- ADDITIONAL INFORMATION PERTINENT TO REQUIREMENT-SG13APR227348.docx
DOCX document 19 KB Posted
- Solicitation number
- HC101322QA311
- Issued by
-
Defense Information Systems Agency
About this file
This document provides additional technical requirements for a federal contract opportunity seeking a channelized OC-12 leased circuit between two government sites. Key details include that the selected vendor must provide PowerPoint drawings showing the fiber route and connectivity diagrams in KMZ or KML format. Technical testing requirements specify frame format, rate, proposed channelization, availability, response time, and fiber terminations. The document also outlines minimum specifications for error performance, loss of bit count integrity, and round trip delay. Quotes for the channelized OC-12 lease are due by August 10, 2022 to the Defense Information Systems Agency to support mission requirements at Dyess Air Force Base.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| - HC101322QA311.v1.pdf | ||
| - Vendor Block Diagram Sample and Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDITIONAL INFORMATION PERTINENT TO REQUIREMENT
THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR TECHNICAL REVIEW SHOWING THE ROUTE FROM THE COMMERCIAL DEMARCS TO THE SUPPORTING CENTRAL OFFICES AND/ORWIRING CENTERS. DRAWINGS MUST INCLUDE TOTAL FIBER MILES ANDROUND TRIP DELAY (RTD).
ADDITIONALLY, THE VENDOR IS TOPROVIDE DITCO WITH DETAILED CIRCUIT/PATH CONNECTIVITYDIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OFPRESENCE (POP) FOR PROPOSAL EVALUATION AND AS A FINAL RECORDOF THE INSTALLED PATH. THESE DIAGRAMS MUST BE PROVIDED TODISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-PROVISIONING-TEAM@MAIL.MIL. REMARKS CONTINUED: L) FOR HISTORICAL PURPOSES.8. SITE SURVEYS ARE AUTHORIZED AT BOTH GOVERNMENT SITES.9. SINGLE MODE FIBER MUST BE ENGINEERED/PROVISIONED IN SUCH AWAY THAT THE GOVERNMENT CAN CHANGE/REVISE CHANNELIZATIONWITHOUT TELECOM PROVIDER INTERVENTION.
VENDOR MUST MEET SERVICE DATE.SITE SURVEYS ARE AUTHORIZED AT BOTH GOVERNMENT SITES. =======================================================
TESTING REQUIREMENTS
CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
(A) FIBER TERMINATION:FRAME FORMAT: STS-12, 1310NMRATE: PLUS OR MINUS 20 PPM.
(B) GOVERNMENT PROPOSED CHANNELIZATION:9 STS-1S (TIMESLOTS 1-9) 1 STS-3CS (TIMESLOTS 10-12).
(C) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS24 HOURS A DAY, SEVEN DAYS PER WEEK, AT LEAST 99.98% OF THETIME OR IAW THE APPROVED TARIFFS.
(D) ONE-HOUR RESPONSE TIME TURN-AROUND MUST OCCUR TO REPAIRONCE TROUBLE-CALL HAS BEEN REPORTED.
(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BEENGINEERED INTO CIRCUIT.
(F) SINGLE MODE FIBER TERMINATIONS "SC" CONNECTORS.
(G) NO NETWORK INTERFACE UNIT.
(H) DEDICATED PATH.
(I) CARRIER REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST INANY CIRCUIT OUTAGES.
(J) VENDOR MUST CONDUCT A SATISFACTORY 72 HOUR END TO ENDTEST UTILIZING A 2E23 TEST PATTERN IAW ANSI STANDARD T1.514.ADDITIONALLY, VENDOR MUST CONDUCT SATISFACTORY CONTINUITYCHECKS AND INITIAL 15 MINUTE END TO END TEST ON EACH STS-1.AFTER COMPLETION OF CONTINUITY CHECKS AND INITIAL TESTING,VENDOR MUST COMPLETE A SATISFACTORY 72 HOUR END TO END TESTON THE FIRST STS-1 (TIME-SLOT NUMBER 1) END TO END PRIOR TOTURNING OVER THE OC-12 TO THE ACCEPTING AUTHORITY. THEVENDOR TEST SET/SETS MUST HAVE THE ABILITY TO PRINT THE TESTRESULTS AND THOSE RESULTS MUST BE E-MAILED TO THE ACCEPTINGAUTHORITY FOR REVIEW.
(K) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONAL CENTER.
(L) OC-12 SERVICE WILL BE ACCEPTED ON BEHALF OF THEGOVERNMENT BY THE DGOC:PRI POC: DISA GLOBAL CASA INFRASTRUCTURE INTEGRATION LEASE BBM TEAM, PHONE: (C) 618-418-9813, (D) 418-9813EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-INTEGRATION-LEASE-BB-T@MAIL.MILALT POC: ORGANIZATIONAL NUMBER (CASA RF CIRCUIT ACTIVATIONS)PHONE: (C) 618-418-8691, (D) 418-8691EMAIL: DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL
(M) THE VENDOR MUST PROVIDE THE LONG HAUL CIRCUIT NUMBER ANDTHE 1-800 TROUBLE REPORT NUMBER TO THE ACCEPTING AUTHORITYPRIOR TO THE GOVERNMENT ACCEPTING SERVICE. INSIDE WIRINGMUST BE COMPLETED AND TESTED PROPERLY IAW THE ORDER PRIOR TOTURN-UP TO THE GOVERNMENT.
VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OFOC-12 SERVICE IAW UNIQUE INSTALLATION FACTORS.
INSIDE WIRING IS AUTHORIZED IAW WITH THE UNIQUEINSTALLATION FACTORS.5. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS INADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
FOR UNSATISFACTORY SERVICE OR TO REPORT EQUIPMENT AND/ORCIRCUIT PROBLEMS INVOLVING DISA PROVIDED TRANSPORT AND/OREQUIPMENT, PLEASE CONTACT THE DISN CUSTOMER CONTACT CENTER(DCCC) SCOTT AFB, IL. TOLL FREE: 1-855-868-9500, COML:618-418-9500, DSN: 312-418-9500.
MINIMUM TECHNICAL SPECIFICATIONS:
SPECIFIC FORMAT TO BE USED IS:
LINE RATE: 622.08MB/S 20 PPM.
LINE CODE: OPTIC
FRAME FORMAT: SONET/STS-12
1. TEST AND ACCEPTANCE: FIBER OPTIC OC-12 CIRCUITS SHALL PASSA FULLY DOCUMENTED SATISFACTORY 72 HOUR SOAK TEST BY THE GOCAT SCOTT AFB, IL. PRIMARY: (C) 618-418-8691 (D) 418-8691.
2. TESTING PARAMETERS AND THRESHOLDS: THE FOLLOWING TESTING PARAMETERS SHALL BE MEASURED DURING TEST AND ACCEPTANCE.
TESTING. ERROR PERFORMANCE (AVAILABILITY, SES,DM, EFS) ANDLOSS OF BIT COUNT INTEGRITY SHALL BE MEASURED AND RECORDED OVER THE DURATION OF THE CONTIGUOUS 72 HOUR TESTING INTERVALAND SHALL BE MEASURED AND RECORDED PER DEFINITION IN ITURECOMMENDATION G.826 AND M.2100.
3. ERROR PERFORMANCE:
ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWINGPARAMETER THRESHOLDS TO BE ACCEPTABLE:AVAILABILITY SHALL BE GREATER THAN 99.5%.SEVERELY ERRORED SECONDS (SES) SHALL BE LESS THAN 0.02%.DEGRADED MINUTES (DM) SHALL BE LESS THAN 0.2%.ERROR FREE SECONDS (EFS) SHALL BE GREATER THAN 99%.
4. LOSS OF BIT COUNT INTEGRITY (LBCI): LOSS OF BIT COUNTINTEGRITY SHALL BE MONITORED ONLY BY THE FOLLOWING METHOD:USING TEST EQUIPMENT WHICH CAN DETECT AND MEASURE THEOCCURRENCE OF THE INSERTION OR DELETION OF ONE OR MORE BITSINTO THE DIGITAL BIT STREAM, ON MANY MANUFACTURERS BERT TESTEQUIPMENT THIS IS MONITORED USING THE "PATTERN SLIP"PARAMETER WHERE EVERY OCCURRENCE OF A PATTERN SLIP "EVENT"MARKS THE OCCURRENCE OF A LBCI (RATHER THAN THE RAW TOTALNUMBER OF PATTERN SLIPS ACCUMULATED OVER A TESTING INTERVAL).
5. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALLBE GREATER THAN 24 HOURS.
6. ROUND TRIP DELAY (RTD) FOR THIS OC-12 WILL BE MEASURED INMILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP)SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z.THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TOEFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE GOVERNMENTACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UPAND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORSPROPOSAL, DISA IE161 WILL NOTIFY DITCO IMMEDIATELY INWRITING.
File details come from the government source that posted it. Updated .