HC101321QA459-0002.v0.pdf
PDF 14 KB Posted
- Solicitation number
- HC101321QA459
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101321QA459.v3.pdf | ||
| HC101321QA459-0001.v0.pdf | ||
| Vendor Sample Maps Version2.pdf | ||
| HC101321QA459.v3.pdf | ||
| Vendor Block Sample_Version3.pptx | PPTX presentation |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 8/20/2021
SUBJECT: HC101321QA459-0002 Amend: 0002
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: ******AMENDMENT 00002 ISSUED TO EXTEND PROPSAL DUE DATE TO 27
AUG 2021. ALL ELSE REMAINS THE SAME. **********
1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A LEASE A 10GB ETHERNET
CIRCUIT USING IQO BETWEEN BLDG 656, COMPUTE ROOM, 37 QUEBEC ST. DEVENS, MA
AND BLDG 2B, COMPUTER ROOM, 700 ROBINS AVENUE; PHILADELPHIA, PA
2. CONTRACTORS MUST ADDRESS IN QUOTES COMPLIANCE WITH TESTING AND
ACCEPTANCE REQUIREMENTS WITH “UNDERSTAND AND WILL COMPLY”
3. TESTING & ACCEPTANCE REQUIREMENTS MUST BE COORDINATED WITH GOVERNMENT
POC AT BOTH LOCATIONS BEFORE NOTICE OF COMPLETION IS SUBMITTED TO DITCO.
4. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL
REQUIREMENTS OF THIS INQUIRY/SOLICITATION, READING AND AGREEING WITH THE
STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD
PROVISION 4, AND MEET THE REQUESTED SERVICE DATE.
5. THE SERVICE DATE TO BE MET IS: 29 NOV 2021 (SIP) TO COMPLY WITH PROCUREMENT
ACQUISITION LEAD TIME (PALT) FOR THIS TYPE OF SERVICE.
6. CONTRACTORS MUST CONSIDER ALL ISSUES THAT MAY DELAY THE DELIVERY OF
CIRCUIT ON APPROVED SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE,
OR REQUEST CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET
CONTRACTUAL SERVICE.
7. QUOTES MUST INCLUDE NAME AND INFORMATION ABOUT SUB-CONTRACTOR/LONG
HAUL PROVIDER/OTHER CARRIER INSTALLING CIRCUIT IS ON NET/OFF NET, RTD, JUMBO
FRAMING, TESTING AND OTHER APPLICABLE TECHNICAL INFORMATION. FURTHERMORE,
IF A BUILD IS REQUIRED TO INSTALL, VENDOR MUST INDICATE THE SCOPE OF THE BUILD
(LENGTH, BURIED/AERIAL, TRENCHING/DIRECTIONAL BORING, NEW CONDUIT, ETC.)
VENDOR MUST ALSO INDICATE IF SITE POC (S) HAVE ADVISED THAT PERMISSION FOR
BUILD AT SITE (S) WILL BE GRANTED, AND IF SITE (S) HAVE SUFFICIENT SPACE, POWER
AND HVAC CAPACITY TO SUPPORT VENDOR EQUIPMENT AND CABLING. MAPS/BLOCK
DIAGRAMS ARE AN ACCEPTABLE WAY TO PROVIDE THIS INFORMATION.
8. QUOTES MUST BE UPLOADED TO IDEAS. THE GOVERNMENT IS NOT RESPONSIBLE
FOR MISSING OR OVERLOOKED QUOTES. CONTRACTORS ARE INSTRUCTED TO SUBMIT
HC101321QA459-0002
QUESTIONS AND REQUEST CLARIFICATIONS OF REQUIREMENT (S) BEFORE SUBMITTING
QUOTES. IN RESPONSE TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON
THE GOVERNMENT, NOR ASSUMPTIONS WILL BE ACCEPTED.
9. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101321QA460/TSR RU14JUN217203 AND MUST BE ENGINEERED AND PROVISIONED
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM TSR RU14JUN217203; MEANING THE PHYSICAL PATHS ARE TOTALLY
SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER
BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION
FROM TSR RU14JUN217203.
10. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE
ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/
OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS
ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS
INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE
REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH
INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE DIVERSITY
THROUHGOUT THE FIBER PATH WILL BE FOUND TECHNICALLY DEFFICIENT AND WILL NOT
BE ACCEPTED.
11. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) AND
SHOULD BE CONDUCTED IN COORDINATION WITH LOCAL POCS AT EACH GOVERNMENT
SITE.
12. AWARDS OF DIVERSE REQUIREMENTS WILL ONLY BE SPLIT BETWEEN TWO
CONTRACTORS IF THE DIVERSITY, RTD, SERVICE DATE AND LOWEST PRICE
REQUIREMENTS ARE PRESERVED.
13. TSP: TSP0L7DA1-01
14.THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE
END TO END TO GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM CJON:
SF14JUN218142, MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING
MAN HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS. THE TELECOM
PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR TECHNICAL
REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO THE M. CIRCUIT
SPECIFICATIONS CONTINUED: SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS.
DRAWINGS MUST INCLUDE SEPARATION DISTANCES BETWEEN DIVERSE REQUIREMENTS,
TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD), AND FIBER ROUTES RED LINED
END TO END SO THE GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY
REQUIREMENTS ARE MET. ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH
DETAILED CIRCUIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING
ALL POINTS OF PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE
INSTALLED PATH. 8. THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL
STRENGTH IN DBM) ON THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT
SERVICE DELIVERY POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT
TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT
LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM. 9. THE VENDOR MUST TERMINATE 10GB
ETHERNET SERVICE AT SERVICE DELIVERY LOCATIONS, IAW UNIQUE INSTALLATION
FACTORS. 10. THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO
INSTALLATION AT BOTH LOCATIONS. 11. THE VENDOR MUST CONTACT DISA GOC IP
BACKBONE ENGINEERING AND IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO
TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS. PHONE: (C) 618-418-8627,
(D) 418-8627. 12. THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS
PRIOR TO BEGINNING THEIR END-TO-END TESTING. PHONE: (C) 618-418-8627, (D) 418-8627.
13. THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP
SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT
SUITE AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED
IN THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION
BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST
ENSURE N. TEST & ACCEPTANCE INSTRUCTIONS: TEST SETS ARE PLACED AT THE DROP
SIDE AT THE "A" LOCATION AND AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY
PRIOR TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR
MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING
METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE
COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564.
CIRCUIT REQUIRES THE FOLLOWING PARAMETERS: (A) FIBER TERMINATION: FRAME
FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB ETHERNET-LAN-PHY-SINGLE MODE
FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY. NOTE:
WHEN EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH OF
THE OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO DELIVERY.
(B) COMMITTED INFORMATION RATE (CIR): 10GB. (C) ETHERNET FRAME SIZE WILL BE
CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (MTU) OF 9000 OCTETS (BYTES)
JUMBO FRAMES. (D) NO NETWORK INTERFACE UNIT, DEDICATED PATH. (E) GFE CLOCKING:
VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.
(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL
ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES
STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. NOTE:
ETHERNET FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9000 BYTES. (G) LINE MUST
REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS
PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.
(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE.
(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.
(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER. (K) TELECOM PROVIDER
MUST MAINTAIN OPERATIONS, MAINTENANCE AND ADMINISTRATION MONITORING OF
ETHERNET CIRCUIT. O. REMARKS CONTINUED: (L) THE COMMERCIAL CIRCUIT WILL
BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE DISA GOC IP BACKBONE
ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D)
418-8627. 2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND
MAINTENANCE OF THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS. 3. INSIDE
WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS. 4. VENDOR MUST
COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING
ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 5. VENDOR MUST CONTACT DISA GOC
TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING. 6. ALL
EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA GOC
IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. PRIMARY: (C)
618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950.
MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:
10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL 1. TEST AND ACCEPTANCE: THIS
CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72 HOUR SOAK TEST
BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8627 (D) 418-8627. 2. ERROR
PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING
PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN
99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT
HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE
LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC. 3. MEAN TIME TO LOSS
OF BIT COUNT INTEGRITY (MTTLBCI) SHALL P. REMARKS CONTINUED: BE GREATER
THAN 24 HOURS. 4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL
BE MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT
(SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD
SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE
GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM
THE RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE
CONTRACTORS PROPOSAL, DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.
15. THIS IS A REAWARD OF A CURRENT SERVICE, (LEVC000111EBM). IF THE INCUMBENT
QUOTE IS EVALUATED AS THE LOWEST PRICE TECHNICABLE ACCEPTABLE, THE CURRENT
CSA WILL BE ADMINSTRATIVELY DISCONTINUED USING THE DATE PRIOR TO THE START
DATE OF NEW CSA
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: RU16JUN217204
4. CCSD: DIR3B1Z1
Z. DITCO CONTACT:
Benjamin Sparlin
618-418-6836 benjamin.r.sparlin.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph V.QUOTE DUE DATE AND TIME change from:
Aug 23, 2021 4:00:00 PM CDT
To:
Aug 27, 2021 4:00:00 PM CDT