HCP:_Archery_Range_Hazard_Tree_Mitigations_(Addendum_#1_Revision).pdf
PDF 225 KB Posted
- Attached to
- HCP: Archery Range Hazard Tree Mitigations
- Solicitation number
- 2026-RFP - Informal-00501
- Issued by
- San Mateo County, California
About this file
This document is an Addendum #1 Revision to a Request for Proposals (RFP-Informal No. 2026-RFP-Informal-00501) issued by the San Mateo County Department of Parks for hazard tree mitigation and woody debris management services at the Kings Mountain Archery (KMA) course located in Huddart County Park, Woodside, California. The project encompasses mitigation of four hazard trees, including three tree removals and one tree pruning, along with processing and management of woody debris and fuel loads generated from these activities. A mandatory pre-proposal meeting is scheduled for June 25, 2026, at 8:30 AM at the project site, with attendance required in hard hat and high-visibility vest. Proposals must be submitted electronically through the OpenGov Procurement portal by 11:55 PM on July 3, 2026, with contract award anticipated by July 20, 2026. The resulting contract will have a term of two months, commencing after full execution by both parties.
Bidders must meet minimum qualifications including comprehensive general liability insurance of $1,000,000, motor vehicle liability insurance of $1,000,000, prevailing wage compliance for all workers, and having at minimum one International Society of Arboriculture (ISA) certified arborist on staff. All work must comply with ANSI Z133 Safety Standards, ANSI A300 Tree Care Standards, and ISA Best Management Practices. The County has adopted a local business preference ordinance that provides scoring advantages to local businesses, local non-profits, and certified small or micro businesses headquartered in San Mateo County. Evaluation occurs in two phases: Phase 1 involves a pass/fail assessment of the project approach and schedule, and Phase 2 evaluates proposals on a pass/fail basis for price competitiveness. No specific contract value or budget is disclosed in the solicitation; pricing is submitted by bidders for each line item (three tree removals, one pruning, and woody debris management). Contractors selected for awards above $200,000 require Board of Supervisors approval and must comply with the Levine Act regarding campaign contribution disclosures to County officers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HCP_ScopeOfWork_Specifications_(1).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
County of San Mateo
Request for Proposals (RFP - Informal) for HCP: Archery
Range Hazard Tree Mitigations
Parks Department
RFP - Informal No. 2026-RFP - Informal-00501
RFP - Informal Contact: Austin Lam alam@smcgov.org
1. Introduction and Schedule
The County of San Mateo (the “County” or “SMC”) covers most of the San Francisco Peninsula. The region covers 744 mi and is home to nearly 800,000 residents and 20 incorporated cities. The County provides for the health and welfare of all people within its borders and serves as the local government for the unincorporated areas. Innovation thrives here in industries including bioscience, computer software, green technology, hospitality, financial management, health care, education and transportation. The
County prides itself on how that prosperity fosters its commitment to protecting and enhancing the health, safety, welfare and natural resources of the community.
1.1. Summary
The San Mateo County (SMC) Department of Parks is here to provide the public with recreational opportunities in a safe and effective manner, and to protect and enhance the natural resources of the
County.
SMC Parks operate 24 separate parks, encompassing over 16,000 acres, and 190 miles of county and local trails. Parks are located throughout the County and represent a wide variety of natural settings including a coastside marine reserve, a bayside recreational area, coastal mountain woodland areas, and urban site.
Approximately 3 million visitors utilize the various trails and parks maintained by SMC.
Furthermore, to improve access and public safety, SMC Parks manages hazard trees located near high use area and critical infrastructure. Multiple trees have been identified on Parks land for hazard tree mitigation. Safely mitigating the hazard trees, while avoiding surrounding targets, such as visitors, vehicles, natural resources, and infrastructure, is critical to establishing a successful project. The hazard trees are located in the Kings Mountain Archery (KMA) course in Huddart County Park, Woodside, CA.
A total of four (4) trees are being requested for hazard tree mitigation, this includes three (3) tree removals and one (1) pruning. Additionally, woody debris and fuel management is requested for the logs and woody debris along the KMA course.
1.2. Background
All work performed in SMC Parks must abide by ANSI Z133 Safety Standards, ANSI A300 Tree Care
Standards, and ISA BMP's. Communication with ranger and Parks staff as requested is essential for a successful project.
1.3. Contact Information
Project Contact:
Fernando Guzman III County Arborist Email: fguzman1@smcgov.org Phone: (661) 809-5498
Procurement Contact:
Austin Lam Management Analyst Email: alam@smcgov.org Phone: (650) 599-1367 mailto:fguzman1@smcgov.org tel:(661)809-5498 mailto:alam@smcgov.org tel:(650)599-1367
Page 3 of 12 Release date of June 17, 2026
Department:
Parks Department
Department Head:
Emma Gonzalez Director
1.4. Timeline
RFP Released June 17, 2026
Pre-Proposal Meeting (Mandatory) June 25, 2026, 8:30am
Kings Mountain Archery (Archery Fire Road, Redwood City, CA 94062)
GPS: 37.429061, -122.304458
HARD HAT & HI-VIS VEST REQUIRED
Proposal Due Date and Time July 3, 2026, 11:55pm
Anticipated Contract Award Date July 20, 2026
2. Scope of Work
2.1. Important Instructions for Electronic Submittal
San Mateo County Parks is accepting electronic quote submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.
2.2. Scope of Work or Project Details
San Mateo County Parks is seeking quotes for hazard tree mitigation and woody debris management services at Huddart County Park's Kings Mountain Archery (KMA).
Kings Mountain Archery: (Archery Fire Road, Redwood City, CA 94062)
GPS: 37.429061, -122.304458
This project includes the mitigation of four (4) hazard trees, including the pruning of one (1) tree and the removal of three (3) trees. On site, mandatory pre-bid meeting is scheduled for, Thursday June 25th, 2026, at 8:30 AM. Hard hat and Hi-Vis vest is required for the pre-bid meeting. Those unable to attend the pre-solicitation meeting, must contact the County Arborist to schedule a site visit. Bidders must be experienced with the pruning and removal of large trees. Bidders must meet San Mateo
County's contractor eligibility requirements, including but not limited to: insurance, prevailing https://procurement.opengov.com/governments/3340/signup
Page 4 of 12 Release date of June 17, 2026 wage, and credential requirements. Must be prepared to provide W-9 documentation and proof of
COLI insurance. For any questions, please contact San Mateo County Arborist, Fernando Guzman, at
(650) 613-0517. Deadline for quote submittal is 11:55 PM, on July 3rd, 2026.
Insurance Requirements
Comprehensive General Liability $1,000,000
Motor Vehicle Liability $1,000,000
Prevailing Wage Requirement
All workers employed on this project must be provided prevailing wages. Certified payroll documentation may be required.
ISA Arborist Certification Requirement
Contractor must have at minimum one (1) worker on staff who holds their International Society of
Arboriculture (ISA) arborist certification.
2.3. Expected Tasks/Deliverables
• Safe mitigation of four (4) trees and management of woody debris and fuels in KMA course.
• Processing of woody debris generated from hazard tree mitigation activities, including: hauling, lopping, bucking, chipping and broadcasting according to CAL FIRE standards and SMC Parks' specifications. See document attached.
• Appropriately report any sensitive environmental resources that may be significantly impacted by work activities to NRM and Parks staff.
• Coordinate with Parks staff to schedule mitigation work at least five (5) days in advance. Notify
Parks staff and rangers on a daily basis, when contracted staff arrives or is expected to arrive.
• Estimate the amount of woodchips or mulch that is generated, broadcasted, and hauled off.
Report this amount of in an excel sheet provided by the County.
3. Submission Requirements
3.1. Submission Deadline
Proposals must be electronically received by 11:55 pm, on Friday, July 3, 2026 via eProcurement system.
Allow sufficient time for the upload to complete by the Due Date and Time. Partial uploads will automatically terminate, and proposals will be rejected. The eProcurement system submission time will be the official submission time. The County will not be responsible for and may not accept proposals that are late due to slow internet connections or for any other failure of the eProcurement system.
NOTE: The County does not maintain the eProcurement system and is not liable for site failures or technical problems. To resolve technical issues, contact OpenGov Technical Support by using the real
Page 5 of 12 Release date of June 17, 2026 time chat located in the lower right hand corner of the screen, or via email at procurement-support@opengov.com https://procurement.opengov.com/portal/smcgov
3.2. Pre-submission Registration
Organizations or individuals interested in responding to this solicitation must register online with the
County of San Mateo at:
• https://procurement.opengov.com/portal/smcgov
It is recommended that organizations complete this registration as soon as possible. The County will not be responsible for and may not accept proposals that are late due to a failure to register in the eProcurement system.
3.3. Submission via eProcurement Portal
Required Documents
Please refer to the Technical Proposal section for submittal documents and requirements.
Electronic Submissions
Include the proposer name and the RFP title and number in each filename. Submit proposals via the eProcurement website, allowing sufficient time for the upload to complete by the Due Date and Time. As noted above, the eProcurement portal submission time will be the official submission time, and partial uploads will automatically terminate, and proposals will be rejected. Contact eProcurement Portal with technical questions regarding this site.
Conflicts between Certain Requirements
Prior to the submission deadlines and solely relating to a determination of the timeliness of questions, comments, and proposal submissions, information displayed on the eProcurement portal site will take precedence in the event of a discrepancy between that information and the information within the solicitation documents. For all other discrepancies, the information in the solicitation documents will take precedence.
Format
Documents should be created in the following format:
• Text should be Times New Roman (12-point minimum font size) and unjustified (i.e., with a ragged-right margin)
• Pages should have margins of at least one inch on all sides (excluding headers and footers)
• If the proposal is lengthy, a Table of Contents should be included.
• PDF format is preferred.
Errors in Proposals mailto:procurement-support@opengov.com mailto:procurement-support@opengov.com https://procurement.opengov.com/portal/smcgov https://procurement.opengov.com/portal/smcgov https://procurement.opengov.com/portal/smcgov/projects/262514/document?section=undefined
Page 6 of 12 Release date of June 17, 2026
The County will not be liable for any errors in proposals. Proposals may be rejected as unresponsive if they are late, incomplete, missing pages or information, or cannot be opened for any reason. The County may waive minor irregularities, but such waiver will not modify any remaining RFP requirements.
3.4. Procurement Preference for Local Businesses and Local Non-Profits
The County of San Mateo has adopted a Procurement Preference for Local Businesses Ordinance (County
Ord. Code Ch. 2.89.) The purpose of this Ordinance is to promote a strong local economy by giving preference to local businesses, local non-profits, local small and micro businesses, and local small and micro non-profits in County procurements, to the extent consistent with the law and interests of the public. The County’s process for applying local preferences to competitive procurements is set forth in
County Ordinance Code Section 2.89.030. The Ordinance and exemptions (e.g. the ordinance will be exempt when all bids or proposals received are from Non-Profit Organizations) can be reviewed here:
Chapter 2.89 - PROCUREMENT PREFERENCE FOR LOCAL BUSINESSES | Code of Ordinances |
San Mateo County, CA | Municode Library
The requirements for bidders to establish eligibility for a local preference for this solicitation are detailed below in Section III (Submission Requirements) The Ordinance does not apply if a procurement is determined to be exempt (County Ord. Code sec. 2.89.050), and the County reserves the right to waive application of the Ordinance to this procurement if determined to be in the best interests of the County
(County Ord. Code sec. 2.89.060).
4. Minimum Qualifications, Local Preference Ordinance, and Technical Proposal
4.1. Minimum Qualifications
4.1.1. W-9 Submission
Please submit a W-9 signed in wet blue ink and currently dated, if you have not worked with SMC Parks on a project in the last two (2) years.
4.1.2. Insurance Requirements
Insurance Requirements
Comprehensive General Liability $1,000,000
Motor Vehicle Liability $1,000,000
Submit copies of current insurance, if you have not worked with SMC Parks on a project in the last two (2) years.
4.1.3. Prevailing Wage Requirement*
All workers employed on this project must be paid prevailing wages. Certified payroll documentation may be requested.
☐ Please confirm
*Response required
4.1.4. ISA Certified Arborist On Staff?*
Please confirm an ISA certified arborist is on staff.
https://library.municode.com/ca/san_mateo_county/codes/code_of_ordinances?nodeId=TIT2AD_ART2.8INFIPRCOCO_CH2.89PRPRLOBU https://library.municode.com/ca/san_mateo_county/codes/code_of_ordinances?nodeId=TIT2AD_ART2.8INFIPRCOCO_CH2.89PRPRLOBU
Page 7 of 12 Release date of June 17, 2026
☐ Please confirm
*Response required
4.1.5. ISA Certified Arborist Credential*
Provide ISA credential id for verification.
Maximum response length: 20 characters
*Response required
4.1.6. Vendor is not excluded, suspended or debarred from the System for Award
Management (SAM). *
☐ Please confirm
*Response required
4.1.7. If applicable, what is the registered Business Name and Unique Entity ID (UEI) No.?
Unique Entity ID (UEI) numbers can be found on sam.gov
4.1.8. Project Approach & Schedule*
This section should correlate to the Scope of Work . Proposer should give a short summary describing how it will perform the relevant work, including completion time, working hours, crew size, equipment use and etc.
*Response required
4.1.9. Introduction and Executive Summary *
Submit a letter of introduction and executive summary of the proposal. The letter must contain:
• Name, title and contact information (email, phone, and address) for representative of proposer that is responsible for communication related to this RFP.
• Name, title, contact information, and signature of person authorized to obligate firm to perform the commitment contained in the proposal.
Submission of the letter will constitute a representation by proposer that it is willing and able to perform the commitments contained in the proposal and has not violated the terms of this RFP.
*Response required
4.1.10. Performance Measure*
The performance measure are:
• Project remains within budget.
• Communicates with Park staff as requested.
• Safely complete requested work.
• Complete work according to specifications and standards.
Page 8 of 12 Release date of June 17, 2026
☐ Please confirm
*Response required
4.2. Procurement Preference for Local Businesses and Local Non-Profits
4.2.1. Is the Proposer a "Local Business"?
As Defined by Chapter 2.89.020 of the San Mateo County Ordinance Code, a “Local Business” means any for-profit business which has its principal place of business, or is headquartered, in San Mateo
County. If this designation applies to the proposer, a self-attestation form must be completed and provided with this response.
Please download the below documents, complete, and upload. If this designation is not applicable, please leave blank.
• SMC_LocalBusiness_self-atte...
4.2.2. Is the Proposer a Non-Profit?*
A Non-Profit is defined as a tax-exempt public charity organization (within the meaning of section
501(c)(3) of the Internal Revenue Code) that is formed for purposes other than making a profit, is exempt from paying federal income taxes on the income generated for their exempt purposes.
☐ Yes
☐ No
*Response required
When equals "Yes"
4.2.3. Is the Proposer a "Local Non-Profit"
As Defined by Chapter 2.89.020 of the San Mateo County Ordinance Code, a “Local Non-Profit" means a tax-exempt public charity organization (within the meaning of section 501(c)(3) of the
Internal Revenue Code) that is formed for purposes other than making a profit, is exempt from paying federal income taxes on the income generated for their exempt purposes, and has its principal place of business, or is headquartered, in San Mateo County. If this designation applies to the proposer, a self-attestation form must be completed and provided with this response.
Please download the below documents, complete, and upload. If this designation is not applicable, please leave blank.
• SMC_LocalBusiness_self-atte...
4.2.4. Is the Proposer a Local "Small" or "Micro" Business?
As Defined by Chapter 2.89.020 of the San Mateo County Ordinance Code:
“Small Business” means any business which holds a Small Business Certification awarded by the
California Office of Small Business and Disabled Veteran Business Enterprise Services (OSDS).
“Micro Business” means any Small Business certified by the OSDS which is automatically designated by the OSDS as a Micro Business due to gross annual receipts falling below the OSDS-designated dollar amount.
https://government-project.s3.us-west-2.amazonaws.com/181058/6417ee00-d47d-4708-90f9-2a47dd51b2e5_SMC_LocalBusiness_self-attestation_form_120424.pdf https://government-project.s3.us-west-2.amazonaws.com/181058/23f425e3-2794-4144-828d-5b909b017089_SMC_LocalBusiness_self-attestation_form_120424.pdf
Page 9 of 12 Release date of June 17, 2026
If the above designations apply, please provide the OSDS provided Certification ID.
If this designation is not applicable, please leave blank.
4.2.5. Is the Proposer a Local "Small" or "Micro" Non-Profit?
As Defined by Chapter 2.89.020 of the San Mateo County Ordinance Code:
“Small Non-Profit" means a Local Non-Profit with an annual revenue of $1,000,000 to $2,500,000 according to its most recently filed IRS Form 990.
“Micro Non-Profit" means a Local Non-Profit with an annual revenue of less than $1,000,000, according to its most recently filed IRS Form 990.
If the above designations apply, please provide your latest filed IRS form 990. A filing from the last two calendar years is acceptable.
If this designation is not applicable, please leave blank.
5. Pricing Proposal
HAZARD TREE MITIGATION PRICING TABLE
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Hazard Tree Removal (Unique ID:
ARME-03182026-1104)
1 $
2 Hazard Tree Pruning (Unique ID:
NODE-03182026-1211)
1 $
3 Hazard Tree Removal (Unique ID:
NODE-03182026-2029)
1 $
4 Hazard Tree Removal (Unique ID:
ARME-03182026-1144)
1 $
5 Woody debris management 1 $
TOTAL
6. Evaluation and Selection Criteria
The proposals will be evaluated by a selection committee with relevant expertise. The County intends to evaluate the proposals generally in accordance with the criteria itemized below. Proposers with the highest scoring proposals may be interviewed by the committee to make the final selection.
Page 10 of 12 Release date of June 17, 2026
6.1. Phase 1
No. Evaluation Criteria Scoring Method Weight (Points)
1. Project Approach & Schedule Pass / Fail 10 (100% of Total)
6.2. Phase 2
No. Evaluation Criteria Scoring Method Weight (Points)
1. Price Pass / Fail 100 (100% of Total)
7. Instructions to Proposers
7.1. Instructions
Proposers are encouraged to attend a pre-proposal conference on Thursday, June 25, 2026, at 8:30 am, to be held at Kings Mountain Archery (Archery Fire Road, Redwood City, CA 94062) GPS: 37.429061, -
122.304458 HARD HAT & HI-VIS VEST REQUIRED. All questions will be addressed at this conference and any available new information will be provided at that time. If you have further questions regarding the RFP, please post them on the eProcurement portal.
7.2. Communications
A. As of the issuance date of this RFP and continuing until it is canceled or an award is made, no proposer or person acting on behalf of a prospective proposer may discuss any matter relating to the RFP with any officer, agent, or employee of the County, other than through eProcurement portal, to the Authorized Contact Person, or as outlined in the evaluation or protest procedures.
B. Proposers (including any agent, owner, employee, board members, or other such affiliates) shall not offer any gift, favor, or other personal benefit to any County officer or employee during the procurement process for this agreement, including during the solicitation period and contract negotiations.
Violation of the foregoing prohibitions may result in a proposer being found non-responsible and barred from participating in this or future procurements.
7.3. Contract Award
A. Award Procedure
Contract negotiations are neither an offer nor guarantee that a contract will be executed. A contract award, if any is made, will be to the responsive, responsible proposer offering the overall best value to the County for the services and goods described in this solicitation, or as applicable, for a specific portion of the services and goods described. Any agreement reached will be memorialized in a formal agreement using the attached template, executed by the appropriate authority.
Page 11 of 12 Release date of June 17, 2026
B. Notice of Intent to Award
If a decision is made to take steps to enter into an agreement with one or more proposers, the
County will post a Notice of Intent to Award or otherwise notify proposers the remaining proposers of their non-selection. Notice may instead be provided by including approval of the agreement as an item on an agenda for a meeting of the Board of Supervisors.
C. Commencement of Performance
After all parties have signed the agreement, the County will notify the contractor and performance may proceed. Prior to execution of the agreement by the County, no County employee may authorize work under the agreement. Any work performed prior to the full execution of the Agreement may not be compensated.
D. Levine Act DisclosureThe Levine Act (California Government Code Section 84308) imposes certain requirements on parties contracting with the County of San Mateo related to campaign contributions to County “officers,” including elected County officers and candidates seeking elective office, who may participate in making a decision on certain County contracts. Elected
County officers in San Mateo County include: the San Mateo County Board of Supervisors, Assessor-County Clerk-Recorder, County Controller, Coroner, District Attorney, Sheriff, and Tax
Collector-Treasurer.Generally, under current County policy, approval by the Board of
Supervisors is required for any agreement for services above $200,000, and agreements for services below that threshold may be approved by Department heads.If your proposal is selected, you will be required to certify compliance with the Levine Act.As part of this process, you will need to certify and warrant that you have fully complied, and will remain in full compliance, with all applicable requirements of the Levine Act in connection with the
Agreement, including making any required disclosures of campaign contributions to County
Officers, which includes but may not be limited to elected County Officers. Elected County
Officers include members of the San Mateo County Board of Supervisors, as well as the
Assessor-County Clerk-Recorder, Controller, Coroner, District Attorney, Sheriff, and Tax
Collector-Treasurer. Any campaign contribution required to be disclosed under the Levine Act in connection with this Agreement shall be disclosed on the County of San Mateo Levine Act
Disclosure Form, a copy of which is available from the County upon request.Parties are solely responsible for accurate certification and disclosure. The Levine Act is complex, and this brief description is not legal advice. For example, certain contributions must be aggregated when determining whether contributions have exceeded the $500 threshold. If your proposal is selected, you are urged to review the Levine Act and consider consulting an attorney.
7.4. Term
Parks Department is issuing Request for Proposal (RFP) No. 2026-RFP - Informal-00501 for HCP:
Archery Range Hazard Tree Mitigations.
The agreement shall have a term of two (2) months. The County’s standard contract template has been included with this solicitation. The awarded contractor will be expected to sign an agreement prepared by
Page 12 of 12 Release date of June 17, 2026 the County using this template. Please ensure that your firm has completed legal review of these contract terms. If your firm wishes to request exceptions to these standard terms, submit a Contract Exceptions
Request by the Deadline for Questions, Comments and Contract Exceptions listed in the Solicitation
Schedule below. The County will consider Contract Exceptions Requests but reserves the right to reject requested modifications to its standard terms.
| 1. Introduction and Schedule |
| 1.1. Summary |
| 1.2. Background |
| 1.3. Contact Information |
| 1.4. Timeline |
| 2. Scope of Work |
| 2.1. Important Instructions for Electronic Submittal |
| 2.2. Scope of Work or Project Details |
| 2.3. Expected Tasks/Deliverables |
| 3. Submission Requirements |
| 3.1. Submission Deadline |
| 3.2. Pre-submission Registration |
| 3.3. Submission via eProcurement Portal |
| 3.4. Procurement Preference for Local Businesses and Local Non-Profits |
| 4. Minimum Qualifications, Local Preference Ordinance, and Technical Proposal |
| 4.1. Minimum Qualifications |
| 4.1.1. W-9 Submission |
| 4.1.2. Insurance Requirements |
| 4.1.3. Prevailing Wage Requirement* |
| 4.1.4. ISA Certified Arborist On Staff?* |
| 4.1.5. ISA Certified Arborist Credential* |
| 4.1.6. Vendor is not excluded, suspended or debarred from the System for Award Management (SAM). * |
| 4.1.7. If applicable, what is the registered Business Name and Unique Entity ID (UEI) No.? |
| 4.1.8. Project Approach & Schedule* |
| 4.1.9. Introduction and Executive Summary * |
| 4.1.10. Performance Measure* |
| 4.2. Procurement Preference for Local Businesses and Local Non-Profits |
| 4.2.1. Is the Proposer a "Local Business"? |
| 4.2.2. Is the Proposer a Non-Profit?* |
| 4.2.3. Is the Proposer a "Local Non-Profit" |
| 4.2.4. Is the Proposer a Local "Small" or "Micro" Business? |
| 4.2.5. Is the Proposer a Local "Small" or "Micro" Non-Profit? |
| 5. Pricing Proposal |
| 6. Evaluation and Selection Criteria |
| 6.1. Phase 1 |
| 6.2. Phase 2 |
| 7. Instructions to Proposers |
| 7.1. Instructions |
| 7.2. Communications |
| 7.3. Contract Award |
| 7.4. Term |
File details come from the government source that posted it. Updated .