1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A NEW 10GB ETHERNET SERVICE ON THE IQO BULLETIN BOARD, BETWEEN (BLDG) 430; (RM) 125; 3100 MCKINLEY AVE, DES MOINES, IA, 50321 AND (BLDG) 301D, (RM) 53; 106 PEACEKEEPER DRIVE, OFFUTT AFB, NE 68113. A. ESTABLISH TSP: TSP0L3TCD-01 B. THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. 2. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND AGREEING WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC TECHNICAL REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED SERVICE DATE. FAILURE TO READ AND ADHERE TO ANY PORTION OF THE INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD. 3. THE SERVICE DATE TO BE MET IS: 03 JAN 2022 (SIP). THE GOVERNMENT ASSUMES THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT THE SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE OR COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS. 4. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. IN RESPONSE TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL BE ACCEPTED. CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND REQUEST CLARIFICATIONS OF THE REQUIREMENT(S) BEFORE SUBMITTING QUOTES. QUESTIONS SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING THE SOLICITATION PHASE ONLY, AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE POSTED TO BETA.SAM. 5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH INQUIRY HC101321QA462 / TSR RU11JUN217199 AND MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS (SDP) FROM INQUIRY HC101321QA454 / TSR RU11JUN217201; MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM INQUIRY HC101321QA462 / TSR RU11JUN217199 . 6. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS, ENSURING THE PHYSICAL END-TO-END DIVERSITY REQUIREMENTS ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE INCLUDED IN THE ATTACHMENTS. 7. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH LOCAL POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT, AT A MINIMUM, CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE STRATEGY.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1 - Vendor Sample Maps_Version2 (2).pdf | ||
| 1 - Vendor Block Sample_Version3 (002) (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMARCS TO THE SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS.
DRAWINGS MUST INCLUDE SEPARATION DISTANCES BETWEEN DIVERSE REQUIREMENTS,
TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD), AND FIBER ROUTES RED LINED END
TO END SO THE GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY
REQUIREMENTS ARE MET.
ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH
CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF
PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH.
THESE DIAGRAMS MUST BE PROVIDED TO DISA HQ IE16 (DISA. MEADE.IE.MBX.IE16-
PROVISIONING-TEAM@MAIL.MIL) FOR HISTORICAL PURPOSES.
THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON
THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY
POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE
GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED
TO -3 TO -9 DBM.
THE VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY
LOCATIONS, IAW UNIQUE INSTALLATION FACTORS.
THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT
BOTH LOCATIONS.
THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE
COORDINATION AND ACTIVATION PROCESS. PHONE: (C) 618-418-8627, (D) 418-8627. Q.
TEST & ACCEPTANCE INSTRUCTIONS:
THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO
BEGINNING THEIR END-TO-END TESTING. PHONE: (C) 618-418-8627, (D) 418-8627.
THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE
OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE
AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN
THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION
BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST
ENSURE TEST SETS R. CIRCUIT SPECIFICATIONS: ARE PLACED AT THE DROP SIDE AT THE
"A" LOCATION AND AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO
TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE TESTING. DITCO: THE VENDOR
MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING
METHODOLOGY FOR NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE
COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564.
1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB
ETHERNET-LAN-PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS
DETERMINED BY SITE SURVEY. NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT
CHANGE THE TX/RX WAVELENGTH OF THE OPTIC, THE VENDOR WILL NOTIFY THE
GOVERNMENT 30 DAYS PRIOR TO DELIVERY.
(B) COMMITTED INFORMATION RATE (CIR): 10GB.
(C) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION
UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES.
(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH.
(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO
CIRCUIT.
(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL
ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES
STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. S.
CIRCUIT SPECIFICATIONS CONTINUED: NOTE: ETHERNET FRAME SIZE DESIGNATOR 'H'
(MTU) IS EQUAL TO 9000 BYTES.
(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,
SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.
(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE.
(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.
(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.
(K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND
ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.
(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY
THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB,
IL. (C) 618-418-8627, (D) 418-8627.
2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF
THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.
3. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.
4. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO
REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
5. VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO
BEGINNING THEIR END-TO-END TESTING.
6. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA
GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.
PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950.
7. DD FORM 1368 WILL BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO 350-135-1 BY
RNSOC, SCOTT AFB, IL. GUIDANCE ON SUBMISSION IS AVAILABLE AT
<HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.AS P>. CLICK ON "DISA-DITCO
CIRCULAR, 350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION
PROCEDURES."
MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:
10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL
1. TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,
SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-
418-8627 (D) 418-8627.
2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE
FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE
GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN
TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564
STANDARDS.JITTER SHALL BE LESS THAN 3 MSEC DELAY SHALL BE BETTER THAN 10
MSEC.
3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL V. REMARKS
CONTINUED: BE GREATER THAN 24 HOURS.
4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN
MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE
CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR
EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION.
THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-
UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL,
DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING. W. DIVERSITY/AVOIDANCE
INSTRUCTIONS: (** DIVERSITY INFO **) NETWORK DIVERSITY REQUIRED: PHYSICAL
DIVERSITY; COMMERCIAL DIVERSITY: YES; DIVERSITY FROM CJON: SF12FEB206102 / TSR
RU11JUN217199.