HC101323QA228 ADDITIONAL TESTING AND INSTALLATION REQUIREMENTS .pdf
PDF 103 KB Posted
- Solicitation number
- HC101323QA228
- Issued by
-
Defense Information Systems Agency
About this file
This document outlines requirements for a federal contract solicitation to provide, install, and maintain a 1 gigabit Ethernet circuit between two specified locations. The solicitation requests quotes to engineer and provision a totally diverse 1Gb Ethernet circuit on diverse physical paths with a minimum 50 meter separation. The circuit must be installed and tested according to detailed specifications including 24-hour end-to-end testing at the committed information rate, provision of drawings showing fiber routes and separation distances, conducting site surveys, maintaining 24/7 network monitoring, and coordinating with the Defense Information Systems Agency for testing, acceptance, and activation. The selected vendor will be responsible for ongoing operations, maintenance, and administration of the circuit to meet stringent availability, frame loss, jitter, and other error performance requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDITIONAL TESTING AND INSTALLATION REQUIREMENTS
***ATTENTION LEMOORE LOCATION***
1. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY
DIVERSE END TO END TO THE GOVERNMENT'S SERVICE DELIVERY POINTS
(SDP'S) FROM TSR RU24MAY238580
2. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH TSR
RU24MAY238580 AND AWARDED AS A PAIR TO A SINGLE VENDOR TO ENSURE
DIVERSITY
3. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY
DIVERSE END TO END TO GOVERNMENT'S SERVICE DELIVERY POINTS
(SDP'S) FROM TSR RU24MAY238580, MEANING THAT PHYSICAL PATHS ARE
TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, (CENTRAL OFFICE
LOCATIONS), AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM THERE
MUST BE A 50 METER PHYSICAL SEPARATION FROM TSR RU24MAY238580.
4. THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWI
NGS FOR TECHNICAL REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL D
EMARCS TO THE SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. D
RAWINGS MUST INCLUDE SEPARATION DISTANCES BETWEEN DIVERSE REQUIRE
MENTS, TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD), AND FIBER RO
UTES RED LINED END TO END SO THE GOVERNMENT CAN CONFIRM PHYSICAL
END TO END DIVERSITY REQUIREMENTS ARE MET. ADDITIONALLY, THE VEND
OR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH CONNECTIVITY DI
AGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF PRESENCE
(POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH
. THESE DIAGRAMS MUST BE PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE.
MBX.IE16-PROVISIONING-TEAM@MAIL.MIL) FOR HISTORICAL PURPOSES.
***THE 50 METER SEPARATION IS WAIVED INSIDE BLDG 740 FOR LEMOORE
LOCATION.***
TEST & ACCEPTANCE INSTRUCTIONS:
1. 1G TESTING CRITERIA: VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING
48 HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING.
2. THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE
DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN
THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THEIR OR LOCAL
EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE
"Z" LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE
COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE
TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT
THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER
TO THE GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST
THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING
METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE
COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564.
3. THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH
IN DBM) ON THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT
SERVICE DELIVERY POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO
CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN
SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3.0 TO -9.0 DBM.
4. THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72
HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C)
618-418-8627 (D) 418-8627.
5. THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE
GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D)
418-8627
CIRCUIT SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS:
LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM
LINE CODE: ETHERNET
1. FIBER TERMINATION FRAME FORMAT OF ETHERNET, 802.3AE, 1310NM
2. THROUGHPUT SHALL BE REPORTED AS LAYER 2 (L2) CIR. CIR: 1G
LEASED CIRCUITS, THE VENDOR/TP IS REQUIRED TO DELIVER THE LAYER 2
CIR THROUGHPUT OF 988.49 MBPS USING THE SPECIFIED EMIX FRAME
PATTERN ABCDEFGH OF CORROSPONDING FRAME SIZES OF 64, 128, 256,
512, 1024, 1280, 1518 AND 9000 BYTES
3. RTD: ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL
BE MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY
POINT (SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT
(SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 10
MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION.
NOTE: FOR LOCATIONS THAT HAVE A TOTAL FIBER ROUTE DISTANCE OVER
600 MILES (ONE WAY), WHERE THE 10 MILLISECONDS RTD SPECIFICATION
CANNOT REASONABLE BE MET, THE RTD SHALL BE LESS THAN OR EQUAL TO
10 MILLISECONDS PER 350 MILES MEASURED IN A STRAIGHT LINE BETWEEN
THE A AND Z LOCATIONS.THE GOVERNMENT ACCEPTING AUTHORITY WILL
CONFIRM THE RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES
NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA IE161 WILL NOTIFY
DITCO IMMEDIATELY IN WRITING.
4. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE
FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE:
(A) AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER.
(B) FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT
HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS.
(C) JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN
10 MSEC.
5. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE
GREATER THAN 24 HOURS.
6. THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO
INSTALLATION AT BOTH LOCATIONS.
7. VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER
8. VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY
CIRCUIT OUTAGES.
9. TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND
ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.
10. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN
ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER
LOCATIONS.
11. VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS
PRIOR TO BEGINNING THEIR END-TO-END TESTING.
12. THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE
COORDINATION AND ACTIVATION PROCESS. PHONE: (C) 618-418-8627,
(D) 418-8627.
13. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE
TO THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP,
SCOTT AFB, IL. PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL
FREE: 855-868-9950.
IMPLEMENTATION ASSISTANCE:
FOR SERVICE ACTIVATION INQUIRIES/SCHEDULING/ASSISTANCE, CONTACT
THE DISA GLOBAL SERVICE ACTIVATIONS: DSN 312-418-8627 OPT 1,
CMCL 001-618-418-8627 OPT 1.
File details come from the government source that posted it. Updated .