO represented NH identified as a part of its RTN. |
| QIN.C.2#4 |
| Collaborative I: Recruitment Target Number (RTN) and 1-Star Category Target Count (SCTC) and required documentation of participation: Participation Agreements and Decisions Not to Participate |
C.2.2 and C.2, Section G - Appendix 2
| COR/GTL |
| Nov. 30, 2014 |
11/30/2014 Electronically, via CMS designated system (e.g., DDST).
Template: ParticipationAgreement or Decisions Not to Participate
| QIO must meet RTN and SCTC counts as calculated for each individual participating state and territory |
| QIO must recruit >12% of RTN, inclusive of >12% SCTC. QIO must have a fully executed Participation Agreement for each QIO represented NH identified as a part of its RTN. |
| QIN.C.2#5 |
| Collaborative I: Recruitment Target Number (RTN) and 1-Star Category Target Count (SCTC) and required documentation of participation: Participation Agreements and Decisions Not to Participate |
| COR/GTL |
| December 31, 2014 12/31/2014 |
Electronically, via CMS designated system (e.g., DDST).
Template: Participant Agreement or Decisions Not to Participate
| QIO must meet RTN and SCTC counts as calculated for each individual participating state and territory |
| QIO must recruit >18% of RTN, inclusive of >18% SCTC. QIO must have a fully executed Participation Agreement for each QIO represented NH identified as a part of its RTN. |
| QIN.C.2#6 |
| Collaborative I: Recruitment Target Number (RTN) and 1-Star Category Target Count (SCTC) and required documentation of participation: Participation Agreements and Decisions Not to Participate |
| COR/GTL |
| Jan. 31, 20151/30/2015 |
| Electronically, via CMS designated system (e.g., DDST). |
Template: Participation Agreement or Decisions Not to Participate
| QIO must meet RTN and SCTC counts as calculated for each individual participating state and territory |
| QIO must recruit >24% of RTN, inclusive of >24% SCTC. QIO must have a fully executed Participation Agreement for each QIO representeNH identifiedd as a part of its RTN. |
| QIN.C.2#7 |
| Collaborative I: Recruitment Target Number (RTN) and 1-Star Category Target Count (SCTC) and proofs of participation: Participation Agreements and Decisions Not to Participate |
| COR/GTL |
| Feb. 28, 20152/27/2015 |
Electronically, via CMS designated system (e.g., DDST).
| QIO must meet RTN and SCTC counts as calculated for each individual participating state and territory |
| QIO must recruit >30% of RTN, inclusive of >30% SCTC. QIO must have a fully executed Participation Agreement for each QIO represented NH identified as a part of its RTN. |
| QIN.C.2#8 |
| Collaborative I: Recruitment Target Number (RTN) and 1-Star Category Target Count (SCTC) and documentation of participation: Participation Agreements and Decisions Not to Participate |
| COR/GTL |
| March 31, 20153/3April 30, 20151/2015 |
| Electronically, via CMS designated system (e.g., DDST). |
| QIO must meet RTN and SCTC counts as calculated for each individual participating state and territory |
| QIO must recruit >35% of RTN, inclusive of >35% SCTC. QIO must have a fully executed Participation Agreement for each NH identified as a part of its RTN. |
| QIN.C.2#9 |
| Collaborative I and II: QAPI Self Assessment Tool |
C.2.6.3 Areas for Rapid Cycle Quality Improvement Testing and Implementation
| COR/GTL |
| Annually, beginning Monthly beginning |
Apr. 30, 2015 - Sept 30,, 2018 4/30/2015 – 9/30/2018 Electronically, via CMS designated system (e.g., DDST).
Nursing homes will complete and /or update QAPI Self Assessment.
For NHs with existing QAPI Tools, update at least once during each Collaborative in which the NH participates . For NHs without an existing Tool, the NH will evaluate itself, complete the Self Assessment, and identify its beginning status.
QIO must recruit >95% of total number of nursing homes participating in Collaborative I and II and shall have NHs initiate, update and maintain QAPI Self Assessment Tool
| QIN.C.2#10 |
| Collaborative II: Recruitment Target Number (RTN) and 1-Star Category Target Count (SCTC) and documentation of participation: Participation Agreements and Decisions Not to Participate |
| COR/GTL |
| 10/31/2016October 31, 2016 |
| Electronically, via CMS designated system (e.g., DDST). |
| QIO must meet RTN and SCTC counts as calculated for each individual participating state and territory |
| QIO must recruit >50% of RTN, inclusive of >50% SCTC. QIO must have a fully executed Participation Agreement for each QIO representedNH identified as a part of its RTN. |
| QIN.C.2#11 |
| Collaborative II: Recruitment Target Number (RTN) and 1-Star Category Target Count (SCTC) and documentation of participation: Participation Agreements and Decisions Not to Participate |
| COR/GTL |
| 11/30/2016Nov. 30, 2016 |
| Electronically, via CMS designated system (e.g., DDST). |
| QIO must meet RTN and SCTC counts as calculated for each individual participating state and territory |
| QIO must recruit >60% of RTN, inclusive of >60% SCTC. QIO must have a fully executed Participation Agreement for each QIO counted NH identified as a part of its RTN. |
| QIN.C.2#12 |
| Collaborative II: Recruitment Target Number (RTN) and 1-Star Category Target Count (SCTC) and documentation of participation: Participation Agreements and Decisions Not to Participate |
| COR/GTL |
| December 31, 201612/30/2016 |
| Electronically, via CMS designated system (e.g., DDST). |
Template: Participation Agreement or Decisions Not to Participate
| QIO must meet RTN and SCTC counts as calculated for each individual participating state and territory |
| QIO must recruit>70% of RTN, inclusive of >70% SCTC. QIO must have a fully executed Participation Agreement for each QIO countedNH identified as a part of its RTN. |
| QIN.C.2#13 |
| Collaborative II: Recruitment Target Number (RTN) and 1-Star Category Target Count (SCTC) and documentation of participation: Participation Agreements and Decisions Not to Participate |
| COR/GTL |
| Jan. 31, 20171/31/2017 |
| Electronically, via CMS designated system (e.g., DDST). |
| QIO must meet RTN and SCTC counts as calculated for each individual participating state and territory |
| QIO must recruit>80% of RTN, inclusive of >80% SCTC. QIO must have a fully executed Participation Agreement for each QIO countedNH identified as a part of its RTN. |
| QIN.C.2#14 |
| Collaborative II: Recruitment Target Number (RTN) and 1-Star Category Target Count (SCTC) and documentation of participation: Participation Agreements and Decisions Not to Participate |
| COR/GTL |
| Feb. 28, 20172/28/2017 |
| Electronically, via CMS designated system (e.g., DDST). |
| QIO must meet RTN and SCTC counts as calculated for each individual participating state and territory |
| QIO must recruit >90% of RTN, inclusive of >90% SCTC. QIO must have a fully executed Participation Agreement for each QIO counted NH identified as a part of its RTN |
| QIN.C.2#15 |
| Collaborative II: Recruitment Target Number (RTN) and 1-Star Category Target Count (SCTC) and documentation of participation: Participation Agreements and Decisions Not to Participate |
| COR/GTL |
| March 31, 20173/31/2017 |
| Electronically, via CMS designated system (e.g., DDST). |
| QIO must meet RTN and SCTC counts as calculated for each individual participating state and territory |
| QIO must recruit 100% of RTN, inclusive of 100% SCTC. QIO must have a fully executed Participation Agreement for each QIO counted NH identified as a part of its RTN. |
| QIN.C.2#16 |
| Collaborative I and II: Nursing Home Participation Agreement |
C.2.2
| COR/GTL |
| In alignment with RTN and SCTC recruitment dates |
| QIO will submit Participation Agreements electronically, via CMS designated system (e.g., DDST). |
| A the QIO RTN. |
| QIO will maintain a file A Participation Agreements must be submitted for every nursing home counted as a part of the RTN. |
| QIN.C.2#17 |
| Collaborative I and II: 1-Star Nursing Home Decisions Not to Participate |
C.2.2
| COR/GTL |
| Ad hoc but in alignment with recruitment requirements for SCTC |
| Electronically, via CMS designated system (e.g., DDST). |
| 1-Star Nursing Homes actively recruited for engagement and deciding not to participate in either Collaborative I and/or II shall have their Decisions not to Participate uploaded into the DDST system. |
| The QIO’s Decisions Not to Participate will provide documentation with no less than the information noted in C.2.2. |
| QIN.C.2#18 |
| Peer-Coach Recruitment: Nursing Home Staff |
C.2.3 Peer-Coach Recruitment
| COR/GTL |
| 10/30/2014 |
12/31/2014 3/31/2015 Oct. 30, 2014, Dec. 28, 2014 February 30, 2015 Electronically, via CMS designated system (e.g., DDST).
Oct 30, 2014 QIO shall provide description of training schedule; identify Nursing Homes, staff, and measures.
Dec. 28, 2014 QIO shall provide plans for utilization of Peer-Coaches Feb. 30, 2015 submission shall document activities and use of Peer-Coaches.
QIO shall provide Peer-Coach Recruitment and training information consisting of no less than the information specified in C.2.3
QIN.C.2#19
Beneficiary and Family Engagement
Peer-Coach Recruitment: Beneficiary and Family Member Engagement:
Task C.2.3 Peer-Coach Recruitment
COR/GTL
October 31, 2014 and January 30, 2015
10/30/2014 12/31/2014 3/31/2015
Electronically, via CMS designated system (e.g., DDST).
For every service area – state or territory - there shall be at least one (1) resident or family member participating as a Peer-Coach, in qualifying states.
Report shall include activities, dates, and role of beneficiary and/or family members involvement as Peer-Coaches
| QIN.C.2#20 |
| Beneficiary and/or Family-member Engagement: Participation in QIO Quality Improvement Activities |
Task C.2.4 Beneficiary Recruitment
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
Electronically, via CMS designated system (e.g., DDST).
Beneficiary involvement in QIO QI activities.
(1)The QIO shall include residents and/or family members in > 2 quality improvement activities Report shall include activities, dates, and methods of Beneficiary and Family-member engagement in QIO QI activities
| QIN.C.2#21 |
| Beneficiary and/or Family-member Engagement: Participation in Nursing Home Quality Improvement Activities |
Task C.2.4 Beneficiary Recruitment
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
Electronically, via CMS designated system (e.g., DDST).
The QIO shall foster beneficiary and family-member involvement in nursing home QI activities.
(2)The QIO shall encourage nursing homes to include residents and family-members in
Report shall include activities, dates, and methods QIO used to promote increased participation of Beneficiary and Family-member engagement in nursing homes
| QIN.C.2#22 |
| Partner and Stakeholder Recruitment |
State Survey Agency and Letter of Agreement C.2.5 Partner and Stakeholder Recruitment
| COR/GTL |
| Beginning |
9/30/2014, continuing quarterly ad hoc until end of SOW Electronically, via CMS designated system (e.g., DDST).
| Foster communication and align efforts. |
| SSA’s Letter of Agreement shall contain no less than the information contained in C.2.5: (1) Initial contact with SSA shall be within first 60 days of SOW. (2) Letter of agreement shall include date, person and plan for participation in LAN, and follow-up. (3) Role of SSA in achieving the goals of the Nursing Home Task Order in the SOW. |
| QIN.C.2#23 |
| Monitoring and Reporting Requirements |
Task C.2.7
HAC: Increase mobility among long-stay nursing home residents
Section B. General Desired Outcomes
| COR/GTL |
| Quarterly beginning |
April 30, 2015 4/30/2015 and continuing until July 2018 9/28/2018 Electronically, via CMS designated system (e.g., DDST).
| TBD |
| TBD |
| QIN.C.2#24 |
| HAC: Decrease use of unnecessary antipsychotic medication |
Section B. General Desired Outcomes
| COR/GTL |
| Quarterly beginning |
April 30, 2015 4/30/2015 and continuing until July 20189/28/2018
| Electronically, via CMS designated system (e.g., CASPERDDST). |
| TBDTBD |
| TBDTBD |
| QIN.C.2#25 |
| HAC: Develop community specific measure(s) to reduce avoidable hospital admissions and readmissions: Track intervention effectiveness measures targeting the root causes associated with reducing avoidable hospital admissions and readmissions |
Section B. General Desired Outcomes
| COR/GTL |
| Quarterly beginning |
April 30, 20154/30/2015 and continuing until July 20189/28/2018 Electronically, via CMS designated system (e.g., DDST).TBD
| In alignment with C.3 Convening Communities to Improve Care Coordination for Beneficiaries and Families LANs, QIO will assist providers to identify and track intervention effectiveness measures targeting the root causes associated with reducing hospital admissions and readmissions. |
| For C.2.B, QIO will determine effectiveness of community measures, identified in C.3. by identifying effectiveness of interventions and QI activities, e.g., RCAs, QIO work to reduce rates of hospital admissions and readmissions |
| QIN.C.2#26 |
| Alignment and Coordination (avoiding duplication of effort): Partners and Stakeholder Recruitment |
C.2.5 Partner and Stakeholder Recruitment
| COR/GTL |
| Quarterly with a start date of 10/31/2014 and continuing until July 2018 9/28/2018 |
| Electronically, via CMS designated system (e.g. DDST). |
| Plan should identify which improvements are already being targeted in the state and how the QIO will work collaboratively to leverage existing activities without duplicating efforts. |
| Duplication of Effort Mitigation Plan |
| QIN.C.2#27 |
| Data on -Interventions |
Task C.2.7.
| COR/GTL |
| Quarterly with a start date of 6/30/2015 10/31/2014 until the end of the Task Order9/28/2018 |
Electronically, via CMS designated system (e.g., DDST).
| Template |
| TBD |
| QIN.C.2#28 |
| Sustainability Plan |
Task C.2.8
| COR/GTL |
| 10/31/2014 and Annually until the end of the Task Order. |
Electronically, via CMS designated system (e.g., DDST).
| Template |
| The QIO shall develop and implement a sustainability plan that will promote, facilitate, and ensure continued improvement in the goals and measures attained after the end of the SOW. |
QIN-QIO SoW IDIQ Contract No. _________________ Quality Improvement Task Order No. 001 Attachment J-1a – Schedule of Deliverables
| No. |
| Item |
| Recipient |
| Due Date(s) |
| Reporting Mechanism |
| Notes |
| Evaluation |
of Deliverable
Task C.3 – Coordination of Care
| QIN.C.3#1 |
| Task Work Plan |
Task C.3.1
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
| Electronically, via CMS designated system (e.g., DDST). |
| QIN.C.3#2 |
| Community Coalition Recruitment Plan |
Task C.3.2
(Include in Task Work Plan)
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
Electronically, via CMS designated system (e.g., DDST).
The QIO must include in their plan:
1. Minimum of 40% of the FFS population in the regionstate, including 60% of the FFS population across the region
2. 10% of beneficiaries must reside in rural areas
3. Identification of level of experience (new, intermediate, experienced)
4. Identification of target beneficiary populations
Template for Plans shall be provided by CMS.
| QIN.C.3#3 |
| Medication Safety and Adverse Drug Event Prevention Recruitment |
Task C.3.5
| COR/GTL |
| Quarterly with a start date of 10/31/2014 until the end of the Task Order |
Electronically, via CMS designated system (e.g., DDST).
The QIO must include in their plan:
1. Identification of level of experience (new, intermediate, experienced)
2. Identification of target beneficiary populations
3. Number of Beneficiaries on targeted medications(Anticoagulants, Diabetic Agents, Opioids)
T…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .