CED_1B10_Freezer.pdf
PDF 19 KB Posted
- Attached to
- Supply of Reach-In Freezers and Refrigerators
- Solicitation number
- HDEC04-18-R-0035
- Issued by
-
Defense Commissary Agency
About this file
CED 1B10 - Freezer
View the file
Other files
| File | Type | Posted |
|---|---|---|
| pdp1952.pdf | ||
| CED_1D04_Refrigerator.pdf | ||
| Sources_Sought_04-18-R-0035_-_Reach-In_Freezers_and_Refrigerators.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INITIATED
11/13/2017
CED
BAKERY DEPARTMENT
Minimal Acceptable Standards
REVISION
xx/xx/xx
1B10 Freezer, reach-in, 2 or 3 door, self-contained PAGE 1 of 2
FY16r.05
1 Purpose of this Equipment: To store frozen bakery and delicatessen products in the working area of departments. This unit is not intended for sales display.
2 Federal Supply Class: 4110
3 General Operating Specifications:
3.1 Dimensions:
3.1.1 1B10-2: 52 to 58 inches wide, 29 to 35 inches deep, 83 to 85 inches high.
3.1.2 1B10-3: 76 to 87 inches wide, 29 to 35 inches deep, 83 to 85 inches high
3.2 Salient Characteristics that shall be provided:
3.2.1 Self-contained
3.2.2 Cabinet front and doors to be stainless steel; anodized aluminum sides and back acceptable
3.2.3 Self-closing doors with standard locks.
3.2.4 Insulated cabinet and doors
3.2.5 Automatically activated interior lighting
3.2.6 Automatic defrost
3.2.7 Exterior temperature display
3.2.8 Adjustable heavy duty chrome, stainless steel or PVC coated shelves
3.2.9 1B10-2: four casters, at least two locking
3.2.10 1B10-3: six casters, at least two locking
3.2.11 Temperature of -10 degrees Fahrenheit (-23c) or lower.
3.3 Industry Standards / Requirement(s):
3.3.1 Industry Standards: Underwriters Laboratory (UL) listed and National
Sanitation Foundation (NSF) certification, or approved equivalent. Conformité Européene (CE) is not acceptable for a standard.
3.3.2 Must conform to Section 612 of the Clean Air Act and the EPA’s Significant New Alternatives Policy (SNAP). Chlorofluorocarbon (CFC) free, type R290 (Propane), R744 (Co2), R600a (Isobutane) refrigerants are acceptable.
(Refrigerants R134a, R404A, R410 and HCFC22 will be acceptable only until 1 January 2019.
3.3.3 Warranty period shall be for (1) year from date of delivery against defective material and workmanship and shall include parts, service and labor.
3.4 Information Technology requirements: N / A
3.5 Color Requirement(s): N / A
INITIATED
11/13/2017
CED
BAKERY DEPARTMENT
Minimal Acceptable Standards
REVISION
xx/xx/xx
1B10 Freezer, reach-in, 2 or 3 door, self-contained PAGE 2 of 2
FY16r.05
4 Electrical Requirements:
4.1 ___X__ Standard U.S.A. electrical specifications: 115 volts, 60 Hertz, 1 phase, with a maximum amperage draw of 15 amps.
4.2 __N/A___ Pacific overseas store requesting 120V / 50HZ / 1PH.
4.3 _ N/A___ Europe overseas store requesting 220 V / 50HZ / 1PH.
4.4 Attached minimum 9 foot cord with a NEMA 5-15 or 5-20 plug.
4.5 NOTE: the operating range for 120 volts is 110 to 120 volts; the operating range for 220 volts is 208 to 230 volts.
5 Standard Contractor Requirements:
5.1 Must be shipped ready to plug in, and use
5.2 Information to be provided by the Contractor to the commissary at the time of delivery:
5.2.1 Point of Contact for Service
5.2.2 Installation and Operating Instructions
5.2.3 Parts List
5.3 Maintenance Sustainability Requirements: Continued parts support is required for the projected life cycle of the equipment plus 5 years.
6 Special Coordinating / Safety Instructions: N / A
| 1 Purpose of this Equipment: To store frozen bakery and delicatessen products in the working area of departments. This unit is not intended for sales display. |
| 3.3 Industry Standards / Requirement(s): |
| 3.5 Color Requirement(s): N / A |
| 4.1 ___X__ Standard U.S.A. electrical specifications: 115 volts, 60 Hertz, 1 phase, with a maximum amperage draw of 15 amps. |
| 4.5 NOTE: the operating range for 120 volts is 110 to 120 volts; the operating range for 220 volts is 208 to 230 volts. |
| 5 Standard Contractor Requirements: |
| 6 Special Coordinating / Safety Instructions: N / A |
File details come from the government source that posted it.