About this file

This document contains a request for proposal and pump submittal example. The Defense Information Systems Agency is seeking proposals to upgrade the condenser water filtration, controls and piping system at its facility in San Antonio, Texas. The goal is to improve reliability, energy use and redundancy in accordance with Department of Defense standards. Specifically, the contractor must enhance the cooling towers, replace piping, adjust the water pump, run temporary chillers for redundancy testing and adjust the water filtration controls. The project concerns only the facility's IT mechanical system and not the overall building system. A site visit is scheduled for March 31st with sessions at 9:00am and 12:30pm Central Time for contractors to better understand the work location and conditions. Questions are due by April 9th at 2:00pm Central Time to mark.e.kraft2.civ@mail.mil. The pump submittal example provides specifications for a model pump to meet the required flow rates, pressures, efficiencies and power needs for the system.

View the file

Other files for this federal contract opportunity

Other files attached to Condenser Water Filtration System Upgrade, newest first.
File Type Posted
HC102821R00180009.pdf PDF
QandA.xlsx XLSX spreadsheet
HC102821R00180008.pdf PDF
HC102821R00180007.pdf PDF
HC102821R00180003.pdf PDF
Appendix R - Temporary Chiller Connection Point Drawing V2.pdf PDF
HC102821R00180002.pdf PDF
Q and A on Water Filtration Upgrade.xlsx XLSX spreadsheet
IMG_1624.JPG JPG image
IMG_1626.JPG JPG image
IMG_1625.JPG JPG image
IMG_1616.JPG JPG image
IMG_1612.JPG JPG image
IMG_1611.JPG JPG image
IMG_1606.JPG JPG image
IMG_1605.JPG JPG image
IMG_1608.JPG JPG image
IMG_1597.JPG JPG image
IMG_1591.JPG JPG image
IMG_1592.JPG JPG image
IMG_1588.JPG JPG image
IMG_1584.JPG JPG image
IMG_1582.JPG JPG image
IMG_1579.JPG JPG image
IMG_1576.JPG JPG image
IMG_1623.JPG JPG image
IMG_1621.JPG JPG image
IMG_1617.JPG JPG image
IMG_1613.JPG JPG image
IMG_1615.JPG JPG image
IMG_1599.JPG JPG image
IMG_1596.JPG JPG image
IMG_1590.JPG JPG image
IMG_1589.JPG JPG image
IMG_1585.JPG JPG image
IMG_1583.JPG JPG image
IMG_1578.JPG JPG image
IMG_1572.JPG JPG image
IMG_1577.JPG JPG image
IMG_1575.JPG JPG image
IMG_1573.JPG JPG image
encl 4_qasp - SAT CW Filtration and Upgrades.pdf PDF
Appendix J - Labeling Specification.docx DOCX document
Appendix R - Temporary Chiller Connection Point Drawing.pdf PDF
Appendix G - ASHRAE Standard 202 - 2013.pdf PDF
Appendix E - VFD Specification.docx DOCX document
HC102821R0018-CLIN Pricing Worksheet.xlsx XLSX spreadsheet
Appendix A - Mechanical Drawing Set (FOUO).pdf PDF
Appendix Q - Contractor NDA.docx DOCX document
Appendix P - Electrical Safety Program.pdf PDF
Show all 50

Condenser Water Filtration System Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WIZE-C4F857 09/23/2020

McNevin Company

(303) 322-0165 sales@mcnevinco.com

Model: 8x10x17.5B

2100 US gpm

82.5 ft

33 ft

84.1 %

76.2 %

16.5 in

60 hp

51.9 bhp

1200 rpm

1138 rpm

5.44 ft

108 ft

579 US gpm

2317 US gpm

68 ºF

Water

4166 lbs

30.29 ft²

8x10x17.5B

1138 RPM

Performance curve meets 14.6 / ISO 9906 acceptance criteria WIZE-C4F857

Constant Speed Curve (1180 rpm)

Operating Point

Flow: 2100 US gpm Head: 82.5 ft Speed: 1138 Efficiency: 84.1% Point BHP: 51.9 End Of Curve: 70.2%

Maximum Duty Point (at rated motor speed)

Flow: 2178 US gpm Head: 88.7 ft Speed: 1180 Efficiency: 84.2% Point BHP: 57.8 NOL Flow: 2556 US gpm Runout Flow: 3103 US gpm NOL (BHP): 59.1