CED_2ROE00.docx
DOCX document 187 KB Posted
- Attached to
- Calcultators, Desk
- Solicitation number
- HDEC0416R0045
- Issued by
-
Defense Commissary Agency
About this file
Commissary Equipment Description (CED) for Desk Calculators
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HDEC0416R0045_Calculators_Desk.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INITIATED
06/06/16
CED
ADMINISTRATION
DEPARTMENT
Minimal Acceptable Standards
REVISION
xx/xx/xx
| 2ROE00 |
| Calculator, desk |
| PAGE 1 of 2 |
Purpose of this Equipment: To perform routine accounting calculations.
1 Federal Supply Class: 7420
2 General Operating Specifications:
2.1 Dimensions:
2.1.1 Dimensional sizes, such as length, width, and height are not critical to this equipment so long as this equipment is a portable desk model.
2.2 Salient Characteristics that shall be provided:
2.2.1 12 digit display
2.2.2 Round up and round down functions
2.2.3 Decimal settings: +, 0, 1, 2, 3, 4, 6, with decimal override (floating decimal)
2.2.4 Memory capabilities
2.2.5 Print in black and red
2.2.6 Uses 2.25 inch paper rolls
2.3 Industry Standards / Requirement(s):
2.3.1 Industry Standards: Underwriters Laboratory (UL) listed, or approved equivalent. CE is not acceptable for a standard.
2.3.2 Warranty period shall be for a minimum of six months from date of delivery/installation against defective material and workmanship and shall include parts, service and labor.
2.4 Information Technology requirements: N / A
2.5 Color Requirement(s): N / A
3 Electrical Requirements:
3.1 Standard U.S.A. electrical specifications: 120 Volts, 60 Hertz, 1 phase.
3.2 _____ Pacific Theater stores 120 V / 50 HZ / 1 PH (Applies to these stores only: Atsugi, Misawa, Sagami, Sagamihara, Yokosuka, Yokota, Camp Zama, and Kanto Plains CDC. All other stores are standard U.S.A. 60 cycle voltages.)
3.3 Minimum 6 foot cord with a NEMA Standard plug, or a manufacturer’s equivalent to comply with the equipment plug in requirements.
3.4 NOTE: the operating range for 120 volts is 110 to 120 volts; the operating range for 220 volts is 208 to 230 volts.
Standard Contractor Requirements:
3.5 Must be shipped ready to, plug in and use
3.6 Information to be provided by the Contractor to the commissary at the time of delivery:
3.6.1 Point of Contact for Service
3.6.2 Installation and Operating Instructions
3.6.3 Parts List
3.7 Maintenance Sustainability Requirements: Continued parts support is required for the projected life cycle of the equipment plus 5 years.
Special Coordinating / Safety Instructions: N / A
STORE ORDER REQUEST
STORE NAME: __________________________ DODAAC: ____________________
QUANTITY: _______
FY16r.01 image1.jpeg
File details come from the government source that posted it. Updated .