Henry Co Door Painting.docx
DOCX document 20 KB Posted
- Attached to
- Henry Co Door Painting
- Solicitation number
- SRC0000037778
- Issued by
- Greene County, Alabama
About this file
This is a Specifications document from the State of Alabama Department of Human Resources for exterior door preparation and painting services at the Henry County DHR facility. The project involves preparing and repainting six (6) exterior doors that exhibit rust, peeling paint, and deteriorating finishes. A mandatory site visit is required for all prospective suppliers on Tuesday, December 1st, 2026 at 9:00 AM at the Henry County Department of Human Resources, 507 Kirkland Street, Abbeville, AL 36310. Attendance at the site visit is a prerequisite for quotation submission and award consideration. All suppliers must sign in during the visit. The scope of work includes surface preparation (removal of loose and peeling paint, rust removal, cleaning, and sanding), application of rust-inhibiting oil-based primer, and application of white exterior-grade water-based urethane semi-gloss finish coats. The supplier shall furnish all labor, materials, equipment, protective coverings, and other supplies necessary to complete the work. Work scheduling and coordination shall occur with designated Henry County DHR points of contact, and the supplier is responsible for protecting property, maintaining safe access, and performing cleanup upon project completion. All work is subject to inspection and acceptance by county personnel before final completion.
The quotation shall be firm and fixed-price, inclusive of all labor, materials, equipment, preparation, painting, and cleanup costs. Payment terms are Net 30, with payment made within thirty (30) days following satisfactory completion, acceptance, and receipt of a proper invoice referencing the applicable purchase order. No advance payment shall be made. The supplier must provide qualified personnel experienced in exterior surface preparation and painting, maintain required licenses and insurance, follow workplace safety requirements and manufacturer instructions, and provide appropriate supervision throughout the project. No work shall commence until an authorized purchase order or other procurement document is issued, and no additional work, substitutions, or scope changes shall be performed without prior authorization. Any anticipated delays must be communicated promptly to designated county representatives.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DOPQQBPV4.08.26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF ALABAMA
DEPARTMENT OF HUMAN RESOURCES
HENRY COUNTY DHR
SPECIFICATIONS FOR EXTERIOR DOOR PREPARATION AND PAINTING SERVICES
LOCATION OF SERVICES
Mandatory Site Visit Tuesday December 1st, 2026 @9am A mandatory site visit is required for all prospective suppliers prior to submitting a quotation. The purpose of the site visit is to allow suppliers to inspect the six (6) exterior doors, assess existing conditions, take necessary measurements, and determine the labor, materials, and equipment required to complete the work. Attendance at the mandatory site visit is required for a quotation to be considered for award. Suppliers are responsible for ensuring their quotations include all costs associated with completing the specified work. All suppliers must sign in on the sign-in sheet during the visit. The sign-in sheet should be submitted to the POC for the county office.
Henry County Department of Human Resources 507 Kirkland Street Abbeville, AL 36310 Points of Contact:
Carolyn Brown Julie Lindsey
PURPOSE AND SCOPE OF WORK
The Alabama Department of Human Resources is seeking a qualified supplier to provide labor, materials, equipment, and supplies necessary to prepare and repaint six (6) exterior doors at the Henry County DHR facility. The existing doors have areas of rust, peeling paint, and deteriorating finishes requiring surface preparation and repainting. All work shall be performed in a professional manner to restore the appearance of the doors and provide a durable, weather-resistant finish.
1. SURFACE PREPARATION
The supplier shall:
· Prepare the exterior-facing side of six (6) existing doors for painting.
· Remove loose, peeling, or deteriorating paint.
· Remove surface rust and properly prepare affected areas.
· Clean surfaces to remove dirt, dust, grease, and other contaminants.
· Sand or otherwise prepare surfaces as necessary to ensure proper primer and paint adhesion.
· Protect surrounding glass, door hardware, brickwork, flooring, and adjacent surfaces from damage or paint overspray.
2. PRIMING AND PAINTING
The supplier shall:
· Apply an appropriate rust-inhibiting, oil-based primer to prepared surfaces, compatible with the selected finish coat.
· Apply a white, exterior-grade, water-based urethane semi-gloss finish suitable for the existing door material.
· Apply the number of coats necessary to achieve complete, uniform coverage in accordance with manufacturer instructions.
· Ensure painted surfaces are free of excessive brush marks, runs, drips, and visible defects.
· Allow appropriate drying and curing time between applications.
3. MATERIALS AND EQUIPMENT
The supplier shall furnish all labor, paint, primer, tools, equipment, protective coverings, and other materials necessary to complete the work. All materials shall be appropriate for exterior use and compatible with the surfaces being painted. The total quoted price shall include all labor, materials, equipment, transportation, cleanup, and other costs necessary to complete the specified services.
4. WORK SCHEDULE AND COORDINATION
All services shall be scheduled and coordinated with the designated Henry County DHR points of contact. Work shall be performed at times approved by the county office to minimize disruption to daily operations and public access. The supplier shall maintain safe access to the building during the project and shall not obstruct required entrances or exits without prior coordination and approval.
5. CLEANUP AND PROPERTY PROTECTION
The supplier shall protect DHR property and surrounding areas throughout the project. Upon completion, the supplier shall remove all painting supplies, debris, masking materials, and equipment and leave the work areas clean. Any damage caused by the supplier during performance of the services shall be the supplier's responsibility.
6. INSPECTION AND ACCEPTANCE
All work shall be subject to inspection by designated Henry County DHR personnel. The supplier shall correct any deficiencies associated with the specified work before final acceptance. The project shall be considered complete when all six exterior doors have been properly prepared, primed, painted, and accepted by the county office.
7. PRICING REQUIREMENTS
The supplier shall provide a firm, fixed-price quotation for completion of the entire project. The quotation shall include all labor, materials, equipment, preparation, painting, and cleanup.
PROCUREMENT REQUIREMENTS
All services shall be procured in accordance with applicable State of Alabama procurement requirements and DHR purchasing procedures. The supplier shall not begin work until an appropriate purchase order, or other authorized procurement document has been issued. No additional work, substitutions affecting cost, or changes to the approved scope shall be performed. Verbal authorization from county personnel shall not constitute approval for additional expenditures.
8. PAYMENT TERMS
Payment terms shall be Net 30. Payment shall be made within thirty (30) days following satisfactory completion and acceptance of the specified services and receipt of a proper invoice, subject to applicable State of Alabama payment requirements. The invoice must reference the applicable purchase order and be submitted in accordance with the instructions provided on the purchase order.
No advance payment shall be made.
9. SUPPLIER RESPONSIBILITIES
The supplier shall:
· Provide qualified personnel experienced in exterior surface preparation and painting.
· Maintain any licenses and insurance required by applicable law and procurement documents.
· Follow applicable workplace safety requirements and manufacturer instructions.
· Provide appropriate supervision throughout the project.
· Complete the work in a professional and workmanlike manner.
· Coordinate scheduling and completion with the designated county representatives.
10. COMPLETION REQUIREMENTS
The supplier shall complete all work within the timeframe established through coordination with Henry County DHR and the applicable purchase order. Any anticipated delays shall be communicated promptly to the designated county representatives. All specified services must be completed and accepted before final payment is processed.
File details come from the government source that posted it. Updated .