IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 3/2/2022
SUBJECT: HC101322QA004-0001 Amend: 0001
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: THE PURPOSE OF THIS AMEND IS AS FOLLOWS:
1. CHANGE SERVICE DATE TO 19 JUL 2022
2. CHANGE PROPOSAL DUE DATE TO 31 MAR 2022
ALL ELSE REMAINS UNCHANGED
1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 10GB WAVE SERVICE USING
IQO BETWEEN BLDG 4397, ROOM 119 (DCO), 1S FL, 103 1ST AVENUE, MCAS CHERRY POINT,
NC 28533-0014 AND BLDG 1-1434, ROOM 6, 1 FL, 3338 SCOTT STREET, FORT BRAGG, NC
28310-500 FOR 60 MONTHS WITH NO BASIC TERMINATION LIABILITY.
2. CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND
ACCEPTANCE REQUIREMENTS WITH “UNDERSTAND AND WILL COMPLY”
3. TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH GOVERNMENT
POC AT BOTH LOCATIONS BEFORE NOTICE OF COMPLETION IS SUBMITTED TO DITCO.
4. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS INQUIRY/SOLICITATION, READING AND AGREEING WITH THE
STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD
PROVISION 4, AND MEET THE REQUESTED SERVICE DATE.
5. THE SERVICE DATE TO BE MET IS: 19 JUL 2022 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TYPE OF SERVICE.
6. CONTRACTORS MUST CONSIDER ALL ISSUES THAT MAY DELAY THE DELIVERY OF
CIRCUIT ON APPROVED SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE,
OR REQUEST CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET
CONTRACTUAL SERVICE.
7. QUOTES MUST INCLUDE NAME AND INFORMATION ABOUT SUB-CONTRACTOR/LONG
HAUL PROVIDER/OTHER CARRIER INSTALLING CIRCUIT IS ON NET/OFF NET, RTD, JUMBO
FRAMING, TESTING AND OTHER APPLICABLE TECHNICAL INFORMATION. FURTHERMORE,
IF A BUILD IS REQUIRED TO INSTALL, VENDOR MUST INDICATE THE SCOPE OF THE BUILD
(LENGTH, BURIED/AERIAL, TRENCHING/DIRECTIONAL BORING, NEW CONDUIT, ETC.)
VENDOR MUST ALSO INDICATE IF SITE POC (S) HAVE ADVISED THAT PERMISSION FOR
BUILD AT SITE (S) WILL BE GRANTED, AND IF SITE (S) HAVE SUFFICIENT SPACE, POWER
HC101322QA004-0001
AND HVAC CAPACITY TO SUPPORT VENDOR EQUIPMENT AND CABLING. MAPS/BLOCK
DIAGRAMS ARE AN ACCEPTABLE WAY TO PROVIDE THIS INFORMATION.
8. QUOTES MUST BE UPLOADED TO IDEAS. THE GOVERNMENT IS NOT RESPONSIBLE
FOR MISSING OR OVERLOOKED QUOTES. CONTRACTORS ARE INSTRUCTED TO SUBMIT
QUESTIONS AND REQUEST CLARIFICATIONS OF REQUIREMENT (S) BEFORE SUBMITTING
QUOTES. IN RESPONSE TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON
THE GOVERNMENT, NOR ASSUMPTIONS WILL BE ACCEPTED.
9. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101322QA014/TSR SG10SEP216909 AND MUST BE ENGINEERED AND PROVISIONED
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM TSR SG10SEP216909; MEANING THE PHYSICAL PATHS ARE TOTALLY
SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER
BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION
FROM TSR SG10SEP216909.
10. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE
ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/
OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS
ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS
INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE
REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH
INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE DIVERSITY
THROUHGOUT THE FIBER PATH WILL BE FOUND TECHNICALLY DEFFICIENT AND WILL NOT
BE ACCEPTED.
11. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) AND
SHOULD BE CONDUCTED IN COORDINATION WITH LOCAL POCS AT EACH GOVERNMENT
SITE.
12. AWARDS OF DIVERSE REQUIREMENTS WILL ONLY BE SPLIT BETWEEN TWO
CONTRACTORS IF THE DIVERSITY, RTD, SERVICE DATE AND LOWEST PRICE
REQUIREMENTS ARE PRESERVED.
13. ESTABLISH TSP:TSP0FDXLT-01
14. THE 50 METER SEPARATION IS WAIVED INSIDE BLDG 4397 FOR THE CHERRY POINT
LOCATION. ALL FIBER SUPPORTING THIS REQUIREMENT MUST BE BURIED, AERIAL
FIBER IS NOT AUTHORIZED. 8. THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR
POWERPOINT L. REMARKS CONTINUED: DRAWINGS FOR TECHNICAL REVIEW SHOWING
THE ROUTE FROM THE COMMERCIAL DEMARCS TO THE SUPPORTING CENTRAL OFFICES
AND/OR WIRING CENTERS. DRAWINGS MUST INCLUDE TOTAL FIBER MILES AND ROUND-
TRIP DELAY (RTD). ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED
CIRCUIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL
POINTS OF PRESENCE (POP) FOR PROPOSAL EVALUATION AND AS A FINAL RECORD OF
THE INSTALLED PATH. SITE SURVEYS ARE AUTHORIZED AT BOTH GOVERNMENT SITES.
SINGLE MODE FIBER MUST BE ENGINEERED/PROVISIONED IN SUCH A WAY THAT THE
GOVERNMENT CAN CHANGE/REVISE CHANNELIZATION WITHOUT TELECOM PROVIDER
INTERVENTION. A. NOTE 1 (JITTER): IN A STEADY-STATE CONDITION, THE PATTERN
OF SYNCHRONOUS TRANSPORT SIGNAL (STS) POINTER ADJUSTMENTS, SDN TO SDN
(END-TO-END THROUGH THE SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE
NO MORE STRESSFUL (I.E., CREATE MORE JITTER THROUGH THE DESYNCHRONIZER
AS DESCRIBED IN TABLE 6 OF ANSI T1.105.03-1994) THAN THE POINTER ADJUSTMENT
SEQUENCE IN FIGURE 5 OF ANSI T1.105.03-1994. DURING TRANSIENT EVENTS (WHICH
SHALL OCCUR NO MORE THAN 2 TIMES PER DAY), THE PATTERN OF STS POINTER
ADJUSTMENTS, SDN TO SDN (END-TO-END THROUGH THE SERVICE PROVIDED NETWORK
OUTPUTS), SHALL BE FOUR OR LESS PER HOUR. ADDITIONALLY, THE MAXIMUM TIME
INTERVAL ERROR (MTIE) OVER A PERIOD OF S SECONDS, OR WANDER, SHALL NOT
EXCEED (.01S + 10000) NANOSECONDS FOR VALUES OF S GREATER THAN 10,000. B.
WAVELENGTH TRANSMISSION SERVICES: WAVELENGTH TRANSMISSION SERVICES
FOR RATES OF 10GBPS SHALL BE IN ACCORDANCE WITH ITU-T RECOMMENDATIONS
G.709(03/2003), G.707(12/03), G.957(03/06), G.692(10/98) & TELCORDIA GR253-IE4. THE
PROVIDED WAVELENGTH TRANSMISSION SERVICE SHALL NOT INHIBIT GOVERNMENT
OPERATION OF UNDERLYING PROTOCOLS AND M. REMARKS CONTINUED: TRANSPORT
SYSTEMS SUCH AS, BUT NOT LIMITED TO, SONET/SDH, IP, ATM, GIGABIT ETHERNET,
AND ENCRYPTION. THE WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL PASS
ALL PAYLOAD, PATH AND LINE OVERHEAD BYTES TRANSPARENTLY (UNTOUCHED/
UNALTERED) AND WITHOUT MONITORING SDP TO SDP. THERE SHALL NOT BE ANY LINE
TERMINATING EQUIPMENT (LTE) BETWEEN SDP AND SDP. C. SINGLE MODE FIBER MUST BE
TERMINATED TO THE LINE SIDE OF THE FIBER TERMINATING PATCH PANEL INSTALLED IN
THE DISA IE1 PROVIDED MSPP SUITE AT CHERRY POINT, NC AND THE FIBER TERMINATING
PATCH PANEL INSTALLED IN THE DISA IE1 PROVIDED ODXC SUITE INSTALLED AT FT
BRAGG, NC. D. THE TELECOM PROVIDER MUST CONTACT DISA GOC TIER-II ENGINEERING
UPON RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND ACTIVATION
PROCESS. PRI POC: DISA GLOBAL CASA INFRASTRUCTURE INTEGRATION LEASE BB
TEAM PHONE: (C) 618-418-9813, (D) 418-9813 EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-
INFRASTRUCTURE-INTEGRATION-L EASE-BB-T@MAIL.MIL ALT POC: ORGANIZATIONAL
NUMBER (CASA RF CIRCUIT ACTIVATIONS) PHONE: (C) 618-418-8691, (D) 418-8691 EMAIL:
DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL N. DITCO INSTRUCTIONS
CONTINUED: ONCE TELECOM PROVIDER HAS COMPLETED INSIDE WIRING FROM
THEIR FIBER DISTRIBUTION PANEL INSTALLED IN THEIR DWDM EQUIPMENT SUITE TO
THE GOVERNMENT SERVICE DELIVERY POINT (SDP) AT EACH LOCATION, THEY MUST
ENSURE THE LIGHT LEVEL READINGS (DB LOSS) ARE ADJUSTED TO READ -3 TO -9 LOSS.
ADDITIONALLY, THESE LEVELS MUST BE DOCUMENTED ON THE NOTICE OF COMPLETION
(NOC) SENT TO DITCO. ***THE VENDOR MUST TERMINATE SINGLE MODE FIBER AT BOTH
LOCATIONS IAW UNIQUE INSTALLATION FACTORS. THE SINGLE MODE FIBER MUST PASS
A DOCUMENTED SATISFACTORY 72 HOUR END TO END TEST IAW ITU STANDARD M.2101
PRIOR TO TURN-UP TO THE GOVERNMENT.
1.VENDOR MUST MEET SVC DATE. 2. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
(A) FIBER TERMINATION: SINGLE-MODE INTERFACE O. REMARKS CONTINUED:
REQUIREMENT/INTERFACE DATA RATE: LINE CODING, FRAME FORMAT, PHYSICAL
CONNECTOR, 10 GBPS, NRZ, SCRAMBLED PER ANSI T1.104-1991 (R2003). ALL OPTIONS
DEFINED SC CONNECTOR, SINGLE-MODE FIBER PER ANSI T1.105.06-2002 (SR-0, SR-1,
IR-1, IR-2, LR-1, LR-2, LR-3). (B) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE
TO USERS 24 HOURS A DAY, SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER. (C)
ONE-HOUR RESPONSE TIME TURN-AROUND MUST OCCUR TO REPAIR ONCE TROUBLE-
CALL HAS BEEN REPORTED. (D) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT)
NOT TO BE ENGINEERED INTO CIRCUIT. (E) SINGLE MODE FIBER TERMINATIONS "SC"
CONNECTORS. (F) NO NETWORK INTERFACE UNIT. (G) DEDICATED PATH. (H) CARRIER
REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES. (I) THE
VENDOR MUST CONDUCT A 72 HOUR SATISFACTORY END TO END TEST ON THE 10
WAVE SERVICE IAW ITU STANDARD M.2101. ADDITIONALLY, THE VENDOR TEST SET/
SETS MUST HAVE THE ABILITY TO PRINT THE TEST RESULTS AND THOSE RESULTS
MUST BE EMAILED TO THE ACCEPTING AUTHORITY FOR REVIEW. (J) VENDOR MUST
HAVE A 24X7 NETWORK OPERATIONAL CENTER. (K) THE COMMERCIAL CIRCUIT WILL BE
ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE DGOC: PRI POC: DISA GLOBAL
CASA INFRASTRUCTURE INTEGRATION LEASE BB TEAM PHONE: (C) 618-418-9813, (D)
418-9813 EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-INTEGRATION-L EASE-
BB-T@MAIL.MIL ALT POC: ORGANIZATIONAL NUMBER (CASA RF CIRCUIT ACTIVATIONS)
PHONE: (C) 618-418-8691, (D) 418-8691 EMAIL: DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-
ACTIVATIONS@MAIL.MIL (L) THE VENDOR MUST PROVIDE THE LONG HAUL CIRCUIT
NUMBER AND THE 1-800 TROUBLE REPORT NUMBER TO THE ACCEPTING AUTHORITY
PRIOR TO THE GOVERNMENT ACCEPTING SERVICE. INSIDE WIRING MUST BE COMPLETED
AND TESTED PROPERLY IAW THE ORDER PRIOR TO TURN-UP TO THE GOVERNMENT.
3. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE
FIBER IAW UNIQUE INSTALLATION FACTORS. P. REMARKS CONTINUED: 4. INSIDE WIRING
IS AUTHORIZED IAW WITH THE UNIQUE INSTALLATION FACTORS. 5. VENDOR MUST
COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING
ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 6. FOR UNSATISFACTORY SERVICE
OR TO REPORT EQUIPMENT AND/OR CIRCUIT PROBLEMS INVOLVING DISA PROVIDED
TRANSPORT AND/OR EQUIPMENT, PLEASE CONTACT THE DISN CUSTOMER CONTACT
CENTER (DCCC) SCOTT AFB, IL. TOLL FREE: 1-855-868-9500, COML: 618-418-9500, DSN:
312-418-9500.
MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:
10GB. LINE CODE: NRZ. FRAME FORMAT: SCRAMBLED IAW ANSI T1.104-1991 (R2003).
1. TEST AND ACCEPTANCE: FIBER OPTIC 10GB WAVE CIRCUITS SHALL PASS A FULLY
DOCUMENTED SATISFACTORY SOAK TEST BY THE GOC AT SCOTT AFB, IL. PRIMARY: (C)
618-418-8691, (D) 418-8691. 2. THE WAVELENGTH TRANSMISSION SERVICE PROVIDED
SHALL MEET THE FOLLOWING PERFORMANCE REQUIREMENTS ON A MONTHLY BASIS.
PERFORMANCE REQUIREMENT/PERFORMANCE SPECIFICATION: NON-DIVERSE/NON-
PROTECTED AVAILABILITY: GREATER THAN OR EQUAL TO 99.5% OR BETTER. MONTHLY
SHORT INTERRUPTION EVENT COUNT (SEIC): LESS THAN OR EQUAL TO 9%. ERRORED
SECONDS (ES): LESS THAN OR EQUAL TO 0.005%. SEVERELY ERRORED SECONDS (SES):
LESS THAN OR EQUAL TO 0.00035. BACKGROUND BLOCK ERROR RATIO (BBER): LESS THAN
OR EQUAL TO 5 X 10-6. BIT COUNT INTEGRITY (BCI)/PATTERN SLIP (PAT SLIP): LESS THAN
OR EQUAL TO 1 PER 72 HOURS. JITTER: SEE NOTE 1 (JITTER). BER: LESS THAN OR EQUAL
TO 1X10-12. DELAY (ONE WAY): * LESSER OF 10 MSEC OR (0.01 X D MSEC) * WHERE "D" IS
THE SDP-TO-SDP TRANSMISSION DISTANCE, MEASURED R. SHORTEST GREAT CIRCLE,
IN KILOMETERS. 3. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL
BE MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT
(SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD
SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE
GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM
THE RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE
CONTRACTOR’S PROPOSAL, DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.
(** DIVERSITY INFO **) SERVICE DIVERSITY REQUESTED; DUAL HOMING CCSD: 6PY3; (**
ADDITIONAL PROVISIONING INFORMATION **) (ORG ACCT) DISN FIBER OPTIC BACKBONE &
O/W CONTROL
15. THIS IS A REAWARD OF A CURRENT SERVICE, (CCGI000027EBM). IF THE INCUMBENT
QUOTE IS EVALUATED AS THE LOWEST PRICE TECHNICABLE ACCEPTABLE, THE CURRENT
CSA WILL BE ADMINSTRATIVELY DISCONTINUED USING THE DATE PRIOR TO THE START
DATE OF NEW CSA.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: SG08SEP216891
4. CCSD: DIYU6MY3
Z. DITCO CONTACT:
Benjamin Sparlin
618-418-6836 benjamin.r.sparlin.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Mar 21, 2022
To:
Jul 19, 2022
Paragraph V.QUOTE DUE DATE AND TIME change from:
Jul 19, 2022 4:00:00 PM CDT
To:
Mar 31, 2022 4:00:00 PM CDT