This amended solicitation seeks quotes for telecommunications services. The selected contractor must provide, install, and maintain a 2.5Gb Wave service between Building 700, Room 104A located at 362 Otis Street in Rome, NY and Building 308, Room 203 located at 5450 Carlisle Pike in Mechanicsburg, PA for 60 months with no basic termination liability. The service must be engineered and provisioned totally diverse from an existing service and have a minimum physical separation of 50 meters. Quotes are due by May 19, 2022 and the requested service date is July 25, 2022. The solicitation is issued by the Defense Information Systems Agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101322QA265-0003.v0.pdf | ||
| Vendor Block Sample_Version3.pptx | PPTX presentation | |
| HC101322QA265.v1.pdf | ||
| Vendor Sample Maps Version2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 5/3/2022
SUBJECT: HC101322QA265-0001 Amend: 0001
A. TYPE ACTION: AMEND
1. PURPOSE: *******THE PURPOSE OF THIS AMEND IS TO REMOVE THE REQUIREMENT
FOR BURIED FIBER. ALL ELSE REMAINS UNCHANGED.********
1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 2.5GB WAVE SERVICE
BETWEEN BLDG 700, ROOM 104A, 362
OTIS STREET, ROME, NY AND BLDG 308, ROOM 203, 5450 CARLISLE PIKE,
MECHANICSBURG, PA FOR 60 MONTHS WITH NO BASIC
TERMINATION LIABILITY (BTL).
2. CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND
ACCEPTANCE REQUIREMENTS WITH “UNDERSTAND AND WILL COMPLY”
3. TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH GOVERNMENT
POC AT BOTH LOCATIONS BEFORE NOTICE OF COMPLETION IS SUBMITTED TO DITCO.
4. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS INQUIRY/SOLICITATION, READING AND AGREEING WITH THE
STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD
PROVISION 4, AND MEET THE REQUESTED SERVICE DATE.
5. THE SERVICE DATE TO BE MET IS: 5 SEP 2022 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TYPE OF SERVICE.
6. CONTRACTORS MUST CONSIDER ALL ISSUES THAT MAY DELAY THE DELIVERY OF
CIRCUIT ON APPROVED SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE,
OR REQUEST CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET
CONTRACTUAL SERVICE.
7. QUOTES MUST INCLUDE NAME AND INFORMATION ABOUT SUB-CONTRACTOR/LONG
HAUL PROVIDER/OTHER CARRIER INSTALLING CIRCUIT IS ON NET/OFF NET, RTD, JUMBO
FRAMING, TESTING AND OTHER APPLICABLE TECHNICAL INFORMATION. FURTHERMORE,
IF A BUILD IS REQUIRED TO INSTALL, VENDOR MUST INDICATE THE SCOPE OF THE BUILD
(LENGTH, BURIED/AERIAL, TRENCHING/DIRECTIONAL BORING, NEW CONDUIT, ETC.)
VENDOR MUST ALSO INDICATE IF SITE POC (S) HAVE ADVISED THAT PERMISSION FOR
BUILD AT SITE (S) WILL BE GRANTED, AND IF SITE (S) HAVE SUFFICIENT SPACE, POWER
AND HVAC CAPACITY TO SUPPORT VENDOR EQUIPMENT AND CABLING. MAPS/BLOCK
DIAGRAMS ARE AN ACCEPTABLE WAY TO PROVIDE THIS INFORMATION.
HC101322QA265-0001
8. QUOTES MUST BE UPLOADED TO IDEAS. THE GOVERNMENT IS NOT RESPONSIBLE
FOR MISSING OR OVERLOOKED QUOTES. CONTRACTORS ARE INSTRUCTED TO SUBMIT
QUESTIONS AND REQUEST CLARIFICATIONS OF REQUIREMENT (S) BEFORE SUBMITTING
QUOTES. IN RESPONSE TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON
THE GOVERNMENT, NOR ASSUMPTIONS WILL BE ACCEPTED.
9. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101322QA283/TSR SG15MAR227238 AND MUST BE ENGINEERED AND PROVISIONED
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM TSR SG15MAR227238 ; MEANING THE PHYSICAL PATHS ARE TOTALLY
SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER
BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION
FROM TSR SG15MAR227238 .
10. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE
ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/
OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS
ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS
INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE
REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH
INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE DIVERSITY
THROUHGOUT THE FIBER PATH WILL BE FOUND TECHNICALLY DEFFICIENT AND WILL NOT
BE ACCEPTED.
11. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) AND
SHOULD BE CONDUCTED IN COORDINATION WITH LOCAL POCS AT EACH GOVERNMENT
SITE.
12. AWARDS OF DIVERSE REQUIREMENTS WILL ONLY BE SPLIT BETWEEN TWO
CONTRACTORS IF THE DIVERSITY, RTD, SERVICE DATE AND LOWEST PRICE
REQUIREMENTS ARE PRESERVED.
13. ESTABLISH TSP: TSP0EWRC5-01
14. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE
END TO END TO GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM CJON:
SG15MAR227238, MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING
MAN HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS. THE
TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR
TECHNICAL REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO
THE M. SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. DRAWINGS MUST
INCLUDE SEPARATION DISTANCES BETWEEN DIVERSE REQUIREMENTS, TOTAL FIBER
MILES AND ROUND TRIP DELAY (RTD), AND FIBER ROUTES RED LINED END TO END SO
THE GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY REQUIREMENTS
ARE MET. ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/
PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF
PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH. 8.
THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON THE
EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY POINT
(SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT
ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9
DBM. 9. THE VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY
LOCATIONS, IAW UNIQUE INSTALLATION FACTORS. 10. THE VENDOR MUST CONDUCT
WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT BOTH LOCATIONS. 11. THE
VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION
GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND
ACTIVATION PROCESS. PHONE: (C) 618-418-8627, (D) 418-8627. 12. THE VENDOR MUST
CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR END-
TO-END TESTING. PHONE: (C) 618-418-8627, (D) 418-8627. 13. THE PROVIDER MUST
CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL
EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION
TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE
AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL
DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE N. TEST & ACCEPTANCE
INSTRUCTIONS: TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND
AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE
GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR
24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK
INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR)
IAW ITU-T-Y.1564.
CIRCUIT REQUIRES THE FOLLOWING PARAMETERS: (A) FIBER TERMINATION: FRAME
FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB ETHERNET-LAN-PHY-SINGLE MODE
FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY. NOTE:
WHEN EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH OF
THE OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO DELIVERY.
(B) COMMITTED INFORMATION RATE (CIR): 10GB. (C) ETHERNET FRAME SIZE WILL BE
CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (MTU) OF 9000 OCTETS BYTES)
JUMBO FRAMES. (D) NO NETWORK INTERFACE UNIT, DEDICATED PATH. (E) GFE CLOCKING:
VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.
(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL
ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES
STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. NOTE:
ETHERNET FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9000 BYTES. (G) LINE MUST
REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS
PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.
(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE.
(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.
(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER. (K) TELECOM PROVIDER
MUST MAINTAIN OPERATIONS, MAINTENANCE AND ADMINISTRATION MONITORING OF
ETHERNET CIRCUIT. O. REMARKS CONTINUED: (L) THE COMMERCIAL CIRCUIT WILL
BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE DISA GOC IP BACKBONE
ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D)
418-8627. 2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS. 3. INSIDE
WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS. 4. VENDOR MUST
COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING
ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 5. VENDOR MUST CONTACT DISA GOC
TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING. 6. ALL
EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA GOC
IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. PRIMARY: (C)
618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950.
MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:
10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL 1. TEST AND ACCEPTANCE: THIS
CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72 HOUR SOAK TEST
BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8627 (D) 418-8627. 2. ERROR
PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING
PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN
99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT
HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE
LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC. 3. MEAN TIME TO LOSS
OF BIT COUNT INTEGRITY (MTTLBCI) SHALL P. REMARKS CONTINUED: BE GREATER
THAN 24 HOURS. 4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL
BE MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT
(SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD
SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE
GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM
THE RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE
CONTRACTORS PROPOSAL, DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.
15. THIS IS A REAWARD OF A CURRENT SERVICE, (CSA#GGTG000113EBM). IF THE
INCUMBENT QUOTE IS EVALUATED AS THE LOWEST PRICE TECHNICABLE ACCEPTABLE,
THE CURRENT CSA WILL BE ADMINSTRATIVELY DISCONTINUED USING THE DATE PRIOR TO
THE START DATE OF NEW CSA.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: SG15MAR227235
4. CCSD: DIYU6EX2
Z. DITCO CONTACT:
Benjamin Sparlin
618-418-6836 benjamin.r.sparlin.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Sep 5, 2022
To:
Jul 25, 2022
Paragraph M.3.TSR NUMBER change from:
SG15MAR227235A
SG15MAR227235
Delete the following:
LOCATION OF TERMINATION C:
ADDRESS: 308; 5450 CARLISLE PIKE; MECHANCSBRG, PA, 17050-0975
ROOM: 203; 2 FL
LOCATION: CCI
EXTENSION OF TELECOMMUNICATIONS SERVICE: All facilities between vendor's commercial communications interface point and termination location shall be provided by vendor. All cables shall be run in accordance with local site standards.
INTERFACE: SONET OC-48; OPTICAL; SNAP CLICK
DEMARK: (BLDG) 308; (RM) 203; 2 FL; 5450 CARLISLE PIKE; MECHANCSBRG, PA, 17050-0975
NPA/NXX: 717/790
UNIQUE INSTALLATION FACTORS: A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE
MODE FIBER FROM DROP SIDE OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL (FDP)
BLDG 308, ROOM 203 TO LINE SIDE OF DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN ODXC
SUITE (UODWMEC010) BLDG 308, ROOM 203. TERMINATE WITH "SC" CONNECTORS TO DISA PROVIDED FIBER
TERMINATING PATCH PANEL.
B. VENDOR MUST PROVIDE FIBER STRANDS FROM THEIR POINT OF PRESENCE TO ODXC SUITE WITHOUT
SPLICING AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT
BE BROKEN IN THE MIDDLE AND MUST BE CONTINUOUS.
C. LENGTH OF SINGLE MODE FIBER JUMPERS REQUIRED WILL BE BASED ON LOCATION OF THEIR POINT OF
PRESENCE.
D. CIRCUIT MUST BE TAGGED WITH LOCAL CIRCUIT ID AND LONG HAUL CIRCUIT NO. AS APPLICABLE AT DROP SIDE
OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL (FDP) BLDG 308, ROOM 203.
ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT
WHEN SERVICE IS COMPLETE.
E. VENDOR MUST SCHEDULE/COORDINATE WITH POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO
SITE SURVEYS OR INSTALLATIONS.
INSIDE WIRE INSTALLATION / MAINTENANCE REQUIRED: CPIWI-YES/CPIWM-YES
CONTACT: (PMRY POC) MR. DAN S BRAMBLEY; ISA.MECHANICSBURG.EIS.MBX.CIRCUITS-CKTS @MAIL.MIL;
DANIEL.S.BRAMBLEY.CIV@MAIL.MIL; (CMCL) 717-918-6200; (DSN) 322-918-6200
Delete the following:
LOCATION OF TERMINATION D:
ADDRESS: 308; 5450 CARLISLE PIKE; MECHANCSBRG, PA, 17050-0975
ROOM: 203; 2 FL
LOCATION: BIO
EXTENSION OF TELECOMMUNICATIONS SERVICE: All facilities between vendor's commercial communications interface point and termination location shall be provided by vendor. All cables shall be run in accordance with local site standards.
INTERFACE:
DEMARK:
NPA/NXX: 717/790
UNIQUE INSTALLATION FACTORS:
INSIDE WIRE INSTALLATION / MAINTENANCE REQUIRED:
CONTACT: (PMRY POC) MR. DAN S BRAMBLEY; (UNCLASS ORG) DISA.MECHANICSBURG.EIS.MBX.CIRCUITS-CKTS
@MAIL.MIL; (UNCLASS USER) DANIEL.S.BRAMBLEY.CIV@MAIL.MIL; (CMCL) 717-918-6200; (DSN) 322-918-6200
Location A, DEMARK change from:
(BLDG) 700; RM 104A; 1 FL; 362 OTIS STREET; ROME, NY, 13441-4812
Location A, UNIQUE INSTALLATION FACTORS change from:
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM LINE SIDE OF
DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN ODXC SUITE (UODWROM010) BLDG 700, ROOM 104A TO DROP SIDE OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL (FDP) BLDG
700, ROOM ROOM 104A.
B. VENDOR MUST PROVIDE FIBER STRANDS FROM DISA IE1 PROVIDED FIBER PATCH PANEL TO DROP SIDE
OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL (FDP) WITHOUT SPLICING AND OR USE
OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE
MIDDLE AND MUST BE CONTINUOUS.
C. CIRCUIT MUST BE TAGGED WITH LOCAL CIRCUIT ID AND LONG HAUL CIRCUIT NO. AS APPLICABLE AT DROP SIDE
OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL (FDP) BLDG 700, ROOM 104A.
ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT
WHEN INSTALLATION IS COMPLETE.
D. VENDOR MUST SCHEDULE/COORDINATE WITH POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO
SITE SURVEYS OR INSTALLATIONS.
Location A, CONTACT change from:
(PMRY POC) MR. DANIEL FOLEY; (UNCLASS USER) DANIEL.FOLEY.6@US.AF.MIL; (CMCL) 315-334-6152; (DSN) 312-
587-6152 (ALT POC) CIRCUIT ACTIONS; (UNCLASS ORG) USAF.NY.224-ADG.LIST.224-SS-SC-CIRCUIT-A
CTIONS@MAIL.MIL; (CMCL) 315-334-6760; (DSN) 587-6760
(PMRY POC) MR. DANIEL FOLEY; DANIEL.FOLEY.6@US.AF.MIL; (CMCL) 315-334-6152; (DSN) 312-587-6152
(ALT POC) CIRCUIT ACTIONS;
USAF.NY.224-ADG.LIST.224-SS-SC-CIRCUIT-A CTIONS@MAIL.MIL; (CMCL) 315-334-6760; (DSN) 587-6760
Location A, INTERFACE change from:
SONET OC-48; OPTICAL; SNAP CLICK (SC)
Location A, INSIDE WIRE INSTALLATION / MAINTENANCE REQUIRED change from:
CPIWI-YES/CPIWM-YES
Location A, TERMINAL EQUIPMENT change from:
ODXC SWITCH (SN 9000 SC INTELLIGENT OPTICAL SWITCH)(GFE) (DISA IE1 PROVIDED) UODWROM010 OPTICAL
INTERFACE CARD (GFE)(DISA IE1 PROVIDED) FIBER TERMINATING PATCH PANEL (GFE)(DISA IE1
PROVIDED)SYCAMORE-SN9000-OPTI-DIGITAL-C-CONNECT
FIBER CABLE X-CONNECT, IN-HOUSE,INSIDE WIRE,SINGLE-MODE, 1310NM, TELCO
Location B, LOCATION OF TERMINATION B change from:
ADDRESS: 700; 362 OTIS STREET; ROME, NY, 13441-4812
ROOM: 104A; 1 FL
LOCATION: ROME
ADDRESS: 308; 5450 CARLISLE PIKE; MECHANCSBRG, PA, 17050-0975
ROOM: 203; 2 FL
LOCATION: NSAMCNCS
Location B, DEMARK change from:
(BLDG) 700; RM 104A; 1 FL; 362 OTIS STREET; ROME, NY, 13441-4812
(BLDG) 308; (RM) 203; 2 FL; 5450 CARLISLE PIKE; MECHANCSBRG, PA, 17050-0975
Location B, UNIQUE INSTALLATION FACTORS change from:
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM LINE SIDE OF
DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN ODXC SUITE (UODWROM010) BLDG 700, ROOM 104A TO DROP SIDE OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL (FDP) BLDG
700, ROOM ROOM 104A.
B. VENDOR MUST PROVIDE FIBER STRANDS FROM DISA IE1 PROVIDED FIBER PATCH PANEL TO DROP SIDE
OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL (FDP) WITHOUT SPLICING AND OR USE
OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE
MIDDLE AND MUST BE CONTINUOUS.
C. CIRCUIT MUST BE TAGGED WITH LOCAL CIRCUIT ID AND LONG HAUL CIRCUIT NO. AS APPLICABLE AT DROP SIDE
OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL (FDP) BLDG 700, ROOM 104A.
ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT
WHEN INSTALLATION IS COMPLETE.
D. VENDOR MUST SCHEDULE/COORDINATE WITH POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO
SITE SURVEYS OR INSTALLATIONS.
To:
A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER FROM DROP SIDE OF
COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL (FDP) BLDG 308, ROOM 203 TO LINE SIDE OF
DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN ODXC SUITE (UODWMEC010) BLDG 308, ROOM 203. TERMINATE WITH "SC" CONNECTORS TO DISA PROVIDED FIBER TERMINATING PATCH PANEL.
B. VENDOR MUST PROVIDE FIBER STRANDS FROM THEIR POINT OF PRESENCE TO ODXC SUITE WITHOUT
SPLICING AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT
BE BROKEN IN THE MIDDLE AND MUST BE CONTINUOUS.
C. LENGTH OF SINGLE MODE FIBER JUMPERS REQUIRED WILL BE BASED ON LOCATION OF THEIR POINT OF
PRESENCE.
D. CIRCUIT MUST BE TAGGED WITH LOCAL CIRCUIT ID AND LONG HAUL CIRCUIT NO. AS APPLICABLE AT DROP SIDE
OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL (FDP) BLDG 308, ROOM 203.
ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT
WHEN SERVICE IS COMPLETE.
E. VENDOR MUST SCHEDULE/COORDINATE WITH POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR TO
SITE SURVEYS OR INSTALLATIONS.
Location B, CONTACT change from:
(PMRY POC) MR. DANIEL FOLEY; DANIEL.FOLEY.6@US.AF.MIL; (CMCL) 315-334-6152; (DSN) 312-587-6152
(ALT POC) CIRCUIT ACTIONS;
USAF.NY.224-ADG.LIST.224-SS-SC-CIRCUIT-A CTIONS@MAIL.MIL; (CMCL) 315-334-6760; (DSN) 587-6760
To:
(PMRY POC) MR. DAN S BRAMBLEY; ISA.MECHANICSBURG.EIS.MBX.CIRCUITS-CKTS @MAIL.MIL;
DANIEL.S.BRAMBLEY.CIV@MAIL.MIL; (CMCL) 717-918-6200; (DSN) 322-918-6200
Location B, INTERFACE change from:
SONET OC-48; OPTICAL; SNAP CLICK (SC)
SONET OC-48; OPTICAL; SNAP CLICK
Location B, NPA/NXX change from:
315/334
To:
717/790
Location B, COUNTRY CODE change from:
Location B, TERMINAL EQUIPMENT change from:
FIBER CABLE X-CONNECT, IN-HOUSE,INSIDE WIRE,SINGLE-MODE, 1310NM, TELCO
FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO
File details come from the government source that posted it. Updated .