HC101322QA451_v0.zip
ZIP file 2 MB Posted
- Solicitation number
- HC101322QA451
- Issued by
-
Defense Information Systems Agency
About this file
This document outlines the details of a federal contract award notice. The contract was awarded to OpenCape Corporation on March 24, 2023 for $462,726.70 to provide, install, and maintain a point-to-point dedicated 10Gb Ethernet circuit over dedicated non-routed commercial transport using wave transport technology. The circuit must have a maximum latency of 10 milliseconds or less between Building 10828 at Wright-Patterson AFB in Ohio and Building 168 at Otis Air National Guard Base in Massachusetts. The required service date is August 3, 2023, and delays may result in liquidated damages assessed according to standard contract provisions. The circuit must be engineered and provisioned with fully diverse physical paths from the government delivery points, including having at least 50 meters of physical separation, from another related circuit being provisioned under a separate inquiry number. The Defense Information Systems Agency is the awarding agency.
1. IN ACCORDANCE WITH INQUIRY HC101322QA451, PROCEED TO PROVIDE, INSTALL, AND MAINTAIN A PT-TO-PT DEDICATED 10GB ETHERNET OVER DEDICATED, NON-ROUTED COMMERCIAL TRANSPORT USING WAVE TRANSPORT TECHNOLOGY WITH 10GB ETHERNET (LAN-PHY) HAND-OFF BETWEEN BLDG 10828, ROOM 8110A, 4180 WATSON WAY WRIGHT-PATTERSON AFB, OH 45433/CCI AND BLDG 168; RM 212, 168 IZZEA STREET, OTIS AIR NATIONAL GUARD BASE, MA, 02542/CCI. A. THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. NOTE: FOR LOCATIONS THAT HAVE A TOTAL FIBER ROUTE DISTANCE OVER 600 MILES (ONE WAY), WHERE THE 10 MILLISECONDS RTD SPECIFICATION CANNOT REASONABLE BE MET, THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS PER 350 MILES MEASURED IN A STRAIGHT LINE BETWEEN THE A AND Z LOCATIONS. B. AVOID DISA MPLS/IP TRANSPORT SERVICES. 2. THE SERVICE DATE TO BE MET IS: 03 AUG 23 (SIP). THE GOVERNMENT WILL ASSESS CONSIDERATION IAW STANDARD PROVISION 42 FOR DELAY ON DELIVERY OF CIRCUIT ON CONTRACTED SERVICE DATE. 3. SEE ATTACHMENTS AND UNIQUE INSTALLATION FACTORS FOR TECHNICAL REQUIREMENTS SPECIFIC TO THIS ORDER. 4. CONTRACTOR MUST UPLOAD NOTICE OF COMPLETION IN IDEAS. 5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH INQUIRY# HC101322QA452 / TSR# AZ26MAR206601 AND MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS (SDP) FROM INQUIRY# HC101322QA451 / TSR# AZ26MAR206605; MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MANHOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM INQUIRY# HC101322QA452 / TSR# AZ26MAR206601.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .