IQO INQUIRY
FM: PL8212
TO: Contractors
DATE (MM/DD/YYYY): 12/28/2022
SUBJECT: HC101323QA002-0001 Amend: 0001
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: HC101323QA002-0001 UPDATES THE PURPOSE STATEMENT AND PROPOSAL
DUE DATE/SERVICE DATE:
1. PROVIDE, INSTALL AND MAINTAIN A DISN 10MPS LAYER 2 ETHERNET CIRCUIT FROM
US EMBASSY IN MEXICO CITY TO MECHANICSBURG, PA; HOWEVER, LEASE IS REQUIRED
FROM SAN ANTONIO, TX TO EMBASSY IN MEXICO.
2. CHANGE THE PROPOSAL DUE DATE TO 12 JAN 23 AND THE SERVICE DATE TO 28 FEB 23.
3. EVERYTHING ELSE REMAINS THE SAME
*****ORIGINAL DATA*****
SUBMIT A QUOTE TO:
1. PROVIDE, INSTALL AND MAINTAIN A DISN 10MPS LAYER 2 ETHERNET CIRCUIT BETWEEN
DISA DECC IN MECHANICSBURG, PA AND THE US EMBASSY IN MEXICO CITY.
*****REMARKS*****
1. REQUESTING DISN FOR THE ENTIRE PATH IF POSSIBLE. A TAIL-LEASE IF NEEDED WILL
ALSO BE ACCEPTABLE PROVIDED DISN IS USED AS MUCH AS AVAILABLE.
2. VENDOR MAY AND IS ENCOURAGED TO PERFORM A SITE SURVEY AND SUBMIT THEIR
ENGINEERING SOLUTION TO THE GOVERNMENT PRIOR TO CONTRACT AWARD.
3. TSP IS BEING ESTABLISHED WITH THIS REQUIREMENT.
4. CONTRACTOR MUST CONTACT THE BELOW LISTED POC AT LEAST 72 HRS PRIOR TO
INSTALLATION. CONTACT INFORMATION WILL BE PROVIDED AT TIME OF AWARD.
5. SERVICE AVAILABILITY 99.5% OR BETTER, WITH 30 MINUTE RESPONSE; 2 HOUR
RESTORAL; UPDATES PROVIDED EVERY 60 MINUTES UNTIL CIRCUIT IS FULLY TESTED AND
OPERATIONAL. VENDOR MUST HAVE 24 HOUR MONITORING FACILITIES AND EQUIPMENT
TO TROUBLESHOOT PATH AND ASSOCIATED EQUIPMENT AFTER INSTALLATION.
A. COMPLETE OUTAGE: INTERFACE OR PROTOCOL NON-OPERATIONAL RESPONSE TIME
FROM INITIAL REPORT OR DETECTION OF CIRCUIT DOWN WILL BE 30 MINUTES AND THE
MEAN RESTORE TIME TO REPAIR (MTTR) MUST BE 120 MINUTES.
B. IMPAIRMENT: IMPAIRED THROUGHPUT OR IMPAIRED CIRCUIT OPERTION (EG. LATENCY
ISSUES, INTERMITTENTLY FLAPPING/BOUNCING, INTERMITTENT ISSUES) RESPONSE TIME
FROM INITIAL REPORT OR DETECTION OF CIRCUIT IMPAIRMENT WILL BE 30 MINUTES AND
THE MEAN RESTORE TIME TO REPAIR (MTTR) MUST BE 240 MINUTES.
HC101323QA002-0001
6. CIRCUIT MUST AVOID SATELLITE LINKS.
7. CIRCUIT SPECIFICATIONS: VENDOR WILL PERFORM ACCEPTANCE TESTING IN
ACCORDANCE WITH EITHER RFC-6815 OR ITU-T Y.1564. SPECIFICALLY, FRAME SIZES OF
64, 128, 256, 512, 1024, 1280 AND 1518 BYTES MUST BE USED. THE TEST MUST VERIFY
LENGHT OF RECEIVED FRAMES, INDICATE NUMBER OF FRAMES DROPPED, NUMBER
OF FRAMES RECIEVED OUT OF ORDER, AND DUPLICATE FRAMES. TEST MUST BE BI-
DIRECTIONAL USING THE SAME DATA RATE IN EACH DIRECTION. BURST TESTS MUST BE
RUN TO DETERMINE MINIMUM INTERVAL BETWEEN FRAMES THAT CAN BE PROCESSED
WITHOUT FRAME LOSS.
A THROUGHPUT TEST IS REQUIRED INDICATING THE FASTEST RATE AT WHICH TEST
FRAME CAN BE TRANSMITTED WITHOUT FRAME LOSS. A SEPARATE THROUGHPUT TEST
MUST BE RUN WITH FRAMES ADDRESSED TO THE HARDWARE BROADCAST ADDRESS
CONSTITUTING AT LEAST 1% OF THE TEST STREAM AND BE EVENLY DISTRIBUTED
THROUGHOUT THE TEST. A LATENCY TEST MUST BE RUN FOR A PERIOD OF NO LESS
THAN 120 SECONDS, AND REPEATED NO LESS THAN 20 TIMES. THE TEST STREAM FOR
THE LATENCY TEST SHOULD BE RUN AT THE THROUGHPUT RATE FOR CORRESPONDING
FRAME SAIZES FROM THE THROUGHPUT TEST. END TO END LATECY WILL BE
CALCULATED AS THE AVERAGE OVER THE 20 TESTS RUN. FRAME LOSS RATE TESTS
SHOULD BE RUN AT THE FRAME RATE CORRESPONDING TO THE MAXIMUM FRAME RATE,
AND REDUCED BY 10% INTERVALS UNTIL THERE ARE AT LEAST TWO CONSECUTIVE RUNS
IN WHICH NO FRAMES ARE LOST.
THROUGHPUT TEST RESULTS: PASSING RATE 100% FOR ALL FRAME BYTE SIZES
EXERCISED. FRAME LOSS RATE (%) RESULTS: FRAME LOSS RATE LESS THAN 0.01% FOR
ALL FRAME BYTE SIZES EXERCIESED. LATENCY WILL BE MEASURED IN ACCORDANCE TO
THE FOLLOWING MAXIMUM TRANSMISSION DELAY FOR ANY CIRCUIT UP TO 500 MILES
AIR-MILES IN LENGHT SHALL BE NO GREATER THAN 13MS ONE-WAY AND ANY POINT-TO-
POINT CIRCUIT LONGER THAN 500 AIR-MILES SHALL BE NO GREATER THAN 50MS ONE WAY
WITHIN THE 48 CONTINENTAL STATES.
ANY APS SWITCHOVER SHALL TAKE LESS THAN 50 MILLISECONDS MONTHLY AVAILABILITY
SHALL BE NO LESS THAN 99.5%
A. VENDOR MUST PROVIDE THE LONG HAUL CIRCUIT NO. AND LEC CKT ID PRIOR TO TURN
UP TO THE GOVERNMENT.
B. VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT
ALL TERMINATING GOVERNMENT LOCATIONS. VENDOR MUST COORDINATE SITE VISIT
WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH
USER LOCATIONS.
C. VENDOR MUST CONTACT IMPLEMENTATION ASSISTANCE TO ESTABLISH THE
COORDINATION AND ACTIVATION PROCESS FOR TURN-UP OR ANY SITE CONTACT ISSUES.
D. INSTALLATION AND MAINTENANCE: IAW THE UNIQUE INSTALLATION FACTORS
E. VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.
F. THE VENDOR TEST SET/SETS MUST HAVE THE ABILITY TO PRINT OR ELECTRONICALLY
OUTPUT THE TEST RESULTS AND THOSE RESULTS MUST BE E-MAILED TO THE ACCEPTING
AUTHRITY FOR REVIEW.
8. VENDOR MUST CALL DISA NOSC AT LEAST 72 HRS PRIOR TO MAINTENANCE.
9. CUSTOMER WILL ACCEPT EARLIEST POSSIBLE INSTALL DATE. INSTALL SOONER IF
POSSIBLE (SIP).
10. JURISDICTIONAL CLASS: INTERSTATE USE 100 PERCENT
11. TECHNICAL ACCEPTABILITY EVALUATION CRITERIA: A QUOTE MUST COMPLY WITH
ALL STANDARD PROVISIONS, PROVISIONS, CLAUSES, AND ADDRESS SECTIONS F-M OF
THE SOLICITATION TO BE DEEMED TECHNICALLY ACCEPTABLE. ALL PORTIONS OF THE
SOLICITATION SHOULD BE CAREFULLY REVIEWED FOR ALL MANDATED REQUIREMENTS
OUTLINED WITHIN THE STANDARD PROVISIONS AND DOCUMENTATION REQUESTED AS
FOUND IN SECTION M AND AFFILIATED ATTACHMENTS. QUOTATIONS MUST INCLUDE
ALL REQUIRED DOCUMENTS AND RESPONSES INDICATED FROM THESE STANDARD
PROVISIONS, PROVISIONS, CLAUSES, SECTION M, AND AFFILIATED ATTACHMENTS
TO BE CONSIDERED TECHNICALLY ACCEPTABLE AND/OR ELIGIBLE FOR AWARD. IN
RESPONSE TO THIS IQO SOLICITATION, NO TERMS, CONDITIONS, OR ASSUMPTIONS WILL
BE ENTERTAINED. IF TERMS, CONDITIONS, AND/OR ASSUMPTIONS ARE INCLUDED IN
A QUOTATION, THE QUOTATION MAY BE EXCLUDED ON GROUNDS THAT IT FAILED TO
COMPLY WITH THE IQO SOLICITATION INSTRUCTIONS.
12. EVALUATION CRITERIA: IN ADDITION TO THE PROCEDURES OUTLINED IN STANDARD
PROVISION 23, TECHNICAL EVALUATION TEAM MEMBERS WILL INCLUDE GOVERNMENT
PERSONNEL AND MAY INCLUDE GOVERNMENT'S CONTRACTED ADVISORS. GOVERNMENT
PERSONNEL WILL MAKE THE FINAL DETERMINATION OF TECHNICAL ACCEPTABILITY.
13. IF THERE ARE QUESTIONS REGARDING SITE SURVEYS OR SITE INFORMATION PLEASE
CONTACT THE CONTRACT SPECIALIST LISTED ON THIS SOLICITATION PRIOR TO THE
QUOTE DUE DATE.
***NOTE: THE CONTRACTOR MUST PROVIDE TSR, CCSD OR CSA IN ALL CORRESPONDENCE
INCLUDING WHEN DELIVERING CIRCUIT TO SITE POC***
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: DO21SEP220492
4. CCSD: WIPDZRK1
Z. DITCO CONTACT:
Shawn Arentsen
618-418-6230 shawn.m.arentsen.civ@mail.mil
Emily A. Etter
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Dec 21, 2022
To:
Feb 28, 2023
Paragraph M.3.TSR NUMBER change from:
DO21SEP220492A
DO21SEP220492
Paragraph V.QUOTE DUE DATE AND TIME change from:
Nov 14, 2022 4:00:00 PM CST
Jan 12, 2023 4:00:00 PM CST