19-R-0003 NOFFS Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HDQMWR-19-R-0003_NOFFS_P00002_Amendment2.pdf | ||
| PPQ_-_Services.docx | DOCX document | |
| HDQMWR-19-R-0003_NOFFS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
P0001 2019 MAR 22
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER, NAVY INSTALLATIONS COMMAND
NAF ACQUISITIONS BRANCH N945
716 SICARD ST. SE BLDG 111 STE 1000
WASHINGTON, DC 20374
POC: CONTRACTING OFFICER, 202-433-9158
CHRISTOPHER.SAUNDERS@NAVY.MIL
SAME AS BLOCK 6
8. NAME AND ADDRESS OF CONTRACTOR No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
HDQMWR-19-R-0003
9B. DATED (SEE ITEM 11)
2019 MAR 13
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not ext-.ended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO
BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF
OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATAT (If Required)
NONAPPROPRIATED FUNDS $
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-
TRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF CNIC 7043.1.
X
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
CNICINST 7043.1, NAF PROCUREMENT POLICY
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 (ONE) copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This purpose of this Amendment is to correct the dates in Section A and Section C.7. As a result, this solicitation is modified as follows:
1. PROPOSAL DUE DATE is hereby corrected to 10 APRIL, 2019.
2. Section C is hereby revised as follows: - See continuation sheet for C4.4, C.7
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
CHRISTOPHER SAUNDERS
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY 19 MARCH 2019
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
SECTION C
DESCRIPTION/SPECFICIATION/STATEMENT OF WORK
Section C.4.4 language is revised from Task 5 to Task 4.
C.4.4 TASK 4 PROGRAM HANDBOOKS AND MISCELLANEOUS
• The contractor shall carry in person or ship all related handouts to the training location
• The contractor shall provide all materials related to the conduct of the Master Trainer Program o Materials may include but are not limited to instructor certifications, participant certificates, course handouts, presentations and manuals
• The contractor shall provide all materials related to the conduct of the Onsite Instructor
Training o Materials may include but are not limited to participant certificates, course handouts and manuals
Section C.7 language is revised with 2019 dates.
C.7 DELIVERABLES AND ACCEPTANCE: A draft course manual, outlines, training event schedules, and all audio-visual media (DVDs) used in the performance of the training shall be forwarded to the CNIC N921 POC listed in Section 10, no later than 01 JUNE 2019.
a. The CNIC POC and the Contractor must agree on all aspects of the curriculum prior to the beginning of the training event.
b. Final draft of the aforementioned deliverables shall be forwarded to the CNIC N921 POC no later than 01 JULY 2019.
QUESTIONS AND RESPONSES
Q.1 What is the anticipated class size range for each of the two, different onsite courses?
A.1 25-30 per course.
Q.2 Are all course locations to be on CONUS bases? If not, please provide tentative locations.
A.2 The courses can be held at any Navy Installation worldwide and performance will always occur within the Fence line of a Navy Installation.
Q.3 Please describe equipment and quantities that will be available to administer courses at each location, i.e. fitness equipment like platforms, racks, bars, weights, plus AV equipment and availability of classroom settings?
A.3 The quantity of equipment will vary based on installation size and operational requirements. Sites are picked based on the maximum class size and availability of needed equipment. Each site will have the necessary equipment to include sufficient space and supplies to facilitate the training. Any periphery equipment or supplies necessary will be identified and will be provided and available at the performance location.
| 2019 MAR 22 |
| P0001 |
| 2019 MAR 13 |
| NONAPPROPRIATED FUNDS $ |
| X |
| CNICINST 7043.1, NAF PROCUREMENT POLICY |
| CHRISTOPHER SAUNDERS |
| 19 MARCH 2019 |