Attachment J-3 QASP.pdf
PDF 36 KB Posted
- Attached to
- Cisco SMARTNet Enterprise Agreement for US Army
- Solicitation number
- HC1028-12-R-0045
- Issued by
-
Defense Information Systems Agency
About this file
Attachment J-3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment J-7 RFP Q A_s.xls | XLS spreadsheet | |
| HC1028-12-R-0045-0002.doc | DOC document | |
| Attachment J-5 Cisco DD254 revised.docx | DOCX document | |
| HC1028-12-R-0045-0001.doc | DOC document | |
| Attachment J-6 AR 25-2.pdf | ||
| Attachment J-1 Cisco Equipment List.xlsx | XLSX spreadsheet | |
| Attachment J-5 Cisco DD254.docx | DOCX document | |
| Attachment J-2 IB Value.xls | XLS spreadsheet | |
| Attachment J-4 Cross Referance Matrix.pdf | ||
| redacted ja.pdf | ||
| HC1028-12-R-0045.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J-3 Cisco QASP
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1. Contract or Task Order Title Cisco SMARTnet Enterprise Agreement
2. Work Requirements:
• Task 1 – Program Management
• Task 2 – Cisco SMARTnet Maintenance
• Task 3 – Inventory Collection and Reporting System
• Task 4 – Reconciliation
• Task 5 – Determining IB Range
3. Primary Method of Surveillance:
The primary methods of surveillance are random checks, observations, inspections, complaints and review of records and files required to be maintained and delivered under this contract. The
Government will use appointed representatives, as well as reports and input from Army person-nel as sources of comments on the Contractor’s performance.
The methods of surveillance listed below shall be used in the administration of this QASP. The specific surveillance method for each performance standard and acceptable quality level is listed below:
a. Customer Feedback - Customer feedback may be obtained either from the results of formal customer satisfaction surveys or from random customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed or emailed and forwarded to the COR who will assess the validity of the complaint and retain it in a documentation file. The
COR shall also maintain the tabulated results of all customer satisfaction surveys on file.
b. 100% Inspection - This level of inspection shall be accomplished by Army site per-sonnel verifying the completion of equipment installation with correct performance.
Performance is inspected/evaluated at each occurrence.
c. Periodic Inspection - This level of inspection consists of the evaluation of selected tasks on other than a 100 percent basis. Periodic inspections can occur on a weekly, monthly, quarterly or yearly basis.
d. Direct Observation - Direct observation is designed to evaluate Cisco contract ser-vices through careful, direct examination of activities to determine whether services conform to contract requirements.
e. Contractor Self Reporting - Contractor proactively reports on performance and alerts Army to potential performance issues. This method relies on the Contractor’s in-place infrastructure and systems for measurement of performance indicators and results.
4. Scope of Performance: The scope of this requirement covers the total Army organization including: Army Commands, Army Service Component Commands, and Direct Reporting Units including Army Reserve Command and National Guard Bureau. Additionally, the total Army includes Joint Organizations where the Army is the Executive Agent, such as SOUTHCOM, EUCOM and AFRICOM. It will also include authorized Army contractors purchasing on behalf of the above organizations. Included in these categories are military, civilian, and contractor personnel. The coverage of this requirement applies to all Continental United States (CONUS) and Outside the Continental United States (OCONUS) sites. This acquisition will provide brand name maintenance support for the entire Army enterprise, excluding Army Medical Command
(MEDCOM), who is supported by Military Health Services (MHS) and US Army Special
Operations Command, who is supported by US Special Operations Command (SOCOM).
The Contractor will provide Cisco-branded SMARTnet maintenance for all Army hardware and software equipment as identified in Attachment 1 – equipment list. The Contractor will deliver software updates through an electronic software download location.
The Contractor will provide a solution to manage Army inventory as part of a required Inventory
Collection & Reporting System. The Contractor will ensure data is located in a secure server environment meeting all US Army data regulations to include storage, clearing, purging, destroying, or disposing of media provided by the US Army (ref AR 25-2).
5. Performance Standards: CIO/G-6 will provide Administrative contract management for this Agreement. PD CHESS is the Software Product Manager for the Army and in that capacity will support CIO/G-6 in the management of this agreement. NETCOM will provide Technical
Management support for this agreement.
Performance Stand-ard
Acceptable Quality Level
(AQL)
Method of Surveillance
Task 6.1.1 – Provide
Program Manager
(PM) to support En-terprise Agreement
PM will be named at contract award. The PM function will not be vacant for more than
30 days.
Name and contact information for
PM will be provided to the government within 5 days of award and within 30 days of a replacement being required.
Task 6.1.2 – Monthly
Performance Report
Report demonstrating key performance indicators will be generated monthly.
The report will be sent to the COR and the CXO Action Officer NLT than the 10 th day of each month.
Task 6.1.2 – Quarter-ly Performance Re-
A Quarterly Performance Re-view will be held at a site to
The report will be provided during
September, December, March and view be named by the government, to provide a report to Army leadership about the status of current project efforts and key performance indicators.
June. A pre-brief should be held with the COR and CXO Action
Officer at least 7 days prior to the
PMR.
Task 6.3 – Provide
Inventory Collection and Reporting
System
Performance occurs when capability is delivered within
90 days of award. The system should have 95% availability.
Routine inspection/audit of portal and services.
Task 6.2.1 The contractor shall provide unlimited, direct access to the
Cisco Technical Assistance
Center (TAC) for technical support. The contractor shall provide coverage 24 Hours x
7 Day x 365 Days per Year
(24x7x365) via telephone, the web, e-mail, chat and social media for all hardware and software technical issues.
Survey Army customers and evaluate feedback
Task 6.2.2 Provide 8x5xNext Business
Day Advanced Hardware
Replacement for the Army’s installed base of Cisco devices with no more than 10 complaints per quarter.
Survey Army customers and evaluate feedback.
Task 6.2.4 Provide 24x7 x4 hour
SMARTnet support to 10% of the Army’s installed base with no more than 10 complaints per quarter.
Survey Army customers and evaluate feedback.
All Tasks The contractor meets all requirements of the PWS and resolves any Government concerns immediately.
Planned sampling and survey of
Army customers.
6. Acceptable Quality Level (AQL):
The AQL for this project is 100% due to the critical support provided for Army activities.
7. Evaluation Method:
The Contracting Officer’s Representative (COR) will perform method of surveillance identified above and notify Contractor of performance deficiencies. The Contractor will provide a response to the COR detailing methods of performance improvement when required by the government. The COR will verify successful upgrades, patches, and/or installation followed by successful normal operation of Cisco hardware/software.
8. Incentives (Positive and/or Negative):
There are no incentives associated with this award.
File details come from the government source that posted it. Updated .