LEMOORE_AMENDMENT_0002.doc
DOC document 44 KB Posted
- Solicitation number
- HDEC08-13-R-0003
- Issued by
-
Defense Commissary Agency
About this file
AMENDMENT 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT__6_revised_TDWS_DLS_dated_March_28_2013.xls | XLS spreadsheet | |
| Enclosure_1_LEMOORE_Questions_and_Answers.doc | DOC document | |
| Revised_Lemoore_PWS_dated_03_28_13.doc | DOC document | |
| revisied_LEMOORE_ATTACHMENT_6_TDWS_DLS.xls | XLS spreadsheet | |
| LEMOORE_AMENDMENT_0001.doc | DOC document | |
| revisied_LEMOORE_ATTACHMENT_6_TDWS_DLS.xls | XLS spreadsheet | |
| LEMOORE_AMENDMENT_0001.doc | DOC document | |
| SOLICITATION__LEMOORE_HDEC0813R0003.doc | DOC document | |
| Attachment_2__Lemoore_PWS_dated_10_25_12_(2).doc | DOC document | |
| ATTACHMENT_4_LEMOORE_Cost_Breakout_-_Loaded_Hourly_Rates_final.xls | XLS spreadsheet | |
| ATTACHMENT_5_LEMOORE__TECH_CAPABILITY.DOC | DOC document | |
| ATTACHMENT_3__WAGE_DETERMINATION_2005_2045_REV_13_6132012_(2).doc | DOC document | |
| ATTACHMENT_6_Typical_Daily_Work_Schedule_Labor_Summary.xls | XLS spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
1. List Attendees from the Pre-Award Site Visit on March 13, 2013:
Cynthia Parker, Store Director, Lemoore NAS Commissary
Betty G. Perkinson, Contracting Officer, HQ-DeCA
Pamela Tyler, Contracting Specialist, HQ-DeCA
Thomas Smith, JanTec Inc.
Darrell Francis, C.M.S.
Felipe Ramirez, A.J.’s Inc.
2. ATTACHMENT 2, PWS, dated October 25, 2012 - is removed in its entirety and replaced with ATTACHMENT 2, PWS, dated March 28, 2013.
Change #1: Paragraph 4.4.2.2 Offload Trucks, Verbiage highlighted has been added to read: The store participates in the DDR receiving process, which means the government receivers will count pallets of merchandise, as they are offloaded from the trucks vs. counting each individual case.
Change #2: Paragraph 4.4.6.1. Multi-Day Shipments with Stock Intermingled, Verbiage highlighted has been added to read: “transport the items identified in paragraph 4.4.2.4 above, and proceed with the processes referenced in paragraphs 4.4.2.5 and 4.4.2.7.”
Change #3: The change is highlighted and located at Exhibit 4-6-2 “REST ROOM ALL AREAS” locker rooms have been added in the section and it now reads “REST ROOMS (ALL AREAS and includes locker rooms)”. Removed verbiage “INSIDE CARTS STORAGE” from the list identifying what is included in the SALES AREA.
Change #4: Exhibit 4-6-4, OUTSIDE AREAS: “COMMISSARY AREA ITEM” new verbiage has been added and highlighted “CART STORAGE AREA”; “AREA IN SQUARE FEET is now -526”; “FLOOR TYPE: CONC”. “FRONT”-“AREA IN SQUARE FEET” has been revised from 4000 square feet to 3,474.
3. ATTACHMENT 6, TDWS/DLS – is removed in its entirety and replaced with the attached revised ATTACHMENT 6, Amendment 0002, and Revised March 28, 2013. The change is located under the “Receiving/Storage/Holding/Area Direct Labor”, block titled “RSHA Coverage for Contractor Work Schedule” as this section is not required in this requirement, that section has been removed.
4. Amended Solicitation Section I - Contract Clauses, CLAUSES INCORPORATED BY REFERENCE: 52.232-99 (Dev) Providing Accelerated Payment to Small Business Subcontractors (Deviation) has been removed in its entirety.
5. Questions received for Solicitation HDEC08-13-R-0003 and the answers provided are enclosed in this amendment as Enclosure 1, Lemoore NAS Commissary, Solicitation: HDEC08-13-R-0003, Questions and Answers. No further questions pertaining to Solicitation HDEC08-13-R-0003 for Shelf Stocking, Receiving/Storage Area, and Custodial Operations at Lemoore NAS Commissary will be considered.
6. CLOSING DATE HAS CHANGED. Proposal must be received at the address indicated in Block 7 of the solicitation no later than 3:00 p.m. EST on April 10, 2013.
SUMMARY OF CHANGES
SECTION I - CONTRACT CLAUSES
The following have been deleted:
| 52.232-99 (Dev) |
| Providing Accelerated Payment to Small Business Subcontractors (Deviation) |
| AUG 2012 |
(End of Summary of Changes)
File details come from the government source that posted it. Updated .