View the file

Other files

File Type Posted
_HC101322QA104-0003.v2 Contents.pdf PDF
HC101322QA104-0001.v1.pdf PDF
_HC101322QA104.v2 Contents.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IQO INQUIRY

FM: PL8211

TO: Contractors

DATE (MM/DD/YYYY): 5/4/2023

SUBJECT: HC101322QA104-0002 Amend: 0002

A. TYPE ACTION: ADMIN AMEND

1. PURPOSE: AMENDMENT IS ISSUED TO:

1. UPDATE INTERFACE INFORMATION TO 1000BASE-LX; PHYSICAL:LC 2. QUOTES DUE

DATE IS CHANGED TO 11 MAY 2023. 3. SERVICE DATE CHANGES TO 8 SEP 2023 SIP.

1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A DEDICATED WHEELHOUSE

FIRSTNET SERVICE AT 2 MB OVER THE IQO CONTRACT FROM AT&T; 5301 N 22ND

ST; ARLINGTON, VA 22205/CCI TO AT&T; 5301 N 22ND ST; ARLINGTON, VA 22205/CCI.

THIS REQUIREMENTS IS TO REPLACE EXISTING ATT TECHNOLOGY FOR CURRENT

WHEELHOUSE CIRCUITS AND MAINTAIN THE SAME LEVEL OF PERFORMANCE.

2. CIRCUIT MUST BE ABLE TO PROVIDE VIRTUAL PRIVATE NETWORK (VPN) CONNECTION.

A NETWORK-BASED MPLS VPN TO LINK LOCATIONS AND EFFICIENTLY TRANSMIT

APPLICATIONS SUCH AS VOICE, DATA, AND VIDEO OVER A SINGLE CONNECTION USING

VARIOUS ACCESS TECHNOLOGIES.

3. ANY TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH

GOVERNMENT POC.

4. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL

REQUIREMENTS OF THIS SOLICITATION, READING AND AGREEING WITH THE STANDARD

PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD PROVISION 4,

AND MEET THE REQUESTED SERVICE DATE.

5. THE SERVICE DATE TO BE MET IS: 11 MAY 2023(SIP).

6. CONTRACTORS MUST CONSIDER ALL ISSUES THAT MAY DELAY THE DELIVERY OF

CIRCUIT ON APPROVED SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE,

OR REQUEST CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET

CONTRACTUAL SERVICE.

7. QUOTES MUST INCLUDE NAME AND INFORMATION ABOUT SUB-CONTRACTOR/LONG

HAUL PROVIDER/OTHER CARRIER INSTALLING CIRCUIT IS ON NET/OFF NET.

8. ESTABLISH TSP: TSP0LCK2X-02

9. MAXIMUM TRANSMISSION DELAY FOR ANY CIRCUIT UP TO 500 MILES AIR-MILES IN

LENGTH SHALL BE NO GREATER THAN 13MS ONE-WAY AND ANY POINT-TO-POINT CIRCUIT

LONGER THAN 500 AIR-MILES SHALL BE NO GREATER THAN 50MS ONE WAY WITHIN THE 48

CONTINENTAL STATES. ANY APS SWITCHOVER SHALL TAKE LESS THAN 50 MILLISECONDS

MONTHLY AVAILABILITY SHALL BE NO LESS THAN 99.5%.

M. ADDITIONAL INFORMATION:

HC101322QA104-0002

3. TSR NUMBER: JS30NOV215399

4. CCSD: CUED75ZU

Z. DITCO CONTACT:

Aaron Fuehne aaron.j.fuehne.civ@mail.mil

Dale L. Rupright

DITCO Contracting Officer

Unless otherwise specified, all other terms and conditions are unchanged.

Paragraph E.SERVICE DATE change from:

Aug 14, 2023

To:

Sep 8, 2023

Paragraph M.3.TSR NUMBER change from:

JS30NOV215399D

JS30NOV215399

Paragraph V.QUOTE DUE DATE AND TIME change from:

Mar 31, 2023 4:00:00 PM CDT

May 11, 2023 4:00:00 PM CDT

Location A, INTERFACE change from:

INTERFACE: FAST ETHERNET; ELECTRICAL: 100BASE-T; PHYSICAL:

RJ-45

INTERFACE: LC; 1000BASE-LX;

Location B, INTERFACE change from:

FAST ETHERNET; ELECTRICAL: 100BASE-T; PHYSICAL:RJ-45

INTERFACE: LC; 1000BASE-LX;

File details come from the government source that posted it. Updated .