This document is an Amendment (0001) to a solicitation (HC101325QA192) for telecommunications services issued by the Defense Information Systems Agency (DISA). The amendment requests quotes to provide, install, and maintain a channelized OC-12 (622.08MB) telecommunications circuit connecting two specific locations: Building NH-95 in Norfolk, VA and Building 2904 at Seymour Johnson Air Force Base in NC for a 60-month period with no basic termination liability.

Key details include a service date of September 11, 2025, with quote submissions due by April 21, 2025 at 12:30 PM CDT. Contractors must provide comprehensive technical information about circuit installation, including sub-contractor details, network configuration, and testing parameters. The solicitation requires stringent performance standards, including 99.5% availability, specific error performance thresholds, and a one-hour response time for trouble repairs. This is a re-award of a current service, and the lowest price technically acceptable (LPTA) source selection process will be used to evaluate quotes.

View the file

Other files

File Type Posted
Vendor Block Sample_Version3.pptx PPTX presentation
HC101325QA192_v0.zip ZIP file
Vendor Sample Maps Version2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IQO INQUIRY

FM: PL8211

TO: Contractors

DATE (MM/DD/YYYY): 4/15/2025

SUBJECT: HC101325QA192-0001 Amend: 0001

A. TYPE ACTION: AMEND

1. PURPOSE: AMEND 0001 ISSUED TO UPDATE POCS FOR ALL SEYMOUR JOHNSON

SERVICE POINTS, SERVICE DATE AND QUOTE DUE DATE. ALL ELSE REMAINS THE SAME.

1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A CHANNELIZED OC-12

(622.08MB) BETWEEN (BLDG) NH-95,(ROOM) A141, 7927 INGERSOL STREET, NORFOLK,

VA(HMPTNRDS/CCI) AND (BLDG)2904,(ROOM) FRAME, 1195 JABARA AVENUE, SEYMOUR

JOHNSON AFB, NC(SYMJHAFB/CCI) FOR 60 MONTHS WITH NO BASIC TERMINATION

LIABILITY (BTL).

2. CONTRACTORS MUST ADDRESS TESTING & ACCEPTANCE COMPLIANCE IN PROPOSAL/

QUOTE WITH UNDERSTAND/WILL COMPLY.

3. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL

REQUIREMENTS OF THIS SOLICITATION. CONTRACTORS MUST ALSO READ AND COMPLY

DITCO ADDITIONAL TELECOMMUNICATIONS TEXT (DATT) AND FEDERAL ACQUISITION

REGULATION (FAR) CLAUSES AND ADDRESS SPECIFIC INSTRUCTIONS IN DATT 4, 7, 52 AND

53 AND OTHER THAT REQUIRE ADDITIONAL INFORMATION TO BE IN COMPLIANCE.

4. THE SERVICE DATE TO BE MET IS: 11 SEP 25

5. CONTRACTORS MUST CONSIDER ALL ISSUES THAT MAY DELAY THE DELIVERY OF

CIRCUIT ON APPROVED SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR

REQUEST CONSIDERATION IAW DATT 42 FOR FAILURE TO MEETCONTRACTUAL SERVICE

DATE.

6. QUOTES MUST INCLUDE AS MUCH INFORMATION ABOUT HOW CIRCUIT WILL BE

INSTALLED. I.E. NAME AND INFORMATION ABOUT SUB-ONTRACTOR/LONG HAUL

PROVIDER/OTHER CARRIER INSTALLING CIRCUIT IS ON NET/OFF NET, RTD, JUMBO

FRAMING, TESTING AND OTHER APPLICABLE TECHNICAL INFORMATION. FURTHERMORE,

IF A BUILD IS REQUIRED TO INSTALL, VENDOR MUST INDICATE THE SCOPE OF THE BUILD

(LENGTH, BURIED/AERIAL, TRENCHING/DIRECTIONAL BORING, NEW CONDUIT).

7. ESTABLISH TSP: TSP0F672X-01

8. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION

HC101325QA193/SG05FEB259210.

9. TESTING & ACCEPTANCE - PARAMETERS:

HC101325QA192-0001

1) VENDOR MUST DELIVER OC-12 SERVICE 2W (UNPROTECTED) FROM LOCATION STATED

IN PARAGRAPH 3. 2) REQUEST VENDOR PROVIDE LIGHT LEVEL READINGS (DB LOSS) ON

EXTENSION FROM THE COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY

POINT (SDP) AT BOTH LOCATIONS. LIGHT LEVELS MUST BE ADJUSTED TO -10 TO -18. 3)

VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT

ALL TERMINATING GOVERNMENT LOCATIONS. VENDOR MUST COORDINATE SITE VISIT

WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT

BOTH USER LOCATIONS. 4) VENDOR MUST CONTACT IMPLEMENTATION ASSISTANCE

TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS FOR TURN-UP OR

ANY SITE CONTACT ISSUES. 5) INSTALLATION AND MAINTENANCE: IAW THE UNIQUE

INSTALLATION FACTORS IN PARAGRAPH 3. 6) VENDOR REQUIRED TO HAVE CIRCUIT

VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES. 7) VENDOR MUST HAVE A 24X7 NETWORK

OPERATIONS CENTER. 8) REQUEST ONE-HOUR RESPONSE TIME TURN-AROUND TO

REPAIR ONCE TROUBLE-CALL HAS BEEN REPORTED. 9) TECHNICAL SPECIFICATIONS

FIBER TERMINATION: OPTICAL, SINGLE MODE, 1310NM PHYSICAL TERMINATION: SC/SC

CONNECTORS FRAME FORMAT: STS-12 RATE: PLUS OR MINUS 20 PPM CHANNELIZATION

REQUIRED: NO CONCATENATION REQUIRED: NO GFE CLOCKING: VENDOR ESFU (OR

EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT. 10) NO NETWORK INTERFACE

UNIT 11) DEDICATED PATH 12) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE

TO USERS 24 HOURS A DAY, SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER. 13)

TESTING PARAMETERS AND THRESHOLDS: ERROR PERFORMANCE (AVAILABILITY, SES,

DM, EFS) AND LOSS OF BIT COUNT INTEGRITY SHALL BE MEASURED AND RECORDED

OVER THE DURATION OF THE CONTIGUOUS 72 HOUR TESTING INTERVAL AND SHALL

BE MEASURED AND RECORDED PER DEFINITION IN ITU RECOMMENDATION G.826 AND

M.2100. ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER

THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR

BETTER SEVERELY ERRORED SECONDS (SES) SHALL BE LESS THAN 0.02% DEGRADED

MINUTES (DM) SHALL BE LESS THAN 0.2% ERROR FREE SECONDS (EFS) SHALL BE

GREATER THAN 99% 15) LOSS OF BIT COUNT INTEGRITY (LBCI): LOSS OF BIT COUNT

INTEGRITY SHALL BE MONITORED ONLY BY THE FOLLOWING METHOD: USING TEST

EQUIPMENT WHICH CAN DETECT AND MEASURE THE OCCURRENCE OF THE INSERTION

OR DELETION OF ONE OR MORE BITS INTO THE DIGITAL BIT STREAM, ON MANY

MANUFACTURERS BERT TEST EQUIPMENT THIS IS MONITORED USING THE "PATTERN

SLIP" PARAMETER WHERE EVERY OCCURRENCE OF A PATTERN SLIP "EVENT" MARKS

THE OCCURRENCE OF A LBCI (RATHER THAN THE RAW TOTAL NUMBER OF PATTERN

SLIPS ACCUMULATED OVER A TESTING INTERVAL) MEAN TIME TO LOSS OF BIT COUNT

INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS. ROUND TRIP DELAY (RTD):

UP TO 500 AIR-MILES THE RTD SHALL BE LESS THAN OR EQUAL TO (10) MILLISECONDS.

ABOVE 500 AIR-MILES THE RTD SHALL BE LESS THAN OR EQUAL TO 1 MILLISECOND

DELAY PER (120 ROUND TRIP)/(60 ONE WAY) AIR-MILES. THE VENDOR'S FDP INSTALLED

IN THEIR COMMERCIAL SUITE. VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS

ORDER THE EXACT TERMINATION POINT WHEN SERVICE IS COMPLETE. VENDOR MUST

CONDUCT A SATISFACTORY 72 HOUR END TO END TEST IAW ITU STANDARD M.2101 PRIOR

TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE TESTING. THE END TO END TEST

WILL NOT BE COMPLETED WITH LOOPS. THE VENDOR TEST SET/SETS MUST HAVE THE

ABILITY TO PRINT OR ELECTRONICALLY OUTPUT THE TEST RESULTS AND THOSE RESULTS

MUST BE E-MAILED TO THE ACCEPTING AUTHORITY FOR REVIEW. ALL EQUIPMENT AND

CIRCUIT PROBLEMS WILL BE REPORTED TO THE CONUS IP BACKBONE E&I GROUP: (C)

618-418-9950 TOLL FREE: 855-868-9950 VENDOR MUST PROVIDE THE LONG HAUL CIRCUIT

NO. AND LEC CKT ID PRIOR TO TURN UP TO THE GOVERNMENT. S. COMPLETION REPORT:

(1) STATION DESIGNATED IN PARAGRAPH 2H AS CCO/CMO WILL SUBMIT COMPLETION

REPORT IAW DISAC 310-130-1, SUPP 1, 2, 3 FORMAT OR DISAC 310-70-1. REPORT WILL

BE ADDRESSED TO ORIGINATOR AND ALL ADDRESSEES OF THIS (TSO). (2) STATIONS

IN PARA 3 OF THIS (TSO) ARE RESPONSIBLE FOR VERIFYING IN-STATION DETAILS AND

FORWARDING THE CORRECT INFORMATION, IF ANY DISCREPANCIES ARE NOTED, TO THE

CCO/CMO DESIGNATED IN PARA 2H. THE CCO/CMO WILL SUBMIT CORRECTIONS TO DISA

VIA "EXCEPTION REPORT" IAW DISAC 310-130-1, CHAP 2. T.

7) ***ATTENTION SEYMOUR JOHNSON LOCATION*** DIVERSITY IS NOT REQUIRED. 8)

THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAW INGS FOR

TECHNICAL REVIEW SHOWING THE ROUTE FROM THE COMMERCIAL D EMARCS TO THE

SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. D RAWINGS MUST INCLUDE

TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD) . ADDITIONALLY, THE VENDOR IS TO

PROVIDE DITCO WITH DETAILED CIRC UIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML

FORMAT, IDENTIFYING ALL POINTS OF PRESENCE (POP) FOR PROPOSAL EVALUATION AND

AS A FI NAL RECORD OF THE INSTALLED PATH. THESE DIAGRAMS MUST BE PROVIDE D TO

DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-PROVISIONING-TEAM@MAIL. MIL) FOR HISTORICAL

PURPOSES. 8. SITE SURVEYS ARE AUTHORIZED AT BOTH GOVERNMENT SITES.

1) VENDOR MUST MEET SVC DATE. 2) CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: STS-12, 1310NM RATE: PLUS OR MINUS 20 PPM

(B) GOVERNMENT PROPOSED CHANNELIZATION: 9 STS-1S (TIMESLOTS 1-9) 1 STS-3CS

(TIMESLOTS 10-12) (C) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO

USERS 24 HOURS A DAY, SEVEN DAYS PER WEEK, AT LEAST 99.5% OF THE TIME OR IAW

THE APPROVED TARIFFS. (D) ONE-HOUR RESPONSE TIME TURN-AROUND MUST OCCUR

TO REPAIR ONCE TROUBLE-CALL HAS BEEN REPORTED. (E) GFE CLOCKING: VENDOR

ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT. (F) SINGLE MODE FIBER

TERMINATIONS "SC" CONNECTORS. (G) NO NETWORK INTERFACE UNIT. (H) DEDICATED

PATH. (I) CARRIER REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT

OUTAGES. (J) VENDOR MUST CONDUCT A SATISFACTORY 72 HOUR END TO END TEST

UTILIZING A 2E23 TEST PATTERN IAW ANSI STANDARD T1.514. ADDITIONALLY, VENDOR

MUST CONDUCT SATISFACTORY CONTINUITY CHECKS AND INITIAL 15 MINUTE END TO

END TEST ON EACH STS-1. AFTER COMPLETION OF CONTINUITY CHECKS AND INITIAL

TESTING, VENDOR MUST COMPLETE A SATISFACTORY 72 HOUR END TO END TEST ON THE

FIRST STS-1 (TIME-SLOT NUMBER 1) END TO END PRIOR TO TURNING OVER THE OC-12 TO

THE ACCEPTING AUTHORITY. THE VENDOR TEST SET/SETS MUST HAVE THE ABILITY TO

PRINT THE TEST RESULTS AND THOSE RESULTS MUST BE E-MAILED TO THE ACCEPTING

AUTHORITY FOR REVIEW. (K) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONAL

CENTER. (L) OC-12 SERVICE WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY

THE DGOC: PRI POC: DISA GLOBAL CASA INFRASTRUCTURE INTEGRATION LEASE BB

TEAM PHONE: (C) 618-418-9813, (D) 418-9813 EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-

INFRASTRUCTURE-INTEGRATION-L EASE-BB-T@MAIL.MIL ALT POC: ORGANIZATIONAL

NUMBER (CASA RF CIRCUI T ACTIVATIONS) PHONE: (C) 618-418-8691, (D) 418-8691 EMAIL:

DISA. SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL (M) THE VENDOR MUST

PROVIDE THE LONG HAUL CIRCUIT NUMBER AND THE 1-800 TROUBLE REPORT NUMBER

TO THE ACCEPTING AUTHORITY PRIOR TO THE GOVERNMENT ACCEPTING SERVICE.

INSIDE WIRING MUST BE COMPLETED AND TESTED PROPERLY IAW THE ORDER PRIOR

TO TURN-UP TO THE GOVERNMENT. 3) VENDOR IS RESPONSIBLE FOR INSTALLATION

AND MAINTENANCE OF OC-12 SERVICE IAW UNIQUE INSTALLATION FACTORS. 4) INSIDE

WIRING IS AUTHORIZED IAW WITH THE UNIQUE INSTALLATION FACTORS. 5) VENDOR

MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING

ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 6) FOR UNSATISFACTORY SERVICE

OR TO REPORT EQUIPMENT AND/OR CIRCUIT PROBLEMS INVOLVING DISA PROVIDED

TRANSPORT AND/OR EQUIPMENT, PLEASE CONTACT THE DISN CUSTOMER CONTACT

CENTER (DCCC) SCOTT AFB, IL. TOLL FREE: 1-855-868-9500, COML: 618-418-9500,

DSN: 312-418-9500. 7) DD FORM 1368 WILL BE SUBMITTED ON THIS TRUNK IAW THE

"PROCUREMENT GUIDE FOR TELECOMMUNICATIONS" BY THE STATION DESIGNATED AS

CCO/CMO. GUIDANCE ON SUBMISSION IS AVAILABLE AT HTTPS://WWW.DITCO.DISA.MIL/

DOCS/PROCUREMENTGUIDEFORTELECOMM UNICATIONS.PDF

MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:

622.08MB/S 20 PPM. LINE CODE: OPTIC FRAME FORMAT: SONET/STS-12 1) TEST AND

ACCEPTANCE: FIBER OPTIC OC-12 CIRCUITS SHALL PASS A FULLY DOCUMENTED

SATISFACTORY 72 HOUR SOAK TEST BY THE GOC AT SCOTT AFB, IL. PRIMARY: (C)

618-418-8691 (D) 418-8691. 2) TESTING PARAMETERS AND THRESHOLDS: THE FOLLOWING

TESTING PARAMETERS SHALL BE MEASURED DURING TEST AND ACCEPTANCE TESTING.

ERROR PERFORMANCE (AVAILABILITY, SES, DM, EFS) AND LOSS OF BIT COUNT INTEGRITY

SHALL BE MEASURED AND RECORDED OVER THE DURATION OF THE CONTIGUOUS 72

HOUR TESTING INTERVAL AND SHALL BE MEASURED AND RECORDED PER DEFINITION

IN ITU RECOMMENDATION G.826 AND M.2100. 3) ERROR PERFORMANCE: ERROR

PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER THRESHOLDS TO

BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5%. SEVERELY ERRORED

SECONDS (SES) SHALL BE LESS THAN 0.02%. DEGRADED MINUTES (DM) SHALL BE LESS

THAN 0.2%. ERROR FREE SECONDS (EFS) SHALL BE GREATER THAN 99%. 4) LOSS OF

BIT COUNT INTEGRITY (LBCI): LOSS OF BIT COUNT INTEGRITY SHALL BE MONITORED

ONLY BY THE FOLLOWING METHOD: USING TEST EQUIPMENT WHICH CAN DETECT AND

MEASURE THE OCCURRENCE OF THE INSERTION OR DELETION OF ONE OR MORE BITS

INTO THE DIGITAL BIT STREAM, ON MANY MANUFACTURERS BERT TEST EQUIPMENT THIS

IS MONITORED USING THE "PATTERN SLIP" PARAMETER WHERE EVERY OCCURRENCE

OF A PATTERN SLIP "EVENT" MARKS THE OCCURRENCE OF A LBCI (RATHER THAN THE

RAW TOTAL NUMBER OF PATTERN SLIPS ACCUMULATED OVER A TESTING INTERVAL).

X. 5) MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER

THAN 24 HOURS. 6) ROUND TRIP DELAY (RTD) FOR THIS OC-12 WILL BE MEASURED IN

MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE

CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR

EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION.

THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP

AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA

IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.

10. THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAW INGS FOR

TECHNICAL REVIEW SHOWING THE ROUTE FROM THE COMMERCIAL D EMARCS TO THE

SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. D RAWINGS MUST INCLUDE

TOTAL FIBER MILES AND ROUND-TRIP DELAY (RTD) . ADDITIONALLY, THE VENDOR IS TO

PROVIDE DITCO WITH DETAILED CIRC UIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML

FORMAT, IDENTIFYING ALL POINTS OF PRESENCE (POP) FOR PROPOSAL EVALUATION AND

AS A FI NAL RECORD OF THE INSTALLED PATH. THESE DIAGRAMS MUST BE PROVIDED TO

DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-PROVISIONING-TEAM@MAIL. MIL) FOR EVALUATION

AND APPROVAL.

11. CONTRACTORS MUST COORDINATE THE IMPLEMENTATION, END-TO-END

TESTING, AND 72-HOUR TEST RESULTS WITH THE DISA IMPLEMENTATION TEAM AT

DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTUREINTEGRATION-LEASE-BB-T@MAIL.MIL.

CONTRACTORS WILL BE GIVEN STEP BY STEP INSTRUCTIONS THAT MUST BE FOLLOWED

TO GET CIRCUIT GOVERNMENT ACCEPTANCE BEFORE SUBMITTING NOC. USE FOR DISA

WAVE REQUIREMENTS (SG) ONLY

12. QUOTES MUST BE UPLOADED TO IDEAS. GOVERNMENT IS NOT RESPONSIBLE FOR

MISSING OR OVERLOOKED QUOTES.

13. THIS IS A REAWARD OF A CURRENT SERVICE, (PTON000048EBM). IF THE INCUMBENT

QUOTE IS EVALUATED AS THE LOWEST PRICE TECHNICABLE ACCEPTABLE, THE CURRENT

CSA WILL BE ADMINSTRATIVELY DISCONTINUED USING THE DATE PRIOR TO THE START

DATE OF NEW CSA. REMOVE IF PROCESSING A NEW LEASE/START

FAILURE TO READ AND ADDRESS ANY OF THE TECHNICAL REQUIREMENTS AND SERVICE

DATE REQUESTED IN THIS INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND

RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD.

M. ADDITIONAL INFORMATION:

3. TSR NUMBER: SG05FEB259211

4. CCSD: DIYU69C3

Z. DITCO CONTACT:

Jennifer Voss

667-890-7560 jennifer.n.voss.civ@mail.mil

Kristina M. Hoff

DITCO Contracting Officer

Unless otherwise specified, all other terms and conditions are unchanged.

Paragraph E.SERVICE DATE change from:

Aug 3, 2025

To:

Sep 11, 2025

Paragraph M.3.TSR NUMBER change from:

SG05FEB259211A

SG05FEB259211

Paragraph V.QUOTE DUE DATE AND TIME change from:

Apr 5, 2025 12:30:00 PM CDT

Apr 21, 2025 12:30:00 PM CDT

Location B, CONTACT change from:

PRI: NICHOLAS GERSPER, D722-4990, C919-722-4990

EMAIL: NICHOLAS.GERSPER@US.AF.MIL

ALT: ALEXANDRIA.COBEDESH, D722-4990, C919-722-4990

EMAIL: ALEXANDRIA.COBEDESH@US.AF.MIL

ORG EMAIL: CIRCUIT.ACTIONS7@US.AF.MIL

To:

CONTACT: (PMRY POC) SERGEANT (AIR FORCE, MARINE) ELY S LINARES;(UNCLASS ORG) ELY.LINARES@US.AF.MIL;

(CMCL) 1-919-722-2666

(ALT POC) SENIOR AIRMAN AIR FORCE THOMAS CRUZ; (UNCLASS USER)

THOMAS.CRUZ.4@US.AF.MIL; (CMCL) 919-722-2666; (DSN) 722-2666

File details come from the government source that posted it. Updated .