411R0015 Amendment 0004.doc
DOC document 148 KB Posted
- Solicitation number
- HDEC04-11-R-0015
- Issued by
-
Defense Commissary Agency
About this file
411R0015 Amendment 0004.doc
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 411R0015 0005 - Cancel Solicitation | — | |
| 411R0015 - Revised P00004.doc | DOC document | |
| 411R0015 0003 - Extend Due Date.doc | DOC document | |
| 411R0015 - Amendmt 0002.doc | DOC document | |
| 411R0015 - Revision 2.doc | DOC document | |
| 411R0015 - Amendment 0001 | — | |
| 411R0015 Revised | — | |
| 411R0015 - Ovens and Proofers.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 14-Jun-2011 04:00 PM to 29-Sep-2011 04:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0001AA
The CLIN extended description has changed from Within Continental United States (CONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Within Continental United States (CONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0001AB
The CLIN extended description has changed from Outside Continental United States (OCONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Outside Continental United States (OCONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
CLIN 0002
The CLIN extended description has changed from Single Rack, ElectricBase Year: July 1, 2011, or date of award if later, through June 30, 2012. to Single Rack, ElectricBase Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0002AA
The CLIN extended description has changed from Single Rack, ElectricBase Year: July 1, 2011, or date of award if later, through June 30, 2012.Model Number:Warranty Period:Warranty POC: to Single Rack, ElectricBase Year: January 1, 2012, or date of award if later, through December 31, 2012.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 0002AB
The CLIN description has changed from CED 1B12-A, Oven, Rotary, Roll-In, to RESERVED.
The CLIN extended description Single Rack, Electric, SHIPPING CHARGES - Do not price. In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Base Year: July 1, 2011, or date of award if later, through June 30, 2012. has been deleted.
The pricing detail quantity has decreased by 10.00 from 10.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 0002AC
The CLIN extended description has changed from Single Rack, Electric, DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Single Rack, Electric, DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0002AD
The CLIN extended description has changed from Single Rack, Electric, INSTALLATION,Within Continental United States (CONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Single Rack, Electric, INSTALLATION,Within Continental United States (CONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0002AE
The CLIN extended description has changed from Single Rack, Electric, DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Single Rack, Electric, DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0002AF
The CLIN extended description has changed from Single Rack, Electric, INSTALLATION,Outside Continental United States (OCONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Single Rack, Electric, INSTALLATION,Outside Continental United States (OCONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
CLIN 0003
The CLIN extended description has changed from Single Rack, GasBase Year: July 1, 2011, or date of award if later, through June 30, 2012. to Single Rack, GasBase Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0003AA
The CLIN extended description has changed from Single Rack, Gas.Base Year: July 1, 2011, or date of award if later, through June 30, 2012.Model Number:Warranty Period:Warranty POC: to Single Rack, Gas.Base Year: January 1, 2012, or date of award if later, through December 31, 2012.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 0003AB
The CLIN description has changed from CED 1B12-B, Oven, Rotary, Roll-In, to RESERVED.
The CLIN extended description Single Rack, Gas, SHIPPING CHARGES - Do not price.In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Base Year: July 1, 2011, or date of award if later, through June 30, 2012. has been deleted.
The pricing detail quantity has decreased by 3.00 from 3.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 0003AC
The CLIN extended description has changed from Single Rack, Gas, DE-INSTALLATION (Remove and Dispose).Within Continental United States (CONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Single Rack, Gas, DE-INSTALLATION (Remove and Dispose).Within Continental United States (CONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0003AD
The CLIN extended description has changed from Single Rack, Gas, INSTALLATION,Within Continental United States (CONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Single Rack, Gas, INSTALLATION,Within Continental United States (CONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0003AE
The CLIN extended description has changed from Single Rack, Gas, DE-INSTALLATION (Remove and Dispose).Outside Continental United States (OCONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Single Rack, Gas, DE-INSTALLATION (Remove and Dispose).Outside Continental United States (OCONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0003AF
The CLIN extended description has changed from Single Rack, Gas, INSTALLATION,Outside Continental United States (OCONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Single Rack, Gas, INSTALLATION,Outside Continental United States (OCONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
CLIN 0004
The CLIN extended description has changed from Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0004AA
The CLIN extended description has changed from Base Year: July 1, 2011, or date of award if later, through June 30, 2012.Model Number:Warranty Period:Warranty POC: to Base Year: January 1, 2012, or date of award if later, through December 31, 2012.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 0004AB
The CLIN description has changed from CED 1B15, Mini-Rotary Oven/Proofer to RESERVED.
The CLIN extended description SHIPPING CHARGES - Do not price.In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Base Year: July 1, 2011, or date of award if later, through June 30, 2012. has been deleted.
The pricing detail quantity has decreased by 8.00 from 8.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 0004AC
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0004AD
The CLIN extended description has changed from INSTALLATION,Within Continental United States (CONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to INSTALLATION,Within Continental United States (CONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0004AE
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0004AF
The CLIN extended description has changed from INSTALLATION,Outside Continental United States (OCONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to INSTALLATION,Outside Continental United States (OCONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
CLIN 0005
The CLIN extended description has changed from Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0005AA
The CLIN extended description has changed from Base Year: July 1, 2011, or date of award if later, through June 30, 2012.Model Number:Warranty Period:Warranty POC: to Base Year: January 1, 2012, or date of award if later, through December 31, 2012.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 0005AB
The CLIN description has changed from CED 1B20-A, Proofer, Roll-In, One-Door to RESERVED.
The CLIN extended description SHIPPING CHARGES - Do not price. In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Base Year: July 1, 2011, or date of award if later, through June 30, 2012. has been deleted.
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 0005AC
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0005AD
The CLIN extended description has changed from INSTALLATION,Within Continental United States (CONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to INSTALLATION,Within Continental United States (CONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0005AE
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0005AF
The CLIN extended description has changed from INSTALLATION,Outside Continental United States (OCONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to INSTALLATION,Outside Continental United States (OCONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
CLIN 0006
The CLIN extended description has changed from Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0006AA
The CLIN extended description has changed from Base Year: July 1, 2011, or date of award if later, through June 30, 2012.Model Number:Warranty Period:Warranty POC: to Base Year: January 1, 2012, or date of award if later, through December 31, 2012.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 0006AB
The CLIN description has changed from CED 1B20-B, Proofer, Roll-In Two-Door to RESERVED.
The CLIN extended description has changed from SHIPPING CHARGES - Do not price. In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to .
The pricing detail quantity has decreased by 12.00 from 12.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 0006AC
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0006AD
The CLIN extended description has changed from INSTALLATION,Within Continental United States (CONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to INSTALLATION,Within Continental United States (CONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0006AE
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
SUBCLIN 0006AF
The CLIN extended description has changed from INSTALLATION,Outside Continental United States (OCONUS)Base Year: July 1, 2011, or date of award if later, through June 30, 2012. to INSTALLATION,Outside Continental United States (OCONUS)Base Year: January 1, 2012, or date of award if later, through December 31, 2012..
CLIN 1001
The CLIN extended description has changed from Option Year 1: July 1, 2012 through June 30, 2013. to Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1001AA
The CLIN extended description has changed from Within Continental United States (CONUS)Option Year 1: July 1, 2012 through June 30, 2013. to Within Continental United States (CONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1001AB
The CLIN extended description has changed from Outside Continental United States (OCONUS)Option Year 1: July 1, 2012 through June 30, 2013. to Outside Continental United States (OCONUS)Option Year 1: January 1, 2013 through December 31, 2013..
CLIN 1002
The CLIN extended description has changed from Single Rack, ElectricOption Year 1: July 1, 2012 through June 30, 2013. to Single Rack, ElectricOption Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1002AA
The CLIN extended description has changed from Single Rack, ElectricOption Year 1: July 1, 2012 through June 30, 2013.Model Number:Warranty Period:Warranty POC: to Single Rack, ElectricOption Year 1: January 1, 2013 through December 31, 2013.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 1002AB
The CLIN description has changed from CED 1B12-A, Oven, Rotary, Roll-In, to RESERVED.
The CLIN extended description Single Rack, Electric, SHIPPING CHARGES - Do not price. In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Option Year 1: July 1, 2012 through June 30, 2013. has been deleted.
The pricing detail quantity has decreased by 7.00 from 7.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 1002AC
The CLIN extended description has changed from Single Rack, Electric, DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 1: July 1, 2012 through June 30, 2013. to Single Rack, Electric, DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1002AD
The CLIN extended description has changed from Single Rack, Electric, INSTALLATION,Within Continental United States (CONUS)Option Year 1: July 1, 2012 through June 30, 2013. to Single Rack, Electric, INSTALLATION,Within Continental United States (CONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1002AE
The CLIN extended description has changed from Single Rack, Electric, DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 1: July 1, 2012 through June 30, 2013. to Single Rack, Electric, DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1002AF
The CLIN extended description has changed from Single Rack, Electric, INSTALLATION,Outside Continental United States (OCONUS)Option Year 1: July 1, 2012 through June 30, 2013. to Single Rack, Electric, INSTALLATION,Outside Continental United States (OCONUS)Option Year 1: January 1, 2013 through December 31, 2013..
CLIN 1003
The CLIN extended description has changed from Single Rack, GasOption Year 1: July 1, 2012 through June 30, 2013. to Single Rack, GasOption Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1003AA
The CLIN extended description has changed from Single Rack, Gas.Option Year 1: July 1, 2012 through June 30, 2013.Model Number:Warranty Period:Warranty POC: to Single Rack, Gas.Option Year 1: January 1, 2013 through December 31, 2013.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 1003AB
The CLIN description has changed from CED 1B12-B, Oven, Rotary, Roll-In, to RESERVED.
The CLIN extended description Single Rack, Gas, SHIPPING CHARGES - Do not price.In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Option Year 1: July 1, 2012 through June 30, 2013. has been deleted.
The pricing detail quantity has decreased by 8.00 from 8.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 1003AC
The CLIN extended description has changed from Single Rack, Gas, DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 1: July 1, 2012 through June 30, 2013. to Single Rack, Gas, DE-INSTALLATION (Remove and Dispose).Within Continental United States (CONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1003AD
The CLIN extended description has changed from Single Rack, Gas, INSTALLATION,Within Continental United States (CONUS)Option Year 1: July 1, 2012 through June 30, 2013. to Single Rack, Gas, INSTALLATION,Within Continental United States (CONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1003AE
The CLIN extended description has changed from Single Rack, Gas, DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 1: July 1, 2012 through June 30, 2013. to Single Rack, Gas, DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1003AF
The CLIN extended description has changed from Single Rack, Gas, INSTALLATION,Outside Continental United States (OCONUS)Option Year 1: July 1, 2012 through June 30, 2013. to Single Rack, Gas, INSTALLATION,Outside Continental United States (OCONUS)Option Year 1: January 1, 2013 through December 31, 2013..
CLIN 1004
The CLIN extended description has changed from Option Year 1: July 1, 2012 through June 30, 2013. to Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1004AA
The CLIN extended description has changed from Option Year 1: July 1, 2012 through June 30, 2013.Model Number:Warranty Period:Warranty POC: to Option Year 1: January 1, 2013 through December 31, 2013.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 1004AB
The CLIN description has changed from CED 1B15, Mini-Rotary Oven/Proofer to RESERVED.
The CLIN extended description SHIPPING CHARGES - Do not price.In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Option Year 1: July 1, 2012 through June 30, 2013. has been deleted.
The pricing detail quantity has decreased by 6.00 from 6.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 1004AC
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 1: July 1, 2012 through June 30, 2013. to DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1004AD
The CLIN extended description has changed from INSTALLATION,Within Continental United States (CONUS)Option Year 1: July 1, 2012 through June 30, 2013. to INSTALLATION,Within Continental United States (CONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1004AE
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 1: July 1, 2012 through June 30, 2013. to DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1004AF
The CLIN extended description has changed from INSTALLATION,Outside Continental United States (OCONUS)Option Year 1: July 1, 2012 through June 30, 2013. to INSTALLATION,Outside Continental United States (OCONUS)Option Year 1: January 1, 2013 through December 31, 2013..
CLIN 1005
The CLIN extended description has changed from Option Year 1: July 1, 2012 through June 30, 2013. to Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1005AA
The CLIN extended description has changed from Option Year 1: July 1, 2012 through June 30, 2013.Model Number:Warranty Period:Warranty POC: to Option Year 1: January 1, 2013 through December 31, 2013.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 1005AB
The CLIN description has changed from CED 1B20-A, Proofer, Roll-In, One-Door to RESERVED.
The CLIN extended description SHIPPING CHARGES - Do not price. In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Option Year 1: July 1, 2012 through June 30, 2013. has been deleted.
The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 1005AC
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 1: July 1, 2012 through June 30, 2013. to DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1005AD
The CLIN extended description has changed from INSTALLATION,Within Continental United States (CONUS)Option Year 1: July 1, 2012 through June 30, 2013. to INSTALLATION,Within Continental United States (CONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1005AE
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 1: July 1, 2012 through June 30, 2013. to DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1005AF
The CLIN extended description has changed from INSTALLATION,Outside Continental United States (OCONUS)Option Year 1: July 1, 2012 through June 30, 2013. to INSTALLATION,Outside Continental United States (OCONUS)Option Year 1: January 1, 2013 through December 31, 2013..
CLIN 1006
The CLIN extended description has changed from Option Year 1: July 1, 2012 through June 30, 2013. to Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1006AA
The CLIN extended description has changed from Option Year 1: July 1, 2012 through June 30, 2013.Model Number:Warranty Period:Warranty POC: to Option Year 1: January 1, 2013 through December 31, 2013.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 1006AB
The CLIN description has changed from CED 1B20-B, Proofer, Roll-In Two-Door to RESERVED.
The CLIN extended description has changed from SHIPPING CHARGES - Do not price. In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Option Year 1: July 1, 2012 through June 30, 2013. to .
The pricing detail quantity has decreased by 9.00 from 9.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 1006AC
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 1: July 1, 2012 through June 30, 2013. to DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1006AD
The CLIN extended description has changed from INSTALLATION,Within Continental United States (CONUS)Option Year 1: July 1, 2012 through June 30, 2013. to INSTALLATION,Within Continental United States (CONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1006AE
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 1: July 1, 2012 through June 30, 2013. to DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 1: January 1, 2013 through December 31, 2013..
SUBCLIN 1006AF
The CLIN extended description has changed from INSTALLATION,Outside Continental United States (OCONUS)Option Year 1: July 1, 2012 through June 30, 2013. to INSTALLATION,Outside Continental United States (OCONUS)Option Year 1: January 1, 2013 through December 31, 2013..
CLIN 2001
The CLIN extended description has changed from Option Year 2: July 1, 2013 through June 30, 2014. to Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2001AA
The CLIN extended description has changed from Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to Within Continental United States (CONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2001AB
The CLIN extended description has changed from Outside Continental United States (OCONUS)Option Year 2: July 1, 2013 through June 30, 2014. to Outside Continental United States (OCONUS)Option Year 2: January 1, 2014 through December 31, 2014..
CLIN 2002
The CLIN extended description has changed from Single Rack, ElectricOption Year 2: July 1, 2013 through June 30, 2014. to Single Rack, ElectricOption Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2002AA
The CLIN extended description has changed from Single Rack, ElectricOption Year 2: July 1, 2013 through June 30, 2014.Model Number:Warranty Period:Warranty POC: to Single Rack, ElectricOption Year 2: January 1, 2014 through December 31, 2014.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 2002AB
The CLIN description has changed from CED 1B12-A, Oven, Rotary, Roll-In, to RESERVED.
The CLIN extended description Single Rack, Electric, SHIPPING CHARGES - Do not price. In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Option Year 2: July 1, 2013 through June 30, 2014. has been deleted.
The pricing detail quantity has decreased by 6.00 from 6.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 2002AC
The CLIN extended description has changed from Single Rack, Electric, DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to Single Rack, Electric, DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2002AD
The CLIN extended description has changed from Single Rack, Electric, INSTALLATION,Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to Single Rack, Electric, INSTALLATION,Within Continental United States (CONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2002AE
The CLIN extended description has changed from Single Rack, Electric, DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 2: July 1, 2013 through June 30, 2014. to Single Rack, Electric, DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2002AF
The CLIN extended description has changed from Single Rack, Electric, INSTALLATION,Outside Continental United States (OCONUS)Option Year 2: July 1, 2013 through June 30, 2014. to Single Rack, Electric, INSTALLATION,Outside Continental United States (OCONUS)Option Year 2: January 1, 2014 through December 31, 2014..
CLIN 2003
The CLIN extended description has changed from Single Rack, GasOption Year 2: July 1, 2013 through June 30, 2014. to Single Rack, GasOption Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2003AA
The CLIN extended description has changed from Single Rack, Gas.Option Year 2: July 1, 2013 through June 30, 2014.Model Number:Warranty Period:Warranty POC: to Single Rack, Gas.Option Year 2: January 1, 2014 through December 31, 2014.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 2003AB
The CLIN description has changed from CED 1B12-B, Oven, Rotary, Roll-In, to RESERVED.
The CLIN extended description Single Rack, Gas, SHIPPING CHARGES - Do not price.In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Option Year 2: July 1, 2013 through June 30, 2014. has been deleted.
The pricing detail quantity has decreased by 5.00 from 5.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 2003AC
The CLIN extended description has changed from Single Rack, Gas, DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to Single Rack, Gas, DE-INSTALLATION (Remove and Dispose).Within Continental United States (CONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2003AD
The CLIN extended description has changed from Single Rack, Gas, INSTALLATION,Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to Single Rack, Gas, INSTALLATION,Within Continental United States (CONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2003AE
The CLIN extended description has changed from Single Rack, Gas, DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 2: July 1, 2013 through June 30, 2014. to Single Rack, Gas, DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2003AF
The CLIN extended description has changed from Single Rack, Gas, INSTALLATION,Outside Continental United States (OCONUS)Option Year 2: July 1, 2013 through June 30, 2014. to Single Rack, Gas, INSTALLATION,Outside Continental United States (OCONUS)Option Year 2: January 1, 2014 through December 31, 2014..
CLIN 2004
The CLIN extended description has changed from Option Year 2: July 1, 2013 through June 30, 2014. to Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2004AA
The CLIN extended description has changed from Option Year 2: July 1, 2013 through June 30, 2014.Model Number:Warranty Period:Warranty POC: to Option Year 2: January 1, 2014 through December 31, 2014.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 2004AB
The CLIN description has changed from CED 1B15, Mini-Rotary Oven/Proofer to RESERVED.
The CLIN extended description SHIPPING CHARGES - Do not price.In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Option Year 2: July 1, 2013 through June 30, 2014. has been deleted.
The pricing detail quantity has decreased by 4.00 from 4.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 2004AC
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2004AD
The CLIN extended description has changed from INSTALLATION,Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to INSTALLATION,Within Continental United States (CONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2004AE
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 2: July 1, 2013 through June 30, 2014. to DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2004AF
The CLIN extended description has changed from INSTALLATION,Outside Continental United States (OCONUS)Option Year 2: July 1, 2013 through June 30, 2014. to INSTALLATION,Outside Continental United States (OCONUS)Option Year 2: January 1, 2014 through December 31, 2014..
CLIN 2005
The CLIN extended description has changed from Option Year 2: July 1, 2013 through June 30, 2014. to Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2005AA
The CLIN extended description has changed from Option Year 2: July 1, 2013 through June 30, 2014.Model Number:Warranty Period:Warranty POC: to Option Year 2: January 1, 2014 through December 31, 2014.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 2005AB
The CLIN description has changed from CED 1B20-A, Proofer, Roll-In, One-Door to RESERVED.
The CLIN extended description SHIPPING CHARGES - Do not price. In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Option Year 2: July 1, 2013 through June 30, 2014. has been deleted.
The pricing detail quantity has decreased by 2.00 from 2.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 2005AC
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2005AD
The CLIN extended description has changed from INSTALLATION,Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to INSTALLATION,Within Continental United States (CONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2005AE
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 2: July 1, 2013 through June 30, 2014. to DE-INSTALLATION (Remove and Dispose),Outside Continental United States (OCONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2005AF
The CLIN extended description has changed from INSTALLATION,Outside Continental United States (OCONUS)Option Year 2: July 1, 2013 through June 30, 2014. to INSTALLATION,Outside Continental United States (OCONUS)Option Year 2: January 1, 2014 through December 31, 2014..
CLIN 2006
The CLIN extended description has changed from Option Year 2: July 1, 2013 through June 30, 2014. to Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2006AA
The CLIN extended description has changed from Option Year 2: July 1, 2013 through June 30, 2014..Model Number:Warranty Period:Warranty POC: to Option Year 2: January 1, 2014 through December 31, 2014.Model Number:Warranty Period:Warranty POC:.
SUBCLIN 2006AB
The CLIN description has changed from CED 1B20-B, Proofer, Roll-In Two-Door to RESERVED.
The CLIN extended description has changed from SHIPPING CHARGES - Do not price. In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.Option Year 2: July 1, 2013 through June 30, 2014. to .
The pricing detail quantity has decreased by 7.00 from 7.00 to 0.00.
The unit of issue Each has been deleted.
SUBCLIN 2006AC
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2006AD
The CLIN extended description has changed from INSTALLATION,Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to INSTALLATION,Within Continental United States (CONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2006AE
The CLIN extended description has changed from DE-INSTALLATION (Remove and Dispose),Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to DE-INSTALLATION (Remove and Dispose),Within Continental United States (OCONUS)Option Year 2: January 1, 2014 through December 31, 2014..
SUBCLIN 2006AF
The CLIN extended description has changed from INSTALLATION,Within Continental United States (CONUS)Option Year 2: July 1, 2013 through June 30, 2014. to INSTALLATION,Within Continental United States (OCONUS)Option Year 2: January 1, 2014 through December 31, 2014..
CLIN 0007 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
SHIPPING CHARGES - Do not price.
FFP
In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.
Base Year: January 1, 2012, or date of award if later, through December 31, 2012.
FOB: Destination
NET AMT
CLIN 1007 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
SHIPPING CHARGES - Do not price.
In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.
Option Year 1: January 1, 2013 through December 31, 2013.
NET AMT
CLIN 2007 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
SHIPPING CHARGES - Do not price.
In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for a specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.
Option Year 2: January 1, 2014 through December 31, 2014.
NET AMT
The following have been modified:
ADDENDUM TO 52.212-1
INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS
I. SUBMISSION OF OFFERS: [(Reference Paragraph (b)]
a. Proposals may be submitted by mail or electronically by email or facsimile. If submitting by mail, proposals are to be submitted to the Defense Commissary Agency, Operations Contracting Division, DOK, Attn: Trina Barnes, 1300 E. Ave, Fort Lee, VA 23801-1800. Proposals may be emailed to Ms. Barnes at DOSContracting2@deca.mil or faxed to 804-734-8009 ext. 76197. The complete proposal with authorized representative’s signature must be received by the closing date and time. Offerors are also required to be registered in the Central Contractor’s Registration (CCR) database at http://ccr.gov. Offerors are required to submit subcontracting plans with their proposals in accordance to the guidelines prescribed in FAR Clause 52.219-9 Alt II.
b. Product Information: The offerors shall submit descriptive literature, a matrix, or other information that demonstrates that the proposed products meet all the mandatory generalized operating specifications Commissary Equipment Descriptions (CEDs) 1B12-A, 1B12-B, 1B15, 1B20-A and 1B20-B.
c. To obtain the complete specifications (referred to as Commissary Equipment Description or CED) specified in each line item follow the steps below.
1. Go to www.commissaries.com
2. Select the tab “About Us”
3. Select “Business with DECA”
4. Select “Equipment”
5. Select “Automated Commissary Equipment Descriptions” (ACED)
6. “Search CED”
7. In “Search” enter the CED number
8. Click on the CED link twice
9. Press “Open” and the CED will open for viewing/printing
d. Offerors must have updated on-line representations completed via ORCA, http://orca.bpn.gov
e. Past Performance References: Submit at least 5 references; companies that you have conducted business with over the last five years for delivery of products that are similar to those listed in this solicitation. Provide by fax the following information for each reference to Trina Barnes at 804-734-8009, press pause at least twice and then dial 76197 no later than September 20, 2011.
(1) Delivery Period
(2) Company Name and Address
(3) Point of Contact Name and Title
(4) Phone Number
(5) Facsimile Number
(6) E-Mail Address
(7) Description of Product Delivered
The references will be asked to provide information on your company’s past performance with regard to timeliness of delivery, quality of products, and business relations. The contracting officer will contact the references provided to obtain this information. Any other past performance information available to the Contracting Officer will also be considered.
f. Price: Provide your best price for each item. DO NOT include shipping costs in the price.
g. Shipping Costs: Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.
II. PERIOD FOR ACCEPTANCE OF OFFERS: [(Reference Paragraph (c)]
Change minimum acceptance period to 90 days.
ADDENDUM TO 52.212-4
ADDENDUM TO 52.212-4
TERMS AND CONDITIONS – COMMERCIAL ITEMS
The following paragraphs have been changed/added to FAR 52.212-4 Terms and Conditions – Commercial Items.
1. Administrative Modifications:
The government may issue unilateral written modifications that do not affect the substantive rights of the parties. Examples of administrative modifications are corrections in the payment office address or changes to the accounting and appropriation data.
2. Payment Procedures:
Funding will be provided on individual delivery orders. Payment will be made by Defense Finance and Accounting Service (DFAS). Contract payments will be processed electronically via EFT through the Defense Finance and Accounting Service (DFAS). Prior to DFAS releasing any contract payment, the contractor must submit a proper invoice using Wide Area Work Flow (WAWF) electronic commerce by utilizing the “combo” method. After a proper invoice is received, a Government representative will acknowledge acceptance and receipt of the service via WAWF. After all items are properly submitted, the contract payment will be processed via DFAS electronically.
The contractor must access the WAWF Vendor Tools on the DFAS website and complete the requirements to obtain an active WAWF account. This will allow the contractors to submit invoices via WAWF so that payments can be processed electronically through EFT.
For additonal WAWF information, see clause 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (MAR 2008).
Clause FAR 52.213-1, Fast Pay Procedures, applies to orders whose final destination is outside the continental United States.
3. Period of Performance:
Base Year:
January 1, 2012, or date of award if later, through December 31, 2012
Option Year 1:
January 1, 2013 through December 31, 2013
Option Year 2:
January 1, 2014 through December 31, 2014
4. Delivery:
Delivery orders will be issued and accessed through the Electronic Document Access System (EDA) http://eda.ogden.disa.mil. Contractors must complete the on-line registration available at the website in order to retreive documents displayed there.
The site survey must be completed 30 days after receipt of the order. Delivery orders to deinstall old equipment and to furnish and install new equipment will not be issued until the Contracting Officer’s Representative has ensured that the conditions described in the site survey have been completed and/or resolved. Equipment delivery date shall be 30 days after receipt of the delivery order. Work to de-install existing equipment and to install new oven and/or proofer must be completed within 15 days after receipt of de-install/install request from the store. Delivery to commissaries shall be made between the hours of 7:00 am and 3:00 pm local time, Monday through Friday, excluding official Government holidays.
5. Shipping:
FOB destination within the continental United States. Some delivery locations may require packaging and preparation for overseas shipment, but the contractor is responsible only for shipment to the port. Equipment destined for overseas shipment will be wrapped, blocked, and braced using best commercial practices so that the equipment arrives at destination without damage. Each Outside Continental United States (OCONUS) delivery order will include packing and marking instructions to the shipping port specified in the order. The contractor shall mark each shipment with the name of the contractor, contract number, and requisition number.
6. Be advised that this contract will be posted on http://www.commissaries.com/business/contracting.cfm at two distinct points during the procurement cycle:
(1) RECENT CONTRACT AWARDS - The first posting will take place immediately after the contract is awarded and will contain only the base year pricing.
(2) HISTORICAL PRICING – The second posting will take place when it is time for re-solicitation of an existing contract and will contain all CLINs and Sub-CLINs prices of the base period and all exercised options of the contract which is about to expire and is being re-solicited.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .