MPE-S_RFP_AMD01.pdf
PDF 480 KB Posted
- Attached to
- Mission Partner Environment Services (MPE-S)
- Solicitation number
- HC1047-18-R-4012
- Issued by
-
Defense Information Systems Agency
About this file
This document outlines a solicitation for a Mission Partner Environment Services (MPE-S) contract. The Defense Information Systems Agency (DISA) intends to issue a solicitation for an Indefinite Delivery, Indefinite Quantity (IDIQ) contract with a single award to provide services to design, implement, and operate the MPE enterprise. The requirement includes full life cycle services at the enterprise level for all legacy and emerging Multi-National Information Sharing and MPE networks, systems, and projects. The scope encompasses capabilities analysis, engineering, software development, program management, and test and evaluation. The period of performance is one five-year ordering period with anticipated award in the fourth quarter of 2018. The contract will have firm-fixed-price and cost-plus-fixed-fee line items as well as cost reimbursement travel line items. The geographic area of performance is worldwide. Interested parties can access the full solicitation on FBO.gov when released in July 2018.
Revised RFP
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to post the Government's responses to questions for clarif ication and to extend the submission deadline to 17 September 2018 at 5:00 pm EST. The follow ing documents have been amended: (1) the RFP, (2) Attachment 6 Cost and Price Template, and (3) Attachment 9 Sample Task Order. All changes to the RFP and Attachment 9 are highlighted in yellow . Changes to the price template are addressed in the responses.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 48
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HC104718R4012
X 9B. DATED (SEE ITEM 11)
09-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Sep-2018
CODE
DEFENSE INFORMATION SYSTEMS AGENCY
P.O. BOX 549
FT. MEADE MD 20755
HC1047 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HC104718R4012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
as of 18 May 2018
Contract Number: (completed by the KO at time of Contract or TO award) Task Order Number: (completed by the KO at time of TO award or N/A) Contractor Name (completed by the KO at time of Contract or TO award) Tracking Number: (completed by the KO when complete package is received) Previous Contract and Task Order Number:
The effort is new and subsumes ENCORE II Contract number HC1028-08-D-2016; Task Order number VC04
1. Contracting Officer’s Representative (COR). See Section G.5., Points of Contact, which will be included in the awarded Contract.
2. Contract Title. Mission Partner Environment-Services (MPE-S)
3. Background. MPE-S is a new requirement to supply the full-range of Mission Partner Environment (MPE)-compatible services and associated supply items to the Department of Defense (DoD) and its Mission Partners (MPs).
The emergent MPE “connects nations, decision makers, staffs, and people to common information and data resources. It is leader centric and network enabled, reflecting the commander’s decision-making requirements balanced against risk. Operationally, improved information sharing enables the commander’s ability to create unity of effort, possess speed of command and build trust during Mission Partnered operations. It is the essence of our ability to fight as one team with our Mission Partners.” (Source: “Business Case Analysis: Final, Mission Partner Environment – Information System (MPE-IS) V1.0, July 29, 2016).
The MPE utilizes an operational framework to provide the DoD and its Mission Partners (MPs) effective information sharing and data exchange through planning, preparation, training, and execution of operations. The operational framework allows MPE members to develop a network for rapid information sharing and data exchange in a common language and at a prescribed security classification level. MPE facilitates the connection, reception, collection, correlation, gathering, and sharing of information from multiple and often disparate MP networks to the appropriate end users in order to increase situational awareness, informed decision making, collaboration, and successful mission execution, training, testing, experimentation, and operational events.
The MPE information sharing and data exchange environment allows for both: (1) continuous information sharing between the DoD and MPs, and (2) episodic information sharing and data exchange arrangements for specific missions, which may include unanticipated partners. Services and associated supply items related to the “Steady State Operation of the MPE” allow continuous information sharing between the DoD and MPs to occur on an ongoing and uninterrupted basis. Episodic information sharing and data exchange arrangements often require “Design, Development and Transition of MPE Services, Programs, Releases and Projects” to enable short-term episodic arrangements to be established on a rapid basis.
The episodic MPE operational framework requires the rapid establishment of an information sharing and data exchange, tailored to a specific mission, with unanticipated partners, and with minimal notice. The episodic MPE framework employs a federated network model where multiple, different MP networks utilizing different applications and tools are connected in order to share and/or exchange specified information and/or data.
Capabilities available under this Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract include advanced design, prototyping, development, testing and implementation of new technologies and approaches, and Tier 2 and 3 services.
In addition to MPE SECRET//RELEASABLE networks and information systems, MPE also includes an Unclassified Information Sharing Systems (UISS) portfolio, which features the All Partners Access Network (APAN). APAN is the premier unclassified information sharing and collaboration enterprise for the DoD.
4. Objectives.
The Contractor shall supply all services and associated equipment to design, implement and operate the MPE enterprise. The Contractor shall ensure all services and associated equipment conform to, or are compatible with, MPE architecture, standards, and specifications. The Contractor shall interface its activities with other Contractors performing local MPE-S for the Combatant Commands (CCMDs) and other DoD components.
5. Scope.
The scope is to provide full MPE life cycle services at the enterprise level for all legacy and emergent Multinational Information Sharing (MNIS)/MPE networks, systems and projects. This Contract will specifically provide on an on-demand basis, the full array of services and all functional elements such as capabilities and requirements analysis;
engineering; engineering management; software development; business management; program management; the provision of information technology (IT) equipment, interconnected system(s), or subsystem(s) of equipment; life cycle logistics; and, test and evaluation and associated items of supply, equipment, hardware, software, parts, tools and infrastructure to the MPE-IS and any related program, system, project, study, or other efforts, including legacy systems contributing to, or interfacing with, the MPE-IS, which are needed to deploy and operate the worldwide MPE. This Contract will also provide the full-range of services for Command, Control, Communications, Computer and Intelligence, Surveillance and Reconnaissance (C4ISR) Systems and any related or successor systems to the Combatant Command, Service, or Agency (CC/S/A)’s and any other DoD components engaged in any manner in supporting the MPE.
Specific details of task assignments, deliverables, delivery locations, documentation, training, applicable Government/DoD/Customer/Industry standards will be provided within individual Task Orders.
Four task areas constitute the technical scope of this Contract:
Task Area 1: Contract and Task Order Management Task Area 2: Design, Development and Transition of MPE Services, Programs, Releases and Projects Task Area 3: Steady State Operation of the MPE Task Area 4: Supply Chain Risk Management (SCRM)
The Government may require surge support during the base or any option period. Surge modifications will be within the scope of the Contract and any Task Order issued under this Contract and will provide increased services for the defined task areas of this PWS. Surge support over the life of the Contract will not exceed 35% of the Contractor’s total proposed cost/price for the base and all option periods, including a six-month extension of services pursuant to
FAR 52.217-8.
6. Performance Requirements.
6.1 Task 1 – Contract and Task Order Management
6.1.1 Subtask 1 – Service Management Plan (SMP) – The Contractor shall develop an ISO/IEC 20000 SMP tailored to the specific services required under this Contract. The Contractor shall incorporate engineering and business best practices into its management of all services, releases and projects. The Contractor’s overall approach for integrating the two shall be described in the SMP. The Contractor’s adherence to this SMP process shall be reviewed at Contract and Task Order Contractor Performance Reports (CPRs), and shall be incorporated into 90 Day Action Plans and Integrated Master Schedules (IMSs). The content of the SMP shall be in accordance with ISO/IEC 20000- 2:2012. An initial SMP shall be submitted with the Contractor’s proposal, and an updated version 60 days after award of the first Task Order. The SMP shall be updated thereafter in accordance with ISO/IEC 20000-2:2012 and Contractor implementing procedures.
Deliverable: Service Management Plan (SMP)
6.1.2 Subtask 2 – Monthly ID/IQ Progress Report (MPR) – The Contractor shall submit an MPR that addresses all elements of the Contractor’s SMP, in a format mutually agreed upon with the Government. If not specifically addressed in the Contractor’s SMP content, the MPR shall include:
- A brief description of activities and deliverables during the current month by Task Order. This description shall include problem definition and recommendations for program resolution. Particular attention shall be given to risk management and cybersecurity activities
- Trips, technical visits, and related results for the reporting period
- Identification of key personnel and personnel reassignments including personnel added or removed from the ID/IQ, Task Orders and all subtasks the Contractor will or did support
- Cost-reimbursement estimates, estimated date of funds depletion, and the status of invoicing. Status of
Contract line item numbers (CLIN) ceilings, obligations and projected demand.
Deliverable: Monthly Progress Report (MPR)
6.1.3 Subtask 3 – Monthly ID/IQ Contractor Performance Report – The Contractor shall develop a rolling 90 day action plan which shall be updated monthly. The plan, in conjunction with the MPR, shall serve as a baseline for the monthly CPR meeting with the Government program office, and the Contracting Officer, in person or via teleconference, video-teleconference or collaborative software applications as agreed to by the Government, to review progress, schedule and performance under this ID/IQ and all Task Orders. The Contractor shall prepare a CPR PowerPoint briefing to be utilized at the CPR meeting, which shall address staffing, progress, risks, milestones, Task Order owner feedback, invoicing, other direct costs (ODC), and status of Government Furnished Equipment (GFE), including Contractor-purchased, Government-owned items, if any. The Contractor shall address schedule and performance of each Task Order and the ID/IQ as a whole, noting any problems or risks and alternative courses of action (COA), recommending solutions and identifying tasks requiring Government decision or interaction. The Contractor shall proactively identify and prioritize risks and alternative COAs sufficiently in advance to permit Government intervention and action before a risk becomes an issue.
The Contractor shall ensure the CPR and an updated 90 Day Action Plan are provided to Government participants via the COR no less than three (3) days prior to the meeting, and that data presented at program reviews is correct and not more than ten (10) workdays old as of the date of the meeting. Meeting minutes shall be delivered to the Government within five (5) working days following the CPR Review.
Deliverables: Contractor Performance Report (CPR) CPR Meeting Minutes 90 Day Action Plan
6.1.4 Subtask 4 – Monthly Task Order Review – The Contractor shall develop a rolling 90 day action plan which shall be updated monthly. The plan shall serve as a baseline for the monthly CPR meetings with a Task Order holder, in person or via teleconference, video-teleconference or collaborative software applications as agreed to by the Government, to review progress, schedule and performance under a particular Task Order. The CPR shall address staffing, progress, risks, milestones, invoicing, ODCs, and status of GFE, including Contractor-purchased, Government-owned items, if any. For cost-plus-fixed-fee (CPFF) labor, the Contractor shall list all staff assigned to the Task Order by name and function, with the CPFF hours expended by each staff member during the month, and cumulative for the Task Order, against the Work Breakdown Structure (WBS) established in section 6.1.6. The Contractor shall address schedule and performance of the Task Order, noting any problems or risks and alternative
COAs, recommending solutions and identifying tasks requiring Government decision or interaction. The Contractor shall proactively identify and prioritize risks and alternative COAs sufficiently in advance to permit Government intervention and action before a risk becomes an issue.
The Contractor shall ensure the CPR and an updated 90 Day Action Plan for the Task Order are provided to Government participants via the COR no later than three (3) days prior to the meeting, and that data presented at program reviews is correct and not more than ten (10) workdays old as of the date of the meeting. Meeting minutes shall be delivered to the Government within five (5) working days following the CPR Review.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverables: Contractor Performance Report (CPR) CPR Meeting Minutes 90 Day Action Plan
6.1.5 Subtask 5 – Transition-out SMP and Contract Closeout – The Contractor shall deliver a Transition-out SMP 120 calendar days prior to the end of this Contract. This SMP shall provide detailed procedures to enable the incoming Contractor to assume MPE-S without interruption or degradation of service. The Contractor shall transfer all operational materials to the Government and to the incoming Contractor including diagrams, user guides, technical topology and architecture, password lists, and programmatic information to ensure that the outgoing transition does not degrade MPE performance.
The Contractor shall conduct a formal Contract closeout process, including transition-out activities, to ensure continuity with the succeeding Contractor.
Deliverable: Transition-out SMP
6.1.6 Subtask 6 – Integrated Master Schedule (IMS) – The Contractor shall develop and update weekly a Microsoft Project (MS Project) IMS for the work required under a Task Order. The Contractor shall use a WBS that aligns to the Task Order PWS.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverable: Integrated Master Schedule (IMS) Work Breakdown Structure (WBS)
6.2 Task 2 – Design, Development and Transition of MPE Services, Programs, Releases and Projects
The Contractor shall design and transition MPE-S, programs, releases and projects. The Contractor shall develop a business case and technical estimate for each new service, release or project, unless waived, in writing, by the Government. The Contractor shall prototype, test and demonstrate the service or project, in cooperation with the lead Operational Test Agency (OTA) and potentially the Joint Interoperability Test Command (JITC). The Contractor shall transition or deploy and operationally test the service or project. The Contractor shall operate and maintain the service or project on an interim or permanent basis as determined by the Government. The Contractor shall provide, on an on-demand basis, the full-range of state-of-the-art hardware and software, and “as-a-service” offerings related to the design, development and transition of MPE services, programs, releases and projects, on a pay-for-use basis.
6.2.1 Subtask 1 – Systems Engineering and Development – The Contractor shall perform systems engineering and software-related tasks in accordance with the latest versions of Institute of Electrical and Electronics Engineers (IEEE) Standards 1220-2005 and 1362-1998, and ISO/IEC 15288. The Contractor shall translate Government-specified requirements into functional and systems requirements, and shall demonstrate the allocation of requirements to the subsystem level using an automated requirements traceability tool. The Contractor shall meet all cybersecurity requirements as part of this allocation process. Specific cybersecurity requirements may be detailed at the Task Order level.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverable: Requirements Traceability Matrix Requirements Traceability Tool
6.2.2 Subtask 2 – Technology Roadmap, Prototyping, Testing, Installation, and Operation – The Contractor shall develop and maintain a roadmap of new technologies, which the Contractor has determined have potential for integration into the MPE within a five-year, rolling timeframe. This roadmap shall consider technologies with a maturity at least equivalent to RDT&E appropriation budget activity 03, “Advanced Technology Development.” The Contractor shall give first consideration to Commercially Available Off-the-Shelf (COTS) technologies and, second, to DoD Government Off-the-Shelf (GOTS) technologies.
The Contractor shall prototype and test new technologies in a sandbox (i.e., non-production) environment, potentially in cooperation with the OTA and JITC. The Contractor shall host engineering reviews to demonstrate performance of the technology at the key stages of its life cycle. The Contractor shall include a technology in the roadmap based on business factors (e.g., return on investment) as well as system technical refresh or performance improvements. The Contractor shall conduct site surveys in order to determine if the use of a site is feasible given space, infrastructure, and other requirements. The Contractor shall install the first article of the technology, and may install any or all of subsequent instances, as determined by the Government, based on the Government’s evaluation of the stability or complexity of the technology. The Contractor shall operate and maintain the new technology until the Government determines the technology meets all requirements and is stable, mature, suitable, effective, and/or ready to be fully deployed to all users. The Contractor shall install, test, and maintain multi-enclave clients (MEC) to support technology roadmaps, prototyping, testing, installation, and operation.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverables: Technology Roadmap
Engineering Review Checklist Site Survey Report Test Plan Test Results
6.2.3 Subtask 3 – Software Development and the Development/Security/Operations (Dev/Sec/Ops) Model – The Contractor shall develop software and applications for MPE systems and projects. The Contractor shall employ a Dev/Sec/Ops rapid or continuous delivery model for software and application development and delivery. This model may also be applied to special projects, products and services. This model shall be integrated with the Contractor’s ISO/IEC 20000 processes.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverables: Software Technical Documentation
Applications Planning and Release Management Plans Story Boards Priority Features List
6.2.4 Subtask 4 – Engineering and Business Management – The Contractor shall develop a business case and a Technical and Cost Estimate for any new service, release or project. The Business Case Analysis (BCA) shall feature an Economic Viability Assessment Methodology (Source: “DoD IT Business Case Analysis Template”) to determine the most favorable business alternative for meeting a technical requirement. The BCA shall take into account Coalition/MPE Future Years Defense Program (FYDP) funding profiles. The Technical and Cost Estimate shall support an integrated MPE, vice a stovepiped architecture. The Technical and Cost Estimate shall be standardized, uniform, and rate-based, for ease of Government review and comparison of successive estimates.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverables: Business Case Analysis
Technical and Cost Estimate
6.2.5 Subtask 5 – Mission Partner Environment – Information System (MPE-IS) – The Contractor shall provide services to support the definition, development, testing, deployment and sustainment of the MPE-IS, a prospective Acquisition Category IA (ACAT IA), and any successor or related ACATs. Services shall include systems engineering, information technology architecting, cybersecurity, and systems acquisition documentation development in accordance with DoD Instruction (DoDI) 5000.02, SUBJECT: Operation of the Defense Acquisition System. Associated hardware, software, parts, tools and cloud services shall be procured as ODCs.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverables: DoD Architecture Framework (DoDAF) Views
DoDI 5000.02 Documents
6.2.6 Subtask 6 – Change and Configuration Management – The Contractor shall populate MPE Request for Change (RFC) forms based on its own Technical and Cost Estimates, and for requirements received through authoritative sources such as Chairman of the Joint Chiefs of Staff Instruction 6285.01C (CJCSI 6285.01C), “Multinational and Other Mission Partner (MNMP) Information Sharing Requirements Management Process,” and other CC/S/A requirements processes. The Contractor shall staff and process these forms and associated documentation through the Government’s change management workflow, which may include organizational entities such as the Engineering Review Board (ERB), Change Advisory Board (CAB), and Configuration Control Board (CCB). The Contractor shall conduct, track and manage all such actions. Once approved by the Government, the Contractor shall upload all configuration items (CI) into the MPE configuration management database (CMDB). The Contractor shall develop an Implementation Plan for each change, per individual customer Task Orders.
The Contractor shall keep the CMDB up-to-date. The Contractor shall develop and/or update the Configuration Management Plan (CMP), per individual customer Task Order. The Contractor shall perform a quarterly audit of the CMDB in order to ensure accuracy, consistency, and conformity with accepted practices. The Contractor shall report the results to include discrepancies, recommendations for close out or further action, and the documentation and tracking of action items.
The Contractor shall develop DoDAF views of the MPE/MPE-IS technical baselines. The Contractor shall develop Tactics, Techniques, and Procedures (TTPs) and CC/S/A directives and guidance for change and configuration management, as prescribed by individual Task Orders.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverables: Request for Change (RFC) Form
Change Implementation Plan Change and Configuration Management Tracking Sheet Configuration Management Database (CMDB) Audit Report DoDAF Views
Tactics, Techniques, and Procedures (TTPs) Configuration Management Plan (CMP)
6.3 Task 3 – Steady State Operation of the MPE
6.3.1 Subtask 1 – Tier 2 and Tier 3 Service Desks, and Knowledge Management – The Contractor shall provide Tier 2 and Tier 3 services. The Contractor shall be a self-certified Tier 3 Cybersecurity Service Provider (CSSP). The Contractor shall provide Tier 3 engineers who are experts in their fields and are responsible for not only resolving issues escalated by both Tier 1 and Tier 2 personnel, but also for the research and development of solutions to new or unknown issues. The Contractor Tier 3 engineers shall, when highly complex problems are encountered, coordinate troubleshooting and problem resolution activities with the original developers or original equipment manufacturers for in-depth analysis. As needed, the Contractor shall develop a workaround to return the service to operation, and publish the workaround to the Tier 1 and Tier 2 support organizations across all deployed MPE-S by leveraging the knowledge management environment. The Contractor shall verify the workaround complies with test and change management policies, as prescribed in individual Task Orders. The Contractor shall provide Tier 3 services for deployed networks and services during Task Order specified core hours.
The Contractor shall develop and maintain a Problem Management Database, which shall capture and concisely display Mean Time to Restore (MTTR) on all tickets assigned to Tier 3, either by escalation or other means; number of tickets open, pending, and closed; and, MPE network system operational availability (Ao) and reliability.
The Contractor shall develop TTPs for the Contractor’s Tier 3 processes, the devolution process for MPE, and MPE transition and implementation processes, and other MPE areas and processes as the need arises.
The Contractor shall create and operate a knowledge management environment, the primary purpose of which shall be to support Tier 3 services.
The Contractor shall document lessons learned for each Tier 3 incident. The lessons learned shall be delivered to the customer and made available in the knowledge management environment for future reference.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverable: Lessons Learned Problem Management Database Knowledge Management Database Tactics, Techniques, and Procedures (TTPs)
CC/S/A Directives and Guidance Documents
6.3.2 Subtask 2 – Customer Relationship Management (Optional) – The Contractor shall have a Customer Account Representative(s) (CAR) who shall be the primary point of contact for the Contracting Officer’s Representative for Contractor performance under individual Task Order Contract. The CAR shall communicate COR concerns to the Contractor’s top management. The Contractor shall document receipt of these concerns and any remedies taken.
The Contractor shall incorporate these concerns into its Plan-Do-Check-Act (PDCA) cycle to achieve process improvements.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverable: Customer Concerns Resolution Report
6.3.3 Subtask 3 – ISO/IEC 20000 Continuous Improvement – The Contractor shall continually improve its ISO/IEC 20000 Service Management System (SMS) and the services provided under this Contract through the Contractor’s institutionalized, routine exercise of the ISO/IEC 20000 PDCA methodology. The Contractor shall provide the Government with a copy of report(s) submitted to its top management listing continual improvement opportunities identified through the PDCA methodology, and how they may directly or indirectly affect the services provided under this Contract. The report shall also address actions the Contractor shall take to implement these improvement opportunities, with specific quantifiable, demonstrable improvements the Government will realize to services performed under this Contract. The Contractor shall also, on a monthly basis, collect and document recommendations from the Government on process or service issues the Government considers candidates for PDCA review. The Continual Improvement Opportunities Report shall report the Contractor’s disposition of these candidate items. In keeping with ISO/IEC 20000-2, risk to the services provided under this Contract shall be addressed through the PDCA methodology and associated deliverables.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverable: Continual Improvement Opportunities Report
PDCA Candidates from the Government
6.3.4 Subtask 4– Other Integrated Product Support Elements – The Contractor shall perform supply tasks. The Contractor shall manage and maintain Bills of Material (BOM). The Contractor shall receive, store, inventory, transfer, issue, redistribute, and dispose of items. The Contractor shall catalogue, manage shelf life and warranties, and assure the integrity of the supply chain. The Contractor shall manage technical data pursuant to the technical data rights strategy specified at the Task Order level. The Contractor shall develop and update MPE product support TTPs. The Contractor shall develop and maintain technical standards and specifications. The Contractor shall develop and maintain technical manuals and drawings. The Contractor shall cleanse, migrate, verify and validate data. The Contractor shall store and backup data. The Contractor shall provide training. The Contractor shall develop and deliver computer-based training/distance learning. The Contractor shall provide classroom training and MPE operations over-the-shoulder instruction.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverable: Bill of Material (BOM)
Training Materials (as required) Product Support TTP Technical Standards and Specifications Technical Manuals and Drawings
6.3.5 Subtask 5 – Information Assurance (IA), Cybersecurity, Computer Network Defense (CND), and Certification and Accreditation (C&A) – The Contractor shall analyze Information Assurance Vulnerability Alerts (IAVA) and Information Assurance/Cybersecurity Vulnerability Bulletins for enclave impacts and provide recommended actions. The Contractor shall ensure enclave, network, and computer design services include the incorporation of DoD-directed IA vulnerability solutions. The Contractor shall ensure enclave systems, networks, and computer environments employ Information Systems Security Engineering and are consistent with MPE and CC/S/A cybersecurity architecture requirements, as prescribed in individual Task Orders. The Contractor shall ensure the design of hardware, operating systems, and software applications address cybersecurity requirements for new services, projects and releases. The Contractor shall apply all cybersecurity/IA vulnerability solutions. The Contractor shall develop and maintain C&A/Risk Management Framework (RMF) documentation. The Contractor shall install, test, monitor, maintain and operate the procedures and tools (e.g., cybersecurity software, hardware and network) required for C&A/RMF activities.
The Contractor shall deploy, test, operate and maintain cross-domain solutions and services.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverable: Risk Management Framework (RMF) Documentation
6.3.6 Subtask 6 – Laboratory Services – The Contractor shall provide test plans, testing requirements, and scenarios to the laboratory. The test plan shall include operational testing, developmental testing, evaluation testing, and JITC certification tests. In coordination with JITC, the Contractor shall conduct testing to ensure interoperability and mission continuity when that system or device is inserted into the operational MPE. The Contractor shall audit the laboratory on a quarterly basis to validate that it has maintained configurations in accordance with the prescribed baseline.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverables: Test Plan Test Results Laboratory Configuration Audit
6.3.7 Subtask 7 – Cryptologic and Key Management Services – The Contractor shall manage the life cycle of all controlled cryptographic items (CCI). The Contractor shall receive, inventory, store and ship all CCI devices and equipment. The Contractor shall perform acceptance testing of all incoming CCI.
6.3.8 Subtask 8 – Circuit Provisioning – The Contractor shall provision MPE circuits. The Contractor shall coordinate, monitor, and control circuit provisioning to facilitate quality implementations and minimize disruption to the production network. The Contractor shall perform pre-deployment coordination prior to each installation site visit in order to ensure the highest probability of successful completion of each circuit provisioning task. The Contractor shall develop and update weekly a Circuit Status List.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverable: Circuit Status List
6.3.9 Subtask 9 – Desktop Installation and Maintenance – The Contractor shall install and maintain managed desktop infrastructure and traditional desktops, including Multi-Enclave Clients (MEC), Virtual Desktop Infrastructure (VDI), and thick clients. The Contractor shall also install and maintain phones, printers and all other client-side hardware. The Contractor shall adhere to all applicable international, national and local standards for these installations.
6.3.10 Subtask 10 – Exercise Services – The Contractor shall design and establish episodic enclaves, and nodes, as necessary, for North Atlantic Treaty Organization (NATO), coalition, joint, and an individual military service’s exercises. The Contractor shall provide all services related to these episodic enclaves and/or the MPE national and international exercises. The Contractor shall extend Tier 3 services for these exercises. The Contractor shall disestablish the episodic enclave at the completion of the exercise. The Contractor shall perform on-site engineering and IT management of Tactical Processing Centers and client-side hardware.
All deliverables in this Subtask are Task Order dependent. Individual Task Orders may require deliverables beyond those listed in this PWS.
Deliverable: Episodic Enclave Design
6.4 Task 4 – Supply Chain Risk Management (SCRM) Planning
This Contract and its associated Task Orders are subject to the Federal SCRM policies and regulations including the Defense Federal Acquisition Regulation Supplement (DFARS) 252.239-7017 Notice of Supply Chain Risk, DFARS 252.239-7018 Supply Chain Risk, DoD Instruction 5200.44 Protection of Mission Critical Functions to Achieve Trusted Systems and Networks, Section 806 of the FY2011 NDAA Requirements for Information Relating to Supply Chain Risk, and internal DISA SCRM Processes and Procedures.
The Contractor shall submit a SCRM plan as part of its Task Order 0001 proposal. Upon Task Order 0001 award, the SCRM plan will be incorporated into the ID/IQ Contract.
Deliverable: Supply Chain Risk Management (SCRM) Plan
7. Performance Standards. Performance Standards will be identified in the Task Order-level PWS and Quality Assurance Surveillance Plan (QASP).
8. Incentives. Both positive and negative incentives may be applied. In general, positive incentives, in the form of favorable Contractor Performance Assessment Reporting System (CPARS) assessments, may be used to recognize outstanding performance on Task Orders. Conversely, negative incentives in the form of negative Contractor Performance Assessment Reporting System (CPARS) assessments, may be utilized to document marginal or unacceptable quality of services or products, which is defined as performance below the AQLs identified in the
QASP.
Negative incentives tied to the Contractor’s inability to meet specified performance standards may be included at the Task Order level as deemed necessary by the Government.
9. Place of Performance. The primary place of performance shall be the Washington, DC metro area, principally Northern Virginia and Fort Meade, MD. Upon the COR’s approval, other potential CONUS/OCONUS work locations include Air Force facilities, Fairfax, VA; AFRICOM (Stuttgart, Germany), CENTCOM (Tampa, FL;
Kuwait; Bahrain; Afghanistan), SOUTHCOM (Miami, FL), NORTHCOM (Colorado Spring, CO), SOCOM (Tampa, FL), JCSE (Tampa, FL), US Forces-Korea (USFK) (Youngsan AB, Osan AB, Kunsan AB, and Camp Humphries). Additional places of performance are to be determined based on customer requirements and real world events. The specific place(s) of performance will be specified in individual Task Orders.
The Government may supply up to 24 onsite seats, desk phones, and DISA laptops at DISA Headquarters, MNIS Division Central Offices, Fort George G. Meade, MD 20755. The Contractor must provide offsite seating for the personnel assigned to this Contract or Task Orders exceeding these 24 seats. Future operational situations and requirements may require the Government to reduce Contractor onsite seats at which time the Contractor shall be responsible for providing additional offsite seating. The seating or office space for these offsite personnel shall be located within 25 miles of DISA Headquarters, Fort Meade, MD. In addition, the place(s) of performance may be subject to change based on future operational situations and requirements.
Frequent local travel within the National Capitol region is anticipated. Local travel within a fifty-mile radius of the individual’s daily duty station is not reimbursable under this effort.
The Contractor may establish a telework program that is similar to DISA Instruction 220-15-57 or customer instructions, and is approved by the COR. The COR does not approve individual Contractor employee telework agreements or activities; rather, the COR will approve the Contractor’s overall telework process to ensure it provides the support required under this PWS. The Contractor’s telework process shall incorporate all DoD and DISA or customer security policies, and include procedures for unplanned telework as a result of contingencies and emergencies. As directed by the COR, the Contractor shall continue performance in emergency or mission essential conditions. Any equipment such as laptops or phones provided to Contractor personnel shall be returned at the termination of the engagement or at another time mutually agreeable to both parties. Additionally, the Contractor may be required to account for the whereabouts of their personnel should this information be requested by the COR.
Alternate Place of Performance – Contingency Only. As determined by the COR, Contractor employees may be required to work at an alternate place of performance (e.g., home, the Contractor's facility, or another approved activity within the local travel area) in cases of unforeseen conditions or contingencies (e.g., pandemic conditions, exercises, government closure due to inclement weather, etc.). Non-emergency/non-essential Contractors should not report to a closed government facility. The Contractor shall prepare all deliverables and other Contract documentation utilizing Contractor resources. To the extent possible, the Contractor shall use best efforts to provide the same level of services as stated in the PWS. In the event the services are impacted, reduced, compromised, etc., the Contracting Officer or the Contractor may request an equitable adjustment pursuant to the Changes clause of the Contract.
10. Period of Performance. The Contract’s period of performance is one five year ordering period. The Contract also includes the 6-month Extension of Services in accordance with FAR 52.217-8. As directed by the COR, the Contractor shall continue performance in emergency or mission essential conditions.
Task Orders may be issued during any of the Contract years. The performance period for each Task Order will be specified within the order and may extend five years beyond the expiration date of this Contract. Task Orders shall be priced according to the negotiated rates agreed upon for each applicable Contract year for the Task Order’s period of performance.
11. Delivery Schedule.
PWS
Task#
Deliverable Title Format Due Date Distribution/Copies Frequency and Remarks
6.1.1 ISO/IEC 20000
Service Management Plan (SMP)
ISO/IEC
20000-2
With Contractor’s technical proposal, and updated version 60 days after award
As required in Section L for original; Standard Distribution* for update
One time / Due at time of proposal submission.
Final:
Frequency – One time / Due 60 days after award
6.1.2 Monthly
Progress Report (MPR)
MS Word 10th day of each month; if the 10th day falls on a weekend or holiday, submit on the first business day following
Soft/electronic copy emailed to COR and portal
Monthly, on 10th calendar day
6.1.3 Contractor
Performance Report (CPR)
MS
PowerPoint
Within the first 20 days of the month following the report month
Soft/electronic copy emailed to COR and portal
Monthly, no later than 20th calendar day
6.1.3 CPR Meeting
Minutes
MS Word Within 5 working days of a CPR meeting
Soft/electronic copy emailed to COR and portal
Monthly, within 5 workdays after
CPR
6.1.3
90 Day Action Plan
MS
PowerPoint
3 working days prior to the CPR meeting
Soft/electronic copy emailed to COR and portal
Final – 60 days after award, and monthly updates thereafter
6.1.4 Task Order
Contractor Performance Report (CPR)
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.1.4 Task Order CPR
Meeting Minutes
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.1.4 Task Order 90
Day Action Plan
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
Deliverable Title Format Due Date Distribution/Copies Frequency and Remarks
6.1.5 Transition-Out
Service Management Plan (SMP)
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order
6.1.6
Integrated Master Schedule
(IMS)
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.1.6 Work
Breakdown Structure (WBS)
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.1 Requirements
Traceability Matrix
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.1 Requirements
Traceability Tool
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.2 Technology
Roadmap
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.2 Engineering
Review Checklist
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.2 Site Survey
Report
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.2 Test Plan – New
Technologies
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.2 Test Results –
New Technologies
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.3 Software
Technical Documentation
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.3 Applications To be
determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.3 Planning and
Release Management Plans
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order
Deliverable Title Format Due Date Distribution/Copies Frequency and Remarks
6.2.3 Story Boards To be
determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.3 Priority Features
List
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.4 Business Case
Analysis
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.4 Technical and
Cost Estimate
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.5 DoD
Architecture Framework (DoDAF) views
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.5 DoDI 5000.02
Documents
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.6 Request for
Change (RFC) Form
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.6 Change
Implementation Plan
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.6 Change and
Configuration Management Tracking Sheet
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.6 Configuration
Management Database (CMDB) Audit Report
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.6 DoDAFs Views To be
determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order
6.2.6
Tactics, Techniques, and Procedures (TTPs)
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.2.6 Configuration
Management Plan (CMP)
To be determined at
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at
Deliverable Title Format Due Date Distribution/Copies Frequency and Remarks the Task Order level the Task Order level
6.3.1 Lessons Learned To be
determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
6.3.1 Problem
Management Database (DB)
To be determined at the Task Order level
To be determined at the Task Order level
To be determined at the Task Order level
To…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .