ADDITIONAL INFORMATION PERTINENT TO REQUIREMENT

THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END

TO END TO GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR

RU11JUN217202, MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING

MAN HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS.

ADDITIONALLY AS A MINIMUM THERE MUST BE A 50 METER PHYSICAL SEPARATION

FROM TSR RU11JUN217202.

THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR

TECHNICAL REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO THE

SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. DRAWINGS MUST INCLUDE

SEPARATION DISTANCES BETWEEN DIVERSE REQUIREMENTS, TOTAL FIBER MILES AND

ROUND TRIP DELAY (RTD), AND FIBER ROUTES RED LINED END TO END SO THE

GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE

MET. ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED

CIRCUIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL

POINTS OF PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE

INSTALLED PATH. THESE DIAGRAMS MUST BE PROVIDED TO DISA HQIE16

(DISA.MEADE.IE.MBX.IE16-PROVISIONING-TEAM@MAIL.MIL) FOR HISTORICAL

PURPOSES.

THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON

THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY

POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE

GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE

ADJUSTED TO -3 TO -9 DBM.

THE VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY

LOCATIONS, IAW UNIQUE INSTALLATION FACTORS.

THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION

AT BOTH LOCATIONS.

THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE

COORDINATION AND ACTIVATION PROCESS. PHONE: (C) 618-418-8627, (D) 418-8627

THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO

BEGINNING THEIR END-TO-END TESTING. PHONE: (C) 618-418-8627, (D) 418-8627.

THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE

OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE

AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN

THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION

BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST

ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT THE

"Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE

GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR

24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK

INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION RATE

(CIR) IAW ITU-T-Y.1564.

VENDOR MUST MEET SERVICE DATE.SITE SURVEYS ARE AUTHORIZED AT BOTH

GOVERNMENT SITES.

TESTING REQUIREMENTS

1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-

10GB ETHERNET-LAN-PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC"

CONNECTORS AS DETERMINED BY SITE SURVEY. NOTE: WHEN EXTENDED REACH

OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH OF THE OPTIC, THE

VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO DELIVERY.

(B) COMMITTED INFORMATION RATE (CIR): 10GB.

(C) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM

TRANSMISSION UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES.

(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH.

(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED

INTO CIRCUIT.

(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE

FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK

INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION

RATE (CIR) IAW ITU-T-Y.1564. NOTE: FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL

TO 9000 BYTES.

(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24

HOURS A DAY, SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5%

AVAILABILITY OR BETTER.

(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF

TROUBLE.

(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT

OUTAGES.

(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.

(K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND

ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.

(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE

GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D) 418-8627.

2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE

OF THE SERVICE IAW THE UNIQUE NSTALLATION FACTORS.

3. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.

4. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO

REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.

5. VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO

BEGINNING THEIR END-TO-END TESTING.

6. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA

GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.

PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950.

MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS:

LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM

LINE CODE: OPTICAL

1. TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,

SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY:

(C) 618-418-8627 (D) 418-8627.

2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE

FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY

SHALL BE GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO

ZERO WHEN TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET

ITU-T-Y.1564 STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE

BETTER THAN 10 MSEC.

3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER

THAN 24 HOURS.

4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE

MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT

(SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE

RTD SHALL BE LESS THAN OR EQUAL TO 10 (10MS (<450)/15MS (450-1000)/ 20MS

(1000-1500)/ 29MS (>1500)) MILLISECONDS TO EFFECTIVELY SUPPORT THE

GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL

CONFIRM THE RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES NOT

ALIGN WITH THE CONTRACTORS PROPOSAL, DISA IE161 WILL NOTIFY DITCO

IMMEDIATELY IN WRITING. *****DIVERSITY INFO: SERVICE DIVERSITY

REQUESTED; DUAL HOMING CCSD:BU83****.

5. ADDITIONAL PROVISIONING INFORMATION: (ORG ACCT) DISA (DISN IPROUTER

NETWORK BACKBONE AND BACKBONE HOSTS)(CONUS AND OCONUS) ANY

ADDRESSEE ON THE (TSO) WILL NOTIFY ALL ADDRESSEES IMMEDIATELY BY

MESSAGE IDENTIFYING ANY ISSUES, PROBLEMS, OR SITUATIONS WHICH MAY

PREVENT OR DELAY THE IMPLEMENTATION OF THIS TELECOMMUNICATIONS

SERVICE ORDER (TSO). ALL STATIONS WILL REVIEW THE CONFIGURATION,

EQUIPMENT, CONTACT NUMBERS AND ADDRESSES CONTAINED IN THIS (TSO)

AND PROVIDE UPDATES TO ORIGINATOR OF (TSO) ANY ERRORS SO THAT

SUBSEQUENT (TSOS) MAY BE UPDATED.