- ADDITIONAL INFORMATION PERTINENT TO REQUIREMENT- RU22JUN217206.pdf
PDF 84 KB Posted
- Solicitation number
- HC101321QA474
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| - HC101321QA474.v1.pdf | ||
| - Vendor Block Diagram Sample and Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDITIONAL INFORMATION PERTINENT TO REQUIREMENT
THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END
TO END TO GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR
RU11JUN217202, MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING
MAN HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS.
ADDITIONALLY AS A MINIMUM THERE MUST BE A 50 METER PHYSICAL SEPARATION
FROM TSR RU11JUN217202.
THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR
TECHNICAL REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO THE
SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. DRAWINGS MUST INCLUDE
SEPARATION DISTANCES BETWEEN DIVERSE REQUIREMENTS, TOTAL FIBER MILES AND
ROUND TRIP DELAY (RTD), AND FIBER ROUTES RED LINED END TO END SO THE
GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE
MET. ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED
CIRCUIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL
POINTS OF PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE
INSTALLED PATH. THESE DIAGRAMS MUST BE PROVIDED TO DISA HQIE16
(DISA.MEADE.IE.MBX.IE16-PROVISIONING-TEAM@MAIL.MIL) FOR HISTORICAL
PURPOSES.
THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON
THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY
POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE
GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE
ADJUSTED TO -3 TO -9 DBM.
THE VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY
LOCATIONS, IAW UNIQUE INSTALLATION FACTORS.
THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION
AT BOTH LOCATIONS.
THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE
COORDINATION AND ACTIVATION PROCESS. PHONE: (C) 618-418-8627, (D) 418-8627
THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO
BEGINNING THEIR END-TO-END TESTING. PHONE: (C) 618-418-8627, (D) 418-8627.
THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE
OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE
AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN
THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION
BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST
ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT THE
"Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE
GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR
24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK
INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION RATE
(CIR) IAW ITU-T-Y.1564.
VENDOR MUST MEET SERVICE DATE.SITE SURVEYS ARE AUTHORIZED AT BOTH
GOVERNMENT SITES.
TESTING REQUIREMENTS
1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-
10GB ETHERNET-LAN-PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC"
CONNECTORS AS DETERMINED BY SITE SURVEY. NOTE: WHEN EXTENDED REACH
OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH OF THE OPTIC, THE
VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO DELIVERY.
(B) COMMITTED INFORMATION RATE (CIR): 10GB.
(C) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM
TRANSMISSION UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES.
(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH.
(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED
INTO CIRCUIT.
(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE
FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK
INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION
RATE (CIR) IAW ITU-T-Y.1564. NOTE: FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL
TO 9000 BYTES.
(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24
HOURS A DAY, SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5%
AVAILABILITY OR BETTER.
(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF
TROUBLE.
(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT
OUTAGES.
(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.
(K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND
ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.
(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE
GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D) 418-8627.
2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE
OF THE SERVICE IAW THE UNIQUE NSTALLATION FACTORS.
3. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.
4. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO
REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
5. VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO
BEGINNING THEIR END-TO-END TESTING.
6. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA
GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.
PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950.
MINIMUM TECHNICAL SPECIFICATIONS:
SPECIFIC FORMAT TO BE USED IS:
LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM
LINE CODE: OPTICAL
1. TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,
SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY:
(C) 618-418-8627 (D) 418-8627.
2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE
FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY
SHALL BE GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO
ZERO WHEN TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET
ITU-T-Y.1564 STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE
BETTER THAN 10 MSEC.
3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER
THAN 24 HOURS.
4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE
MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT
(SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE
RTD SHALL BE LESS THAN OR EQUAL TO 10 (10MS (<450)/15MS (450-1000)/ 20MS
(1000-1500)/ 29MS (>1500)) MILLISECONDS TO EFFECTIVELY SUPPORT THE
GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL
CONFIRM THE RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES NOT
ALIGN WITH THE CONTRACTORS PROPOSAL, DISA IE161 WILL NOTIFY DITCO
IMMEDIATELY IN WRITING. *****DIVERSITY INFO: SERVICE DIVERSITY
REQUESTED; DUAL HOMING CCSD:BU83****.
5. ADDITIONAL PROVISIONING INFORMATION: (ORG ACCT) DISA (DISN IPROUTER
NETWORK BACKBONE AND BACKBONE HOSTS)(CONUS AND OCONUS) ANY
ADDRESSEE ON THE (TSO) WILL NOTIFY ALL ADDRESSEES IMMEDIATELY BY
MESSAGE IDENTIFYING ANY ISSUES, PROBLEMS, OR SITUATIONS WHICH MAY
PREVENT OR DELAY THE IMPLEMENTATION OF THIS TELECOMMUNICATIONS
SERVICE ORDER (TSO). ALL STATIONS WILL REVIEW THE CONFIGURATION,
EQUIPMENT, CONTACT NUMBERS AND ADDRESSES CONTAINED IN THIS (TSO)
AND PROVIDE UPDATES TO ORIGINATOR OF (TSO) ANY ERRORS SO THAT
SUBSEQUENT (TSOS) MAY BE UPDATED.
File details come from the government source that posted it. Updated .