This is a roof abatement and replacement drawing bid set for Gilead Hill School in Hebron, Connecticut, prepared as 100% construction documents for a state project (Project No. 067-044RR). The project scope involves the removal and replacement of the roof at 580 Gilead Street, Hebron, Connecticut 06248. The bid set, issued for bid on January 26, 2026, includes detailed abatement plans and specifications for hazardous material removal prior to roof replacement. The project identifies multiple contaminated materials requiring specialized removal and disposal, including asbestos-containing (AC) tar on the metal roof deck, insulation board contaminated with AC tar and presumed PCB bulk product waste, AC curb tar, and residual AC tar on vents. Additionally, chlorofluorocarbons (2 units) and lead-based paint at both high and low levels have been identified on various components within the work area, with high levels of lead (≥1.0 mg/cm²) documented on structural steel beams.

All work must be performed by lead-trained workers in full compliance with OSHA Lead in Construction Standard 1926.62. The project requires adherence to all applicable regulations governing the handling, removal, and disposal of asbestos, PCBs (polychlorinated biphenyls), lead-based paint, and other hazardous materials. The construction documents are drawn to a scale of 1/16" = 1'-0" and were prepared by Friar Engineering (860-678-1291, Farmington, Connecticut) with professional consultation. The bid set provides comprehensive specifications and site plans necessary for contractors to accurately estimate costs and develop removal and disposal procedures compliant with all environmental and occupational safety requirements.

View the file

Other files

File Type Posted
Online Q and A Instruction (2).pdf PDF
35065_Feb_27_26_solicitation_doc.pdf PDF
PROSPECTIVE BIDDERS - 2.pdf PDF
DAS post.pdf PDF
35065_Mar_2_26_solicitation_doc.pdf PDF
35065_Mar_30_26_solicitation_doc.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 2

UNIVERSAL WASTE KEY:

LOCATIONS OF AC TAR ON METAL ROOF DECK. REMOVE BOTTOM

LAYER OF INSULATION BOARD CONTAMINATED WITH AC TAR AND

DISPOSE OF AS REGULATED ASBESTOS AND PRESUMED PCB BULK

PRODUCT WASTE.

REMOVE AC CURB TAR AND DISPOSE OF AS REGULATED ASBESTOS

WASTE.

REMOVE RESIDUAL AC TAR ON VENT AND DISPOSE OF AS

REGULATED ASBESTOS AND PRESUMED PCB BULK PRODUCT WASTE.

ASBESTOS KEY:

AC = ASBESTOS-CONTAINING

PCB = POLYCHLORINATED BIPHENYLS

PPM = PARTS PER MILLION

CHLOROFLUOROCARBONS: (2 EA)

LEAD-BASED PAINT NOTE:

BOTH HIGH AND LOW LEVELS OF LEAD-BASED PAINT WERE FOUND ON

VARIOUS COMPONENTS WITHIN THE WORK AREA. ALL WORK MUST BE

PERFORMED BY LEAD-TRAINED WORKERS AND COMPLY WITH AND MEET

THE REQUIREMENTS OF ALL ASPECTS OF 1926.62 OSHA LEAD IN

CONSTRUCTION STANDARD.

HIGH LEVELS OF LEAD ( 1.0 MG/CM ) WERE IDENTIFIED ON THE FOLLOWING

SURFACES:

· STRUCTURAL STEEL BEAMS

NOT IN SCOPE

SHEET NO.

PROFESSIONAL SEAL

21 Talcott Notch Road Farmington, CT 06032

DATENO.

REVISIONS

friar.com 860.678.1291

CONSULTANT

DATE:

SCALE:

PROJ. #:

DRAWN:

CHECKED:

DESCRIPTION

24-065.12T1

12/08/2025

150 MAIN STREET, SUITE B

BRISTOL, CONNECTICUT 06010

860-589-8257

BB

JE

1/16" = 1'-0"

01/26/2026 ISSUED FOR BID

ROOF

ABATEMENT PLAN

HM-1SCALE: 1/16" = 1'-0"

ROOF ABATEMENT PLAN

100%

CONSTRUCTION

DOCUMENTS

HEBRON, CT 06248

ROOF REPLACEMENT

GILEAD HILL

580 GILEAD STREET

STATE PROJECT NO. 067-044RR

SCHOOL

phohenthal Rectangle