This is an amendment to a solicitation seeking quotes to provide, install, and maintain a 10Gbps non-switched Ethernet circuit between two buildings in California. Vendors are required to submit color powerpoint drawings showing end to end diverse physical routing with separation distances and round trip delays. Quotes are due by June 27, 2022 and must include monthly recurring and non-recurring pricing. Award will be made to the vendor or vendors offering the lowest priced technically compliant solutions that meet the diversity and service date requirements either as a single award or split award. The Defense Information Systems Agency is the contracting agency.

View the file

Other files

File Type Posted
HC101322QA349.v0.pdf PDF
HC101322QA349 Circuit Specs and Testing.docx DOCX document
Sample Vendor Block Diagram and Maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IQO INQUIRY

FM: PL8211

TO: Contractors

DATE (MM/DD/YYYY): 6/2/2022

SUBJECT: HC101322QA349-0001 Amend: 0001

A. TYPE ACTION: ADMIN AMEND

1. PURPOSE: ***THE PURPOSE OF AMEND 0001 IS TO:***

1. EXTEND THE QUOTE DUE DATE TO 27 JUNE 2022 DUE TO ADDRESS CHANGE MADE ON

DIVERSITY PAIR SOLICITATION HC101322QA348.

ALL ELSE REMAINS UNCHANGED

1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A LEASE A 10GB, NON-

SWITCHED, ETHERNET CIRCUIT BETWEEN BLDG 33, NETWORK ROOM, 1 ADMINISTRATION

CIRCLE, CHINA LAKE NWC, CA AND BLDG 1482, ROOM 169, 1482 READ RD, NORTH ISLAND

NAS, CA

- CONTRACTOR SHALL PROVIDE ETHERNET FRAME SIZE CONFIGURED TO SUPPORT

MAXIMUM TRANSMISSION UNIT (MTU) OF 9000 (BYTES) JUMBO FRAMES

- CONTRACTORS SHALL MEET RTD OF LESS THAN OR EQUAL TO 10 MILLISECONDS PER

350 MILES MEASURED AS THE GREAT CIRCLE DISTANCE BETWEEN THE "A" AND "Z"

LOCATIONS TO SUPPORT THE GOVERNMENT MISSION. IF THE RTD CHANGES IT WOULD BE

NOTIFIED VIA AMENDMENT TO SOLICITATION.

- SEE UNIQUE INSTALL FACTS

- CUSTOMER REQUESTS SOONER IF POSSIBLE, SERVICE DATE (SIP)

- VENDOR QUOTE MUST INCLUDE THE A LOC AND Z LOC LEC’S ALONG WITH THE

VENDOR’S SUB-CONTRACTOR/LONG-HAUL PROVIDER/CARRIERS FOR THE SERVICE

-VENDOR QUOTES MUST INDICATE IF LEC’S ARE CURRENTLY ON-NET OR IF A BUILD IS

REQUIRED TO COMPLETE THE SERVICE.

- IF A BUILD IS REQUIRED TO COMPLETE THE SERVICE, VENDOR MUST INDICATE THE

SCOPE OF THE BUILD (LENGTH, BURIED/AERIAL, TRENCHING/DIRECTIONAL BORING, NEW

CONDUIT, ETC), AND VENDOR MUST INDICATE IF THE SITE HAS GRANTED PERMISSION

FOR VENDOR TO BUILD INTO THE SITE (MUST ALSO PROVIDE THE SITE POC’S NAME THAT

GRANTED PERMISSION) AND HAS SUFFICIENT SPACE, POWER AND HVAC CAPACITY TO

SUPPORT THE VENDOR EQUIPMENT AND CABLING.

2. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL

REQUIREMENTS OF THIS INQUIRY/SOLICITATION, READING AND AGREEING WITH THE

HC101322QA349-0001

STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD

PROVISION 4, AND MEET THE REQUESTED SERVICE DATE.

3.THE SERVICE DATE TO BE MET IS: 26 SEP 2022 (SIP) TO COMPLY WITH PROCUREMENT

ACQUISITION LEAD TIME (PALT) FOR THIS TYPE OF SERVICE. ANY CHANGES TO THE

ORIGINAL SERVICE DATE WILL BE NOTIFIED VIA AMENDMENT TO THE SOLICITATION AND

POSTED TO FBO. THE GOVERNMENT ASSUMES THAT CONTRACTORS HAVE CONSIDERED

ALL ISSUES THAT MAY DELAY THE DELIVERY OF CIRCUIT ON REQUESTED SERVICE

DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW

STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE.

4. CONTRACTORS MUST ENSURE THAT QUOTES SHALL INCLUDE SUFFICIENT DETAIL

FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE

GOVERNMENT REQUIREMENTS. RATHER, CONTRACTORS MUST PROVIDE CONVINCING

RATIONALE TO ADDRESS HOW THEY INTEND TO MEET THE REQUIREMENT. IN RESPONSE

TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT,

NOR ASSUMPTIONS WILL BE ACCEPTED. CONTRACTORS ARE INSTRUCTED TO SUBMIT

QUESTIONS AND REQUEST CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE

SUBMITTING QUOTES. QUOTES MUST BE UPLOADED TO IDEAS.

5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION

HC101322QA348/TSR RU07APR227811 AND MUST BE ENGINEERED AND PROVISIONED

TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS

(SDP) FROM TSR RU07APR227811; MEANING THE PHYSICAL PATHS ARE TOTALLY

SEPARATE INCLUDING MANHOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER

BUILDS. ADDITIONALLY, AS A MINIMUM MUST HAVE 50 METERS / 164 FEET PHYSICAL

SEPARATION FROM TSR RU07APR227811.

6. TO DETERMINE THE AWARDEE(S) OF DIVERSE REQUIREMENTS, THE GOVERNMENT WILL

FIRST EVALUATE THE LOWEST PRICED SOLUTION FOR EACH SOLICITATION. IF THOSE

TWO SOLUTIONS ARE DIVERSE FROM EACH OTHER AND MEET ALL REQUIREMENTS,

AWARD WILL BE MADE TO THE CONTRACTOR OR CONTRACTORS THAT PROPOSED

THE TWO SOLUTIONS. IF THE TWO LOWEST PRICED SOLUTIONS ARE NOT AWARDABLE

BECAUSE THEY ARE NOT DIVERSE FROM EACH OTHER OR DO NOT MEET REQUIREMENTS,

THE GOVERNMENT WILL EVALUATE THE NEXT LOWEST PRICED COMBINATION FOR

BOTH SOLICITATIONS UNTIL IT DETERMINES THE LOWEST PRICED COMBINATION THAT

MEETS ALL REQUIREMENTS. AWARDS WILL BE MADE AS A PAIR TO ONE CONTRACTOR

ONLY OR SPLIT THE AWARD BETWEEN TWO CONTRACTORS THAT MEET ALL TECHNICAL

REQUIREMENTS, REQUESTED SERVICE DATE AND PROPOSE THE LOWEST PRICE.

7. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES

FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR

WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE

BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES

AND ROUND-TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD

PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS

INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE

REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH

INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE DIVERSITY

THROUGHOUT THE FIBER PATH WILL BE FOUND TECHNICALLY DEFICIENT AND WILL NOT

BE ACCEPTED. (DO NOT INCLUDE THIS PARAGRAPH IN REQUIREMENTS TO BE WORKED IN

CONJUNCTION/COORDINATION UNLESS MAPS/DRAWINGS ARE REQUIRED).

8. PRE-AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) AND

SHOULD BE CONDUCTED IN COORDINATION WITH LOCAL POCS AT EACH GOVERNMENT

SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM, CONTRACTORS CONDUCT PHONE

SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF THE WORK TO BE PERFORMED IN

DETERMINING THEIR PRICE STRATEGY.

9. CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND

ACCEPTANCE REQUIREMENTS.

10. TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH CUSTOMER

ACCEPTANCE AUTHORITY BEFORE NOTICE OF COMPLETION IS SUBMITTED TO DITCO. (IF

WORKING DISA ETHERNET, WAVE, SONET (OC-03 AND HIGHER REQUIREMENTS INCLUDE

THE BELOW INFO

FOR DISA REQUIREMENTS THE TESTING AND ACCEPTING AUTHORITY IS:

DISA DSCC IE Mailbox DCP Commercial Activation

11. ESTABLISH TSP: TSP0LMUBD-01

FAILURE TO READ AND ADDRESS ANY OF THE TECHNICAL REQUIREMENTS AND SERVICE

DATE REQUESTED IN THIS INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND

RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD.

M. ADDITIONAL INFORMATION:

3. TSR NUMBER: RU07APR227812A

4. CCSD: DIR3B1N2

Z. DITCO CONTACT:

Donna Voss

DONNA.M.VOSS7.CIV@MAIL.MIL

Robert E Spencer

DITCO Contracting Officer

Unless otherwise specified, all other terms and conditions are unchanged.

Paragraph V.QUOTE DUE DATE AND TIME change from:

Jun 13, 2022 4:00:00 PM CDT

To:

Jun 27, 2022 4:00:00 PM CDT

File details come from the government source that posted it. Updated .